Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “construction costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Affordable Solid Panel "Perfect Wall" System

The SPS is an innovative interpretation of the “perfect wall” concept, in which environmental control layers are located on the exterior side of the structural components, as opposed to traditional cavity insulated, stud-framed walls. The primary objective of this study is to validate the SPS technology in terms of its constructability, cost, and performance. Specifically for this project, we partnered with two affordable housing nonprofits in Minnesota—Twin Cities Habitat for Humanity and Urban Homeworks—to build five new houses using SPS walls, as well as two high-performance stud-framed comparison homes. We also reviewed cost and performance data from 13 SPS homes built prior to this project by MonoPath and Spero Environmental Builders. Reviewing the outcomes of these 20 homes total, we find promising results in terms of constructability, cost, and performance, although more structural performance data are needed before this new technology can see widespread adoption.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Software Verification and Validation Guidelines for Non-Linear Soil-Structure Interaction Analysis

Seismic analysis of structures, systems, and components (SSCs), including the consideration of soil-structure interaction (SSI) effects, is an important and required step in the design and licensing of nuclear power plant SSCs important to safety. Historically, the SSI analysis of nuclear structures has been performed using equivalent linear methods. However, there has been considerable industry investment in alternative seismic design and analysis approaches to reduce the construction cost of new reactors. Toward that goal and in alignment with the Licensing Modernization Project (LMP) framework, the Nuclear Regulatory Commission (US NRC) has proposed a risk-informed, performance-based approach to seismic design that allows inelastic response in those nuclear plant structures not required for confinement. As a complementary effort, reactor designers are exploring nonlinear seismic analysis methods to optimize structural designs and reduce construction costs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SSR COST – COmposite Structural Technologies for advanced reactor deployment (Final Scientific/Technical Report)

Moltex is designing a Generation 4 or Advanced nuclear reactor, the molten salt fast spectrum SSR-W. The design intent is to reduce the cost and complexity of the nuclear systems by relying on inherent safety characteristics, instead of engineered systems. One such characteristic as a natural tendency for power to decrease as temperature increases. Another characteristic that improves natural safety is the fact that the working fluids (molten salts) are at atmospheric pressure at operating temperatures. This significantly reduces the need for pressure boundary components and systems. Moltex is highly motivated to develop simple and economic reactors to reduce the carbon intensity and improve energy security of global electricity production. The COST project investigated the opportunities for reducing construction cost of advanced reactors with the adoption of Rigid Elastic Composite Civil works (RECC). The construction design and methods used in currently operational light water power plants would generally be suboptimal for the SSR-W since there is no requirement for civil structures to withstand high pressure accidents such as hydrogen combustion or steam explosion. In parallel to downselecting the most promising RECC-type technology, accident scenarios representing the largest credible challenge to the SSR-W civil and construction design were modelled. The capability of an SSR-W reactor constructed with and without the selected construction technology was evaluated and the consequential licensing challenges identified. A construction schedule and cost estimate of the SSR-W with and without the selected RECC construction technology was developed. Once the above data was collected, then Moltex was able to review the safety performance, license-ability and cost/schedule benefit of applying the preferred construction technology. The CAPEX/NPV benefit was quantified, and the licensing risks and opportunities were documented. Finally, the CAPEX/NPV benefit of the advanced construction technology was modest due to the suitability of traditional stick-built construction for the SSR-W design. However, previously unidentified benefits of the advanced construction technology were revealed during the studies that could credibly de-risk certain aspects of the design to be licensed. Since licensing (duration and delays) are very significant in new build project costs, the cost benefits may be significant. Further studies on the risk reduction of the construction technology are foreseen.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Distinct xylem responses to acute vs prolonged drought in pine trees

