Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Life Cycle Analysis and Life Cycle Costing for Municipal Solid Waste (MSW) Management and Materials Redeployment to Support ARPA-E’s Potential Program on Waste to Energy and Materials

Municipal solid waste infrastructure in the United States contains complex supply chains to transport, sort, and sequester waste. This project developed models to estimate the environmental and economic costs of waste infrastructure in the U.S. using data from several municipalities. Life cycle costing (LCC) models were developed for waste management relevant supply chain steps, including waste collection, sorting, landfilling, waste-to-energy, ash processing, and recycling. A waste-to-materials and energy (WTM&E) life cycle analysis (LCA) and LCC dashboard was developed in collaboration with Argonne National Laboratory (ANL) and an LCC tool was developed for additional analysis.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY 2020 Radionuclide Migration Project Status

The Waste Management Project provides safe, compliant, and cost-effective waste management services for the Hanford Site and the U.S. Department of Energy (DOE) complex. Part of these services includes safe disposal of low-level waste and mixed low-level waste at the Hanford Low-Level Waste Burial Grounds in accordance with the requirements of DOE Order 435.1, Radioactive Waste Management. To partially satisfy these requirements, performance assessment analyses were completed and approved. DOE Order 435.1 also requires continuing data collection to increase confidence in the critical assumptions used in these analyses to characterize the operational features of the disposal facility that are relied on to satisfy the performance objectives identified in the order.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Characterization to Inform Sustainable Recovery of Critical Minerals from Fossil Energy Waste Feedstocks

Rare earth elements (REE) and other critical minerals (CM, e.g., Co, Li) have important uses in green energy and modern technologies, yet are vulnerable to potential supply chain disruptions. One potential domestic source of CM is fossil energy wastes, such as acid mine drainage (AMD) and treatment solids (AMD solids), coal combustion ash, and Oil and Gas (O&G) drilling wastes (drill cuttings and produced waters). CM recovery from these waste feedstocks is promising due to their abundances and fast availability as waste products. On the other hand, the CM occurrence in these wastes is in small quantities compared to traditional ore bodies. Thus, novel and strategic separation and extraction processes are under exploration. Researchers at DOE’s National Energy Technology Laboratory (NETL) are collecting and analyzing CM data for aforementioned fossil energy wastes, and utilizing advanced geochemical characterization (e.g., synchrotron microprobe and sequential extraction) to understand the CM speciation and binding environments in these materials to better inform sustainable and effective recovery. Successful examples discussed in this talk include: (1) the discovery of easily mobile REE phases in Ca-rich coal combustion ash and developing a patented REE recovery process from Ca-rich Powder River Basin coal ash; (2) the successful identification of REE/Co/Ni/Zn hosting phases in acid mine drainage treatment solids (AMD solids) with diverse chemical composition (Al, Mn, or Fe-rich) informing the sequential recovery of different REE/CMs from AMD solids; (3) the recovery potential of Li and other CMs in O&G produced waters and drill cuttings. The innovations driven by characterization have the potential to offset the cost of waste management and wastewater treatments while reducing the cost and environmental footprint of CM extraction.

characterization and extraction↗

Characterization Inform Sustainable Recovery of Critical Minerals from Fossil Energy Waste Feedstocks

Rare earth elements (REE) and other critical minerals (CM, e.g., Co, Ni, Li) have important uses in green energy and modern technologies, yet are vulnerable to potential supply chain disruptions. One potential domestic CM source is fossil energy wastes, such as acid mine drainage (AMD) and treatment solids (AMD solids), coal combustion ash, and Oil and Gas (O&G) drilling wastes (drill cuttings and produced waters). While they can contain lower CM concentrations then traditional ore, the quantity and fast availability as waste feedstock makes them a promising CM resource. To explore their promise, researchers at DOE’s National Energy Technology Laboratory (NETL) have collected and analyzed CM data for aforementioned fossil energy wastes, and utilized advanced geochemical characterization (e.g., synchrotron microprobe and sequential extraction) to identify the CM speciation and binding environments, and developed sustainable and targeted CM recovery. Successful examples include: (1) the discovery of easily mobile REE phases in Ca-rich coal combustion ash and developing a patented REE recovery process from Ca-rich Powder River Basin coal ash; (2) the successful identification of REE/Co/Ni/Zn hosting phases in acid mine drainage treatment solids (AMD solids) with diverse chemical composition (Al, Mn, or Fe-rich) informing the sequential recovery of different REE/CMs from AMD solids; (3) the recovery potential of Li and other CMs in O&G produced waters and drill cuttings. The innovations driven by characterization have the potential to offset the cost of waste management and wastewater treatments while reducing the cost and environmental footprint of CM extraction.

