Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “environmental requirements program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

NASA's Agency-wide Strategy for Environmental Regulatory Risk Analysis and Communication

NASA's mission is to pioneer the future in space exploration, scientific discovery, and aeronautics research. To help enable existing and future programs to pursue this mission, NASA has established the Principal Center for Regulatory Risk Analysis and Communication (RRAC PC) to proactively identify, analyze, and communicate environmental regulatory risks to the NASA community. The RRAC PC is chartered to evaluate the risks posed to NASA Programs and facilities by environmentally related drivers. The RRAC PC focuses on emerging environmental regulations, as well as risks related to operational changes that can trigger existing environmental requirements. Changing regulations have the potential to directly affect program activities. For example, regulatory changes can restrict certain activities or operations by mandating changes in how operations may be done or limiting where or how certain operations can take place. Regulatory changes also can directly affect the ability to use certain materials by mandating a production phase-out or restricting usage aPi'iications of certain materials. Such changes can result in NASA undertaking material replacement efforts. Even if a regulation does not directly affect NASA operations, U.S. and international regulations can pose program risks indirectly through requirements levied on manufacturers and vendors of components and materials. For example, manufacturers can change their formulations to comply with new regulatory requirements. Such changes can require time-consuming and costly requalification certification for use in human spaceflight programs. The RRAC PC has implemented several strategies for proactively managing regulatory change to minimize potential adverse impacts to NASA Programs and facilities. This presentation highlights the lessons learned through establishing the RRAC PC, the process by which the RRAC PC monitors and distributes information about emerging regulatory requirements, and the cross-Agency cooperation that is vital to supporting NASA's mission.

Duda, Kristen↗

Environmental Surveillance at Los Alamos during 2009

Environmental Surveillance at Los Alamos reports are prepared annually by the Los Alamos National Laboratory (the Laboratory) environmental organization, as required by US Department of Energy Order 5400.1, General Environmental Protection Program, and US Department of Energy Order 231.1A, Environment, Safety, and Health Reporting. These annual reports summarize environmental data that are used to determine compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and departmental policies. Additional data, beyond the minimum required, are also gathered and reported as part of the Laboratory’s efforts to ensure public safety and to monitor environmental quality at and near the Laboratory. Chapter 1 provides an overview of the Laboratory’s major environmental programs and explains the risks and the actions taken to reduce risks at the Laboratory from environmental legacies and waste management operations. Chapter 2 reports the Laboratory’s compliance status for 2009. Chapter 3 provides a summary of the maximum radiological dose the public and biota populations could have potentially received from Laboratory operations and discusses chemical exposures. The environmental surveillance and monitoring data are organized by environmental media (air in Chapter 4; water and sediments in Chapters 5 and 6; soils in Chapter 7; and foodstuffs and biota in Chapter 8) in a format to meet the needs of a general and scientific audience. Chapter 9 provides a summary of the status of environmental restoration work around LANL. The new Chapter 10 describes the Laboratory’s environmental stewardship efforts and provides an overview of the health of the Rio Grande. A glossary and a list of acronyms and abbreviations are in the back of the report. Appendix A explains the standards for environmental contaminants, Appendix B explains the units of measurements used in this report, Appendix C describes the Laboratory’s technical areas and their associated programs, and Appendix D provides web links to more information.

54 ENVIRONMENTAL SCIENCES↗

SRS 2022 Annual Site Environmental Report (ASER)

ASER stands for the Annual Site Environmental Report and is the primary document that the U.S. Department of Energy uses to inform the public of environmental performance and conditions at SRS. • ASERs are required by U.S. Department of Energy to provide the public and stakeholders information on: – Environmental program performance – Site wide environmental monitoring and surveillance effectiveness – Compliance status with environmental standards and requirements • SRS published its first ASER in 1959

DAVIS, COLLEEN↗

Groundwater Protection Program Management Plan For The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with the multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.

54 ENVIRONMENTAL SCIENCES↗

Programmed cell death regulator BAP2 is required for IRE1-mediated unfolded protein response in Arabidopsis

Environmental and physiological situations can challenge the balance between protein synthesis and folding capacity of the endoplasmic reticulum (ER) and cause ER stress, a potentially lethal condition. The unfolded protein response (UPR) restores ER homeostasis or actuates programmed cell death (PCD) when ER stress is unresolved. The cell fate determination mechanisms of the UPR are not well understood, especially in plants. Here, we integrate genetics and ER stress profiling with natural variation and quantitative trait locus analysis of 350 natural accessions of the model species Arabidopsis thaliana . Our analyses implicate a single nucleotide polymorphism to the loss of function of the general PCD regulator BON-ASSOCIATED PROTEIN2 (BAP2) in UPR outcomes. We establish that ER stress-induced BAP2 expression is antagonistically regulated by the UPR master regulator, inositol-requiring enzyme 1 (IRE1), and that BAP2 controls adaptive UPR amplitude in ER stress and ignites pro-death mechanisms in conditions of UPR insufficiency.