Increasing dryness challenges trees’ ability to maintain water transport to the leaves. Most plant hydraulics models use a static xylem response to water stress. Yet, in reality, lower soil moisture and warmer temperatures during growing seasons feed back onto xylem development. In turn, adjustments to water stress in the newly built xylem influence future physiological responses to droughts. In this study, we investigate the annual variation of anatomical traits in branch xylem in response to different soil and atmospheric moisture conditions and tree stress levels, as indicated by seasonal predawn leaf water potential (??L,pd). We used a 6-year field experiment in southwestern USA with three soil water treatments applied to Pinus edulis Engelm trees—ambient, drought (45% rain reduction) and irrigation (15–35% annual water addition). All trees were also subject to a natural 1-year acute drought (soil and atmospheric) that occurred during the experiment. The irrigated trees showed only moderate changes in anatomy-derived hydraulic traits compared with the ambient trees, suggesting a generally stable, well-balanced xylem structure under unstressed conditions. The artificial prolonged soil drought increased hydraulic efficiency but lowered xylem construction costs and decreased tracheid implosion safety ((t/b)2), suggesting that annual adjustments of xylem structure follow a safety–efficiency trade-off. The acute drought plunged hydraulic efficiency across all treatments. The combination of acute and prolonged drought resulted in vulnerable and inefficient new xylem, disrupting the stability of the anatomical trade-off observed in the rest of the years. The xylem hydraulic traits showed no consistent direct link to ??L,pd. In the future, changes in seasonality of soil and atmospheric moisture are likely to have a critical impact on the ability of P. edulis to acclimate its xylem to warmer climate. Furthermore, the increasing frequency of acute droughts might reduce hydraulic resilience of P. edulis by repeatedly creating vulnerable and less efficient anatomical structure.

Guerin, Marceau↗

Benefits of hydrogen production research

An economic analysis of total monetary benefits arising from increased volume and efficiency of hydrogen production from various primary energy sources is carried out. The analysis is based on NASA's projections of future hydrogen demand in terms of both established industrial-chemical uses and new energy system applications, along with the mix of primary energy sources needed to meet this demand. A cost methodology model is worked out with the basic cost elements being plant construction costs, feedstock and energy costs, and operating and labor-related costs. A computer simulation technique was developed and a set of model calculations was performed. Some representative outputs of the computer analysis are displayed and conclusions are drawn on major factors determining the overall savings possible in hydrogen production and on its technological and economic impact.

Manvi, R.↗

Pulsed High Temperature Superconducting Central Solenoid for Revolutionizing Tokamaks

Commonwealth Fusion Systems (CFS) has developed the technical foundation for a fast-ramping High Temperature Superconducting (HTS) Central Solenoid Model Coil (CSMC), addressing key challenges in fusion energy advancement. This breakthrough enables the design of all-HTS pulsed tokamak power plants that promise to reduce projected electricity costs by 50% and overnight construction costs by 25% compared to steady-state tokamaks, while eliminating the need for complex external current drives.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Conceptual Cost Estimating

Kennedy Space Center data aid in efficient construction-cost managment. Report discusses development and use of NASA TR-1508, Kennedy Space Center Aerospace Construction price book for preparing conceptual budget, funding cost estimating, and preliminary cost engineering reports. Report based on actual bid prices and Government estimates.

Brown, J. A.↗

Strawman Optical Reception Development Antenna (SORDA)

A strawman design of a ground-based station for receiving optical communications from deep space is presented. This strawman will serve as a basis for further study and design refinement. The recommendation to build rather than to use an existing facility is explained. Parameters of the design were selected to postulate a workable system, starting with a 10 m diameter, hexagonally segmented, f/0.5 primary mirror. The effects of variations of design parameters on performance and cost are discussed. Some design formulas are included. An electro-optical functional block diagram is presented and discussed. Cost calculations are based on a previous cost model for the hardware or on typical construction costs per unit area for several types of facilities. Other cost factors are included in the usual way for Construction of Facilities. The ratio of high and low reasonable values was less than a factor of 2, with a best estimate of under $16,000,000.

Kerr, E. L.↗

Factors Impacting Nuclear Energy Share in U.S. Energy Markets

The purpose of this report is to collate information and findings from recent studies conducted by national and international bodies/institutes to identify approaches for maintaining/enhancing the role of nuclear energy in the current and future energy mix of the United States. This report shows how nuclear generation grew quickly to provide 20% of U.S. electricity, sustaining that level for three decades without the benefit of new construction, but is now projected to decline going forward. Nuclear construction costs in the U.S. spiraled out of control, ending construction for two decades and the recent resumption of construction has continued the pattern of schedule delays and cost overruns. However, nuclear operations exhibited strong learning, achieving and sustaining the highest capacity factor of any electricity generation technology and license extensions and uprates have sustained nuclear market share. The share of nuclear energy in the U.S. electricity market is projected to decline by ~1/3rd over the next 30 years The report provides an overview of how the markets work in theory and in practice. It indicates how market deregulation and clean energy policies have created conditions where nuclear plants are being retired for economic rather than technical reasons. The report also shows how many of the markets do not in practice have free competition but instead have outcomes that are being determined more and more by policy instead of market forces. While electricity costs from existing nuclear plants are low, electricity from new builds is projected to be too expensive to be competitive head-to-head with natural gas, even for nth-of-a-kind costs. Wind and solar energy have enjoyed an extended period of sustained subsidy. This protected environment has resulted in a sustained reduction in plant level costs to the point that some of these Variable Renewable Energy (VRE) technologies are becoming competitive even if their direct subsidies are removed. But plant level costs underestimate total VRE costs which include a number of system-level externalities. The incremental system value of additional VRE capacity was shown to decline as market share increases, with solar value declining more quickly than wind. The report closes with examination of a possible future for nuclear generation as part of deep decarbonization of the electricity sector. This approach avoids direct competition with natural gas. The two options for achieving 100% decarbonization are to use only renewables or to use all zero emissions technologies, and the report shows the second approach is much less expensive than the first.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A fixed collector employing reversible vee-trough concentrator and a vacuum tube receiver for high temperature solar energy systems

