At least 127 records · Page 7

Pumping optimization model for pump and treat systems - 15091

Pump and Treat systems are being utilized to remediate contaminated groundwater in the Hanford 100 Areas adjacent to the Columbia River in Eastern Washington. Design of the systems was supported by a three-dimensional (3D) fate and transport model. This model provided sophisticated simulation capabilities but requires many hours to calculate results for each simulation considered. Many simulations are required to optimize system performance, so a two-dimensional (2D) model was created to reduce run time. The 2D model was developed as a equivalent-property version of the 3D model that derives boundary conditions and aquifer properties from the 3D model. It produces predictions that are very close to the 3D model predictions, allowing it to be used for comparative remedy analyses. Any potential system modifications identified by using the 2D version are verified for use by running the 3D model to confirm performance. The 2D model was incorporated into a comprehensive analysis system (the Pumping Optimization Model, POM) to simplify analysis of multiple simulations. It allows rapid turnaround by utilizing a graphical user interface that: 1 allows operators to create hypothetical scenarios for system operation, 2 feeds the input to the 2D fate and transport model, and 3 displays the scenario results to evaluate performance improvement. All of the above is accomplished within the user interface. Complex analyses can be completed within a few hours and multiple simulations can be compared side-by-side. The POM utilizes standard office computing equipment and established groundwater modeling software. (authors)

54 ENVIRONMENTAL SCIENCES↗

Development of a groundwater transport simulation tool for remedial process optimization - 15316

The groundwater remedy for hexavalent chromium at the Hanford Site includes operation of five large pump-and-treat systems along the Columbia River. The systems at the 100-HR-3 and 100-KR-4 groundwater operable units treat a total of about 9,840 liters per minute (2,600 gallons per minute) of groundwater to remove hexavalent chromium, and cover an area of nearly 26 square kilometers (10 square miles). The pump-and-treat systems result in large scale manipulation of groundwater flow direction, velocities, and most importantly, the contaminant plumes. Tracking of the plumes and predicting needed system modifications is part of the remedial process optimization, and is a continual process with the goal of reducing costs and shortening the time frame to achieve the cleanup goals. While most of the initial system evaluations are conducted by assessing performance (e.g., reduction in contaminant concentration in groundwater and changes in inferred plume size), changes to the well field are often recommended. To determine the placement for new wells, well realignments, and modifications to pumping rates, it is important to be able to predict resultant plume changes. In smaller systems, it may be effective to make small scale changes periodically and adjust modifications based on groundwater monitoring results. Due to the expansive nature of the remediation systems at Hanford, however, additional tools were needed to predict the plume reactions to system changes. A computer simulation tool (the Pumping Optimization Model, or POM) was developed to support pumping rate recommendations for optimization of large pump-and-treat groundwater remedy systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank Side Cesium Removal System Project and Technology Maturation Program - 19519

Washington River Protection Solutions (WRPS) is the Tank Operating Contractor (TOC) for the U.S. Department of Energy-Office of River Protection (DOE-ORP) on the Hanford Site. The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. WRPS is in the process of designing the Tank Side Cesium Removal (TSCR) system to produce Low Activity Waste (LAW) from Hanford tank waste. The LAW will be transferred to the Waste Treatment and Immobilization Plant (WTP) LAW Vitrification Facility, where the hazardous constituents in the LAW will be immobilized in a durable glass waste form for disposal. The TSCR Project demonstrates a tank-side treatment system for providing feed to the WTP LAW Vitrification Facility. This system removes cesium from supernatant tank waste using non-elutable cesium ion exchange media to meet the applicable waste acceptance criteria for the WTP. In support of the project, a tailored Technology Maturation/Testing Plan (TMP) has been developed to identify principal Technology Elements (TEs) for the proposed process, designate Critical Technology Elements (CTEs), identify gaps in the existing knowledge base and identify the necessary activities to mature the technologies for successful deployment of TSCR. The project scope and technology maturation approach are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

