Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

TA-60-1 Heavy Equipment Shop Areas SWPPP Rev 2 Jan 2017-Final

The primary activities and equipment areas at the facility that are potential stormwater pollution sources include; The storage of vehicles and heavy equipment awaiting repair; or repaired vehicles waiting to be picked up; The storage and handling of oils, anti-freeze, solvents, degreasers, batteries and other chemicals for the maintenance of vehicles and heavy equipment; and Equipment cleaning operations including exterior vehicle wash-down. Steam cleaning is only done on the steam cleaning pad area located at the north east end of Building 60-0001.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CA Air Resource Board's Off-Road Diesel Equipment Regulation 2017 DOORS Reporting.

Sandia National Laboratories/CA (SNL/CA) operates 14 diesel vehicles subject to the Off-Road Diesel Equipment Regulation; all the vehicles are classified as low-use vehicles. Annually, SNL/CA must report to the CA Air Resources Board (ARB) the hour-meter readings on our Off-Road Low-Use Diesel Equipment. This is to verify to the CA ARB that our equipment is being operated less than 200 hr/yr and therefore is considered “low-use” and not subject to the strict emissions standards for off-road diesel equipment. The reporting is done using DOORS, the CA ARB’s on-line reporting tool. The hour meter data for CY2017 has already been submitted using DOORS. The final step in the annual reporting process, which needs to be done by DOE, is to submit the Responsible Official Affirmation of Reporting (ROAR), which affirms that the information reported using DOORS is accurate. The ROAR is to be signed by a “Responsible Official” and can be submitted as a hardcopy ROAR or an electronic ROAR (e-ROAR) by March 1st, 2018. CA ARB’s preferred mechanism of ROAR submission is by using the e-ROAR.

47 OTHER INSTRUMENTATION↗

Risk and Cost Analysis of Utilizing FLEX Equipment for O&M Cost Reduction in Nuclear Power Plants

Several Nuclear Power Plant (NPP) operators in USA have announced to close their plants despite there are remaining years on their operating licenses. The cause of these closures is because the plant operators suffer financial losses. Approximately 80% of USA NPPs would have undergone financial losses if they were situated in a deregulated electricity market. In a deregulated market, electricity generators are independent entities separate from the transmission companies and Independent System Operator (ISO) which manages the market. NPPs in this market are termed merchant NPPs, and their profitability is determined solely from electricity generation revenues. Meanwhile, regulated and public power nuclear units’ profitability is determined by the regulatory process in place for each unit. Due to the complexity of differentiating each regulated and public power NPP’s regulations 36 NPPs are at an immediate risk of retiring early to stop losses, while 27 units will likely to follow in the long run. Today, cost is well-recognized and important factor in NPP decision-making that cannot be ignored. Therefore, it is essential to consider risk and cost together in decision-making to strengthen the position of the nuclear industry in an economically challenging energy market. With operational and maintenance (O&M) cost at 70% of the total operating expenditure of an NPP and some plants closing prematurely despite excellent safety record, there is an urgent need to address the high O&M cost. One of the novel entities that provide additional safety resulting in reduced risk of nuclear power plants is Flex equipment. Flex strategies were postulated by the US NRC in the wake of Fukushima Dai-chi accident to address beyond design-basis accidents and improve plant flexibility. Flex strategy comprise both onsite and off-site component storage for the provision of additional materials and equipment. This work explored innovative ways of utilizing the onsite Flex equipment during regular plant operation, for purposes in addition to the intended use of beyond design basis accidents. This report describes the risk and cost analysis of using Flex equipment during regular or unplanned maintenance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Airport Ground Support Equipment Infrastructure & Logistics Electrification Assessment Tool: 2025 Data Development, Modeling and Analysis for DFW

The aviation industry is increasingly turning to modernize freight facilities by integrating electric Ground Support Equipment (eGSE) to enhance operational efficiency of freight facility moving vehicles and equipment. Airports worldwide are adopting eGSE to streamline cargo movement, reduce fuel and maintenance costs, and improve logistics coordination.1 North America, with its advanced aviation infrastructure, leads this transition, leveraging Internet of things (IoT)-enabled automation and zero emission technologies to boost reliability and reduce human errors.2 Electrification of freight facility moving vehicles and equipment boosts turnaround times, improves equipment reliability, and optimizes logistics coordination, giving operators a competitive advantage. With rising fuel price volatility and the pressure to meet stringent performance benchmarks, airports are focusing on cost-effective, scalable solutions for long-term financial and operational gains. To further accelerate electrification, airports are integrating Zero Emission Vehicles (ZEVs) into rental car fleets and deploying electric baggage carts, requiring strategic investments in charging infrastructure. 3 The shift, however, presents challenges, such as limited technical expertise, high capital costs, and complex procurement processes. By forging strategic partnerships, leveraging advanced technologies, and optimizing infrastructure investments, airports can create a resilient, future-ready ecosystem that enhances the movement of people and goods through electrification-driven efficiency. Supported by the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO), this electrification effort provides a scalable, cost-effective solution to improve airport freight operations. Through targeted investments and innovation, airports enhance efficiency, reduce costs, and meet performance benchmarks while advancing toward a resilient, electrified future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Apollo experience report: Acceptance checkout equipment for the Apollo spacecraft

