Pathways to Overcome Geothermal Deployment Barriers

Geothermal resources represent a vast domestic energy supply that can provide a fexible and reliable source of electricity as well as contribute to clean energy goals. In the United States, geothermal exploration and development are subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level. These are necessary to address potential environmental and resource impacts at geothermal project sites, but may act as barriers to geothermal deployment, slowing timelines and raising costs. The 2022 NREL report, Non-Technical Barriers to Geothermal Development in California and Nevada, presents fndings of a study on non-technical barriers that may infuence geothermal project development.

geothermal↗

The Argonne SuperGel for CBRN Decontamination - 20160

The Argonne SuperGel was developed between 2003 and 2015 to fill a gap in our nation's capability to quickly decontaminate important structures following a radiological or nuclear release event. Specifically, the decontamination technology was developed to minimize damage to monuments, high valued structures, and critical infrastructure while reducing environmental and health impacts. An important criterion during its development, common reagents were employed that could be easily acquired in order to minimize the timeline for its deployment. Its current formulation uses off-the-shelf super-absorbing hydrogels common to the food and agricultural industry and common salts. Over the years, two formulations of the Argonne SuperGel have been developed to specifically target radioactive cesium contaminations and then, more generically, actinide and fission product contaminations. A biodegradable derivative of phosphoric acid is used in small amounts to promote the removal of insoluble actinide species. The original order of unit operations for the SuperGel technology was 1) applying the wash solution to promote mobility of the contaminants on the surface, 2) applying the hydrogel to absorb the wash solution and contaminants, and 3) removing the hydrogel for disposal. During the course of our studies, we tested a new formulation of the gel technology that eliminated the need for a separate step to apply the wash solution without a compromise in decontamination factors. Greater than 70% and >95% of Cs-137 were removed from concrete and tile coupons, respectively, after two decontaminations, with the best results using wash solutions of 1.0 M KCl and 1.0 M NH{sub 4}Cl formulations. We found no statistical difference between results at 30 deg. C and 40 deg. C or at 70% and 90% relative humidity. We tested the gel under strong UV irradiation to simulate extreme environments. While a tropical noontime UV flux did not adversely affect the gel system decontamination of Cs-137 from concrete or tile coupons, the noontime flux resulted in significant dehydration of the gel after two hours of constant exposure. The rehydration of the gel by the humid air (at 90% humidity and 40 deg. C) was slow and may not be sufficient to offset dehydration by the sun. Americium decontamination from concrete was 70% after optimizing the phosphoric acid derivative and carbonate salt concentration in the wash solution. Since its development, we have had the opportunity to test the SuperGel in the removal of legacy contaminations in hot cell facilities and former glovebox facilities at Argonne. This has provided a unique opportunity to evaluate the SuperGel on a range of contaminants outside the original specifications for its use. We will report on the origin of the gel formulation, some highlighted experimental data including independent testing by the US EPA which has never been reported, and its efficacy for removing legacy alpha contaminations and its potential use for removal of chemical and biological hazardous agents. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evolution of Distributed Energy Resource Grid Interconnection Standards for Integrating Emerging Storage Technologies

Grid interconnection standards facilitate safe and reliable grid integration of distributed energy resources (DERs). Evolution of a standard for DERs is expected to capture and accommodate widely different characteristics of DER and minimize unique grid integration challenges. This makes development of a uniform grid interconnection standard for all types of DERs a challenging and an ever-evolving consideration. This paper presents a detailed timeline of evolution, from the early 2000s to 2018, of DER interconnection standards and the research that informed their development. This is followed by a review of the research topics being considered in the grid integration of Energy Storage Systems (ESSs) which are expected to have the most significant growth amongst all DER types. These help in highlighting the need for a new standard to accommodate the unique characteristics of ESSs, and where the existing DER interconnection standard frameworks may be leveraged.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Basic Results of Alignment and Summary of Operations of the Main K-1000-60/3000 Turbine Unit with a Small Number of Bearings at the Bushehr Nuclear Power Plant