59 BASIC BIOLOGICAL SCIENCES↗

Atmospheric Ionizing Radiation (AIR): Analysis, Results, and Lessons Learned From the June 1997 ER-2 Campaign

The United States initiated a program to assess the technology required for an environmentally safe and operationally efficient High Speed Civil Transport (HSCT) for entrance on the world market after the turn of the century. Due to the changing regulations on radiation exposures and the growing concerns over uncertainty in our knowledge of atmospheric radiations, the NASA High Speed Research Project Office (HSRPO) commissioned a review of "Radiation Exposure and High-Altitude Flight" by the National Council on Radiation Protection and Measurements (NCRP). On the basis of the NCRP recommendations, the HSRPO funded a flight experiment to resolve the environmental uncertainty in the atmospheric ionizing radiation levels as a step in developing an approach to minimize the radiation impact on HSCT operations. To minimize costs in this project, an international investigator approach was taken to assure coverage with instrument sensitivity across the range of particle types and energies to allow unique characterization of the diverse radiation components. The present workshop is a result of the flight measurements made at the maximum intensity of the solar cycle modulated background radiation levels during the month of June 1997.

Wilson, J. W.↗

Savannah River Site Environmental report for 2012

This report is an overview of effluent monitoring and environmental surveillance activities conducted on and in the vicinity of SRS from January 1 through December 31, 2012 - including the Site's performance against applicable standards and requirements. Details are provided on major programs such as the Environmental Management System (EMS) and permit compliance.

54 ENVIRONMENTAL SCIENCES↗

Long-Term Monitoring of Utility-Scale Solar Energy Development and Application of Remote Sensing Technologies: Summary Report

In anticipation of increased utility-scale solar energy development over the next 20 to 50 years, federal agencies and other organizations have identified a need to develop comprehensive long-term monitoring programs specific to solar energy development. Increasingly, stakeholders are requesting that federal agencies, such as the U.S. Department of the Interior Bureau of Land Management (BLM), develop rigorous and comprehensive long-term monitoring programs. Argonne National Laboratory (Argonne) is assisting the BLM in developing an effective long-term monitoring plan as required by the BLM Solar Energy Program to study the environmental effects of solar energy development. The monitoring data can be used to protect land resources from harmful development practices while at the same time reducing restrictions on utility-scale solar energy development that are determined to be unnecessary. The development of a long-term monitoring plan that incorporates regional datasets, prioritizes requirements in the context of landscape-scale conditions and trends, and integrates cost-effective data collection methods (such as remote sensing technologies) will translate into lower monitoring costs and increased certainty for solar developers regarding requirements for developing projects on public lands. This outcome will support U.S. Department of Energy (DOE) Sunshot Program goals. For this reason, the DOE provided funding for the work presented in this report.

14 SOLAR ENERGY↗

2015 Site Environmental Report Fernald Preserve

The Fernald Preserve 2015 Site Environmental Report provides stakeholders with the results from the Fernald, Ohio, Site’s environmental monitoring programs for 2015; a summary of the U.S. Department of Energy’s (DOE’s) activities conducted onsite; and a summary of the Fernald Preserve’s compliance with the various environmental regulations, compliance agreements, and DOE policies that govern site activities. This report has been prepared in accordance with the “Integrated Environmental Monitoring Plan,” which is Attachment D of the Comprehensive Legacy Management and Institutional Controls Plan (LMICP) (DOE 2016). Remediation of the Fernald Preserve has been successfully completed with the exception of the groundwater. During 2015, activities at the Fernald Preserve included: environmental monitoring activities related to direct radiation, groundwater, and surface water; ecological restoration monitoring and maintenance as well as inspections, care, and monitoring of the site and the OSDF to ensure that provisions of the LMICP are fully implemented; OSDF leak detection monitoring and collection, monitoring, and treatment of leachate from the OSDF; extraction, monitoring, and treatment of contaminated groundwater from the Great Miami Aquifer (Operable Unit 5); ongoing operation of the Fernald Preserve Visitors Center, associated outreach, and educational activities; and monitoring as specified in the site’s National Pollutant Discharge Elimination System (NPDES) permit. Environmental monitoring programs were developed to ensure that the remedy remains protective of the environment. The requirements of these programs are described in detail in the LMICP and reported in this Site Environmental Report.

54 ENVIRONMENTAL SCIENCES↗

Assessment of Thermal Control and Protective Coatings

This final report is concerned with the tasks performed during the contract period which included spacecraft coating development, testing, and applications. Five marker coatings consisting of a bright yellow handrail coating, protective overcoat for ceramic coatings, and specialized primers for composites (or polymer) surfaces were developed and commercialized by AZ Technology during this program. Most of the coatings have passed space environmental stability requirements via ground tests and/or flight verification. Marker coatings and protective overcoats were successfully flown on the Passive Optical Sample Assembly (POSA) and the Optical Properties Monitor (OPM) experiments flown on the Russian space station MIR. To date, most of the coatings developed and/or modified during this program have been utilized on the International Space Station and other spacecraft. For ISS, AZ Technology manufactured the 'UNITY' emblem now being flown on the NASA UNITY node (Node 1) that is docked to the Russian Zarya (FGB) utilizing the colored marker coatings (white, blue, red) developed by AZ Technology. The UNITY emblem included the US American flag, the Unity logo, and NASA logo on a white background, applied to a Beta cloth substrate.