The acceptance checkout equipment for the Apollo spacecraft is described, and the history of the major equipment modifications that were required to meet the Apollo Program checkout requirements is traced. Some major problem areas are outlined, and a discussion of future checkout methods is included. The concept of the future checkout methods presented provides for an increase in test equipment standardization among NASA programs and among all testing phases within a program. The capability for increased automation and reduction in the test equipment inventory is provided in the proposed concept.

Burtzlaff, I. J.↗

High voltage design guide for airborne equipment

The report supplies the theoretical background and design techniques needed by an engineer who is designing electrical insulation for high-voltage high-power components, equipment, and systems on aircraft. A literature survey and abundant bibliography identify references that provide further data on the subjects of partial discharges, corona, field theory and plotting, voids and processes for applying insulation. Both gaseous and solid insulations are treated. Cryogenic and liquid design notes are included. Tests and test equipment for high voltage insulation and equipment are defined. Requirements of test plans and procedures for high-voltage high-power equipment are identified and illustrated by examples. Suggestions for high-voltage specifications are provided. Very few of the Military and Government specifications deal with system voltages above 10kv, thus most aircraft high-voltage specifications will have to be derived from the power industry specifications and standards produced by ASTM, IEEE, and NEMA.

W G Dunbar↗

Analysis of flight equipment purchasing practices of representative air carriers

The process through which representative air carriers decide whether or not to purchase flight equipment was investigated as well as their practices and policies in retiring surplus aircraft. An analysis of the flight equipment investment decision process in ten airlines shows that for the airline industry as a whole, the flight equipment investment decision is in a state of transition from a wholly informal process in earliest years to a much more organized and structured process in the future. Individual air carriers are in different stages with respect to the formality and sophistication associated with the flight equipment investment decision.

Source record↗

The role of engineering in the flight equipment purchasing process

The role of the airline engineering department in the flight equipment acquisition process is examined. The data for the study was collected from six airlines. The principal findings of the study include: (1) engineering activities permeate, but do not dominate the airline flight equipment decision process. (2) The principal criterion for the flight equipment acquisition decision is return on investment. (3) The principal sources of information for the airline engineering departments in the monitoring process are the manufacturers of equipment. Subsidiary information sources include NASA publications and conferences, among others and (4) The engineering department is the principal communication channel for technical information.

Source record↗

Shuttle orbiter S-band communications equipment design evaluation

An assessment of S-band communication equipment includes: (1) the review and analysis of the ability of the various subsystem avionic equipment designs to interface with, and operate on signals from/to adjoining equipment; (2) the performance peculiarities of the hardware against the overall specified system requirements; and (3) the evaluation of EMC EMI test results of the various equipment with respect to the possibility of mutual interferences.

Springett, J. C.↗

Public service user terminus study compendium of terminus equipment

General descriptions and specifications are given for equipments which facilitate satellite and terrestrial communications delivery by acting as interfaces between a human, mechanical, or electrical information generator (or source) and the communication system. Manufactures and suppliers are given as well as the purchase, service, or lease costs of various products listed under the following cateories: voice/telephony/facsimile equipment; data/graphics terminals; full motion and processes video equipment; and multiple access equipment.

Source record↗

Orbiter electrical equipment utilization baseline

The baseline for utilization of Orbiter electrical equipment in both electrical and Environmental Control and Life Support System (ECLSS) thermal analyses is established. It is a composite catalog of Space Shuttle equipment, as defined in the Shuttle Operational Data Book. The major functions and expected usage of each component type are described. Functional descriptions are designed to provide a fundamental understanding of the Orbiter electrical equipment, to insure correlation of equipment usage within nominal analyses, and to aid analysts in the formulation of off-nominal, contingency analyses.

Source record↗

Mixing 4D equipped and unequipped aircraft in the terminal area

The problem of mixing four-dimensional (4D) equipped aircraft (aircraft equipped with on-board guidance systems that can predict and control the touchdown-time of an aircraft to an accuracy of a few seconds throughout the descent) with unequipped aircraft in the terminal area has been investigated via a real-time air traffic control simulation study. The objective of this study was to develop scheduling algorithms and operational procedures for various traffic mixes that ranged from 25 percent to 75 percent 4D equipped aircraft. Results indicate substantial reduction in controller workload and an increase in orderliness when more than 25 percent of the aircraft are 4D equipped. Moreover, this is accomplished without increasing the workload or adding delays for the unequipped aircraft.

