Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “demand forecasting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Developing Passenger Demand Models for International Aviation from/to Egypt: A Case Study of Cairo Airport and Egyptair

This research is concerned with developing passenger demand models for international aviation from/to Egypt. In this context, aviation sector in Egypt is represented by the biggest and main airport namely Cairo airport as well as by the main Egyptian international air carrier namely Egyptair. The developed models utilize two variables to represent aviation demand, namely total number of international flights originating from and attracted to Cairo airport as well as total number of passengers using Egyptair international flights originating from and attracted to Cairo airport. Such demand variables were related, using different functional forms, to several explanatory variables including population, GDP and number of foreign tourists. Finally, two models were selected based on their logical acceptability, best fit and statistical significance. To demonstrate usefulness of developed models, these were used to forecast future demand patterns.

Abbas, Khaled A.↗

Insights into Methodologies and Operational Details of Resource Adequacy Assessment: A Case Study with Application to a Broader Flexibility Framework

Assessing and maintaining resource adequacy (RA) is a core pillar of power systems. However, recent changes in the physical makeup of these systems and the conditions under which these systems must operate have yielded a renewed interest in the methods, metrics, and assumptions that underpin RA assessments. In this paper, we systematically explore a wide range of RA modeling dimensions, including: the objective function and level of operational detail in the underlying model formulation; the quantity (look-ahead) and quality (accuracy) of data that is available for making operational decisions within those models; and the physical configuration of solar photovoltaics (PV) with battery storage hybrid resources. We apply a set of probabilistic RA tools and production cost modeling tools to a realistic test system based loosely on a future Electric Reliability Council of Texas power system dominated by solar PV resources. Under the assumptions of our system and models, we find that multi-stage probabilistic assessments may provide a more robust evaluation of RA by capturing a wider range of operational and system interactions, but this comes at a computational cost of 1-2 orders of magnitude longer run time depending on the specific configuration. In addition, the information on thermal generator availability impacts RA performance by an order of magnitude more than solar resource forecasts, which is driven by the comparatively larger magnitude of thermal outages than solar forecast errors within our test system. Lastly, the flexibility provided by hybrid and other resources can help reduce system load-shedding event frequencies and enable the system to be more robust to inaccurate forecast information, and alternative hybrid inverter sizes can impact RA levels by 1-2 orders of magnitude. Our results point to the importance of a broader flexibility framework to describe the interaction between (1) flexibility "supply" from both physical resource capabilities and operational constraints considered in the modeling, and (2) flexibility "demand" from forecast errors, thermal generator outages, and other sources of uncertainty, as well as their RA impacts. Results are likely sensitive to the system buildout explored; future work could consider additional system configurations and conditions.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Energy-efficient multimodal mobility networks in transportation digital twins: Strategies and optimization

The study proposes a comprehensive Transportation Mobility (TransitMo) framework covering conceptual design, model formulation, optimization, simulation, and impact analysis of the transportation mobility system. TransitMo is composed of a transportation digital twin developed in Simulation of Urban MObility (SUMO) and an Intelligent Traffic Management and Control Center (ITMCC) that identifies the best ways to improve the movement of people within urban areas using various modes of transportation. This study encompasses advanced modeling techniques, algorithms, and strategic testing to optimize energy efficiency and mobility in a multimodal shared mobility network. TransitMo’s practical applications are exemplified through a city-scaled simulation network in Chattanooga, TN, employing demographic data to analyze historical traffic patterns and forecast future demands. Central to this methodology are three models: the User Preference Model (UP), the Energy Consumption Model (EC), and the System Optimization Model (SO). These models work in concert to iteratively devise the optimal travel incentives and minimize the total system cost in a real-time manner. In conclusion, test results verified that the proposed adaptive incentive program and optimized bus scheduling can improve network performance by increasing public transit ridership.