Mell, Richard J.↗

NOAA requirements and programs

Service programs in NOAA that contemplate using the Geostationary Operational Environmental Satellite (GEOS) Data Collection System (DCS) are considered. The GEOS DCS will be operated by the National Environmental Satellite Service of NOAA as an integral part of the national operation environmental satellite program. This plan is concerned with that part of the GEOS program connected with collection and relay of data from remote locations. Service programs include: (1) hydrological data collection; (2) oceanographic data collection; (3) marine observations from data buoys; (4) Tsunami warning service; and (5) meteorological service.

Flanders, A. F.↗

Spacelab baseline ECS trace contaminant removal test program

An estimate of the Spacelab Baseline Environmental Control System's contaminated removal capability was required to allow determination of the need for a supplemental trace contaminant removal system. Results from a test program to determine this removal capability are presented.

Ray, C. D.↗

HydroEcoLSTM: A Python package with graphical user interface for hydro-ecological modeling with long short-term memory neural network

Machine learning (ML) is emerging as a promising tool for modeling hydro-ecological processes due to the increasing availability of large environmental data. However, the use of ML requires sufficient programming knowledge due to a lack of a graphical user interface (GUI). In this study, we introduced a GUI package, named HydroEcoLSTM, with the long short-term memory network (LSTM) as the core model, that allows non-ML experts to utilize their domain knowledge to construct complex ML models. We demonstrated the functionalities of HydroEcoLSTM with two practical examples, including (1) predictions of streamflow in both gauged and ungauged catchments and (2) predictions of multiple outputs (i.e., streamflow and isotope transport from two catchments). The simulation results obtained in both case experiments are satisfactory. In the first example, the average Nash–Sutcliffe Efficiency (NSE) for streamflow simulation during the testing period is 0.79 while the application of the trained model in two assumed ungauged catchments also achieves the average NSE of 0.68. In the second example, the average NSE for streamflow and instream isotope simulation during the testing period is 0.71. Ultimately, applications of HydroEcoLSTM with real-world examples demonstrate its potential use for practical applications and research without requiring extensive coding skills.

54 ENVIRONMENTAL SCIENCES↗

Site Environmental Report for 2008, Volume 1

The Site Environmental Report for 2008 is an integrated report on the environmental programs at Lawrence Berkeley National Laboratory and satisfies the requirements of DOE order 231.1A, Environment, Safety, and Health Reporting. Volume II contains individual data results from surveillance and monitoring activities

54 ENVIRONMENTAL SCIENCES↗

Site Environmental Report for 2008, Volume II

The Site Environmental Report for 2008 is an integrated report on environmental programs at Lawrence Berkeley National Laboratory and satisfies the requirements of DOE Order 231.1 A., Environment, Safety, and Health Reporting. Volume II contains individual data results from surveillance and monitoring activities

54 ENVIRONMENTAL SCIENCES↗

2019 Site Sustainability Plan (Narrative)

Clean energy and sustainability, long at the core of the United States (U.S.) Department of Energy (DOE) mission and championed at Sandia National Laboratories (SNL), are reinforced in Executive Order (EO) 13834, Efficient Federal Operations. Though no longer in effect as of May 2018, EO 13693, Planning for Federal Sustainability in the Next Decade, is referenced throughout this document. DOE's Strategic Sustainability Performance Plan (SSPP) embodies the Department's sustainability commitment and establishes the foundation for DOE to meet the objectives of the EO. The SNL Site Sustainability Plan (SSP) is prepared annually to support DOE's Strategic Sustainability Performance Plan (SSPP) and the National Nuclear Security Administration's (NNSA) sustainability goals and broader sustainability program. Accordingly, the content of this SSP covers the SNL contributions toward meeting the DOE sustainability goals, including the DOE requirement to comply with EO 13834. This SSP fulfills the contractual requirement for National Technology & Engineering Solutions of Sandia, LLC (NTESS), the management and operating (M&O) contractor for SNL, to deliver an annual sustainability plan to the NNSA and Sandia Field Office (SFO). The SNL Environmental Management System (EMS) implements sustainable practices for enhancing environmental, energy, and transportation management performance. SNL's EMS is a quality-based system modeled on the Plan-Do-Check-Act structure for continuous improvement. The EMS is a part of SNL's Integrated Safety Management System and functions within the overall Laboratory Operating System. The SNL EMS is International Organization for Standardization (ISO) 14001 certified and incorporates all relevant federal, state, local, and DOE requirements. The EMS is coordinated and implemented through 20 environmental programs, five of which are included within the scope of this SSP: Air Quality Compliance (AQC); Materials; Sustainability & Pollution Prevention; Energy and Water; Fleet Services; and, Waste Management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Waste Isolation Pilot Plant Environmental Monitoring Plan (Rev. 6)

This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the Environmental Monitoring Program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. This EMP describes radiological environmental monitoring, nonradiological environmental monitoring, and land management and surveillance programs during the facility's operational life.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