Tobias, L.↗

Tethered Satellite System (TSS) core equipment

To date, three Tethered Satellite System (TSS) missions of the Italian provided scientific satellite orbiting in the ionosphere connected to U.S. Space Shuttle is foreseen. The first mission will use an electrically conductive tether of 20 km deployed upward from the orbiter flying at 300 km altitude. This mission will allow investigation of the TSS electrodynamic interaction with the ionosphere due to the high voltage induced across the two terminators of the system during its motion throughout the geomagnetic field. The second mission will use a dielectric tether of 100 km deployed downward from the Orbiter flying at 230 km altitude. Tethered-vehicle access to altitude as low as 120 to 150 km from the Orbiter would permit direct long term observation of phenomena in the lower thermosphere and determination of other dynamical physical processes. The third mission would use the same configuration of the first electrodynamic mission with the complete Core Equipment. Study of power generation by tethered systems would be possible by operating the Core Equipment in the inverted current mode. This mode of operation would allow ion current collection upon the TSS satellite by controlling its potential with respect to the ambient ionospheric plasma. The main requirements of the Core Equipment configuration to date foreseen for the first TSS electrodynamic mission is described. Besides the Core Equipment purposes, its hardware and operational sub-modes of operation are described.

Bonifazi, C.↗

An investigation of TNAV equipped aircraft in a simulated en route metering environment

This document presents the results of an effort to estimate how often a TNAV (Time Navigation) equipped aircraft could be given a TNAV clearance in the En Route Metering (ERM) system as a function of the percentage of arriving traffic which is TNAV equipped. A fast-time simulation of Denver Stapleton international arrival traffic in the Denver Air Route Traffic Control Center route structure, including en route metering operations, was used to develop data on estimated conflicts, clearance communications and fuel usage for traffic mixes of 25, 50, 75 and 100% TNAV equipped. This study supports an overall effort by NASA to assess the benefits and required technology for using TNAV-equipped aircraft in the ERM environment.

Groce, J. L.↗

Bar-Code System Tracks Test Equipment

Administration of complicated system speeded and simplified. Computer system uses bar codes to keep track of more than 2,200 items of test equipment. BETUS (Barcode Equipment Tracking and Utilization System), maintains data base on what items borrowed, who is using them and where, and when calibrated. Keeps records on tools and small electronic components. Saves on equipment purchases and recovers missing equipment more quickly. Cuts check-in and checkout time by 90 percent.

Rogers, Jacob R.↗

The new Section 23 of DO160C/ED14C lightning testing of externally mounted electrical equipment

The new Section 23 is introduced which has only very recently been fully approved by the RTCA for incorporation into the first revision of DO160C/ED14C. Full threat lightning direct effects testing of equipment is entirely new to DO160, the only existing lightning testing is transient testing for LRU's (Line Replaceable Units) by pin or cable bundle injection methods, for equipment entirely contained within the airframe and assumed to be unaffected by direct effects. This testing required transients of very low amplitude compared with lightning itself, whereas the tests now to be described involve full threat lightning testing, that is using the previously established severe parameters of lightning appropriate to the Zone, such as 200 kA for Zone 1A as in AC20-136. Direct effects (i.e., damage) testing involves normally the lightning current arc attaching to the object under test (or very near to it) so submitting it to full potential for the electric, mechanical, thermal and shock damage which is caused by high current arcing. Since equipment for any part of the airframe require qualification, tests to demonstrate safety of equipment in fuel vapor regions of the airframe are also included.

Burrows, B. J. C.↗

Flight equipment supporting metabolic experiments on SLS-1

Five experiments in different aspects of human metabolism will be performed on Spacelab Life Sciences-1. Nine items of equipment from the Life Sciences Laboratory Equipment inventory will be used: the rack-mounted centrifuge, the hematocrit centrifuge, the low-gravity centrifuge, a body-mass measurement device, a urine monitoring system, the Spacelab refrigerator/freezer, the Orbiter refrigerator, an in-flight blood collection system, and a pocket voice recorder. In addition, each experiment will require some specialized equipment such as incubators and culture blocks for an immunology experiment, and tracers for a fluid and electrolyte experiment and a hematology experiment. The equipment for these experiments has been developed over many years, in some cases since the Skylab program in the early 1970s, and has been certified for use on the Space Shuttle.

Leach, Carolyn S.↗

The placement of equipment in the Space Station Freedom using constraint based reasoning

This paper describes the Rack Equipment Placement and Optimization System. The primary objective of this system is to assist engineers with the placement of equipment into the racks of the modules of Space Station Freedom. It accomplishes this by showing a user where equipment placement is possible and by generating potential layouts. The system uses an explicit representation of integration constraints to search for potential solutions for individual rack equipment items. A simulated annealing process is being evaluated for total solution generation as well. Versions of this system are in use now and are assisting with the development of the Space Station Freedom at the Marshall Space Flight Center in Huntsville, Alabama.

Tanner, Steve↗