Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “execution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Automatic generation of executable communication specifications from parallel applications

Portable parallel benchmarks are widely used and highly effective for (a) the evaluation, analysis and procurement of high-performance computing (HPC) systems and (b) quantifying the potential benefits of porting applications for new hardware platforms. Yet, past techniques to synthetically parameterized hand-coded HPC benchmarks prove insufficient for today's rapidly-evolving scientific codes particularly when subject to multi-scale science modeling or when utilizing domain-specific libraries. To address these problems, this work contributes novel methods to automatically generate highly portable and customizable communication benchmarks from HPC applications. We utilize ScalaTrace, a lossless, yet scalable, parallel application tracing framework to collect selected aspects of the run-time behavior of HPC applications, including communication operations and execution time, while abstracting away the details of the computation proper. We subsequently generate benchmarks with identical run-time behavior from the collected traces. A unique feature of our approach is that we generate benchmarks in CONCEPTUAL, a domain-specific language that enables the expression of sophisticated communication patterns using a rich and easily understandable grammar yet compiles to ordinary C + MPI. Experimental results demonstrate that the generated benchmarks are able to preserve the run-time behavior - including both the communication pattern and the execution time - of the original applications. Such automated benchmark generation is particularly valuable for proprietary, export-controlled, or classified application codes: when supplied to a third party. Our auto-generated benchmarks ensure performance fidelity but without the risks associated with releasing the original code. This ability to automatically generate performance-accurate benchmarks from parallel applications is novel and without any precedence, to our knowledge.

42 ENGINEERING↗

Redundant Execution of HPC Applications with MR-MPI

This paper presents a modular-redundant Message Passing Interface (MPI) solution, MR-MPI, for transparently executing high-performance computing (HPC) applications in a redundant fashion. The presented work addresses the deficiencies of recovery-oriented HPC, i.e., checkpoint/restart to/from a parallel file system, at extreme scale by adding the redundancy approach to the HPC resilience portfolio. It utilizes the MPI performance tool interface, PMPI, to transparently intercept MPI calls from an application and to hide all redundancy-related mechanisms. A redundantly executed application runs with r*m native MPI processes, where r is the number of MPI ranks visible to the application and m is the replication degree. Messages between redundant nodes are replicated. Partial replication for tunable resilience is supported. The performance results clearly show the negative impact of the O(m^m) messages between replicas. For low-level, point-to-point benchmarks, the impact can be as high as the replication degree. For applications, performance highly depends on the actual communication types and counts. On single-core systems, the overhead can be 0% for embarrassingly parallel applications independent of the employed redundancy configuration or up to 70-90% for communication-intensive applications in a dual-redundant configuration. On multi-core systems, the overhead can be significantly higher due to the additional communication contention.

Engelmann, Christian↗

Profiling an application for power consumption during execution on a compute node

Methods, apparatus, and products are disclosed for profiling an application for power consumption during execution on a compute node that include: receiving an application for execution on a compute node; identifying a hardware power consumption profile for the compute node, the hardware power consumption profile specifying power consumption for compute node hardware during performance of various processing operations; determining a power consumption profile for the application in dependence upon the application and the hardware power consumption profile for the compute node; and reporting the power consumption profile for the application.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Profiling an application for power consumption during execution on a plurality of compute nodes

Methods, apparatus, and products are disclosed for profiling an application for power consumption during execution on a compute node that include: receiving an application for execution on a compute node; identifying a hardware power consumption profile for the compute node, the hardware power consumption profile specifying power consumption for compute node hardware during performance of various processing operations; determining a power consumption profile for the application in dependence upon the application and the hardware power consumption profile for the compute node; and reporting the power consumption profile for the application.

97 MATHEMATICS AND COMPUTING↗

Distributing an executable job load file to compute nodes in a parallel computer

Distributing an executable job load file to compute nodes in a parallel computer, the parallel computer comprising a plurality of compute nodes, including: determining, by a compute node in the parallel computer, whether the compute node is participating in a job; determining, by the compute node in the parallel computer, whether a descendant compute node is participating in the job; responsive to determining that the compute node is participating in the job or that the descendant compute node is participating in the job, communicating, by the compute node to a parent compute node, an identification of a data communications link over which the compute node receives data from the parent compute node; constructing a class route for the job, wherein the class route identifies all compute nodes participating in the job; and broadcasting the executable load file for the job along the class route for the job.