42 ENGINEERING↗

A low-complexity non-intrusive approach to predict the energy demand of buildings over short-term horizons

Reliable, non-intrusive, short-term (of up to 12 hours ahead) prediction of a building's energy demand is a critical component of intelligent energy management applications. A number of such approaches have been proposed over time, utilizing various statistical and, more recently, machine learning techniques, such as decision trees, neural networks and support vector machines. Importantly, all of these works barely outperform simple seasonal auto-regressive integrated moving average models, while their complexity is significantly higher. Here, we propose a novel low-complexity non-intrusive approach that improves the predictive accuracy of the state-of-the-art by up to ~10%. The backbone of our approach is a K-nearest neighbours search method, that exploits the demand pattern of the most similar historical days, and incorporates appropriate time-series pre-processing and easing. In the context of this work, we evaluate our approach against state-of-the-art methods and provide insights on their performance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Improving future travel demand projections: a pathway with an open science interdisciplinary approach

Transport accounts for 24% of global CO 2 emissions from fossil fuels. Governments face challenges in developing feasible and equitable mitigation strategies to reduce energy consumption and manage the transition to low-carbon transport systems. To meet the local and global transport emission reduction targets, policymakers need more realistic/sophisticated future projections of transport demand to better understand the speed and depth of the actions required to mitigate greenhouse gas emissions. In this paper, we argue that the lack of access to high-quality data on the current and historical travel demand and interdisciplinary research hinders transport planning and sustainable transitions toward low-carbon transport futures. We call for a greater interdisciplinary collaboration agenda across open data, data science, behaviour modelling, and policy analysis. These advancemets can reduce some of the major uncertainties and contribute to evidence-based solutions toward improving the sustainability performance of future transport systems. The paper also points to some needed efforts and directions to provide robust insights to policymakers. We provide examples of how these efforts could benefit from the International Transport Energy Modeling Open Data project and open science interdisciplinary collaborations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Technology requirements for post-1985 communications satellites

The technical and functional requirements for commercial communication satellites are discussed. The need for providing quality service at an acceptable cost is emphasized. Specialized services are postulated in a needs model which forecasts future demands. This needs model is based upon 322 separately identified needs for long distance communication. It is shown that the 1985 demand for satellite communication service for a domestic region such as the United States, and surrounding sea and air lanes, may require on the order of 100,000 MHz of bandwith. This level of demand can be met by means of the presently allocated bandwidths and developing some key technologies. Suggested improvements include: (1) improving antennas so that high speed switching will be possible; (2) development of solid state transponders for 12 GHz and possibly higher frequencies; (3) development of switched or steered beam antennas with 10 db or higher gain for aircraft; and (4) continued development of improved video channel compression techniques and hardware.

Burtt, J. E.↗

Rural land mobile radio market assessment and satellite and terrestrial system concepts

Market potential exists; the nature of the market in terms of service needs, usage characteristics, service requirements, and forecasting the demand to the year 2000; alternative system cncepts that show promise in addressing the identified needs, in a cost effective manner; and advanced technology requirements associated with these concepts are considered.

Stevenson, S. M.↗

Information Requirements for Supervisory Air Traffic Controllers in Support of a Wake Vortex Departure System