Stuckman, Mengling↗

Informed Critical Mineral Recovery from Fossil Energy Waste Feedstocks

Critical minerals (CM), such as rare earth elements (REE), cobalt, nickel, and lithium, have important uses in modern energy and technologies, yet are vulnerable to potential supply chain disruptions. One potential domestic CM source is fossil energy wastes, such as coal combustion ash, acid mine drainage (AMD) and treatment solids (AMD solids), and Oil and Gas (O&G) drilling wastes (drill cuttings and produced waters). CM recovery from these feedstocks is promising due to their abundant quantity and fast availability as waste products. To develop informed and effective CM recovery, DOE’s National Energy Technology Laboratory (NETL) have collected and analyzed CM data for aforementioned fossil energy wastes, and utilized advanced geochemical characterization (e.g., synchrotron microprobe, sequential extraction and geochemical modeling) to identify the CM speciation and binding environments. Novel methods that recover multiple CMs while co-producing other valuable byproducts from these feedstocks have been developed. Successful examples include: (1) the discovery of easily mobile REE phases in Ca-rich coal combustion ash resulted in a patented REE recovery process from the ash feedstock while producing zeolite sorbents from the extraction wastes; (2) the successful identification of REE/Co/Ni/Zn hosting phases in acid mine drainage treatment solids (AMD solids) has informed the sequential CM recovery from AMD solids and has inspired lithium sorbent development from the extraction wastes; (3) the recovery potential of Li and other CMs in O&G produced waters and drill cuttings has been explored while the extraction residuals have been demonstrated to support plant growth as soil supplements. The innovations driven by characterization information have the potential to maximize CM recovery revenue, offset the cost of waste management and wastewater treatments while reducing the cost and environmental footprint of CM extraction.

characterization and extraction of rare earth elem↗

Integrated Landscape Management to Reduce Biomass Feedstock Access Costs

Using geospatial, machine learning, and optimization techniques, a field scoring and design framework known as the bioenergy Landscape Environmental Assessment and Design System (bioLEADS) was developed and used to show through modelling that it is possible to reduce biomass feedstock access costs, improve field revenue, and shift intensive row crop production away from subfield areas susceptible to erosion and low in soil organic carbon. The purpose of bioLEADS is to automate agricultural field selection and subfield allocation to perennial energy crop production while incorporating reduced biomass feedstock access costs to support attaining the U.S. Department of Energy (DOE) Bioenergy Technologies Office (BETO) cost targets.

09 BIOMASS FUELS↗

River Basin Export Reduction Optimization Support Tool; a tool to screen options for reducing nutrient loads while minimizing cost

Abstract Excess loading of nitrogen and phosphorus to river networks causes environmental harm, but reducing loads from large river basins is difficult and expensive. We developed a new tool, the River Basin Export Reduction Optimization Support Tool (RBEROST) to identify the least‐cost combinations of management practices that will reduce nutrient loading to target levels in downstream and mid‐network waterbodies. We demonstrate the utility of the tool in a case study in the Upper Connecticut River Basin in New England, USA. The total project cost of optimized lowest‐cost plans ranged from $18.0 million to $41.0 million per year over 15 years depending on user specifications. Plans include both point source and non‐point source management practices, and most costs are associated with urban stormwater practices. Adding a 2% margin of safety to loading targets improved the estimated probability of success from 37.5% to 99%. The large spatial scale of RBEROST, and the consideration of both point and non‐point source contributions of nutrients, make it well suited as an initial screening tool in watershed planning.