One System Overview - 16579

The U.S. Department of Energy (DOE), Office of River Protection (ORP) is responsible for managing and completing the River Protection Project mission, which is to 'safeguard the nuclear waste stored in Hanford's 177 underground tanks, and to manage the waste safely and responsibly until it can be treated in the Waste Treatment and Immobilization Plant for final disposition'. The Office of River Protection's work scope is currently performed through two primary contracts: - The Tank Operations Contract, held by Washington River Protection Solutions LLC, (WRPS) includes the construction, operation, and maintenance activities necessary to safely store, retrieve, and transfer tank wastes; provide supplemental tank waste treatment; provide storage and/or disposal of primary and secondary waste streams; design, construction and commissioning of the Low-Activity Waste Pretreatment System; and support ORP to integrate Hanford Tank Waste Treatment and Immobilization Plant (WTP) completion and startup with Tank Farms operations. - The WTP Contract, held by Bechtel National, Inc. (BNI), includes the design, construction, and commissioning of a Pretreatment Facility, two vitrification facilities (one for high-level waste and one for low-activity waste), a dedicated analytical laboratory, and supporting facilities to treat radioactive tank wastes by immobilizing them into a stable glass waste form. One System was established as a means to improve the integration between the tank farms and the WTP project to support its safe and successful startup. One System's scope and purpose focus on mission integration consistent with DOE's plans to treat tank waste in phases, starting with direct feed of the low-activity waste stream to the WTP's Low-Activity Waste (LAW) Vitrification Facility (referred to as DFLAW). The One System organization now has four major focus areas: - Flowsheet Integration? Integrated River Protection Project (RPP) flowsheet development and management; developing a gaps, risks, and opportunities management plan and technical roadmap; and waste feed qualification. - Mission Analysis and Planning? Strategic planning, system planning, and modeling integration. - WTP Startup, Commissioning, and Operations Integration? Interface Control Document (ICD) management, coordinating facilities startup-to-commissioning-to-operations, contract directives and standards identification, and DFLAW program integration. - Project Integration and Controls? Integrated schedule, metrics/dashboards monitoring, and One System risk register. ORP established the DFLAW Program Office in February 2015 as one of its key performance goals. ORP staff, along with contractor managers, have identified roles and responsibilities for the each of the four major focus areas. One System has established an Executive Council and Governance Board to drive program progress and make decisions on DFLAW. This approach allows appropriate government and contractor senior management involvement in the DFLAW Program. Monthly critical path analysis on the integrated DFLAW schedule is being performed. Interface control documents specific to DFLAW have been developed, and system planning and modeling tools are being used to help define the DFLAW flowsheet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MPF X-Ray Module Setup for 2018

The Mobile Plutonium Facility (MPF) is a portable module design facility that can be deployed anywhere in the world for the safe recovery, packaging, and shipment of a nations legacy, or excess plutonium stockpile. All of the modules of MPF have specific purposes for operating in a mission if one were to ever come up. For my past four internships here at SRNL I have been working on the support of the X-Ray module for MPF. This year I installed new equipment I had purchased last year for the X-Ray Module and made sure the module was mission ready for the chance that the team deploys in the future for plutonium recovery. Using digital radiography (DR) and computed tomography (CT) provides the MPF team the ability to verify the contents of containers that would be holding material. This also ensures the safety of the team members in the glovebox facilities by verifying that there are no sharps, liquids, or other items that may harm the workers or glovebox operations when working with radioactive material. X-Ray imaging can also pick up low density objects like plastic bags and tape. Note how the DR image hides the puncture in the inner can while the CT image shows the damage. New DR and CT computers with upgraded software, New imaging panel, NOVO Portable X-Ray System. Because of the new upgrades to the X-Ray module system containers can be scanned and evaluated quicker than before. With the last system the 3D model reconstruction alone would take anywhere from 10-12 minutes, now with the new system that time has been brought down to just shy of 1 minute 30 seconds. The new portable system also can 1,2 or 4 images of an object and stitch them together into a mosaic for scanning of larger containers.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

FUSRAP Case Study - Benefits and Lessons Learned from Implementation of a Modern Data Solution at Maywood - 18399