Closely Space Parallel Runway (CSPR) configurations are capacity limited for departures due to the requirement to apply wake vortex separation standards from traffic departing on the adjacent parallel runway. To mitigate the effects of this constraint, a concept focusing on wind dependent departure operations has been developed, known as the Wake Turbulence Mitigation for Departures (WTMD). This concept takes advantage of the fact that crosswinds of sufficient velocity blow wakes generated by aircraft departing from the downwind runway away from the upwind runway. Consequently, under certain conditions, wake separations on the upwind runway would not be required based on wakes generated by aircraft on the downwind runway, as is currently the case. It follows that information requirements, and sources for this information, would need to be determined for airport traffic control tower (ATCT) supervisory personnel who would be charged with decisions regarding use of the procedure. To determine the information requirements, data were collected from ATCT supervisors and controller-in-charge qualified individuals at Lambert-St. Louis International Airport (STL) and George Bush Houston Intercontinental Airport (IAH). STL and IAH were chosen as data collection sites based on the implementation of a WTMD prototype system, operating in shadow mode, at these locations. The 17 total subjects (STL: 5, IAH: 12) represented a broad-base of air traffic experience. Results indicated that the following information was required to support the conduct of WTMD operations: current and forecast weather information, current and forecast traffic demand and traffic flow restrictions, and WTMD System status information and alerting. Subjects further indicated that the requisite information is currently available in the tower cab with the exception of the WTMD status and alerting. Subjects were given a demonstration of a display supporting the prototype systems and unanimously stated that the WTMD status information they felt important was represented. Overwhelmingly, subjects felt that approving, monitoring and terminating the WTMD procedure could be integrated into their supervisory workload.

Lohr, Gary W.↗

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

Current Environmental Control and Life Support System (ECLSS) development and test activities are not generating data fast enough to provide statistically-supportable precise Orbital Replacement Unit (ORU) failure rate estimates for future missions. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches – namely regular resupply and rapid abort capabilities – will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of operations on board the International Space Station (ISS), a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass for future missions. A Bayesian failure rate estimation approach, such as the one currently implemented by the ISS Program, can help reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior failure rate estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, these subjective (and often inaccurate) prior estimates currently have a strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Supportability↗

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

The currently planned schedule for advanced Environmental Control and Life Support System (ECLSS) development and test activities to support human exploration missions is unlikely to generate sufficient data to enable statistically-supportable, precise Orbital Replacement Unit (ORU) failure rate estimates to meet existing crew safety expectations. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches –namely regular resupply and rapid abort capabilities –will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of International Space Station (ISS) ECLSS operations, a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass. A Bayesian estimation approach, such as the one currently implemented by the ISS Program, can reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, any inaccuracy in theseprior estimates currently hasa strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Reliability↗

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

The currently planned schedule for advanced Environmental Control and Life Support System (ECLSS) development and test activities to support human exploration missions is unlikely to generate sufficient data to enable statistically-supportable, precise Orbital Replacement Unit (ORU) failure rate estimates to meet existing crew safety expectations. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches –namely regular resupply and rapid abort capabilities –will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of International Space Station (ISS) ECLSS operations, a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass. A Bayesian estimation approach, such as the one currently implemented by the ISS Program, can reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, any inaccuracy in theseprior estimates currently hasa strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Reliability↗

Airport Traffic Management and Planning Framework

Initial results from the Athena project show that high-performance computing and high-fidelity traffic simulation can help guide airport traffic management decisions and understand operating bottlenecks.

ADVANCED PROPULSION SYSTEMS↗

Generative AI in Supply Chain Management: Applications, Challenges, and Future Directions

Supply chain management (SCM) is undergoing rapid transformation due to increasing global complexity, demand volatility, and operational disruptions. Generative Artificial Intelligence (GenAI) has emerged as a powerful paradigm capable of synthesizing data, simulating operational scenarios, and enabling adaptive decision-making across supply chain networks. This paper presents a survey of GenAI’s role in SCM, focusing on its applications in predictive analytics, autonomous logistics, and fraud detection. Unlike traditional AI systems that rely primarily on predictive analytics, GenAI models, including large language models, generative adversarial networks, and diffusion-based architectures, enable the creation of synthetic supply chain scenarios and autonomous optimization strategies. This survey provides (1) a taxonomy of GenAI techniques for supply chain applications, (2) a comparative analysis of generative AI approaches with traditional machine learning, reinforcement learning, and blockchain-based methods, and (3) a discussion of key challenges such as data privacy, interpretability, and integration with legacy enterprise systems. Furthermore, we outline open research problems and propose directions for future research toward autonomous, resilient, and sustainable AI-driven supply chains.