Chamberlin, Catherine↗

GIS-Based Modeling of Contaminated Soil Volumes at Multiple Sites in the Formerly Utilized Sites Remedial Action Program - 20149

The remediation of hazardous, toxic, and radioactive waste (HTRW) sites produces cost-related risks associated with the estimation of contaminated soil or debris volumes. Historical risk-management techniques include cost contingencies to cover volume uncertainties that affect project budgeting and decision-making. The Buffalo District teamed with project partners to lessen volume uncertainty and reduce project risks at multiple HTRW sites managed under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Historical remedial investigations under FUSRAP commonly identified the presence of radiological material in site media, the associated human health risk, and then areas of remediation. To manage remedial execution and reduce risk, pre-design or remediation-phase sampling essentially 'chased' contamination, which was not conducive to efficient predictive budgeting derived from Feasibility Study (FS) cost analyses. The Buffalo District first optimized their approach to better understand volume uncertainty by utilizing the Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software [1]. BAASS processed soft data (e.g., gamma walk-over data) and spatial sampling data to estimate the lateral extent of contaminated soil irrespective of depth (i.e., gross contamination extent) and define areas of contaminant uncertainty. The software performed a binary transformation of contaminant concentrations at all sampling points based upon remedial action goals or a sum of ratios approach (i.e., clean, impacted, or range of impacts in soil). The model produced two-dimensional (horizontal) contaminant probability contours and statistical uncertainty in the sampling coverage and resulting contaminant extents. This method was translated vertically by partitioning the sampling data into depth brackets that produced a stacked representation of contaminant extents and uncertainty in the subsurface (i.e., similar to construction lifts). The results commonly led to a better understanding of project uncertainty and the need for sampling strategies that produce high-confidence soil volumes, which control costs. The BAASS-based delineations were eventually replaced by Empirical Bayesian Kriging (EBK) methods available in ArcGIS Spatial or 3D Analysts [2]. The EBK method calculates contaminant probability zones derived from user-controlled semivariograms of the spatial datasets. The resulting probability zones (e.g., 50% or 80% of contaminant probability) represent the two-dimensional surface delineation of the overall horizontal remedial area, similarly to BAASS. However, unlike BAASS, the vertical sampling data within these probability zones became vertical control points to contour a subterranean surface that connects subsurface points to the land-surface delineations of contamination. The resulting representation of horizontal and vertical impacts within an enclosed envelop (volume) of soil included uncertainty distributions that are used to plan uncertainty-reduction sampling. These data-driven and math-based models of three-dimensional sampling results produced well-bounded remedial volumes for project planning and better uncertainty predictions during project budgeting. The EBK method was applied to several FUSRAP sites managed by the Buffalo District and compared to less rigorously modeled sites previously remediated by the District. The comparison of modeled to actual remediated volumes provide a basis for validating the volume-estimation method. This comparison is important to ensure modeled volumes match physical boundaries of site remediation. FUSRAP sites with denser investigative sampling and lesser volume uncertainty proved useful in remedial planning and contracting. The Buffalo District noted that historical sites with sparser sampling arrays had greater disparity between estimated volumes and final remedial volumes. The benefit achieved over the cost of detailed soil sampling appears positive for FUSRAP projects, especially where impacts vary widely and appear unbounded by investigation-phase sampling. The subsequent Empirical Bayesian Kriging of contamination coupled with vertical contouring for soil estimations reduces uncertainty in soil volumes or indicates where sampling is required to reduce uncertainty, which together optimize remedial planning and budgeting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PARETO UI 1.1.0 Release

PARETO is an open-source Python-based software package for oilfield produced water management and beneficiary reuse optimization. PARETO supports produced water industry by providing cost-effective water management solutions. This version introduced an updated User Interface (UI) which makes it easier to navigate and understand the solution for industry users. New Features: - Map files are added for visualization - Added output export function button - Water residual view added - Workflow was streamlined - File extension was expanded - Minor bugfix

