Draft Standard Test Method for Characterizing Mode-I Interlaminar Fracture Toughness of Adhesives with Composite Adherends
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Concurrent engineering offers a great many benefits to engineers and mission designers throughout the world of aerospace. The only downside of concurrent engineering, and this is somewhat unavoidable, is that you don’t know the results of a design session until the end when it is completed. Usually, this is not a problem – you wouldn’t start building a spacecraft before the design is finished. However, within mass and cost constrained systems, you may end up with a final design that although technically sound – is not feasible due to mass or cost limits. Employing in-session mass and cost models with flexible inputs that refine their estimates and variance as more detailed information comes in throughout a design session allows major design changes to be made when the probability of breaching a mass or cost cap exceeds a threshold level. This enables mission designers to re-focus the study, and avoid spending 3-days with 15 engineers designing a non-feasible mission. By understanding key correlations and nested relationships within mass or cost, and specifically mass or cost allocations per mission element by mission type, it’s possible to get flexible-input, statistically based mass and cost estimates very early in the design process. Baseline models are seeded using mission characteristics and general parameters (outer planetary orbiter-probe mission, $500M cost cap for example) to provide a rough estimate of the expected mass or cost. As information gets solidified during the session, it gets added to the model and the estimates are updated. Continuing the orbiter-probe mission example, modeling probe heat shield cost as a percent of total probe cost, and probe cost as a percent of total flight system cost, and total flight system cost as a percent of total mission cost allows a design team to roll-up solidified information to estimate the probability of fitting within a mass or cost constraint early in a concurrent design session. When only the heat shield cost is known, the variance of the final estimate is higher, whereas when the full probe gets defined, naturally, the variance of the estimate decreases. A methodology, model, verification and demo implementation for cost limit breach are presented.
Under the guidance of NASA’s Space Communication and Navigation (SCaN) program, this document, along with its companion documents, LunaNet Services Requirements Document (TBD) and the LunaNet Concept of Operations and Architecture (TBD), provides the basis for a comprehensive set of requirements for operation of a lunar communications and navigation network capable of interoperating with other networks compliant with the Lunar Network (LunaNet) for services to the human exploration, lunar science, and space technology missions. LunaNet will start with a simple architecture of a few nodes to meet the needs of the early missions and evolve to meet the growing needs of a sustained lunar presence. All relay network services are not expected to be met by a single spacecraft platform, or node. The expectation is that the needs of NASA, its partners and other users will be met through a combination of interoperable systems provided by NASA, international partners, and commercial providers. Interoperability across this network-of-networks can be achieved through negotiation of mutually-agreed-upon standards that will be reflected in this document and in the specifications defined by other participants in the combined, cooperative lunar network.
Explore the source record for details and available documents.
In January 2017, the mission concept Psyche: Journey to a Metal World was one of two concepts selected by NASA for implementation as part of the 14th Discovery mission competition. Over the course of the past year, the Psyche team has actively worked to refine and mature the technical design, culminating in a successful completion of the Project Preliminary Design review and approval to proceed to Phase C in mid-2019. Psyche is a deep space mission utilizing solar electric propulsion (SEP), consisting of SPT-140 Hall thrusters which have been successfully employed on multiple commercial spacecraft. When launched, Psyche will carry over 1000 kg of Xenon, and will represent the farthest usage of electric propulsion usage from the Sun – a distance of over 3.3 AU. The use of solar electric propulsion in deep space has resulted in challenges unique to other missions. Spacecraft designs typically balance margins across two main elements – mass and power – that are independent of one another. Utilizing a low thrust trajectory through the application of electric propulsion introduces more elements - namely flight time, missed thrust percentage and thruster duty cycle. Moreover, these elements become connected, presenting additional relationships that must be considered. This paper will present an overview of the margin management process for Psyche, and how it has evolved from the early proposal stage to its current state. It will discuss the elements that are margined, their relationship with one another, and key uncertainties that must be addressed. It discusses challenges and mitigations obtained during the refinement of the Psyche project, culminating in a new margin strategy that enables optimization across many of the system elements, and will serve as a template for future deep space SEP missions.