97 MATHEMATICS AND COMPUTING↗

Distributing an executable job load file to compute nodes in a parallel computer

Distributing an executable job load file to compute nodes in a parallel computer, the parallel computer comprising a plurality of compute nodes, including: determining, by a compute node in the parallel computer, whether the compute node is participating in a job; determining, by the compute node in the parallel computer, whether a descendant compute node is participating in the job; responsive to determining that the compute node is participating in the job or that the descendant compute node is participating in the job, communicating, by the compute node to a parent compute node, an identification of a data communications link over which the compute node receives data from the parent compute node; constructing a class route for the job, wherein the class route identifies all compute nodes participating in the job; and broadcasting the executable load file for the job along the class route for the job.

97 MATHEMATICS AND COMPUTING↗

Execution of computation graphs

A computation graph is accessed. In the computation graph, operations to be performed are represented as interior nodes, inputs to the operations are represented as leaf nodes, and a result of the operations is represented as a root. Selected sets of the operations are combined to form respective kernels of operations. Code is generated execute the kernels of operations. The code is executed to determine the result.

Ravishankar, Mahesh↗

Executive roundtable on coal-fired generation

Power Engineering magazine invited six industry executives from the coal-fired sector to discuss issues affecting current and future prospects of coal-fired generation. The executives are Tim Curran, head of Alstom Power for the USA and Senior Vice President and General Manager of Boilers North America; Ray Kowalik, President and General Manager of Burns and McDonnell Energy Group; Jeff Holmstead, head of Environmental Strategies for the Bracewell Giuliani law firm; Jim Mackey, Vice President, Fluor Power Group's Solid Fuel business line; Tom Shelby, President Kiewit Power Inc., and David Wilks, President of Energy Supply for Excel Energy Group. Steve Blankinship, the magazine's Associate Editor, was the moderator. 6 photos.

20 FOSSIL-FUELED POWER PLANTS↗

Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Near-Term Operational Planning at the Hanford Tank Farms: Link to Execution - 17091

Washington River Protection Solutions, LLC uses an earned value management system to flow-down contractual requirements to operational activities. A Rolling Work Window Schedule Process is then used to plan and coordinate near-term operational activities at the Hanford tank farms for execution. This near-term operational planning process has been extended using a Multi-Year Operating Plan, underpinned with a dynamic simulation model, to better link execution of daily activities with mission objectives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Best practices: Organizational execution

This article, the fourth and final installment in the DOE–IDEA series, focuses on organizational execution and how strong management practices, teamwork, and preparedness contribute to successful district energy systems. It highlights case studies from Ashley Energy and Cornell University to illustrate effective operational strategies. Ashley Energy demonstrates the importance of emergency preparedness and rapid response. After a major flood disrupted its plant, the organization restored service in under 72 hours by relying on pre-established plans, vendor relationships, and trained staff. The case emphasizes proactive contingency planning, understanding insurance processes, and empowering skilled personnel to improvise during crises. Cornell University’s example highlights the role of collaboration and transparency in long-term success. Its district energy system benefits from strong data sharing, real-time energy monitoring, and active involvement of faculty and students in system planning and innovation. This culture of teamwork and data-driven decision-making supports sustainability goals and continuous system improvement. Overall, the article shows that effective organizational execution—through preparedness, collaboration, and data transparency—is essential for maintaining reliable, efficient, and sustainable district energy systems.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Enabling Re-executable Workflows with Near-realtime Visualization, Provenance Capture and Advanced Querying for Mass Spectrometry Data

Mass spectrometry imaging (MSI) enables simultaneous spatially-resolved analysis of numerous ionizable molecules on a sample surface. The current analysis pipeline involves analyzing the data coming off the instrument using a tool called MSI Quickview and saving the results onto a storage drive before moving on to the next experiment. While this works well for single datasets, there is a demand for more scalable, flexible workflows that are re-executable across datasets, support extensive querying and ease collaboration. Here, we present a workflow that moves data analysis from a mere desktop application for single experiments to a more general capability

Re-executable workflow↗

Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Fuels Campaign Execution Plan (Revision 1)

The purpose of the Advanced Fuels Campaign (AFC) Execution Plan is to communicate the structure and management of research, development, and demonstration (RD&D) activities within the Fuel Cycle Research and Development (FCRD) program. Included in this document is an overview of the FCRD program, a description of the difference between revolutionary and evolutionary approaches to nuclear fuel development, the meaning of science-based development of nuclear fuels, and the "Grand Challenge" for the AFC that would, if achieved, provide a transformational technology to the nuclear industry in the form of a high performance, high reliability nuclear fuel system. The activities that will be conducted by the AFC to achieve success towards this grand challenge are described and the goals and milestones over the next 20 to 40 year period of research and development are established.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

INL Site Executable Plan for Energy and Transportation Fuels Management

It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy, Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