Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contingency analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Cyber-Physical Security and Resiliency Analysis Testbed for Critical Microgrids with IEEE 2030.5: Preprint

IEEE 2030.5, also known as the Common Smart Inverter Standard (CSIP) is a protocol that specifies the interface between the end user and the smart grid. This standard was proposed recently, and provides many functions which if implemented incorrectly might lead to vulnerabilities. This paper proposes a cyber-physical microgrid testbed using OpenDSS and IEEE 2030.5 that can be used to study the performance of the CSIP protocol various scenarios. For critical microgrid installations, it is essential that the critical loads are served in spite of multiple contingencies. A resiliency analysis is performed for a military microgrid to study its performance and the results are analyzed.

CVSS↗

Cost Comparison in 2015 Dollars for Radioisotope Power Systems -- Cassini and Mars Science Laboratory

Radioisotope power systems (RPSs) have enabled missions requiring reliable, long-lasting power in remote, harsh environments such as space since the early 1960s. Costs for RPSs are high, but are often misrepresented due to the complexity of space missions and inconsistent charging practices among the many and changing participant organizations over the years. This paper examines historical documentation associated with two past successful flight missions, each with a different RPS design, to provide a realistic cost basis for RPS production and deployment. The missions and their respective RPSs are Cassini, launched in 1997, that uses the general purpose heat source (GPHS) radioisotope thermoelectric generator (RTG), and Mars Science Laboratory (MSL), launched in 2011, that uses the multi-mission RTG (MMRTG). Actual costs in their respective years are discussed for each of the two RTG designs and the missions they enabled, and then present day values to 2015 are computed to compare the costs. Costs for this analysis were categorized into two areas: development of the specific RTG technology, and production and deployment of an RTG. This latter category includes material costs for the flight components (including Pu-238 and fine weave pierced fabric (FWPF)); manufacturing of flight components; assembly, testing, and transport of the flight RTG(s); ground operations involving the RTG(s) through launch; nuclear safety analyses for the launch and for the facilities housing the RTG(s) during all phases of ground operations; DOE’s support for NEPA analyses; and radiological contingency planning. This analysis results in a fairly similar 2015 normalized cost for the production and deployment of an RTG—approximately $118M for the GPHS-RTG and $109M for the MMRTG. In addition to these two successful flight missions, the costs for development of the MMRTG are included to serve as a future reference. Note that development costs included herein for the MMRTG do not include costs from NASA staff or facilities for their development efforts—they only include the amounts costed by DOE and DOE contractors. The 2015 value for MMRTG development is $83M. Both of the RPS types analyzed herein use the general purpose heat source (GPHS) module as the “heart of the RPS.” The estimates presented herein do not include development costs for the GPHS. These estimates also do not include the RPS infrastructure cost to maintain the facilities, equipment, and personnel necessary to enable the production of RPSs, except to the extent that the infrastructure is utilized during the production campaigns to provide RPSs for missions. It was not until after the Cassini mission that an RPS infrastructure funding structure was defined and funded separately from mission-specific elements. The information presented herein could allow for more accurate budget planning estimates for space missions being considered over the next decade and beyond.

07 ISOTOPE AND RADIATION SOURCES↗

Efficacy of a Self-expanding Tract Sealant Device in the Reduction of Pneumothorax and Chest Tube Placement Rates After Percutaneous Lung Biopsy: A Matched Controlled Study Using Propensity Score Analysis

PurposeTo evaluate the use of a self-expanding tract sealant device (BioSentry™) on the rates of pneumothorax and chest tube insertion after percutaneous lung biopsy.Materials and MethodsIn this retrospective study, we compared 318 patients who received BioSentry™ during percutaneous lung biopsy (treated group) with 1956 patients who did not (control group). Patient-, lesion-, and procedure-specific variables, and pneumothorax and chest tube insertion rates were recorded. To adjust for potential selection bias, patients in the treated group were matched 1:1 to patients in the control group using propensity score matching based on the above-mentioned variables. Patients were considered a match if the absolute difference in their propensity scores was ≤equal to 0.02.ResultsBefore matching, the pneumothorax and chest tube rates were 24.5 and 13.1% in the control group, and 21.1 and 8.5% in the treated group, respectively. Using propensity scores, a match was found for 317 patients in the treatment group. Chi-square contingency matched pair analysis showed the treated group had significantly lower pneumothorax (20.8 vs. 32.8%; p = 0.001) and chest tube (8.2 vs. 20.8%; p < 0.0001) rates compared to the control group. Sub-analysis including only faculty who had >30 cases of both treatment and control cases demonstrated similar findings: the treated group had significantly lower pneumothorax (17.6 vs. 30.2%; p = 0.002) and chest tube (7.2 vs. 18%; p = 0.001) rates.ConclusionsThe self-expanding tract sealant device significantly reduced the pneumothorax rate, and more importantly, the chest tube placement rate after percutaneous lung biopsy.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Contingency Contractor Optimization Tool Prototype (Phase 3 Extension- Analyst Tutorial)