A solar heat collection system employing non-tracking reflectors integrated with a fixed vacuum tube receiver which achieves modest year-round concentration (about 2) of the sunlight at low capital costs is discussed. The axis of the vee-trough reflector lies in a east-west direction and requires reversal of the reflector surfaces only twice a year without disturbing the receiver tubes and associated plumbing. It collects most of the diffuse flux. The vacuum tube receiver with selective absorber has no convection losses while radiation and conduction losses are minimal. Significant cost reductions are offered since the vee-trough can be fabricated from inexpensive polished or plastic reflector laminated sheet metal covering 2/3 of the collection area, and only about 1/3 of the area is covered with the more expensive vacuum tube receivers. Thermal and economic performance of the vee-trough vacuum tube system, year-round variation of the concentration factor, incident flux, useful heat per unit area at various operation temperatures and energy cost estimates are presented. The electrical energy cost is estimated to be 77 mills/kWh, and the system construction cost is estimated to be $1140/kWe.

Selcuk, M. K.↗

Techno-economic analysis of cathode material production using flame-assisted spray pyrolysis

The cost of cathode materials contributes approximately 32.7% of the total cell construction cost of lithium-ion batteries, significantly affecting the price of battery packs. To reduce the cathode material manufacturing cost, a flame-assisted spray pyrolysis (FSP) method has been developed to utilize a sustainable solvent of glycerol to manufacture the LiNi 1/3 Mn 1/3 Co 1/3 O 2 (NMC333) cathode materials. The purpose of this study is to evaluate the minimum cathode material selling price (MCSP) of the FSP processes compared with a traditional carbonate co-precipitation pathway. Results show that the MCSP of the FSP is $\$$19.1/kg that is 17% lower than the traditional carbonate co-precipitation pathway as a result of lower fixed operating cost and variable overhead. Sensitivity analysis shows that when the new process is integrated with in-situ sintering and processing, the MCSP can be as low as $\$$15.6/kg. When all the material prices are decreased by 20%, the FSP process can synthesize NMC333 at a price of $\$$2.3/kg lower. According to the simulation result, LiNi 0·8 Mn 0·1 Co 0·1 O 2 (NMC811) has the best potential to meet the U.S. Department of Energy battery price target of $\$$125/kWh, demonstrating that the FSP process is an attractive manufacturing technology for NMC cathode powder material production.

25 ENERGY STORAGE↗

Understanding the Challenges of Financing Modular Construction: A Case Study for Prospective Multifamily Units

Compared to traditional site build, modular construction can significantly shorten construction schedules and speed income generation. Modular construction may also reduce construction costs. Yet access to commercial financing remains one of the most significant barriers to modular construction. Materials must be purchased, and production lines reconfigured for each project months ahead of fabrication. Materials alone can be 60% or more of the total cost of production. As a result, manufacturers require large upfront deposits—often 30% or more of the off-site contract. In addition, the capital-intensive nature of modular construction requires frequent progress payments for manufacturers to maintain cash flow. For those lenders willing to fund modular projects, many require the developer to share more of the risk. This may include the developer paying for line reservation fees and material deposits 3–6 months prior to production. Because these are unsecured loans, interest rates may be higher and loan amounts lower. As suppliers, modular manufacturers discourage retainage. Together, these and other factors may contribute to higher equity requirements for the developer—particularly at the beginning of the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost and Throughput Analysis for the NASA Ames Arc Jet Modernization Program