The results of vibration alignment and the first years of use of the prototype K-1000-60/3000-3 turbine unit of the Bushehr NPP in 2011 – 2016 are examined. As a result of conducting an extensive set of studies and actions, the claimed high-quality operating characteristics of the new design bearings that were used and the high degree of vibrational reliability of the turbine unit were confirmed, and these made it possible to ensure successful commissioning on a short timeline, despite the novelty of the design and the uniqueness of development of the majority of units, taking into account the integration of the equipment with the existing base and the condenser group. During the commissioning work, it was shown that this turbine unit is not inferior in any manner to turbine units of analogous power from other firms.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Oh, My Darling Clementine: A Detailed History and Data Repository of the Los Alamos Plutonium Fast Reactor

The Los Alamos Plutonium Fast Reactor, Clementine, provided the first fast neutron spectrum using a metallic plutonium fuel system and liquid mercury coolant. Clementine is often mentioned in the history of fast, metal-fueled, or metal-cooled designs, with little public information regarding the specifications or timeline. This paper contains a synopsis of each report regarding the development, operation, experimental results, failures, and subsequent disassembly of Clementine to explore this unique reactor within the context of modern advanced reactor development.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Small Hydropower Interconnections: State Interconnection Processes

Small hydropower projects with rated power output between 0 to 20 MW have been the predominant source of hydropower growth over the past decade in the United States (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier. Interconnection of an electricity generating unit is overseen by the distribution or transmission owner, who use interconnection standards and requirements that vary by state. The differences between standards in standards may affect the final cost, timeline, and success of a small hydropower project. Small hydropower project developers across the United States have found interconnection procedures to be fraught with cost surprises and schedule overruns. System operators have struggled to understand impacts to overburdened or rapidly evolving transmission and distribution grids. The results of these shortcomings have been stranded costs and unrealized small hydropower potential. Though regulatory actions and policy recommendations at the state level have increased the situational awareness of interconnection challenges, the remote locations of small hydropower resources and the relatively small revenues associated with energy production through small hydropower facilities continue to make interconnection processes and requirements confusing and costly. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. The second in a series, this paper investigates the interconnection process in each state in the U.S. to compare their attributes. Subsequent papers in the series will analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”) and present best practices (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development. The first paper in the series examined the state of small hydropower projects in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”) to understand the industry characteristics.

13 HYDRO ENERGY↗

Description of FY25 Theory and Simulation Performance Target: Development of an integrated modeling framework for fusion reactor design and assessment

The urgency to deliver fusion power is growing now more than ever, with increasing pressure for both public programs and private companies to meet milestones timelines and overcome significant remaining technical challenges to ensure growth of a nascent fusion industry in time to meet rapidly growing clean energy demands. With incredible advancements in computation and years of investment in fusion model development and validation, integrated modeling is poised to fill a key role in accelerating the timeline to a fusion pilot plant (FPP). Future fusion pilot plants will operate in regimes far beyond current experience, and device design will rely on physics-based prediction and extrapolation. Many concepts will also rely on simulation to assess safety (shielding, tritium management, materials activation and lifetimes), economics and scalability before the decision to build. Importantly, integrated simulation can be used to reveal and solve the complexities of system integration that may otherwise not be apparent in physical components or models developed in isolation. New experimental test facilities that produce relevant conditions to validate and resolve key technical challenges for various subsystems (materials, blankets, fuel cycle, etc.) have been repeatedly called for by the fusion community but are not yet realized. Integrated modeling has an important role in identifying realistic load conditions (thermal, electromagnetic, plasma, neutron and photon loads, etc.) and defining the components and experiments for these test facilities in order to ensure meaningful validation that sufficiently reduces modeling uncertainties and technical risk for the full integrated reactor. The Fusion REactor Design and Assessment (FREDA) SciDAC project is building a component-based integrated modeling framework & data structure to enable self-consistent, multi-fidelity, iterative optimization workflows for the fusion reactor design process. FREDA aims to shorten the time to viable designs by providing a set of flexible workflows to support the various stages of the design process using an integrated model hierarchy, ranging from the simple analytic descriptions to the highest fidelity, theory-based plasma and engineering modeling developed by the fusion and fission communities. These tools are expected to be needed for timely support of FPP design in the milestone program and in the FIRE collaboratives. The plasma simulation backbone of FREDA is IPS-FASTRAN with newly developed coupled Core-Edge Pedestal-SOL (CESOL) workflows, which is being extended to the far-SOL region up to the plasma facing components. FREDA incorporates the FERMI engineering modeling suite and will enable self-consistent evaluation of the thermal shields, limiters, blanket, magnets, and other surrounding structures with predictions of temperatures, erosion, dpa, activation, tritium generation and transport, creep, corrosion, material degradation, etc. Parametric generation of 3D CAD enables rapid iteration of component geometry in response to plasma and loading specifications.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Creating Fantastic PI Workshops