This tutorial walks the user through analysis examples using the Contingency Contractor Optimization Tool Prototype. The examples are designed to showcase key capabilities of the tool. The main goal of this tutorial is to provide examples of how to use the tool to perform analyses to those users acting in the analyst role. All examples and locations used in the prototype are fictional, but are intended to be realistic. Users reading this manual are expected to have a basic understanding and familiarity with the Contingency Contractor Optimization Tool Prototype. This tutorial includes scenarios for the occurrence of two wars, Prussia and New Granada.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Improved Evaluation of Large Network Matrices for Linear Power Flow Within Optimization Problems

This work presents methods for evaluating the Power Transfer Distribution Factor (PTDF) and Line Outage Distribution Factor (LODF) matrices by employing sparse linear algebra for large-scale computing applications. These matrices play a critical role in many power system applications, such as the Unit Commitment Problem (UC), pre- and post-contingency power flow analysis, and transmission expansion. These matrices are typically dense, which means they require a significant amount of time and memory to be computed for large networks. However, by analyzing the structure of the matrices and their computation method, it is possible to use reduced memory methods based on sparse matrix operations. This paper shows that sparse linear algebra algorithms are faster and require less memory and time than traditional dense approaches. Additionally, we explore the effect of matrix sparsification by eliminating trailing digits on power flow calculations.

large scale↗

Improved Evaluation of Large Network Matrices for Linear Power Flow Within Optimization Problems: Preprint

This work discusses methods for evaluating the Power Transfer Distribution Factor (PTDF) and Line Outage Distribution Factor (LODF) matrices by employing sparse linear algebra for large-scale computing applications. These matrices are critical in many power systems applications, such as the Unit Commitment Problem (UC), pre- and post-contingency power flow analysis, and transmission expansion. These matrices are typically dense, which means they require a significant amount of time and memory to be computed for large networks. However, by analyzing the structure of the matrices and their computation method, it is possible to use reduced memory methods based on sparse matrix operations. This paper shows that sparse linear algebra algorithms are faster and require less memory and time than traditional dense approaches. Additionally, we explore the effect of matrix sparsification by eliminating trailing digits on power flow calculations.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Computing contingency statistics in parallel.

Statistical analysis is typically used to reduce the dimensionality of and infer meaning from data. A key challenge of any statistical analysis package aimed at large-scale, distributed data is to address the orthogonal issues of parallel scalability and numerical stability. Many statistical techniques, e.g., descriptive statistics or principal component analysis, are based on moments and co-moments and, using robust online update formulas, can be computed in an embarrassingly parallel manner, amenable to a map-reduce style implementation. In this paper we focus on contingency tables, through which numerous derived statistics such as joint and marginal probability, point-wise mutual information, information entropy, and {chi}{sup 2} independence statistics can be directly obtained. However, contingency tables can become large as data size increases, requiring a correspondingly large amount of communication between processors. This potential increase in communication prevents optimal parallel speedup and is the main difference with moment-based statistics where the amount of inter-processor communication is independent of data size. Here we present the design trade-offs which we made to implement the computation of contingency tables in parallel.We also study the parallel speedup and scalability properties of our open source implementation. In particular, we observe optimal speed-up and scalability when the contingency statistics are used in their appropriate context, namely, when the data input is not quasi-diffuse.