This paper focuses on data production and management practices dating back to 1999 that continue to evolve to support the project today. In 2000, the FUSRAP Maywood Project began using a software environmental data management system and laboratory information management system, developed by a single database administrator (DA) and authored in Microsoft Access{sup TM} (MS Access). The original databases included basic functionality including sample number assignment and label generation, tracking of LIMS gamma spec QC and assignment of basic qualifiers and basic database queries. The DA continued over the next fifteen years to refine the EDMS/LIMS by integrating project-specific data evaluation guidance document processes and Quality Assurance/Quality Control (QA/QC) charting and excursion warning tools. With the retirement of the original DA, the U.S. Army Corps of Engineers (USACE)-Cabrera Team procured and implemented a commercial-leaning solution using modern database tools and an established EDMS vendor. For the database transition process, the project team established and configured the new EDMS/LIMS with basic architecture and accessibility; evaluated existing workflows; established/revised LIMS and EDMS-related documentation (manuals and procedures); and conducted dry runs and validation testing. The overall team coordinated closely to facilitate a seamless transition from initial assessment and authoring, to data migration, and finally to resumption of normal ongoing operations. Key features of the new EDMS Subcontractor's software included lookup tables, an import wizard, data checking options and unique indexes. Since the database systems became operational, the technical staff gathered useful feedback from end users (e.g., lab staff, field engineers, task managers, and the third-party data validator) to refine the EDMS/LIMS operation. This feedback triggered improvements in the performance of onsite laboratory qualification forms, promoted consistency in sample ID numbers between the database sample planning screens and field chain-of-custodies, corrected bugs in the LIMS Duplicate Evaluation Report, eliminated data import issues such as blank, inconsistent or missing data from key fields. One of the advantages of the commercial database solution was that it allowed the project to cut cost over time due to the lower cost of database maintenance provided by the commercial database vendor versus the cost of an on-staff DA. Cost savings are estimated at $40,000 per year. There were also indirect cost savings resulting from implementation of the new database since it allowed better integration of the LIMS and EDMS. While there will always be challenges associated with long term records/data management for any old remediation site, the Maywood Team's approach to an upgraded EDMS/LIMS implementation serves as one element of the overall effort to enhance the integrity and reproducibility of critical data that supports the remediation program while at the same time, more effectively using available resources. These lessons-learned will enhance implementation of cost-effective solutions for similar environmental remediation sites. (authors)

97 MATHEMATICS AND COMPUTING↗

Big Data Framework with Machine Learning for D and D Applications - 19108

The nuclear industry is experiencing a steady increase in maintenance costs even though plants are maintained under high levels of safety, capability and reliability. Nuclear power plants are expected to run every unit at maximum capacity at all times, efficiently utilizing assets with minimal downtime. Surveillance and maintenance of nuclear decommissioning infrastructure provides lot challenges with respect to maintenance or decommissioning of the buildings. There is a need for a framework to analyze the huge amount of data generated by the sensors on the nuclear reactor components as well as structures, to monitor the conditions of these building over a period of time. Emerging technologies such as big data analytics have become a requirement in the nuclear industry to improve structural health monitoring and diagnostics. FIU will make use of existing mature technologies in the areas of imaging, robotics, big data, and machine learning/deep learning to assess the structural integrity of aging facilities at DOE sites. As these facilities await decommissioning, there is a need to understand the structural health of these structures. Many of these facilities were built over 50 years ago and in some cases these facilities have gone beyond the operational life expectancy. In other cases, the facilities have been placed in a state of 'cold and dark' and they are sitting unused, awaiting decommissioning. Finally, some older facilities are one-of-a-kind operational/production facilities supporting critical DOE missions and cannot be shut down. In any of these scenarios, the structural integrity of these facilities may be compromised, so it is imperative that adequate inspections and data collection/analysis be performed on a continuous and ongoing basis. The primary goals of the research include collecting various formats of data such as structured, unstructured and streaming data from the various sensors deployed in buildings, collect videos/pictures from various imaging sources, ingest them using a Hadoop distributed file system and process the data using Spark to perform batch processing and real time analytics. Research and development on various machine learning/deep learning algorithms will also be performed to analyze the heterogeneous data collected from nuclear decommission infrastructure. FIU will design the big data framework to ingest, store and process huge amounts of heterogeneous data collected from many sources and optimize the algorithms to provide insights into the data and predict anomalies observed when compared against baseline conditions. Various modules of this framework will include heterogeneous data sources, message broker, Hadoop distributed file system, Spark for stream and batch processing, machine learning/ deep learning, Cassandra - persistent data store and visualization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pebble Fuel Handling and Reactivity Control for Salt-Cooled High Temperature Reactors