The goal of this SAND report is to provide guidance for other groups hosting workshops and peerto-peer learning events at Sandia. Thus this SAND report provides detail about our team structure, how we brainstormed workshop topics and developed the workshop structure. A Workshop “Nuts and Bolts” section provides our timeline and check-list for workshop activities. The survey section provides examples of the questions we asked and how we adapted the workshop in response to the feedback.

Biedermann, Laura B.↗

Hydropower Geotechnical Foundations: Executive Summary on Current Practice and Innovation Opportunities for Low-Head Applications

The following content provides a companion executive summary of Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications (DeNeale et al. 2020), a technical report developed by Oak Ridge National Laboratory (ORNL) and Knight Piésold Consulting, with funding from the US Department of Energy (DOE) Water Power Technologies Office (WPTO). This executive summary provides a brief synopsis of the broader information contained in the technical report. This study (and the associated technical report): (1) covers background information on hydropower; (2) describes various characteristics relevant to hydropower foundations for undeveloped US streams; (3) presents the current state of practice in foundation development; (4) provides a representative assessment of conventional hydropower foundation costs and timelines; (5) addresses key challenges facing conventional hydropower foundations; and (6) presents opportunity areas and examples for innovative hydropower foundation technologies while highlighting some advances in non-hydropower industries.

13 HYDRO ENERGY↗

Nuclear fuel irradiation testbed for nuclear security applications

The nuclear security community has long been interested in the identification and quantification of nuclear material signatures to understand a material’s provenance, use, and ultimate application. New forensics signatures and methods intended for non-traditional or advanced nuclear fuel applications require fuel irradiation experiments to demonstrate viability and validity. Integral fuel irradiations have historically required significant costs and long timelines to design, irradiate, and characterize. This paper describes how a recently developed nuclear fuel irradiation testbed can be used to provide a low cost, rapid turnaround, modular test environment for irradiation and evaluation of nuclear fuel specimens for nuclear security applications. The irradiation testbed houses six small ‘MiniFuel’ samples within hermetically sealed capsules inside targets that can be removed in between each ∼25-day operating cycle of the High Flux Isotope Reactor (HFIR). As many as nine targets can be irradiated using a single irradiation position (reflector region) in HFIR, allowing for varying irradiation temperatures and burnups. A suite of hot cell capabilities have been established to perform post-irradiation examination for measuring performance (e.g., fuel swelling, fission gas release) and facilitating experiment disassembly for subsequent property measurements, microstructural analysis, or chemical assay. This new testbed allows fuel irradiations to be conducted on an accelerated timeframe to enable rapid proof of concept testing and to provide reference material for nuclear fuel security applications. Recent applications using this testbed include the testing of isotopic taggants in UO 2 fuel (intentional forensics), testing of U-10Mo fuel for down-conversion of highly enriched uranium–fueled reactors, and the production of irradiated UO 2 fuel material for signature analysis of its isotopic composition (plutonium, fission gases, etc.).

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Affordable and Scalable Modular Multifamily Housing: A Case Study on Cost, Construction Time Savings, and Waste Reduction in California: Preprint