99 GENERAL AND MISCELLANEOUS↗

Topological Machine Learning Methods for Power System Responses to Contingencies

While deep learning tools, coupled with the emerging machinery of topological data analysis, are proven to deliver various performance gains in a broad range of applications, from image classification to biosurveillance to blockchain fraud detection, their utility in areas of high societal importance such as power system modeling and, particularly, resilience quantification in the energy sector yet remains untapped. To provide fast acting synthetic regulation and contingency reserve services to the grid while having minimal disruptions on customer quality of service, we propose a new topology-based system that depends on a neural network architecture for impact metric classification and prediction in power systems. This novel topology-based system allows one to evaluate the impact of three power system contingency types, in conjunction with transmission lines, transformers, and transmission lines combined with transformers. We show that the proposed new neural network architecture equipped with local topological measures facilitates more accurate classification of unserved load as well as the amount of unserved load. In addition, we are able to learn more about the complex relationships between electrical properties and local topological measurements on their simulated response to contingencies for the NREL-SIIP power system.

contingency analysis↗

Rooftop Photovoltaics and Electric Vehicle Co-Adoption: Attitudes, Norms, Diffusion, and Economics

The overall objectives of the project were to (1) Identify personal and social norms, peer effects, demographics and contextual factors (such as household energy expenditures, experience with outages, charging infrastructure availability) that may facilitate or hinder Solar-EV co-adoption; (2) outline strategies for the design of programs and practices that will enable reasoned RPV and EV adoption and their co-adoption; and (3) assemble a dataset comprised of survey responses of RPV-EV co-adopters, RPV-only adopters, EV-only adopters, and non-adopters. These objectives were only partially fulfilled given the decision to terminate the project. The research team was able to complete the semi-structured interviews, the core BY1 task and summarize the results below. As well, once the team learned of the research project’s fate, it sought and obtained the DOE SETO Technical Manager’s approval to repurpose funds for BY2 tasks to the extent feasible. Rather than invest further resources in expanding the pool of potential survey respondents and having no budget to survey, the research team repurposed funds subject and undertook a more limited (geographically) survey, but also expanded to it to include contingent valuation questions. The analysis of the survey data will necessarily be delayed given the lack of budget support, although some information on the respondent sample is in the results. Given a lack of attention to co-adoption previously, the insights generated in this project should assist decision-makers and industry actors in the development of programs and practices that enable reasoned RPV adoption and EV adoption and their co-adoption.

14 SOLAR ENERGY↗

Simulation and Postmortem Analysis of Angeles Forest Disturbance Event

Multiple unexpected solar photovoltaic (PV) plant responses in the California region following contingencies in recent years warrant postmortem analysis leveraging digital fault recorder (DFR) data for a better understanding of such events and preventing similar events in the future. Most utilities in US, in general, possess transient stability (TS) phasor-domain models of the power grid. Since traditional phasor-based transient stability planning models cannot perform such analysis, this paper presents an approach to extract a region of such models and convert it to Electromagnetic transient (EMT) models. The approach is based on the determination of the minimum impedance-weighted spanning tree between the fault location and affected PV plants in a Western Electricity Coordinating Council (WECC) planning model followed by conversion of this region into an EMT model. The accuracy of the proposed approach is validated against DFR records obtained from the 2018 Angeles Forest disturbance event.

