Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Shuttle-attached Antenna Flight Experiment Definition Study (FEDS)

The control algorithms, techniques, and hardware which would be required to support whether flight experiments of large space structures control are assessed for a 55-meter diameter wrap-rib reflector with a three degree-of-freedom gimbal. Strowman requirements were established for geometry, mass property, and elastic mode identification as well as for control and slewing. A five-body simulation of the Shuttle and test article was built with the ALLFLEX computer program. A maximum likelihood estimator, the flight experiment timeline, and the LSS control development test plan are discussed.

Hannan, G. J.↗

The Space Station Freedom evolution-phase - Crew-EVA demand for robotic substitution by task primitive

Space Station Freedom represents a significant demand for automation and robotics services as substitutes for crew EVAs. Results are reported from a study aimed at identifying the demand for crew EVA and the crew-task primitive distributions derived for input to future robotic substitution studies. Generic EVA tasks are developed from historical EVA mission timelines, and a set of 70 task primitives defined. The generic task activities are partitioned into task setup, kernel, and tear-down, with standardized task times and frequencies. These standardized times are coupled with inputs from numerous mission data bases in a probabilistic simulation to obtain estimates of total crew-EVA task time demand by crew task primitive. The use of probabilistic model is found to be crucial for understanding, isolating, and addressing the large uncertainties in the EVA task kernels.

Smith, Jeffrey H.↗

The Potassium-Argon Laser Experiment (KarLE): In Situ Geochronology for Mars and Beyond

The search for life in the solar system depends upon discovering the right moments in planetary evolution: when habitable environments existed, when they declined, and when geologic processes operated to preserve traces of life after death. However, an incomplete knowledge of absolute Martian geochronology limits our ability to understand the timing of Martian evolutionary milestones, major climate changes, and stratigraphic epochs [1, 2]. Absolute dating relates these habitability markers to planetarywide geologic, atmospheric, and climate history places, and ties their occurrence to the history of the solar system, especially the Earth-Moon system and the timescale of evolution of life on Earth. KArLE is being developed to anchor the relative timeline of geological events to an absolute chronology that puts Mars into a wider solar system context. KArLE makes its measurements on rock samples that can be obtained by landers or rovers and inserted into a small, mechanically simple chamber. KArLE interrogates the samples using laser-induced breakdown spectrocopy (LIBS), mass spectrometry, and optical imaging. The KArLE experiment is flexible enough to accommodate any partner providing these instrument components, a creative approach that extends the ability of mission payloads to accomplish an additional highly-desirable science measurement for low cost and risk and minimal extra hardware.

Cohen, Barbara A.↗

Satellite services system analysis study. Volume 1, part 2: Executive summary

The early mission model was developed through a survey of the potential user market. Service functions were defined and a group of design reference missions were selected which represented needs for each of the service functions. Servicing concepts were developed through mission analysis and STS timeline constraint analysis. The hardware needs for accomplishing the service functions were identified with emphasis being placed on applying equipment in the current NASA inventory and that in advanced stages of planning. A more comprehensive service model was developed based on the NASA and DoD mission models segregated by mission class. The number of service events of each class were estimated based on average revisit and service assumptions. Service Kits were defined as collections of equipment applicable to performing one or more service functions. Preliminary design was carrid out on a selected set of hardware needed for early service missions. The organization and costing of the satellie service systems were addressed.