AS↗

Industry case studies: Finance

This article, the third in a series on the U.S. Department of Energy and IDEA collaboration, focuses on financial strategies used by institutions to support district energy system modernization and decarbonization. It highlights how effective funding models, long-term cost analysis, and leadership support are critical to implementing large-scale infrastructure upgrades. The case studies show different approaches to financing. Ball State University demonstrates how life-cycle cost analysis and phased funding—supported by state funding, bonds, and grants—enabled a transition to geothermal energy. Penn State’s Hershey Medical Center emphasizes the importance of financial leadership, shifting from reactive budgeting to data-driven, proactive investment in infrastructure. The University of Washington highlights how comprehensive data collection and analytics can justify investments and even create self-sustaining funding mechanisms like green revolving funds. Overall, the article shows that combining strong financial planning, data-driven decision-making, and innovative funding approaches is essential for advancing sustainable district energy systems while managing high upfront costs.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optics Enabled Networks and Architectures for Data Center Cost and Power Efficiency

Bandwidth demand for datacenter networks continues as performance increases and is further fueled by the exploding demand for AI and new HPC workloads. Managing power and costs will require a range of solutions including new networking and workload specialized architectures, composable systems and optical circuit switching. In this study we focus primarily on two topics, examining the benefits of flatter networks (enabled mainly by means of co-packaged-optics-enabled switches) and the utilization improvement potential for composable (disaggregated) systems, while discussing specialized hardware and networks, and optical circuit switching more briefly.

99 GENERAL AND MISCELLANEOUS↗

Depowering of Batteries to Reduce Cost of Ownership

(1) Executive Summary: End of life batteries (EOLBs) present a cost and safety liability for their owners and stakeholders. This is due flammability, energy, and power with EOLBs. Current approaches include cumbersome, expensive packaging, specialized shipping, regulated storage, and they are responsible for over half of the cost of recycling. They all expensively and inadequately address symptoms. OnTo has developed and proven a simple way to resolve the problem systemically, through depowering of lithium-ion batteries (and most any battery other than lead). The low-cost process removes flammability, power, and energy in EOLBs through non-toxic chemical processing. The opportunity for commerce of inert scrap is at least $5 billion greater than the commerce in hazardous scrap, all made possible through OnTo’s technology for efficiency and safety. (2) Depowering Improves Safety and Decreases Cost of Battery Ownership: OnTo’s depowering technology will remove half of the cost of EOLB management and recycling. Without this technology, EOLB recycling will always be a liability. EOLB is hazardous due to inherent flammability of electrolyte and lithium. The shipping and commerce of EOLBs is costly and dangerous all along the chain of custody from owner, dealership/shop, shipper, second-life sorter, (shipper again), and finally to the destination facility recycler. OnTo’s depowering service renders inert most any EOLB packs, modules, and cells. The technology uses a brief, non-toxic treatment applicable to most any chemistry. The industry needs a safe, simple, modular, and inexpensive method to render EOLBs as inert scrap. OnTo’s deactivation system is scalable to the needs of any customer along the EOLB chain of custody. (3) Evidence of Successful Depowering: Untreated batteries will catch fire and explode under abuse conditions such as heat or crush. Slide 2 below shows that untreated batteries will blow-up and expel their internal components with heating, after OnTo’s depowering treatment, the same battery is inert with the same heat treatment (Fig. 7 in the slide). Depowering also removes electrolyte reactivity, eliminating the production of HF and other toxins (Fig 6. in the slide) The depowering process is applicable to large, 26 Ah cells. Fig. 5 in the slide shows the removal of all the electrolyte from whole cells. Removal of flammable material from an EOLB contributes to the inert behavior. OnTo developed this technology through a project supported by the US Department of Energy EERE program, with partners including Seattle King County Metro Transit. While OnTo has generated evidence of successful depowering of batteries, in 2020, a follow-on voucher opportunity for third party analysis of depowered cells and materials was approved through CalTestBed. The expertise of the battery and materials research groups at Lawrence Berkeley National Laboratory will characterize these depowered cells to provide better understanding of the materials level changes in depowering. (4) Pilot Plant for Depowering EOLBs: Making the spoke work in hub-and-spoke While other companies are marketing the hub-and-spoke approach for recycling EOLBs, they rely on dangerous, expensive shredding methods with flimsy IP protection. OnTo offers the only patented, proven ability to depower EOLBs from most any chemistry – at half of the capital cost required for shredding, while eliminating the liability, danger, and waste streams inherent with shredding. The proposed commercial pilot facility is (5) OnTo Technology LLC Company: OnTo develops advanced battery recycling innovations that produce manufacturing quality electrode materials from recycled batteries. Their patented Cathode-healing™ and Deactivation/Depowering processes improve safety and reduce the cost of recycling. OnTo’s breakthrough technologies produce advanced materials for manufacturing batteries useful in applications from portable power to electric vehicles. Contact: Steve Sloop OnTo Technology LLC, 63221 Service Road, STE F, Bend, OR 97703, ssloop@onto-technology.com , 541-389-7897