Samanta, Sayan↗

Criticality Safety Controls and the Safety Basis at PFP

With the implementation of DOE Order 420.1B, Facility Safety, and DOE-STD-3007-2007, 'Guidelines for Preparing Criticality Safety Evaluations at Department of Energy Non-Reactor Nuclear Facilities', a new requirement was imposed that all criticality safety controls be evaluated for inclusion in the facility Documented Safety Analysis (DSA) and that the evaluation process be documented in the site Criticality Safety Program Description Document (CSPDD). At the Hanford site in Washington State the CSPDD, HNF-31695, 'General Description of the FH Criticality Safety Program', requires each facility develop a linking document called a Criticality Control Review (CCR) to document performance of these evaluations. Chapter 5, Appendix 5B of HNF-7098, Criticality Safety Program, provided an example of a format for a CCR that could be used in lieu of each facility developing its own CCR. Since the Plutonium Finishing Plant (PFP) is presently undergoing Deactivation and Decommissioning (D&D), new procedures are being developed for cleanout of equipment and systems that have not been operated in years. Existing Criticality Safety Evaluations (CSE) are revised, or new ones written, to develop the controls required to support D&D activities. Other Hanford facilities, including PFP, had difficulty using the basic CCR out of HNF-7098 when first implemented. Interpretation of the new guidelines indicated that many of the controls needed to be elevated to TSR level controls. Criterion 2 of the standard, requiring that the consequence of a criticality be examined for establishing the classification of a control, was not addressed. Upon in-depth review by PFP Criticality Safety staff, it was not clear that the programmatic interpretation of criterion 8C could be applied at PFP. Therefore, the PFP Criticality Safety staff decided to write their own CCR. The PFP CCR provides additional guidance for the evaluation team to use by clarifying the evaluation criteria in DOE-STD-3007-2007. In reviewing documents used in classifying controls for Nuclear Safety, it was noted that DOE-HDBK-1188, 'Glossary of Environment, Health, and Safety Terms', defines an Administrative Control (AC) in terms that are different than typically used in Criticality Safety. As part of this CCR, a new term, Criticality Administrative Control (CAC) was defined to clarify the difference between an AC used for criticality safety and an AC used for nuclear safety. In Nuclear Safety terms, an AC is a provision relating to organization and management, procedures, recordkeeping, assessment, and reporting necessary to ensure safe operation of a facility. A CAC was defined as an administrative control derived in a criticality safety analysis that is implemented to ensure double contingency. According to criterion 2 of Section IV, 'Linkage to the Documented Safety Analysis', of DOESTD-3007-2007, the consequence of a criticality should be examined for the purposes of classifying the significance of a control or component. HNF-PRO-700, 'Safety Basis Development', provides control selection criteria based on consequence and risk that may be used in the development of a Criticality Safety Evaluation (CSE) to establish the classification of a component as a design feature, as safety class or safety significant, i.e., an Engineered Safety Feature (ESF), or as equipment important to safety; or merely provides defense-in-depth. Similar logic is applied to the CACs. Criterion 8C of DOE-STD-3007-2007, as written, added to the confusion of using the basic CCR from HNF-7098. The PFP CCR attempts to clarify this criterion by revising it to say 'Programmatic commitments or general references to control philosophy (e.g., mass control or spacing control or concentration control as an overall control strategy for the process without specific quantification of individual limits) is included in the PFP DSA'. Table 1 shows the PFP methodology for evaluating CACs. This evaluation process has been in use since February of 2008 and has proven to be simple and effective. Each control identified in the applicable new/revised CSE is evaluated via the table. The results of this evaluation are documented in tables attached to the CCR as an appendix, for each CSE, to the base document.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

UK regulatory review of the double contingency principle in criticality safety - 14379

The UK's regulatory regime is based on Licence Conditions (LCs) attached to a Nuclear Site Licence (NSL) and is non-prescriptive in nature. The law requires licensees to reduce health and safety risks to workers and the public 'so far as is reasonability practicable' (SFAIRP), and this framework provides licensees with flexibility to achieve this. Guidance for inspectors on the assessment of nuclear safety cases has been published in Office for Nuclear Regulation's (ONR) Safety Assessment Principles (SAPs) and supporting Technical Assessment Guides (TAGs). These guidance documents have recently been reviewed in the light of the Fukushima accident. The opportunity has also been taken to reconsider the use of the Double Contingency Principle used in criticality safety cases, an approach commonly regarded as the preferred means of criticality control internationally and featured in the SAPs and TAGs. Licensees in the UK have adopted several approaches in nuclear criticality safety cases based upon a combination of deterministic and probabilistic safety cases using the Double Contingency Principle and Design Basis Analysis. ONR has developed a targeted intervention to sample a number of nuclear safety cases in order to test the adequacy of methodologies used to secure nuclear criticality safety. This paper reports the results of this intervention and considers the need to review the advice currently given by the UK nuclear regulator, including on use of the Double Contingency Principle. (authors)

42 ENGINEERING↗

Reducing Contingency through Sampling at the Luckey FUSRAP Site - 13186

Typically, the greatest risk in developing accurate cost estimates for the remediation of hazardous, toxic, and radioactive waste sites is the uncertainty in the estimated volume of contaminated media requiring remediation. Efforts to address this risk in the remediation cost estimate can result in large cost contingencies that are often considered unacceptable when budgeting for site cleanups. Such was the case for the Luckey Formerly Utilized Sites Remedial Action Program (FUSRAP) site near Luckey, Ohio, which had significant uncertainty surrounding the estimated volume of site soils contaminated with radium, uranium, thorium, beryllium, and lead. Funding provided by the American Recovery and Reinvestment Act (ARRA) allowed the U.S. Army Corps of Engineers (USACE) to conduct additional environmental sampling and analysis at the Luckey Site between November 2009 and April 2010, with the objective to further delineate the horizontal and vertical extent of contaminated soils in order to reduce the uncertainty in the soil volume estimate. Investigative work included radiological, geophysical, and topographic field surveys, subsurface borings, and soil sampling. Results from the investigative sampling were used in conjunction with Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software to update the contaminated soil volume estimate for the site. This updated volume estimate was then used to update the project cost-to-complete estimate using the USACE Cost and Schedule Risk Analysis process, which develops cost contingencies based on project risks. An investment of $1.1 M of ARRA funds for additional investigative work resulted in a reduction of 135,000 in-situ cubic meters (177,000 in-situ cubic yards) in the estimated base volume estimate. This refinement of the estimated soil volume resulted in a $64.3 M reduction in the estimated project cost-to-complete, through a reduction in the uncertainty in the contaminated soil volume estimate and the associated contingency costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scale and the representation of human agency in the modeling of agroecosystems