Source record↗

Overview of the Human Exploration Research Analog (HERA)

In 2013, the Human Research Program at NASA began developing a new confinement analog specifically for conducting research to investigate the effects of confinement on the human system. The HERA (Human Exploration Research Analog) habitat has been used for both 7 and 14 day missions to date to examine and mitigate exploration risks to enable safe, reliable and productive human space exploration. This presentation will describe how the Flight Analogs Project developed the HERA facility and the infrastructure to suit investigator requirements for confinement research and in the process developed a new approach to analog utilization and a new state of the art analog facility. Details regarding HERA operations will be discussed including specifics on the mission simulation utilized for the current 14-day campaign, the specifics of the facility (total volume, overall size, hardware), and the capabilities available to researchers. The overall operational philosophy, mission fidelity including timeline, schedule pressures and cadence, and development and implementation of mission stressors will be presented. Research conducted to date in the HERA has addressed risks associated with behavioral health and performance, human physiology, as well as human factors. This presentation will conclude with a discussion of future research plans for the HERA, including infrastructure improvements and additional research capabilities planned for the upcoming 30-day missions in 2016.

Neigut, J.↗

A Brief History of Space Climatology: From the Big Bang to the Present

This work presents a space climatology timeline ranging from the Big Bang to the present. It begins with a description of the early universe including the origin and abundances of particles significant for radiation effects. It continues to a transition period to modern times when the era of modern space climatology began to emerge due to discoveries of sunspots and the solar activity cycle, along with development of early astronomical methods. The timeline concludes in the modern era with a description of the radiation environments of galactic cosmic rays, solar particle events and the Van Allen Belts.

Galactic Cosmic Rays↗

A Brief History of Space Climatology: From the Big Bang to the Present

This work presents a space climatology timeline ranging from the Big Bang to the present. It began with a description of the early universe including the origin and abundances of particles significant for radiation effects. It continued to a transition period to modern times when the era of modern space climatology began to emerge due to discoveries of sunspots and the solar activity cycle, along with development of early astronomical methods. The timeline concluded in the modern era with a description of the radiation environments of galactic cosmic rays, solar particle events and the Van Allen Belts.

Big bang↗

Performance Report: A timeline for the synchrotron calibration of AXAF

Presented herein are the known elements of the timeline for synchrotron reflectance calibrations of HRMA witness samples (Section 2). In Section 3, lists of measurements to be done on each witness flat are developed. The elements are then arranged into timelines for the three beamlines we expect to employ in covering the full 50-12,000 eV energy range (Section 4). Although the required AXAF operational range is only 0.1-10 keV, we must calibrate the extent to which radiation just outside this band may contaminate our in-band response. In Section 5, we describe the working relationships which exist with each of the beamlines, and estimate the time available for AXAF measurements on each. From the timelines and the available time, we calculate the number of flats which could be measured in full detail over the duration of the program for each beamline. A suggestion is made regarding a minimum required baselines of witness flats from each element coating run or qualification run to be used in the calibration. We intend that this suggestion open discussion of the issue of witness flat deployment.

Tananbaum, H. D.↗

Materials Development: Pitfalls, Successes, and Lessons

The incorporation of new or improved materials in aerospace systems, or indeed any systems, can yield tremendous payoffs in the system performance or cost, and in many cases can be enabling for a mission or concept. However, the availability of new materials requires advance development, and too often this is neglected or postponed, leaving a project or mission with little choice. In too many cases, the immediate reaction is to use what was used before; this usually turns out not to be possible and results in large sums of money, and amounts of time, being expended on reinvention rather than development of a material with extended capabilities. Material innovation and development is time consuming, with some common wisdom claiming that the timeline is at least 20 years. This time expands considerably when development is stopped and restarted, or knowledge is lost. Down selection of materials is necessary, especially as the Technical Readiness Level (TRL) increases. However, the costs must be considered and approaches should be taken to retain knowledge and allow for restarting the development process. Regardless of the exact time required, it is clear that it is necessary to have materials, at all stages of development, in a research and development pipeline and available for maturation as required. This talk will discuss some of theses issues, including some of the elements for a development path for materials. Some history of materials developments will be included. The usefulness of computational materials science, as a route to decreasing material development time, will be an important element of this discussion. Collaboration with outside institutions and nations is also critical for innovation, but raises the issues of intellectual property and protections, and national security (ITAR rules, for example).