Here, we report the genome sequences of three bacterial isolates that werecultured from aerosol samples collected at altitudes of 18 to 29 km above sea level. The isolates tolerate desiccation and shortwave UV radiation and are members of the actino-bacterial genera Curtobacterium and Modestobacter and the betaproteobacterial genus Noviherbaspirillum.
This document, along with its companion documents, provides the basis for a comprehensive set of requirements for operation of a lunar communications and navigation network capable of interoperating with other networks compliant with the Lunar Network (LunaNet). LunaNet will include Earth ground stations and orbiting spacecraft and will provide services to human exploration, lunar science, and space technology missions. LunaNet will start with a simple architecture of a few nodes to meet the needs of the early missions and evolve to meet the growing needs of a sustained lunar presence. All relay network services are not expected to be met by a single spacecraft, or node. The expectation is that the needs of users will be met through a combination of interoperable systems provided by NASA, international partners, and commercial providers. Interoperability across this network-of-networks can be achieved through negotiation of mutually-agreed-upon standards that will be reflected in this document and in the specifications defined by other participants in the cooperative lunar network. This document was written and reviewed by NASA and the European Space Agency (ESA).
This document, along with its companion documents, provides the basis for a comprehensive set of requirements for operation of a lunar communications and navigation network capable of interoperating with other networks compliant with the Lunar Network (LunaNet). LunaNet will include Earth ground stations and orbiting spacecraft and will provide services to human exploration, lunar science, and space technology missions. LunaNet will start with a simple architecture of a few nodes to meet the needs of the early missions and evolve to meet the growing needs of a sustained lunar presence. All relay network services are not expected to be met by a single spacecraft, or node. The expectation is that the needs of users will be met through a combination of interoperable systems provided by NASA, international partners, and commercial providers. Interoperability across this network-of-networks can be achieved through negotiation of mutually-agreed-upon standards that will be reflected in this document and in the specifications defined by other participants in the cooperative lunar network. This document was written and reviewed by NASA and the European Space Agency (ESA).
In preparation for missions to Mars that will involve the return of samples to Earth, it will be necessary to prepare for the receiving, handling, testing, distributing, and archiving of martian materials here on Earth. Previous groups and committees have studied selected aspects of sample return activities, but specific detailed protocols for the handling and testing of returned samples must still be developed. To further refine the requirements for sample hazard testing and to develop the criteria for subsequent release of sample materials from quarantine, the NASA Planetary Protection Officer convened a series of workshops in 2000-2001. The overall objective of the Workshop Series was to produce a Draft Protocol by which returned martian sample materials can be assessed for biological hazards and examined for evidence of life (extant or extinct) while safeguarding the purity of the samples from possible terrestrial contamination. This report also provides a record of the proceedings of Workshop 4, the final Workshop of the Series, which was held in Arlington, Virginia, June 5-7, 2001. During Workshop 4, the sub-groups were provided with a draft of the protocol compiled in May 2001 from the work done at prior Workshops in the Series. Then eight sub-groups were formed to discuss the following assigned topics: Review and Assess the Draft Protocol for Physical/Chemical Testing Review and Assess the Draft Protocol for Life Detection Testing Review and Assess the Draft Protocol for Biohazard Testing Environmental and Health/Monitoring and Safety Issues Requirements of the Draft Protocol for Facilities and Equipment Contingency Planning for Different Outcomes of the Draft Protocol Personnel Management Considerations in Implementation of the Draft Protocol Draft Protocol Implementation Process and Update Concepts This report provides the first complete presentation of the Draft Protocol for Mars Sample Handling to meet planetary protection needs. This Draft Protocol, which was compiled from deliberations and recommendations from earlier Workshops in the Series, represents a consensus that emerged from the discussions of all the sub-groups assembled over the course of the five Workshops of the Series. These discussions converged on a conceptual approach to sample handling, as well as on specific analytical requirements. Discussions also identified important issues requiring attention, as well as research and development needed for protocol implementation.