This report documents the work completed on the X-PREX facility under NEUP Project 11- 3172. This project seeks to demonstrate the viability of pebble fuel handling and reactivity control for fluoride salt-cooled high-temperature reactors (FHRs). The research results also improve the understanding of pebble motion in helium-cooled reactors, as well as the general, fundamental understanding of low-velocity granular flows. Successful use of pebble fuels in with salt coolants would bring major benefits for high-temperature reactor technology. Pebble fuels enable on-line refueling and operation with low excess reactivity, and thus simpler reactivity control and improved fuel utilization. If fixed fuel designs are used, the power density of salt- cooled reactors is limited to 10 MW/m 3 to obtain adequate duration between refueling, but pebble fuels allow power densities in the range of 20 to 30 MW/m 3 . This can be compared to the typical modular helium reactor power density of 5 MW/m3. Pebble fuels also permit radial zoning in annular cores and use of thorium or graphite pebble blankets to reduce neutron fluences to outer radial reflectors and increase total power production. Combined with high power conversion efficiency, compact low-pressure primary and containment systems, and unique safety characteristics including very large thermal margins (>500°C) to fuel damage during transients and accidents, salt-cooled pebble fuel cores offer the potential to meet the major goals of the Advanced Reactor Concepts Development program to provide electricity at lower cost than light water reactors with improved safety and system performance.This report presents the facility description, experimental results, and supporting simulation methods of the new X-Ray Pebble Recirculation Experiment (X-PREX), which is now operational and being used to collect data on the behavior of slow dense granular flows relevant to pebble bed reactor core designs. The X-PREX facility uses novel digital x-ray tomography methods to track both the translational and rotational motion of spherical pebbles, which provides unique experimental results that can be used to validate discrete element method (DEM) simulations of pebble motion. The validation effort supported by the X-PREX facility provides a means to build confidence in analysis of pebble bed configuration and residence time distributions that impact the neutronics, thermal hydraulics, and safety analysis of pebble bed reactor cores. Experimental and DEM simulation results are reported for silo drainage, a classical problem in the granular flow literature, at several hopper angles. These studies include conventional converging and novel diverging geometries that provide additional flexibility in the design of pebble bed reactor cores. Excellent agreement is found between the X-PREX experimental and DEM simulation results. This report also includes results for additional studies relevant to the design and analysis of pebble bed reactor cores including the study of forces on shut down blades inserted directly into a packed bed and pebble flow in a cylindrical hopper that is representative of a small test reactor.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Low Activity Waste Glass Waste Form Data Package for Hanford's Integrated Disposal Facility Performance Assessment - 16480

A Direct Feed Low Activity Waste (DFLAW) flowsheet has been initiated to begin immobilization of Hanford tank wastes. In the DFLAW configuration, a pretreatment system will segregate the high level and the low activity wastes (LAW). The LAW will be immobilized in the Waste Treatment Plant (WTP) and disposed of in Hanford's Integrated Disposal Facility (IDF). To obtain authorization to dispose of wastes in the IDF, a Performance Assessment (PA) must be completed in accordance with DOE Order 435.1. The PA shall include calculations of potential doses to representative future members of the public and potential releases from the facility to provide a reasonable expectation that performance objectives will not be exceeded as a result of operation and closure of the facility. To support the development of the PA, data from ILAW glass testing are needed to model the long term release of contaminants over the compliance period and verify that impacts to groundwater quality will be within performance objective limits. Washington River Protection Solutions is conducting an ILAW glass testing program to produce the required data. This program is a combined effort involving National Laboratories with known expertise in glass waste form research. The work involves accelerated testing to develop parameters that can be used in computer simulations of glass corrosion and contaminant release in the IDF environment. The results of this work will be compiled in an ILAW glass waste form performance data package for the IDF PA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Direct Feed Low Activity Waste Program Throughput Optimization Through Modeling - 18587