Johnson, Sylvia M.↗

System Validation on the Europa Clipper mission in Early Implementation Phase

NASA’s next flag-ship mission - Europa Clipper, will embark on a journey to Jupiter’s icy moon Europa in 2024 to assess its environment and habitability with a highly capable spacecraft. Post Jupiter-Orbit-Insertion, the spacecraft will be commanded to perform intricate, yet meticulously planned Europa flybys to perform science investigations using a suite of instruments, while withstanding Jupiter’s harsh radiation environment. The success of this mission is dependent on a well-coordinated project and its elements such as the flight hardware and software, the ground support and mission operations teams, procedures and other cross-cutting elements. The Europa Clipper project needs to ensure that these elements are realized at a reasonable confidence level prior to launch and other mission critical events. System Validation test and analysis activities exercise and confirm the integrity of the system of all project elements in the expected flight environment with reasonable stressing conditions. These activities go beyond system design requirements verification and are driven by validation objectives that describe the end-to-end functional and operational capabilities required during nominal and off-nominal flight-like scenarios and critical events. The challenges associated with validating that the Europa Clipper project as a whole can function and perform correctly to meet the intended mission objectives with the as-delivered capabilities of all of its elements are daunting. This paper discusses the systematic methodology established in the early implementation phase of the Europa Clipper project for developing System Validation activities and their validation objectives, and addressing any validation-related challenges on the project. Approaches include decomposition of mission objectives using activity timelines in the Mission Design plan for developing nominal scenarios, use of fault trees for exploring off-nominal cases and system boundaries, and use of Model-based Systems Engineering (MBSE) tools for planning and prioritizing these activities.

Wang, Xu↗

The FIFE information system

A description is given of the FIFE (First ISLSCP Field Experiment) information system, which was developed to serve FIFE investigators as a tool for designing the experiment and for organizing and manipulating the complex data set. Fulfilling these functions on an experiment-driven timeline led to abandoning the classical sequential development paradigm of software engineering in favor of a more responsive and broadly based approach. The design, development, and operation of the information system supporting the experiment had to be flexible and under direct day-to-day control of scientist/users. Because of the organization around scientific requirements, the system was able to incorporate diverse data types in a systematic way as they became available, to add scientific rigor by identifying data gaps at an early stage, and to provide real-time quality assurance. These factors are important for designing and building future databases and long-term information systems to support interdisciplinary scientific research.

Strebel, Donald E.↗

Asset - An application in mission automation for science planning

Recent advances in computer technology were used to great advantage in planning science observation sequences for the Voyager 2 encounter with Uranus in 1986. Despite a loss of experienced personnel, a challenging schedule, workforce limitations, and the complex nature of the Uranus encounter itself, the resultant science observation timelines were the most highly optimized of the five Voyager encounters with the outer planets. In part, this was due to the development of a microcomputer-based system, called ASSET (Automated Science Sequence Encounter Timelines generator), which was used to design those science observation timelines. This paper details the development of that system. ASSET demonstrates several features essential to the design of the first expert systems for science planning which will be applied for future missions.

Finnerty, D. F.↗

Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

Hitz, F. R.↗

Computer system evolution requirements for autonomous checkout of exploration vehicles

This study, now in its third year, has had the overall objective and challenge of determining the needed hooks and scars in the initial Space Station Freedom (SSF) system to assure that on-orbit assembly and refurbishment of lunar and Mars spacecraft can be accomplished with the maximum use of automation. In this study automation is all encompassing and includes physical tasks such as parts mating, tool operation, and human visual inspection, as well as non-physical tasks such as monitoring and diagnosis, planning and scheduling, and autonomous visual inspection. Potential tasks for automation include both extravehicular activity (EVA) and intravehicular activity (IVA) events. A number of specific techniques and tools have been developed to determine the ideal tasks to be automated, and the resulting timelines, changes in labor requirements and resources required. The Mars/Phobos exploratory mission developed in FY89, and the Lunar Assembly/Refurbishment mission developed in FY90 and depicted in the 90 Day Study as Option 5, have been analyzed in detailed in recent years. The complete methodology and results are presented in FY89 and FY90 final reports.