deactivation↗

Experimental Investigation of a Novel Membrane-Based Condensing Heat Exchanger for High Efficiency Furnaces

Building space heating consumes approximately one-third of all global natural gas end use. Higher-efficiency (i.e., condensing) furnaces constitute only about 30% of the annual furnace shipments in the United States because the condensing heat exchangers must use highly expensive, corrosion-resistant materials to be protected from acidic components in the furnace flue gas stream. Increasing the market share of high-efficiency furnaces will reduce greenhouse gas emissions. This study developed and tested a benchtop prototype of a novel membrane-based heat exchanger (MHX) for high-efficiency furnaces to achieve nonacidic condensation via nanoporous membranes. Test results show that both sensible and latent heat were recovered by the MHX, and the fraction of latent heat recovery ranged from about 25% to 45% over the range of operating conditions evaluated. The amount of water condensed through the MHX increased with the increase of flue gas flow rate and decreased with increasing coolant temperature. The fraction of latent heat recovery decreased with the increase of flue gas flow rate and coolant temperature. The pH value of condensed water from the MHX was only mildly acidic, varying from 5.3 to 5.6 without any additional treatment, about 2.0 to 2.3 pH points higher (i.e., less acidic) than typical values for the condensate from conventional condensing furnaces. Therefore, feasibility of the MHX was experimentally verified, and the MHX could enable wider market penetration of highly energy-efficient condensing furnaces by reducing costs associated with managing the acid condensation compared with conventional condensing furnaces, possibly enabling the use of existing vent systems when replacing noncondensing furnaces (due to higher flue gas exit temperatures), and possibly reducing furnace first costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Phase II Field Demonstration at Lansing Smith Generating Plant, Southport, Florida (Final Report)

The Final Technical Report: Field Test Design and Pressure Management Strategies for Phase II Field Demonstration of Optimal Pressure Control, Plume Management, and Produced Water Strategies presents the culmination of multi-year efforts under the U.S. Department of Energy’s Brine Extraction and Storage Test (BEST) program, led by EPRI in partnership with Gulf Power at the Plant Smith site near Panama City, Florida. The project was designed to evaluate and demonstrate the technical feasibility of managing subsurface pressures and fluid movement associated with large-scale CO₂ injection, using low-salinity water as a proxy fluid. Through a combination of field injection testing, reservoir modeling, and optimization studies, the research team developed and refined active and passive brine extraction strategies aimed at controlling injection-induced pressure buildup, mitigating risks of fault activation, and managing plume migration. The field demonstration incorporated a new injection well (TIW-2), a new monitoring/extraction well (TEMW-A), and an existing well (TIW-1) repurposed for passive pressure relief. Complementary geophysical monitoring was designed to track plume development and evaluate the effectiveness of pressure management strategies. The report details the integrated workflow encompassing wellfield development, regulatory permitting, model calibration, and survey design. It includes a comprehensive electromagnetic (EM) modeling and inversion study used to develop a cost-effective, time-lapse geophysical monitoring plan capable of imaging the evolving low-salinity plume within the highly saline Lower Tuscaloosa formation. Reservoir simulation results guided the design of the 17-month injection program and the timing of active extraction to maintain formation pressures below a hypothetical fault reactivation threshold. Supporting analyses evaluated potential injectivity risks related to clay fines migration and geochemical incompatibility, identifying practical mitigation measures such as salinity and pH control. The final design recommends a series of crosswell EM surveys—conducted before, during, and after injection—as the most effective and economical approach for plume imaging, supplemented by continuous downhole pressure and flow monitoring. Collectively, the study provides a field-ready framework for cost-effective pressure management and monitoring in support of future CO₂ storage projects.