The Direct Feed Low Activity Waste (DFLAW) program at Hanford allows for the early treatment of tank wastes years earlier than previously planned. Operational Research (OR) modeling is being used to provide invaluable insight into how complex and integrated processes will operate. The DFLAW OR models are used to help optimize the design and operation of the integrated system. The DFLAW OR models include the processes and real-life complexities involved in the day-to-day operation of the systems and equipment, and can predict key performance characteristics including throughput, mission timescale, equipment and labor utilization, lag storage and capacity requirements. The DFLAW OR models also have the in-built capability to simulate random events such as equipment failures. Adding random variability to models introduces a real-life element to model results. For example, OR modeling breakdown analysis of equipment failure and restoration times may inform specific improvements to a design and plant operation, including areas where the provision of spare (duty/standby) equipment would prove beneficial; the optimum number and capacity of lag storage tanks (for waste intermediate storage, reagents, etc.); operational issues, including scheduling constraints, labor resource constraints, effect of shift schedules (e.g. days only, extended shifts, 24/7),, maintenance strategies, including planned maintenance, equipment upgrades, on-hand spare part stockholding, etc. At Hanford, standalone OR models to date, have been used to help identify key operational issues and improve the design and operation of individual systems within the Tank Farms, Low Activity Waste Pretreatment System (LAWPS), Low Activity Waste (LAW) Vitrification and Effluent Management Facility (EMF) and Integrated Disposal Facility (IDF), logistics and infrastructure, 222-S laboratory [References 1 and 2] including: - Identification of critical spares including transfer pumps; - Underpin size and number of lag storage tanks to maintain continuous LAW feed to the LAW melters; - Underpin sample turnaround times at the 222-S Laboratory (e.g. feed prequalification and evaporator campaign samples) and determine how targets can be achieved without impacting waste feed delivery to LAWPS and the LAW Vitrification Facility; - Determine operational strategy required at IDF including shift schedules and sizes and the number of ILAW transporters that can support DFLAW throughput; - Identification of lag storage management strategies for glass formers, reagents, other consumables due to delivery distance and delays due to bad weather; and - Truck delivery badging needs to support 24/7 operation and management of shift in/out times required to reduce congestion. An Integrated DFLAW OR model has been developed and combines the standalone OR models such that integrated throughput and availability can be assessed from a program perspective. The Integrated OR model will provide a more detailed understanding of the interactions between Tank Farms, LAWPS, LAW VIT and IDF such that key bottleneck areas can be identified and ensure improvements are focused. Examples of future improvements that may be considered include identification of critical spare parts, required on-site maintenance capabilities, shift scheduling, and craft and labor availability. The methods, results and insights derived by DFLAW OR modeling efforts are expected to provide useful applications to other projects that involve combinations of mechanical handling, chemical processing, waste treatment/packaging or environmental remediation operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TU-AB-303-06: Does Online Adaptive Radiation Therapy Mean Zero Margin for Intermediate-Risk Prostate Cancer? An Intra-Fractional Seminal Vesicles Motion Analysis

Purpose: To provide benchmark for seminal vesicles (SVs) margin selection to account for intra-fractional motion; and to investigate the effectiveness of two motion surrogates in predicting intra-fractional SV underdosage. Methods: 9 prostate SBRT patients were studied; each has five pairs of pre-treatment and post-treatment cone-beam CTs (CBCTs). Each pair of CBCTs was registered based on fiducial markers in the prostate. To provide “ground truth” for coverage evaluation, all pre-treatment SVs were expanded with isotropic margin of 1,2,3,5 and 8mm, and their overlap with post-treatment SVs were used to quantify intra-fractional coverage. Two commonly used motion surrogates, the center-of-mass (COM) and the border of contour (the most distal points in SI/AP/LR directions) were evaluated using Receiver-Operating Characteristic (ROC) analyses for predicting SV underdosage due to intra-fractional motion. Action threshold of determining underdosage for each surrogate was calculated by selecting the optimal balancing between sensitivity and specificity. For comparison, margin for each surrogate was also calculated based on traditional margin recipe. Results: 90% post-treatment SV coverage can be achieved in 47%, 82%, 91%, 98% and 98% fractions for 1,2,3,5 and 8mm margins. 3mm margin ensured the 90% intra-fractional SV coverage in 90% fractions when prostate was aligned. The ROC analysis indicated the AUC for COM and border were 0.88 and 0.72. The underdosage threshold was 2.9mm for COM and 4.1mm for border. The Van Herk’s margin recipe recommended 0.5, 0 and 1.8mm margin in LR, AP and SI direction based on COM and for border, the corresponding margin was 2.1, 4.5 and 3mm. Conclusion: 3mm isotropic margin is the minimum required to mitigate the intra-fractional SV motion when prostate is aligned. ROC analysis reveals that both COM and border are acceptable predictors for SV underdosage with 2.9mm and 4.1mm action threshold. Traditional margin calculation is less reliable for this application. This work is partially supported a master research grant from Varian Medical Systems.