GeneLab for Colleges and Universities (GL4U) will provide space biology-relevant training in bioinformatics to the next generation of scientists through direct and indirect approaches. The GeneLab (GL) team will host two annual data processing bootcamps, one for college-level students (direct) and one for college educators (indirect – Training of Trainers), in which participants learn to analyze space-relevant omics data hosted on GL. The first bootcamp took place in early June 2021 with about 30 SJSU undergraduate students and covered space biology-specific lectures and hands-on instruction using Jupyter Notebooks (JNs) for RNA sequence (RNAseq) data analysis. All training materials including the enclosed files listed below will be made publicly available on GitHub. RNAseq Bootcamp Lectures (attached in combined file): Introduction to NASA, Space Biology, GeneLab, and the Command Line: NASA_GL_CL_Intro_FINAL.pdf - DRAFT from initial submission NASA_SB_GL_CL_Intro_FULL.pdf - FINAL version presented during the bootcamp - only minor edits from the draft version RNAseq and Data Processing Overview: RNAseq_Overview_FINAL.pdf - DRAFT from initial submission RNAseq_Overview_FULL.pdf - FINAL version presented during the bootcamp - only minor edits from the draft version Overview of the Statistics Used for RNAseq Data Analysis: SJSU_Statistics_Intro_Lecture_FINAL.pdf - DRAFT from initial submission Statistics_Overview_FULL.pdf - FINAL version presented during the bootcamp - only minor edits from the draft version Completed JNs in HTML format (attached in combined file): Unix_Intro_JN_06-2021_completed.html R_Intro_JN_06-2021_completed.html RNAseq_fastq_to_counts_JN_06-2021_completed.html RNAseq_DGE_JN_06-2021_completed.html RNAseq Bootcamp Recordings (attached): GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day1_Part_1_of_5.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day1_Part_2_of_5.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day1_Part_3_of_5.mp4 *There were issues with the part 4 recording so that is not available GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day1_Part_5_of_5.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day2_Part_1_of_3.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day2_Part_2_of_3.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day2_Part_3_of_3.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day3_Part_1_of_4.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day3_Part_2_of_4.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day3_Part_3_of_4.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day3_Part_4_of_4.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day4_Part_1_of_4.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day4_Part_2_of_4.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day4_Part_3_of_4.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day4_Part_4_of_4.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day5_Part_1_of_4.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day5_Part_2_of_4.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day5_Part_3_of_4.mp4 GL4U_RNAseq_Bootcamp_June_2021_Pilot_Day5_Part_4_of_4.mp4
Mississippi Space Services (MSS) the facility services contractor for NASA's John C. Stennis Space Center (SSC), is utilizing technology to improve engineering documentation and data control. Two identified improvement areas, labor intensive documentation research and outdated drafting standards, were targeted as top priority. MSS selected AutoManager(R) WorkFlow from Cyco software to manage engineering documentation. The software is currently installed on over 150 desctops. The outdated SSC drafting standard was written for pre-CADD drafting methods, in other words, board drafting. Implementation of COTS software solutions to manage engineering documentation and update the drafting standard resulted in significant increases in productivity by reducing the time spent searching for documents.
Members of the Commercial Technology Office at the NASA Glenn Research Center have developed an exciting new tool that greatly reduces the lead time in creating and routing Space Act Agreements. The Space Act Agreement Maker (SAAM) is an e-government Web-based system that automates the initial drafting of Space Act Agreements by technical and program personnel. SAAM also is used for editing and will be used later for maintaining electronic copies of all Space Act Agreements. During the initial drafting, the software prompts NASA personnel proposing an agreement to answer questions regarding the agreement. On the basis of the answers, the software selects from a matrix of NASA standard clauses to produce a first draft of the agreement. The draft agreement and information submitted by the NASA personnel are electronically routed to Glenn s Commercial Technology Office for review and, where necessary, editing. The final version of the agreement, along with any supporting documentation, is then routed for electronic concurrence/approval to the necessary internal review participants using the electronic routing system (e-router). SAAM was developed cooperatively by Glenn s Commercial Technology Office and Glenn s Office of Chief Counsel. Currently, SAAM is being evaluated by the NASA Headquarters General Counsel Office for use at all NASA centers. This system allows for the effective processing of Space Act Agreements for NASA s internal and external customers. Document control is maintained by a database. With SAAM s electronic routing, review times can be reduced significantly, allowing Glenn to more rapidly establish partnerships with industry. Prior to the creation of SAAM, it took several hours to draft a Space Act Agreement. With SAAM in place, the document can be written in about 30 min. Using the e-router also saves time in determining where the agreement is in the routing process. The document can be tracked easily, and delays can be avoided. Important research with industry partners can commence quickly after preliminary discussions have been held. The development of these products is in line with the expanding e-government initiative that is part of the Presidential Management Agenda. By using this product, NASA researchers can secure greater support from industry and academia partners. The Space Act Agreement Maker has been very well received at NASA Headquarters and at some of the other NASA centers as well. We anticipate that the NASA Ames Research Center will have the system in place very soon, and that some of the other centers will use SAAM in the near future. The General Counsel s office at NASA Headquarters has encouraged the Glenn team to develop a similar system for processing patent licenses. Find out more about Glenn's Technology Transfer & Partnership Office http://technology.grc.nasa.gov/.