Human agency is an essential determinant of the dynamics of agroecosystems. However, the manner in which agency is represented within different approaches to agroecosystem modeling is largely contingent on the scales of analysis and the conceptualization of the system of interest. While appropriate at times, narrow conceptualizations of agroecosystems can preclude consideration for how agency manifests at different scales, thereby marginalizing processes, feedbacks, and constraints that would otherwise affect model results. Modifications to the existing modeling toolkit may therefore enable more holistic representations of human agency. Model integration can assist with the development of multi-scale agroecosystem modeling frameworks that capture different aspects of agency. In addition, expanding the use of socioeconomic scenarios and stakeholder participation can assist in explicitly defining context-dependent elements of scale and agency. Finally, such approaches, however, should be accompanied by greater recognition of the meta agency of model users and the need for more critical evaluation of model selection and application.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

DeepGrid: Robust Deep Reinforcement Learning-based Contingency Management

Increasing uncertainty raised by the integration of renewable energy resources requires an enormous number of simulations to be carried out for the security assessment of the power grid. However, it is challenging to assess the steady-state and dynamic security indices for different system contingency events by doing an exhaustive analysis in real-time due to the computational and communication constraints. One promising solution is using data-driven techniques along with the system models to train an intelligent contingency management framework to better handle the contingencies in real-time. Nevertheless, implementing a data-driven technique to obtain the best remedial actions necessitates to account for the effect of the measurement noise on the performance of the contingency management. To tackle these challenges, we leverage a robust deep reinforcement learning (DRL) algorithm called Double Deep Q-Network (DDQN) to design a recommender system capable of prescribing optimal control actions with the help of the real-time digital simulator (RTDS). The use of RTDS system in combination with the advanced DRL algorithm allows to explore a wide variety of system contingencies in order to derive better remedial actions. The performance of the proposed algorithm is evaluated in IEEE 9-bus system under different loading conditions, and different network configurations in presence of noisy measurements.

Ghasemkhani, Amir↗

Data Privacy for the Grid: Toward a Data Privacy Standard for Inverter-Based and Distributed Energy Resources

The traditional approach to planning the distribution grid has focused on reliability in the context of gradual and reasonably predictable load growth. Forecasts of load growth, combined with asset management practices, were used by system planners to identify upgrades to the system to maintain or improve reliability. The decisions, typically based within load flow analysis tools, included considerations about contingency scenarios and corporate forecasts (i.e., top-down predictions at a summary level of what would happen in a particular area that could impact load growth and behavior). As a result, today, this traditional approach no longer fits all purposes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evidence of Panmixia between Sympatric Life History Forms of Coastal Cutthroat Trout in Two Lower Columbia River Tributaries

Abstract Coastal cutthroat trout Oncorhynchus clarkii clarkii exhibit resident and migratory life history strategies that often occur sympatrically, but the relationship between these forms within a population is poorly characterized. Through use of passive integrated transponder technology, migratory and resident coastal cutthroat trout were identified in two lower Columbia River tributaries (Abernathy Creek and the Chinook River) separated by more than 80 km. Genetic data from 17 highly variable microsatellite loci were used to ascertain the genetic population structure of these life history forms within and between streams. No distinct genetic separation was observed between the life history forms within a stream, as assessed by four different statistical approaches: permutation tests based on the genetic differentiation index FST, principal components analysis of individuals, analysis of molecular variance, and contingency tests of allele frequency heterogeneity. Genetic differences were an order of magnitude higher between stream samples (FST > 0.03) than between life history forms within a stream (FST < 0.003). The contingency test detected allele frequency differences between migratory and resident life history forms in Abernathy Creek (P = 0.001), but this result was influenced more by age-class structure than by reproductive isolation between life history forms. Results are consistent with a single, randomly mating population in each stream producing both migratory and resident life history forms. These data suggest that individual life history strategy in coastal cutthroat trout is predominantly determined by phenotypic plasticity rather than genotype.

Johnson, Jeffrey R.↗