15 - GEOTHERMAL ENERGY↗

Day-Ahead Probabilistic Forecasting of Net-Load and Demand Response Potentials with High Penetration of Behind-the-Meter Solar-plus-Storage

The goal of this project is to develop advanced methods for day-ahead net-load forecasting, by leveraging the state-of-the-art machine learning techniques. The developed models produce both point and probabilistic forecasts for a variety of use cases, and are versatile to work with different types of data sets. The innovation lies in the novel design of the architectures, leveraging the most recent advances in machine learning that have not been explored in power systems, accompanied by techniques in the broader artificial intelligence fields such as fuzzy systems. This project has achieved the following accomplishments: (1) preprocessing of over 10 data sets covering varying geographical regions, time horizons, and system levels, which form a robust foundation for training and evaluating forecasting models across a wide range of realistic grid scenarios; (2) development of an interactive web app that enables exploratory analysis of load and generation data, and supports better understanding of data trends, anomalies, and correlations, facilitating model development and stakeholder engagement; (3) implementation of over 10 benchmark models for point and probabilistic forecasting, which include a mix of conventional machine learning methods and state-of-the-art deep learning approaches, providing a comprehensive baseline for performance comparison and validation of the proposed models; (4) development of a fuzzy system based gradient boosting model, tailored for small (less than 3 years) data sets, which achieves a mean absolute percentage error (MAPE) of 4% for point forecasting and a 20% improvement in average pinball loss for probabilistic forecasting; (5) development of a Transformer (a state-of-the-art deep learning architecture) based neural network model, tailored for large (3 years or more) data sets, which achieves a MAPE of 2% for point forecasting and a 20% improvement in average pinball loss for probabilistic forecasting; (6) development of a methodology for quantifying DR potential, and extensions of the previous models for multi-target forecasting of net load and DR potential, which achieve a MAPE of 10% for DR potential.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data-driven modeling to enhance municipal water demand estimates in response to dynamic climate conditions

Altered precipitation and temperature patterns from a changing climate will affect supply, demand, and overall municipal water system operations throughout the arid western U.S. While supply forecasts leverage hydrological models to connect climate influences with surface water availability, demand forecasts typically estimate water use independent of climate and other externalities. Stemming from an increased focus on seasonal water demand management, we use the Salt Lake City, Utah municipal water system as a test bed to assess model accuracy versus complexity trade-offs between simple climate-independent econometric-based models and complex climate-sensitive data-driven models to average to extreme wet and dry climate conditions—representative of a new climate normal. Here, the climate-independent model displayed low performance during extreme dry conditions with predictions exceeding 90% and 40% of the observed monthly and seasonal volumetric demands, respectively, which we attribute to insufficient model complexity. The climate-sensitive models displayed greater accuracy in all conditions, with an ordinary least squares model demonstrating a measurable reduction in prediction bias (3.4% vs. -27.3%) and RMSE (74.0 lpcd vs. 294 lpcd) compared to the climate-independent model. The climate-sensitive workflow increased model accuracy and characterized climate-demand interactions, demonstrating a novel tool to enhance water system management.

54 ENVIRONMENTAL SCIENCES↗

Electric energy demand and supply prospects for California

A recent history of electricity forecasting in California is given. Dealing with forecasts and regulatory uncertainty is discussed. Graphs are presented for: (1) Los Angeles Department of Water and Power and Pacific Gas and Electric present and projected reserve margins; (2) California electricity peak demand forecast; and (3) California electricity production.

Jones, H. G. M.↗

The 30/20 GHz fixed communications systems service demand assessment. Volume 3: Annex

A review of studies forecasting the communication market in the United States is given. The applicability of these forecasts to assessment of demand for the 30/20 GHz fixed communications system is analyzed. Costs for the 30/20 satellite trunking systems are presented and compared with the cost of terrestrial communications.

Gamble, R. B.↗