NASA Ames Center is currently evaluating alternatives to modernize the Arc Jet Complex, a critical part of testing for NASA’s planetary missions. NASA’s Arc Jet Complex facilities “are used to simulate the aerothermodynamic heating that a spacecraft endures throughout hypersonic atmospheric entry, and to test candidate thermal protection system (TPS) materials and systems. “Because planetary mission schedules often have tight windows due to planetary alignment constraints, a small increase in schedule could result in a two-year delay. Such a delay could increase the cost of a $1billionmissionbyhundreds of millions of dollars due to project personnel pay and clean room storage. To avoid these costs, the authors support NASA Ames in evaluating return on investment (ROI) and effectiveness of alternatives for modernizing the complex. The first input into the ROI is the deconstruction and construction cost estimates, which are developed using independent research on highly specialized subsystems, vendor quotes, and Unified Facilities Criteria (UFC), depending on the facility and work package. One of the measures of effectiveness is throughput analysis of the test bays, as a main goal of the modernization is to increase the number of possible test runs per year. This analysis is conducted via a probabilistic simulation and accounts for a variety of stochastic factors that influence the sequence of test runs, such as the facility availability; test complexity; the need to pause to assess test results; test failure; and the possibility of a system failure. The methodologies for both these analyses are discussed, along with the challenges presented due to the unique nature of the highly specialized test equipment.

Jennifer Scheel↗

Vacuum Pump-Down of the Annular Insulation Space for Large Field-Erected Liquid Hydrogen Storage Tanks

Insulation systems are critical to liquid hydrogen storage tank performance. Tanks in the capacity range of 100 to 1,000 m 3 are typically shop built and designed with high-vacuum (HV) multi-layer insulation (MLI), whereas storage vessels larger than 1,000 m 3 are typically field-erected and supplied with bulk fill insulation working at moderate vacuum (MV) levels (1-100 millitorr). For large, field-erected vessels, two types of bulk fill insulation typically used: perlite and hollow glass microspheres (glass bubbles). Selection of either material is driven by a tradeoff between CAPEX and OPEX, such as the material and construction cost versus operating thermal performance and maintenance. In either case, the vacuum level needed to achieve optimum performance is likely to drive the field testing and commissioning portion of the construction schedule. A primary goal of this paper is to present practical experience and data for warm vacuum pressure (WVP) and cold vacuum pressure (CVP) levels. Recommended WVP levels needed prior to cooldown consider both perlite powder and glass bubbles. Pumping time expected to achieve target vacuum levels, considering a variety of factors, is also discussed. Recommendations for a standard practice in vacuum-insulated tank commissioning are based on historical NASA data, and those collected during recent projects.

A M Swanger↗

2019 Energy Storage Pricing Survey

Since grid energy storage is still evolving rapidly, it is often difficult to obtain project specific capital costs for various energy storage technologies. This information is necessary to evaluate the profitability of the facility, as well as comparing different energy storage technology options. The goal of this report is to summarize energy storage capital costs that were obtained from industry pricing surveys. The methodology breaks down the cost of an energy storage system into the following component categories: the storage module; the balance of system; the power conversion system; the energy management system; and the engineering, procurement, and construction costs. By evaluating each of the different component costs separately, a synthetic system cost can be developed that provides internal pricing consistency between different project sizes using the same technology, as well as between different technologies that utilize similar components.

25 ENERGY STORAGE↗

2020 Energy Storage Pricing Survey

The annual Energy Storage Pricing Survey (ESPS) series is designed to provide a standardized reference system price for various energy storage technologies across a range of different power and energy ratings. This is an essential first step in comparing systems of the different technologies’ usage costs and total cost of ownership. The final system prices are developed based on data from an extensive set of interviews with representatives across the manufacturing and project development value chain, plus available published data. This information is incorporated into a consistent methodology structure that will allow pricing information to be incorporated at whatever level it was obtained, ranging from component to fully installed system. The ESPS system pricing methodology breaks down the cost of an energy storage system into the following component categories: the storage module; the balance of system; the power conversion system; the energy management system; and the engineering, procurement, and construction costs. By evaluating each of the different component costs separately, a more accurate system cost can be developed that provides internal pricing consistency between different project sizes using the same technology, as well as between different technologies that utilize similar components.

25 ENERGY STORAGE↗

Estimated capital costs of fish exclusion technologies for hydropower facilities

Hydropower is a reliable source of renewable energy, and its future expansion is likely to be in the form of either smaller new stream development (NSD) projects or powering existing non-powered dams. Thresholds for entrainment risk to fish and the requirements for fish exclusion at hydropower facilities often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders, but little quantitative information is present within the literature regarding the specific costs of fish exclusion measures. Cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening were identified using keyword searches of an existing environmental mitigation cost data set and manual extraction from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 p.m.&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens and represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with NSD projects. Results indicate highly variable costs are associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1–2 in.). These data provide an initial baseline for estimating exclusion costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects.

13 HYDRO ENERGY↗