60 APPLIED LIFE SCIENCES↗

WE-AB-BRA-08: Correction of Patient Motion in C-Arm Cone-Beam CT Using 3D-2D Registration

Purpose: Intraoperative C-arm cone-beam CT (CBCT) is subject to artifacts arising from patient motion during the fairly long (∼5–20 s) scan times. We present a fiducial free method to mitigate motion artifacts using 3D-2D image registration that simultaneously corrects residual errors in geometric calibration. Methods: A 3D-2D registration process was used to register each projection to DRRs computed from the 3D image by maximizing gradient orientation (GO) using the CMA-ES optimizer. The resulting rigid 6 DOF transforms were applied to the system projection matrices, and a 3D image was reconstructed via model-based image reconstruction (MBIR, which accommodates the resulting noncircular orbit). Experiments were conducted using a Zeego robotic C-arm (20 s, 200°, 496 projections) to image a head phantom undergoing various types of motion: 1) 5° lateral motion; 2) 15° lateral motion; and 3) 5° lateral motion with 10 mm periodic inferior-superior motion. Images were reconstructed using a penalized likelihood (PL) objective function, and structural similarity (SSIM) was measured for axial slices of the reconstructed images. A motion-free image was acquired using the same protocol for comparison. Results: There was significant improvement (p < 0.001) in the SSIM of the motion-corrected (MC) images compared to uncorrected images. The SSIM in MC-PL images was >0.99, indicating near identity to the motion-free reference. The point spread function (PSF) measured from a wire in the phantom was restored to that of the reference in each case. Conclusion: The 3D-2D registration method provides a robust framework for mitigation of motion artifacts and is expected to hold for applications in the head, pelvis, and extremities with reasonably constrained operative setup. Further improvement can be achieved by incorporating multiple rigid components and non-rigid deformation within the framework. The method is highly parallelizable and could in principle be run with every acquisition. Research supported by National Institutes of Health Grant No. R01-EB-017226 and academic-industry partnership with Siemens Healthcare (AX Division, Forcheim, Germany).

60 APPLIED LIFE SCIENCES↗

Safety Requirement Management System (SRMS) - Improved Documented Safety Analyses Implementation - 18476

Savannah River Remediation (SRR) developed a new software application, Safety Requirement Management System (SRMS), to improve Documented Safety Analysis (DSA) safety requirement implementation in the Savannah River Site's Liquid Waste facilities. Technical Safety Requirement (TSR) Limited Conditions of Operations (LCOs) and related surveillances were previously tracked using four different applications. Due to their differences and their age, the applications introduced a number of operational challenges and vulnerabilities, including outdated platforms, usage demands beyond original design, and different organizational work processes. SRMS was developed to resolve these issues by using a single web-based approach that provides consistency, wider accessibility, simpler maintenance, and a platform for additional functionality. Other SRS facilities are evaluating the application for its applicability as a standard practice across the site. The new SRMS application decreased the administrative overhead for application maintenance, provided the needed TSR change management functionality, and reduced error precursors with the following advantages: - Consistent process/application across all SRR facilities - More efficient way to track and communicate compliance with DSA time-related requirements (i.e., TSR LCOs and surveillances). - Web-based search capability for LCO entries/exits and a record of surveillance performances. - TSR change management and independent reviews through electronic approvals. For example, the application provides the ability to bundle and stage LCO and surveillance changes associated with a TSR revision. The approval process involves multiple roles from the facility to ensure validity. - Formal configuration management program, fully supported by software life cycle documents. SRMS was implemented at Defense Waste Processing Facility (DWPF) in June 2017, with implementation in all Liquid Waste facilities expected by the end of 2017. Next, SRR plans to expand SRMS functionality to include a linking document database (LDD) to support the DSA requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-C-207-01: Four-Dimensional Inverse Geometry Computed Tomography: Concept and Its Validation

