Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “crew scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Exploring Self-Scheduling Strategies and Heuristics in Novice Schedulers

Missions beyond low Earth orbit will require crews to act with greater autonomy. Increasing communication delays will require crews to take on tasks currently supported by Mission Control, including the involved process of scheduling and rescheduling their own complex spaceflight timelines to fit a variety of restrictions and constraints. Astronauts, unlike Mission Control, are not expert planners, however, and determining simple strategies and heuristics that enable them to schedule successfully can increase the range of problems they can solve successfully. In two human-in-the-loop scheduling experiments, we analyzed 1) common strategies among novice schedules, and 2) the development of self-scheduling heuristics. We find that, even when participants are instructed to follow a given strategy, they rapidly develop their own self-scheduling heuristics as they learn to successfully complete the scheduling task. Participants conducting naturally learn to schedule activities with the most constraints first, while participants vary in heuristics in the rescheduling task.

self-scheduling↗

Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

scheduling↗

The reuse of logistics carriers for the first lunar outpost alternative habitat study

The Systems Definition Branch deals with preliminary concepts/designs of various projects currently in progress at NASA. One of these projects is called the First Lunar Outpost. The First Lunar Outpost (FLO) is a proposed permanent lunar base to be located on the moon. In order to better understand the Lunar Habitat, a detailed analysis of the lunar environment as well as conceptual studies of the physical living arrangements for the support crew is necessary. The habitat will be inhabited for a period of 45 days followed by a six month dormant period. Requirements for the habitat include radiation protection, a safe haven for occasional solar flare storms, an airlock module and consumables to support a crew of 4 with a schedule of 34 extra vehicular activities. Consumables in order to sustain a crew of four for 45 days ranges from 430 kg of food to only 15 kg for personal hygiene items. These consumables must be brought to the moon with every mission. They are transported on logistics carriers. The logistics carrier must be pressurized in order to successfully transport the consumables. Refrigeration along with other types of thermal control and variation in pressure are defined by the list of necessary consumables. The objective of the proposed work was to collaborate the Habitat Team with their study on Logistic Carriers as possible alternatives for additional habitable volume. Options for possible reuses was also determined. From this analysis, a recommended design is proposed.

Vargas, Carolina↗

Intelligent perturbation algorithms to space scheduling optimization

The limited availability and high cost of crew time and scarce resources make optimization of space operations critical. Advances in computer technology coupled with new iterative search techniques permit the near optimization of complex scheduling problems that were previously considered computationally intractable. Described here is a class of search techniques called Intelligent Perturbation Algorithms. Several scheduling systems which use these algorithms to optimize the scheduling of space crew, payload, and resource operations are also discussed.

Kurtzman, Clifford R.↗

NASA Space Life Sciences

This slide presentation reviews the requirements that NASA has for the medical service of a crew returning to earth after long duration space flight. The scenarios predicate a water landing. Two scenarios are reviewed that outline the ship-board medical operations team and the ship board science reseach team. A schedule for the each crew upon landing is posited for each of scenarios. The requirement for a heliport on board the ship is reviewed and is on the requirement for a helicopter to return the Astronauts to the Baseline Data Collection Facility (BDCF). The ideal is to integrate the medical and science requirements, to minimize the risks and Inconveniences to the returning astronauts. The medical support that is required for all astronauts returning from long duration space flight (30 days or more) is reviewed. The personnel required to support the team is outlined. The recommendations for medical operations and science research for crew support are stated.