Modular construction can significantly reduce waste when compared to traditional methods. This case study evaluates cost, construction time, and waste metrics for a 195-unit stick-built project and for a 66-unit modular project both based in Los Angeles, CA. We partner with SoLa Impact (real estate developer) and Model/Z (modular manufacturer) to evaluate the impact of Model/Z's 1-bedroom modular unit which is produced in a 160,000 sq ft local factory in South Los Angeles. We compare them to similar stick-built/site-built multifamily construction by the same developer in Los Angeles. This study finds that modular production reduced construction waste through precise prefabrication, concentrated workforce expertise, and streamlined logistics while cutting transportation needs, improving project efficiency and lowering associated timelines and costs. Economies of scale are being realized as Model/Z has produced over 500 affordable housing units and supplied for projects up to 188 units, shortening schedules and lowering per-unit costs and supporting affordable housing goals in income-challenged South Los Angeles. Modular methods offer a scalable, resource-efficient pathway to increasing affordable housing supply while reducing total development costs by 10-15% and project timelines by 50%, while simultaneously creating local jobs and training opportunities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Transuranic Waste Program Framework Agreement - December Deliverable [Slides]

Framework agreement deliverables are: (1) 'DOE/NNSA commits to complete removal of all non-cemented above-ground EM Legacy TRU and newly generated TRU currently-stored at Area G as of October 1, 2011, by no later than June 30, 2014. This inventory of above-ground TRU is defined as 3706 cubic meters of material.' (2) 'DOE commits to the complete removal of all newly generated TRU received in Area G during FY 2012 and 2013 by no later than December 31, 2014.' (3) 'Based on projected funding profiles, DOE/NNSA will develop by December 31, 2012, a schedule, including pacing milestones, for disposition of the below-ground TRU requiring retrieval at Area G.' Objectives are to: (1) restore the 'Core Team' to develop the December, 2012 deliverable; (2) obtain agreement on the strategy for below ground water disposition; and (3) establish timeline for completion of the deliverable. Below Grade Waste Strategy is to: (1) Perform an evaluation on below grade waste currently considered retrievable TRU; (2) Only commit to retrieve waste that must be retrieved; (3) Develop the Deliverable including Pacing Milestones based on planned commitments; (4) Align all Regulatory Documents for Consistency; and (5) answer these 3 primary questions, is the waste TRU; is the waste retrievable, can retrieval cause more harm than benefit?

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MO-D-213-01: Workflow Monitoring for a High Volume Radiation Oncology Center

Purpose: Implement a center wide communication system that increases interdepartmental transparency and accountability while decreasing redundant work and treatment delays by actively monitoring treatment planning workflow. Methods: Intake Management System (IMS), a program developed by ProCure Treatment Centers Inc., is a multi-function database that stores treatment planning process information. It was devised to work with the oncology information system (Mosaiq) to streamline interdepartmental workflow.Each step in the treatment planning process is visually represented and timelines for completion of individual tasks are established within the software. The currently active step of each patient’s planning process is highlighted either red or green according to whether the initially allocated amount of time has passed for the given process. This information is displayed as a Treatment Planning Process Monitor (TPPM), which is shown on screens in the relevant departments throughout the center. This display also includes the individuals who are responsible for each task.IMS is driven by Mosaiq’s quality checklist (QCL) functionality. Each step in the workflow is initiated by a Mosaiq user sending the responsible party a QCL assignment. IMS is connected to Mosaiq and the sending or completing of a QCL updates the associated field in the TPPM to the appropriate status. Results: Approximately one patient a week is identified during the workflow process as needing to have his/her treatment start date modified or resources re-allocated to address the most urgent cases. Being able to identify a realistic timeline for planning each patient and having multiple departments communicate their limitations and time constraints allows for quality plans to be developed and implemented without overburdening any one department. Conclusion: Monitoring the progression of the treatment planning process has increased transparency between departments, which enables efficient communication. Having built-in timelines allows easy prioritization of tasks and resources and facilitates effective time management.

60 APPLIED LIFE SCIENCES↗

Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

Abstract for CRADA between National Energy Technology Laboratory and Blacksand Technology, LLC

The National Energy Technology Laboratory (NETL) and Black Sand Technology, LLC (Participant) will collaborate in the optimization of low-cost manufacturing routes to produce ultralow-oxygen reactive metal powders of M=Ti, Zr, and Nb using Mg or Ca as reduction agents. Reactive metals have a strong chemical affinity to oxygen, making it very challenging to produce high-purity metal powders of these elements with extremely low oxygen content. This project integrates multiscale modeling and experimental validation to provide fundamental understanding of the thermodynamic limits on the deoxygenation process through HDH and optimize the key deoxygenation parameters to achieve ultralow oxygen content ≤0.1 wt.% in the reactive metal powders. The collaboration will significantly expedite the optimization of deoxygenation processes, reducing the timeline for refining deoxygenation techniques for Ti, Zr and Nb and other reactive refractory metals by about 0.5 and 2 years, respectively. This accelerated timeline translates to substantial cost savings estimated at $\$$3 million in research and development expenditures.