Davis, Tom↗

Flight Planning Branch Space Shuttle Lessons Learned

Planning products and procedures that allow the mission flight control teams and the astronaut crews to plan, train and fly every Space Shuttle mission have been developed by the Flight Planning Branch at the NASA Johnson Space Center. As the Space Shuttle Program ends, lessons learned have been collected from each phase of the successful execution of these Shuttle missions. Specific examples of how roles and responsibilities of console positions that develop the crew and vehicle attitude timelines will be discussed, as well as techniques and methods used to solve complex spacecraft and instrument orientation problems. Additionally, the relationships and procedural hurdles experienced through international collaboration have molded operations. These facets will be explored and related to current and future operations with the International Space Station and future vehicles. Along with these important aspects, the evolution of technology and continual improvement of data transfer tools between the shuttle and ground team has also defined specific lessons used in the improving the control teams effectiveness. Methodologies to communicate and transmit messages, images, and files from Mission Control to the Orbiter evolved over several years. These lessons have been vital in shaping the effectiveness of safe and successful mission planning that have been applied to current mission planning work in addition to being incorporated into future space flight planning. The critical lessons from all aspects of previous plan, train, and fly phases of shuttle flight missions are not only documented in this paper, but are also discussed as how they pertain to changes in process and consideration for future space flight planning.

Price, Jennifer B.↗

NASA Flight Planning Branch Space Shuttle Lessons Learned

Planning products and procedures that allowed the mission Flight Control Teams and the Astronaut crews to plan, train and fly every Space Shuttle mission were developed by the Flight Planning Branch at the NASA Johnson Space Center in Houston, Texas. As the Space Shuttle Program came to a close, lessons learned were collected from each phase of the successful execution of these Space Shuttle missions. Specific examples of how roles and responsibilities of console positions that develop the crew and vehicle attitude timelines have been analyzed and will be discussed. Additionally, the relationships and procedural hurdles experienced through international collaboration have molded operations. These facets will be explored and related to current and future operations with the International Space Station and future vehicles. Along with these important aspects, the evolution of technology and continual improvement of data transfer tools between the Space Shuttle and ground team has also defined specific lessons used in improving the control team s effectiveness. Methodologies to communicate and transmit messages, images, and files from the Mission Control Center to the Orbiter evolved over several years. These lessons were vital in shaping the effectiveness of safe and successful mission planning and have been applied to current mission planning work in addition to being incorporated into future space flight planning. The critical lessons from all aspects of previous plan, train, and fly phases of Space Shuttle flight missions are not only documented in this paper, but are also discussed regarding how they pertain to changes in process and consideration for future space flight planning.

Clevenger, Jennifer D.↗

Historical Evolution of NASA Standard Materials Testing with Hypergolic Propellants and Ammonia (NASA Standard 6001 Test 15)

The NASA Johnson Space Center White Sands Test Facility (WSTF) has performed testing of hazardous and reactive aerospace fluids, including hypergolic propellants, with materials since the 1960s with the Apollo program. Amongst other test activities, Test 15 is a NASA standard test for evaluating the reactivity of materials with selected aerospace fluids, in particular hydrazine, monomethylhydrazine, uns-dimethylhydrazine, Aerozine 50, dinitrogen tetroxide oxidizers, and ammonia. This manuscript provides an overview of the history of Test 15 over a timeline ranging from prior to its development and first implementation as a NASA standard test in 1974 to its current refinement. Precursor documents to NASA standard tests, as they are currently known, are reviewed. A related supplementary test, international standardization, and enhancements to Test 15 are also discussed. Because WSTF was instrumental in the development and implementation of Test 15, WSTF experience and practices are referred to in this manuscript.

Greene, Benjamin↗