Hayes, Judith↗

Artificial Gravity in Mars Orbit for Crew Acclimation

NASA’s current baseline plan for a crewed Mars mission anticipates a transit time of up to three hundred days in microgravity and 3-14 days on the Martian surface for gravity acclimation before the crew can safely perform their first Extra-Vehicular Activity (EVA). While there are multiple options for how initial surface operations will be performed, all current designs involve acclimation on the surface, and the impacts on the mission schedule, required supplies, and crew lander systems are significant. This paper proposes an alternative option utilizing artificial gravity, which offers benefits in terms of mission scope, mass savings, crew health, and long-term strategic vision. By moving the acclimation requirement to the orbiting habitat’s existing systems, rather than adding redundant systems to the lander, the Mars Descent Vehicle (MDV) can be a much smaller, simpler, and lighter design. Rather than the lander being designed to support crew for days, it would be mere hours. While ambitious, the concept of pre-acclimation in orbit can be not only safe and feasible, but done with fairly minimal changes to the planned architecture and overall mass requirements. The data used draws on decades of established research and demonstrates how this capability can be not only used for pre-acclimation, but also to support crew during early orbital-only missions, surface abort contingency scenarios, return-to-orbit abort scenarios, and as an early proof of capability into larger and more ambitious artificial gravity designs needed for extended exploration missions in the future.

Rowe, Justin↗

Pilot Fatigue and Circadian Desynchronosis

Pilot fatigue and circadian desynchronosis, its significance to air transport safety, and research approaches, were examined. There is a need for better data on sleep, activity, and other pertinent factors from pilots flying a variety of demanding schedules. Simulation studies of flight crew performance should be utilized to determine the degree of fatigue induced by demanding schedules and to delineate more precisely the factors responsible for performance decrements in flight and to test solutions proposed to resolve problems induced by fatigue and desynchronosis. It was concluded that there is a safety problem of uncertain magnitude due to transmeridian flying and a potential problem due to fatigue associated with various factors found in air transport operations.

Source record↗

The First Development of Human Factors Engineering Requirements for Application to Ground Task Design for a NASA Flight Program

The National Aeronautics and Space Administration has long applied standards-derived human engineering requirements to the development of hardware and software for use by astronauts while in flight. The most important source of these requirements has been NASA-STD-3000. While there have been several ground systems human engineering requirements documents, none has been applicable to the flight system as handled at NASA's launch facility at Kennedy Space Center. At the time of the development of previous human launch systems, there were other considerations that were deemed more important than developing worksites for ground crews; e.g., hardware development schedule and vehicle performance. However, experience with these systems has shown that failure to design for ground tasks has resulted in launch schedule delays, ground operations that are more costly than they might be, and threats to flight safety. As the Agency begins the development of new systems to return humans to the moon, the new Constellation Program is addressing this issue with a new set of human engineering requirements. Among these requirements is a subset that will apply to the design of the flight components and that is intended to assure ground crew success in vehicle assembly and maintenance tasks. These requirements address worksite design for usability and for ground crew safety.

Dischinger, H. Charles, Jr.↗

A space station onboard scheduling assistant

One of the goals for the Space Station is to achieve greater autonomy, and have less reliance on ground commanding than previous space missions. This means that the crew will have to take an active role in scheduling and rescheduling their activities onboard, perhaps working from preliminary schedules generated on the ground. Scheduling is a time intensive task, whether performed manually or automatically, so the best approach to solving onboard scheduling problems may involve crew members working with an interactive software scheduling package. A project is described which investigates a system that uses knowledge based techniques for the rescheduling of experiments within the Materials Technology Laboratory of the Space Station. Particular attention is paid to: (1) methods for rapid response rescheduling to accommodate unplanned changes in resource availability, (2) the nature of the interface to the crew, (3) the representation of the many types of data within the knowledge base, and (4) the possibility of applying rule-based and constraint-based reasoning methods to onboard activity scheduling.

Brindle, A. F.↗

Sleep Issues in Aviation and Space

This article describes the factors that cause sleep issues in aviation and spaceflight. There are many causes of sleep disruption that are common to both domains, including, irregular schedules, circadian misalignment, and inadequate sleep environment. There are also factors that are unique to each type of operation that may lead to the manifestation of sleep disorders among these populations. Each of these factors, and their subsequent impact on sleep, are reviewed in this article.