Purpose: In past few years, the inverse geometry computed tomography (IGCT) system has been developed to overcome shortcomings of a conventional computed tomography (CT) system such as scatter problem induced from large detector size and cone-beam artifact. In this study, we intend to present a concept of a four-dimensional (4D) IGCT system that has positive aspects above all with temporal resolution for dynamic studies and reduction of motion artifact. Methods: Contrary to conventional CT system, projection data at a certain angle in IGCT was a group of fractionated narrow cone-beam projection data, projection group (PG), acquired from multi-source array which have extremely short time gap of sequential operation between each of sources. At this, for 4D IGCT imaging, time-related data acquisition parameters were determined by combining multi-source scanning time for collecting one PG with conventional 4D CBCT data acquisition sequence. Over a gantry rotation, acquired PGs from multi-source array were tagged time and angle for 4D image reconstruction. Acquired PGs were sorted into 10 phase and image reconstructions were independently performed at each phase. Image reconstruction algorithm based upon filtered-backprojection was used in this study. Results: The 4D IGCT had uniform image without cone-beam artifact on the contrary to 4D CBCT image. In addition, the 4D IGCT images of each phase had no significant artifact induced from motion compared with 3D CT. Conclusion: The 4D IGCT image seems to give relatively accurate dynamic information of patient anatomy based on the results were more endurable than 3D CT about motion artifact. From this, it will be useful for dynamic study and respiratory-correlated radiation therapy. This work was supported by the Industrial R&D program of MOTIE/KEIT [10048997, Development of the core technology for integrated therapy devices based on real-time MRI guided tumor tracking] and the Mid-career Researcher Program (2014R1A2A1A10050270) through the National Research Foundation of Korea funded by the Ministry of Science, ICT&Future Planning.

60 APPLIED LIFE SCIENCES↗

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

TH-EF-BRA-03: Assessment of Data-Driven Respiratory Motion-Compensation Methods for 4D-CBCT Image Registration and Reconstruction Using Clinical Datasets

Purpose: To evaluate the performance of a 4D-CBCT registration and reconstruction method that corrects for respiratory motion and enhances image quality under clinically relevant conditions. Methods: Building on previous work, which tested feasibility of a motion-compensation workflow using image datasets superior to clinical acquisitions, this study assesses workflow performance under clinical conditions in terms of image quality improvement. Evaluated workflows utilized a combination of groupwise deformable image registration (DIR) and image reconstruction. Four-dimensional cone beam CT (4D-CBCT) FDK reconstructions were registered to either mean or respiratory phase reference frame images to model respiratory motion. The resulting 4D transformation was used to deform projection data during the FDK backprojection operation to create a motion-compensated reconstruction. To simulate clinically realistic conditions, superior quality projection datasets were sampled using a phase-binned striding method. Tissue interface sharpness (TIS) was defined as the slope of a sigmoid curve fit to the lung-diaphragm boundary or to the carina tissue-airway boundary when no diaphragm was discernable. Image quality improvement was assessed in 19 clinical cases by evaluating mitigation of view-aliasing artifacts, tissue interface sharpness recovery, and noise reduction. Results: For clinical datasets, evaluated average TIS recovery relative to base 4D-CBCT reconstructions was observed to be 87% using fixed-frame registration alone; 87% using fixed-frame with motion-compensated reconstruction; 92% using mean-frame registration alone; and 90% using mean-frame with motion-compensated reconstruction. Soft tissue noise was reduced on average by 43% and 44% for the fixed-frame registration and registration with motion-compensation methods, respectively, and by 40% and 42% for the corresponding mean-frame methods. Considerable reductions in view aliasing artifacts were observed for each method. Conclusion: Data-driven groupwise registration and motion-compensated reconstruction have the potential to improve the quality of 4D-CBCT images acquired under clinical conditions. For clinical image datasets, the addition of motion compensation after groupwise registration visibly reduced artifact impact. This work was supported by the National Cancer Institute of the National Institutes of Health under Award Number R01CA166119. Hugo and Weiss hold a research agreement with Philips Healthcare and license agreement with Varian Medical Systems. Weiss receives royalties from UpToDate. Christensen receives funds from Roger Koch to support research.