36 MATERIALS SCIENCE↗

Small Hydropower Interconnections: Analysis of Interconnection Processes

Small hydropower projects have faced the challenge of navigating the process to interconnect their generation source to electricity distribution and transmission grids. Small hydropower developers have found interconnection procedures to be opaque and ultimately result in unexpected cost surprises and long timelines. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. After reviewing the status of small hydropower (“Small Hydropower Interconnections: Small Hydropower in the United States”) and the interconnection procedures across the United States (“Small Hydropower Interconnections: State Interconnection Processes”) in the first two white papers of this series, this paper uses recent data from small hydropower interconnection applications to benchmark the efficacy of the process. Using data from interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs), this paper provides context for the costs, timelines, and types of upgrades required for small hydropower projects. Interconnection applications and study reports for small hydropower projects were analyzed to collect key pieces of information about the interconnection process, timeline, costs, and type of upgrades required for interconnection. Information sourced from the reports was entered into an Interconnection Benchmarking database (IBdb), which may be found in Appendix A.1. Information from this database was used to evaluate the performance and challenges associated with interconnecting small hydropower projects. This white paper presents a description of the sources contained in the interconnection database (Section 2.0), an analysis of the interconnection timeline (Section 3.0), an evaluation the cost of interconnection upgrades (Section 4.0), and a description of the types of infrastructure upgrades (Section 5.0). The final paper in this series (“Small Hydropower Interconnections: Best Practices”) will use the analysis described here to outline best practices for interconnection processes that will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

Salton Sea Geothermal Development: Nontechnical Barriers to Entry – Analysis and Perspectives

Geothermal energy offers an opportunity to generate baseload, renewable energy that can help support the transition to an energy economy with reduced impacts on climate change and replace older, more expensive, nonrenewable, and more resource-impacting energy-generation facilities. The United States has the largest known geothermal resource in the world, with over 31 GW of conventional geothermal potential. However, due to market conditions, an inability to properly quantify both electrical grid benefits and resource stability, and the difficulty of exploring and developing the geothermal resource, few new geothermal projects have come online over the past three decades. The Salton Sea, in Imperial County, California, provides a prime location and opportunity to develop new geothermal resources. The Salton Sea contains a robust, well-mapped, geothermal resource, with opportunities for concurrent development of lithium and other mineral resources. This report describes the history of geothermal development at the Salton Sea and compares geothermal to other renewable energy sources in the area. The report then uses a techno-economic analysis (TEA) model to analyze the relative benefits and costs of various challenges and opportunities and provides recommendations for streamlining geothermal development at the Salton Sea and elsewhere. The challenges and opportunities analyzed in the TEA model were informed by stakeholder interviews and literature reviews. Based upon the identified challenges and opportunities and the results of the TEA model, primary findings are that certain nontechnical barriers such as permitting costs play only a minor role in determining the viability of development of the geothermal resource at the Salton Sea. Other barriers such as permitting timelines, government/agency coordination, and the potential co-location of lithium extraction with a geothermal plant may result in much larger impacts on project viability.

15 GEOTHERMAL ENERGY↗

International Offshore Geologic Carbon Storage Story Map

The International Offshore Geologic Carbon Storage Story Map provides an overview of offshore geologic carbon storage (GCS) project maturity on a global scale. This story map reviews the history of CO2 storage in offshore sedimentary basins, basic geologic requirements, project timelines and lessons learned through defined project stage progression, areas previously studied for potential future domestic offshore GCS development, and regulatory considerations within different global regions. This resource is a distillation of information collected and recorded in the Offshore Geologic Carbon Storage Inventory Version 1.0 (https://edx.netl.doe.gov/dataset/offshore-gcs-data-inventory).

Assessment↗