Astronaut↗

ARGES: an Expert System for Fault Diagnosis Within Space-Based ECLS Systems

ARGES (Atmospheric Revitalization Group Expert System) is a demonstration prototype expert system for fault management for the Solid Amine, Water Desorbed (SAWD) CO2 removal assembly, associated with the Environmental Control and Life Support (ECLS) System. ARGES monitors and reduces data in real time from either the SAWD controller or a simulation of the SAWD assembly. It can detect gradual degradations or predict failures. This allows graceful shutdown and scheduled maintenance, which reduces crew maintenance overhead. Status and fault information is presented in a user interface that simulates what would be seen by a crewperson. The user interface employs animated color graphics and an object oriented approach to provide detailed status information, fault identification, and explanation of reasoning in a rapidly assimulated manner. In addition, ARGES recommends possible courses of action for predicted and actual faults. ARGES is seen as a forerunner of AI-based fault management systems for manned space systems.

Pachura, David W.↗

STS-81 Flight Day 10

On this tenth day of the STS-81 mission, the flight crew, Cmdr. Michael A. Baker, Pilot Brent W. Jett, Mission Specialists, John M. Grunsfeld, Marsha S. Ivins, Peter J.K. Wisoff, and John Blaha, prepare for the return back to earth. The shuttle's key flight control systems are checked for entry and landing phase of the mission. Commander Mike Baker and Pilot Brent Jett activate one of Atlantis' three hydraulic power units to test the shuttle's aerosurfaces. Baker and Jett fire Atlantis' steering jets in a routine prelanding checkout. The astronauts also test a medical restraint system in the Spacehab module, placing two crewmembers in the device. Crewmembers then begin to stow items away in the crew cabin, initiate the scheduled deactivation of Spacehab systems and associated hardware.

Source record↗

Generalized Separation of an Object Jettisoned from the ISS

The International Space Station (ISS) Program faces unprecedented logistics challenges in both upmass and downmass. Some items employed on the ISS exterior present significant technical issues for a controlled de-orbit on either the shuttle or an expendable supply vehicle. Such manifest problems arise due to structural degradation, insufficient containment of hazardous pressures or contents, excessive size, or some combination of all of these factors. In addition, the mounting hardware and other flight service equipment to manifest the returned equipment must itself be launched, competing with other upmass. EVA techniques and equipment to successfully contain and secure such problematic equipment result in numerous significant risks to the spacewalking crews and cost and schedule risks to the program. The ISS Program office has therefore developed a policy that advises the jettison of the most problematic objects. Such jettisoned items join a small family of nearly co-planar orbital debris objects that threaten the ISS on several timescales, besides threatening all satellites with perigee below the ISS orbit and the general human population on Earth. This analysis addresses the governing physics and the ensuing risks when an object is jettisoned. It is shown that there are four time domains which must be considered, each with its own inherent problems, and that a ballistic solution is usually possible that satsfies all constraints in all domains.

Bacon, Jack↗

Understanding the International Space Station Crew Perspective following Long-Duration Missions through Data Analytics & Visualization of Crew Feedback

The International Space Station (ISS) first became a home and research laboratory for NASA and International Partner crewmembers over 16 years ago. Each ISS mission lasts approximately 6 months and consists of three to six crewmembers. After returning to Earth, most crewmembers participate in an extensive series of 30+ debriefs intended to further understand life onboard ISS and allow crews to reflect on their experiences. Examples of debrief data collected include ISS crew feedback about sleep, dining, payload science, scheduling and time planning, health & safety, and maintenance. The Flight Crew Integration (FCI) Operational Habitability (OpsHab) team, based at Johnson Space Center (JSC), is a small group of Human Factors engineers and one stenographer that has worked collaboratively with the NASA Astronaut office and ISS Program to collect, maintain, disseminate and analyze this data. The database provides an exceptional and unique resource for understanding the "crew perspective" on long duration space missions. Data is formatted and categorized to allow for ease of search, reporting, and ultimately trending, in order to understand lessons learned, recurring issues and efficiencies gained over time. Recently, the FCI OpsHab team began collaborating with the NASA JSC Knowledge Management team to provide analytical analysis and visualization of these over 75,000 crew comments in order to better ascertain the crew's perspective on long duration spaceflight and gain insight on changes over time. In this initial phase of study, a text mining framework was used to cluster similar comments and develop measures of similarity useful for identifying relevant topics affecting crew health or performance, locating similar comments when a particular issue or item of operational interest is identified, and providing search capabilities to identify information pertinent to future spaceflight systems and processes for things like procedure development and training. In addition, the comments were scored for sentiment using a polarity scoring algorithm to identify both positive and negative comments for particular groups and clusters, allowing the team to make analytically informed decisions regarding future hardware and operating procedures. The use of polarity scoring with time series analysis was used to provide insight into how crew health and habitability is changing throughout various spaceflight increments or the station lifecycle as a whole. Finally, a visualization framework was developed to address the needs of the end users to search for and analyze comments by user, category or mission. This paper will discuss how the use of an analytical framework in conjunction with the current human interface, improved the understanding of crew perspective and shortened the time for analysis allowing for more informed decisions and rapid development of improvements. These methods are significantly optimizing the way that this valuable data can be assessed and applied to current and future spaceflight design and development. This collaboration allows the FCI OpsHab team to effectively analyze and share data in a more automated and timely fashion. Trends are no longer derived manually and can be illustrated effectively and accurately with these evolving techniques to an ever growing group of human spaceflight end users.