60 APPLIED LIFE SCIENCES↗

Modeling of the Reactor Core Isolation Cooling Response to Beyond Design Basis Operations - Interim Report

Efforts are being pursued to develop and qualify a system-level model of a reactor core isolation (RCIC) steam-turbine-driven pump. The model is being developed with the intent of employing it to inform the design of experimental configurations for full-scale RCIC testing. The model is expected to be especially valuable in sizing equipment needed in the testing. An additional intent is to use the model in understanding more fully how RCIC apparently managed to operate far removed from its design envelope in the Fukushima Daiichi Unit 2 accident. RCIC modeling is proceeding along two avenues that are expected to complement each other well. The first avenue is the continued development of the system-level RCIC model that will serve in simulating a full reactor system or full experimental configuration of which a RCIC system is part. The model reasonably represents a RCIC system today, especially given design operating conditions, but lacks specifics that are likely important in representing the off-design conditions a RCIC system might experience in an emergency situation such as a loss of all electrical power. A known specific lacking in the system model, for example, is the efficiency at which a flashing slug of water (as opposed to a concentrated jet of steam) could propel the rotating drive wheel of a RCIC turbine. To address this specific, the second avenue is being pursued wherein computational fluid dynamics (CFD) analyses of such a jet are being carried out. The results of the CFD analyses will thus complement and inform the system modeling. The system modeling will, in turn, complement the CFD analysis by providing the system information needed to impose appropriate boundary conditions on the CFD simulations. The system model will be used to inform the selection of configurations and equipment best suitable of supporting planned RCIC experimental testing. Preliminary investigations with the RCIC model indicate that liquid water ingestion by the turbine decreases the developed turbine torque; the RCIC speed then slows, and thus the pump flow rate to the RPV decreases. Subsequently, RPV water level decreases due to continued boiling and the liquid fraction flowing to the RCIC decreases, thereby accelerating the RCIC and refilling the RPV. The feedback cycle then repeats itself and/or reaches a quasi-steady equilibrium condition. In other words, the water carry-over is limited by cyclic RCIC performance degradation, and hence the system becomes self-regulating. The indications achieved to date with the system model are more qualitative than quantitative. The avenues being pursued to increase the fidelity of the model are expected to add quantitative realism. The end product will be generic in the sense that the RCIC model will be incorporable within the larger reactor coolant system model of any nuclear power plant or experimental configuration.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Validation of HELIOS for ATR Core Follow Analyses

This work summarizes the validation analyses for the HELIOS code to support core design and safety assurance calculations of the Advanced Test Reactor (ATR). Past and current core safety assurance is performed by the PDQ-7 diffusion code; a state of the art reactor physics simulation tool from the nuclear industry’s earlier days. Over the past twenty years, improvements in computational speed have enabled the use of modern neutron transport methodologies to replace the role of diffusion theory for simulation of complex systems, such as the ATR. More exact methodologies have enabled a paradigm-shift away from highly tuned codes that force compliance with a bounding safety envelope, and towards codes regularly validated against routine measurements. To validate HELIOS, the 16 ATR operational cycles from late-2009 to present were modeled. The computed power distribution was compared against data collected by the ATR’s on-line power surveillance system. It was found that the ATR’s lobe-powers could be determined with ±10% accuracy. Also, the ATR’s cold startup shim configuration for each of these 16 cycles was estimated and compared against the reported critical position from the reactor log-book. HELIOS successfully predicted criticality within the tolerance set by the ATR startup procedure for 13 out of the 16 cycles. This is compared to 12 times for PDQ (without empirical adjustment). These findings, as well as other insights discussed in this report, suggest that HELIOS is highly suited for replacing PDQ for core safety assurance of the ATR. Furthermore, a modern verification and validation framework has been established that allows reactor and fuel performance data to be computed with a known degree of accuracy and stated uncertainty.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