The pulsing inertial oscillation (PIO) model is a nonlinear, time-dependent, translating vortex solution of the inviscid, compressible fluid dynamic equations in the middle troposphere. The translation of this vortex during a pulse is strikingly similar to that of a supercell storm -- a rotating thunderstorm that can generate tornadoes and hail. Two studies were performed to test the hypothesis that some supercell storms are manifestations of a PIO pulse. The first study applied the model to an intense interior draft whose buoyancy was bounded by a temperature excess of +/- 12 K. The peak updraft speed achieved was 41.5 m/ s and the peak Rossby number was 92.9. The study also pointed to an advanced concept for attaining higher values. The second study applied the PIO model to a supercell storm as a whole and succeeded in replicating its bulk properties, such as mesocyclonic circulation, net mass and moisture influxes, and time track. This study also identified a critical feature of the PIO model that could be tested against storm data: The average vertical draft is downward before the turn in the storm track and upward afterwards. In the conventional theory, the average vertical draft is upward from storm inception until dissipation. These differing draft predictions were compared with the best available data, which are surface mesonetwork data. These data were found to support the PIO model. However, surface data alone are not conclusive, and further measurements are warranted.
The United Nations' activities in the area of space law and the accomplishments of the Outer Space Committee are discussed. Two draft conventions, the draft treaty on the moon and the draft treaty on the registration of space objects are considered. Other issues covered include the direct broadcast by satellite, the boundary between air space and outer space, and remote sensing from space.
The statistical properties of cloud ensembles under a specified large-scale environment, such as mass flux by cloud drafts and vertical velocity as well as the condensation and evaporation associated with these cloud drafts, are examined using a three-dimensional numerical cloud ensemble model described by Soong and Ogura (1980) and Tao and Soong (1986). The cloud drafts are classified as active and inactive, and separate contributions to cloud statistics in areas of different cloud activity are then evaluated. The model results compare well with results obtained from aircraft measurements of a well-organized ITCZ rainband that occurred on August 12, 1974, during the Global Atmospheric Research Program's Atlantic Tropical Experiment.
This summary has been prepared by the workshop rapporteurs as a factual summary of what occurred at the workshop. The planning committee's role was limited to planning and convening the workshop. The views contained in the report are those of individual workshop participants and do not necessarily represent the views of all workshop participants, the planning committee, or the National Research Council. This summary was written using video recordings of the entire workshop proceedings. Speakers attributed in this summary were not asked to review the workshop summary before its release. This workshop summary has been reviewed in draft form by individuals chosen for their diverse perspectives and technical expertise, in accordance with procedures approved by the NRC's Report Review Committee. The purpose of this independent review is to provide candid and critical comments that will assist the institution in making its published report as sound as possible and to ensure that the summary meets institutional standards for objectivity, evidence, and responsiveness to the study charge. The review comments and draft manuscript remain confidential to protect the integrity of the deliberative process. We wish to thank the following individuals for their review of this summary: George Paulikas, The Aerospace Corporation (retired), Marcia Rieke, University of Arizona, Kunio Sayanagi, Hampton University, Marcia Smith, Space and Technology Policy Group, LLC, and Warren Washington, National Center for Atmospheric Research. Although the reviewers listed above have provided many constructive comments and suggestions, they did not see the final draft of the workshop summary before its release. The review of this report was overseen by Kenneth Kellermann, National Radio Astronomy Observatory. Appointed by the NRC, he was responsible for making certain that an independent examination of this report was carried out in accordance with institutional procedures and that all review comments were carefully considered. Responsibility for the final content of this report rests entirely with the authors and the institution.