Bryant, Cody↗

On-Board Training for US Payloads

The International Space Station (ISS) crew follows a training rotation schedule that puts them in the United States about every three months for a three-month training window. While in the US, the crew receives training on both ISS systems and payloads. Crew time is limited, and system training takes priority over payload training. For most flights, there is sufficient time to train all systems and payloads. As more payloads are flown, training time becomes a more precious resource. Less training time requires payload developers (PDs) to develop alternatives to traditional ground training. To ensure their payloads have sufficient training to achieve their scientific goals, some PDs have developed on-board trainers (OBTs). These OBTs are used to train the crew when no or limited ground time is available. These lessons are also available on-orbit to refresh the crew about their ground training, if it was available. There are many types of OBT media, such as on-board computer based training (OCBT), video/photo lessons, or hardware simulators. The On-Board Training Working Group (OBTWG) and Courseware Development Working Group (CDWG) are responsible for developing the requirements for the different types of media.

Murphy, Benjamin↗

Infrared On-Orbit RCC Inspection With the EVA IR Camera: Development of Flight Hardware From a COTS System

In November 2004, NASA's Space Shuttle Program approved the development of the Extravehicular (EVA) Infrared (IR) Camera to test the application of infrared thermography to on-orbit reinforced carbon-carbon (RCC) damage detection. A multi-center team composed of members from NASA's Johnson Space Center (JSC), Langley Research Center (LaRC), and Goddard Space Flight Center (GSFC) was formed to develop the camera system and plan a flight test. The initial development schedule called for the delivery of the system in time to support STS-115 in late 2005. At the request of Shuttle Program managers and the flight crews, the team accelerated its schedule and delivered a certified EVA IR Camera system in time to support STS-114 in July 2005 as a contingency. The development of the camera system, led by LaRC, was based on the Commercial-Off-the-Shelf (COTS) FLIR S65 handheld infrared camera. An assessment of the S65 system in regards to space-flight operation was critical to the project. This paper discusses the space-flight assessment and describes the significant modifications required for EVA use by the astronaut crew. The on-orbit inspection technique will be demonstrated during the third EVA of STS-121 in September 2005 by imaging damaged RCC samples mounted in a box in the Shuttle's cargo bay.

Gazanik, Michael↗

Skylab 4 crew observations

Comments on food, exercise, scheduling, medical training, the effect of fluid shift, and vestibular phenomena are briefly reported. A ballistocardiographic effect of around 60 beats per minute was observed several times for the whole Skylab cluster. Also experienced were light flashes that were well correlated with the South Atlantic anomaly.

E. G. Gibson↗

Crew and life support: ECLSS

The schedule NASA has proposed has four main elements. The focal point of all the life support activity is demonstrator for the initial space station. The demonstrator is composed of items that are ready for Phase C and D development. Technical options are scheduled during the early years to provide alternatives because the capability to substitute must be maintained. Growth technology and supporting research and technology (SR&T) will continue throughout the program life, and as new items emerge, the space station capability will be updated.

Drake, G.↗