01 COAL, LIGNITE, AND PEAT↗

A scoping study of far-SOL main-wall protection limiters for steady-state operation of compact pilot plant tokamaks

We present a novel method for handling steady-state heat fluxes incident on the main wall of pilot plant-scale magnetic fusion devices, based on the utilization of protection limiters in the far scrape-off layer (SOL). This method helps avoid large plasma-wall gaps, without excessively compromising blanket performance. We present an optimization algorithm for determining the appropriate size and scale of these protection limiters given (1) probability distributions of SOL plasma parameters and (2) assumed risk tolerance. As part of this optimization, we have developed an analytic description of parallel heat fluxes across limiter shadows, and an objective cost function (the ‘Far-SOL Marginal Cost’) to quantify the impact that different main-wall thermal management design choices have on reactor capital cost. Applying the model to a midscale fusion pilot plant concept shows that making use of far-SOL protection limiters can reduce capital costs on the order of $500 M, relative to naively increasing the plasma-wall gap. Our analysis demonstrates that the far-SOL power decay length is the highest-leverage plasma assumption for thermal loading of the first wall, and the primary cost driver for main wall thermal management. The relative cost efficiency of protection limiters increases as assumptions on the far-SOL heat flux become more pessimistic. The concepts described in this paper motivate the further development of far-SOL protection limiters as part of larger efforts to design economical core-edge-wall compatible solutions for a fusion pilot plant.

Design under uncertainty↗

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Evaluation of Chemical Decontamination for Contaminated Carbon Steel Scrap by Multiphase Treatment Process - 20249

There is a significant growth in the field of decommissioning of nuclear facilities due the fact that for a lot of them their end of life is nearing. In Taiwan, the government plans to steadily reduce the dependence on nuclear power and moves gradually towards a nuclear-free homeland. Therefore, the development of decommissioning technology becomes the significant issue for the next coming years. The decommissioning of a nuclear power plant is a long process and practical work including radiological surveys, decontamination, dismantling, and the subsequent waste management. Chemical decontamination is an important task in the decommissioning of nuclear power plants and is usually performed by circulating the chemical solution in selected systems or full systems in order to reduce dose levels. However, the decontamination of segmented metal parts is also considered to reduce the contamination to such levels that they may be disposed of at a lower classification or be unconditionally released, and it helps to achieve the goal of waste minimization and provide a more economical cost for disposal management. Chemical decontamination technology is used to remove the contaminated oxides deposited on the surface of metals by dissolving them with chemical mechanisms, such as chelation, acidic or alkaline dissolution, redox reaction and so on. Carbon steel is the major material used in systems and pipelines in the nuclear power plant, thus it is also commonly selected as the target to be decontaminated in the decommissioning process. In this study, the effectiveness of chemical decontamination is evaluated by using multiphase treatment process including the reduction and the oxidation steps. In the step of redox reaction, the oxidation state of the substance is very important. Especially metals of some oxidation states show solubility in water, which has a decisive influence on the chemical decontamination. The experiment of decontamination of metal scraps is carried out by the immersion method within a chemical solution. The relative operation parameters such as temperature, pH, and concentration of the chemical solution are recorded to demonstrate the effect of the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