Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Commissioning of dedicated furnace for Nb3Sn coatings of 2.6GHz single cell cavities

We present the results of commissioning a dedicated fur- nace for Nb3Sn coatings of 2.6 GHz single cell cavities. Nb3Sn is a desired coating due to its high critical temper- ature and smaller surface resistance compared to bulk Nb. Usage of Nb3Sn coated cavities will greatly reduce operat- ing costs due to decreased dependance on cryo cooling. Tin is deposited by use of a tin chloride nucleation agent and tin vapor diffusion. Analysis of the resultant coating was performed using SEM/EDS to verify successful formation of Nb3Sn. Witness samples in line of sight of the source were used in order to understand the coating efficacy.

Kulyavtsev, P. A.↗

Commissioning of new CVD/ALD Furnace at Fermilab

The new CVD/ALD furnace that we are commissioning at Fermilab will allow us to deposit thin films of superconducting materials on RF cavities on different shapes, 1 cell and 9 cells 1.3GHz and 1 cell and 5 cells 650MHz. This furnace is capable to perform two different types of deposition: chemical vapor deposition and atomic layer deposition. Different materials are under investigation to push accelerating superconducting RF cavities to support higher accelerating fields and to operate with lower power loss. The first tests are focusing on the alternative A15 superconductors as: Nb3Ge, Nd3Ga, Nb3Sn, V3Si. The furnace has two different sources of precursors: 1) chlorine furnace, where we can produce the precursors in-situ, so we can build our own precursors and test how the deposited material is affecting the cavity performance, 2) 6 different bubblers, 3 low temperature bubblers and 3 high temperature bubblers. The deposition chamber is a versatile chamber with two independ ent vacuum volumes, to ensure a higher cleanliness of the deposited material. The furnace is designed to have two different configurations: High temperature, up to 1400 C, and low temperature, up to 400 C.

Grassellino, Laura↗

Fermilab’s horizontal test stand upgrade overview and commissioning

Cryo-assemblies with the low-beta Nb3Sn quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab’s magnet test facility. Total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational more than a decade. In order to restore the test stand functions and meet the design and test requirements for the high luminosity LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded test stand was completed during the first cryo-assembly test in 2023. These tests verified all the cryo-mechanical installations, as well as the test stand operations, including controlled cooldown and operation at 1.9 K, the helium recovery capabilities, magnet protection and process controls.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Commissioning of the Second JLAB C75 Cryomodule & Performance Evaluation of Installed C75 Cavities

JLAB has long been a hub of SRF technology with the CEBAF accelerator as one of its first large scale adopters. As SRF technology has advanced, the C50 and C100 programs have allowed for the extension of CEBAF's total energy to 6 GeV and nearly 12 GeV respectively. Along with the increase in energy reach, rates of accelerating gradient degradation have been extracted for these cryomodule designs. A plan to mitigate these losses & maintain robust gradient headroom to deliver the 12 GeV program - the CEBAF Performance Plan - established a multi-year effort of cryomodule refurbishments and replacements. Part of this plan included a cost optimization of the C50 program with more modern processing techniques and the replacement of existing cavities with larger grain boundary cavities produced from ingot Niobium (dubbed C75 for 75 MeV gain). Reports have been made on the prototype pair of C75 cavities installed in a C50 cryomodule and the first full C75 cryomodule installed in 2017 and 2021. This paper reports on the results from the qualification of the cavities for the second C75 module in both a vertical cryostat and the commissioning results of the cryomodule in the CEBAF tunnel. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177.

McCaughan, Michael↗

Commissioning of the IOTA Proton Injector

The Proton Injector for the IOTA storage ring (IPI) is being constructed at the Fermilab Accelerator Science and Technology facility (FAST). It will be a machine capable of delivering 20 mA pulses of protons at 2.5 MeV. IPI will operate alongside the existing electron injector beamline to facilitate further beam physics research and the continued development of novel accelerator technologies at the IOTA ring. This report details the results of the initial commissioning of IPI and an overview of the upcoming experiments with intense proton beams at IOTA.

43 PARTICLE ACCELERATORS↗

Energy Storage and Decarbonization Analysis for Energy Regulators: Technical Analysis for the Illinois Commerce Commission

Jurisdictions around the world are enacting and enforcing an increasing number of policies to fight climate change, leading to higher penetration of variable renewable energy (VRE) and energy storage systems (ESSs) in the power grid. One of the biggest challenges associated with this process is the evaluation of the appropriate amount of ESS required to mitigate the variability of the VREs and achieve decarbonization goals of a particular jurisdiction. This report presents methodologies developed and results obtained for determining the minimum amount of ESS required to adequately serve load in a system where fossil fueled generators are being replaced by VREs over the next two decades. This technical analysis is performed by Sandia National Laboratories for the DOE Office of Electricity Energy Storage Program in collaboration with the Illinois Commerce Commission (ICC). The Illinois MISO Zone 4 is used as a case study. Several boundary conditions are investigated in this analysis including capacity adequacy and energy adequacy to determine the quantity of ESS required for MISO Zone 4. Multiple scenarios are designed and evaluated to incorporate the impact of varying capacity values of VREs and on the resource adequacy of the system. Several retirement scenarios involving fossil-fueled assets are also considered. Based on the current plans of new additions and retirements of generating assets, the results of the technical analysis indicate that Illinois MISO Zone 4 will require a significant quantity of ESS to satisfy their electricity demand over the next two decades.

25 ENERGY STORAGE↗

Flow Sensor Test Article (F-STAr) - Water Testing and Commissioning Report for FY2024

Argonne National Laboratory’s Mechanism Engineering Test Loop (METL) facility is developing new experimental testing capabilities with the Flow Sensor Test Article (F-STAr). F-STAr’s mission is to provide high flowrate, sodium submersible testing capabilities to support the development of sodium cooled nuclear fission reactors. Figure 1 shows a model of F-STAr (left) and a photo of the partially assembled test article (right) with several of the main components labeled. The system currently includes a large pump with desired flowrates of up to 100 GPM; an immersion heater with a maximum power of 5 kW; an immersion cooler with an estimated maximum cooling power of 2 kW; and an experimental test section to support sub-test articles. Initially, F-STAr will be setup for testing flow sensors, specifically Eddy Current Flow Sensors (ECFS). However, the system can be reconfigured to support a wide range of testing needs. For example, F-STAr could be setup to complete testing of hydraulic components, heat exchangers, hydrodynamic bearings, seals, and more. This report will provide an update on the development of F-STAr with a focus on the water testing and commissioning activities during Fiscal Year 2024 (FY24). First, the report will focus on describing the pump development. Specifically, updates will be provided on troubleshooting the pump’s excessive vibrational issues. In addition to updates on the pump, pressure-flowrate performance testing in water will be described. Furthermore, updates will be provided on a pump shaft bushing development as well as rigging procedures. Future work and paths forward for F-STAr will be described. Finally, a short summary on the ECFS development will be described at the end of the report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integration and commissioning plan of Full Flow Purifier at Muon Campus

The Full Flow Purifier for Fermilab’s Muon Campus uses a charcoal bed surrounded by a liquid nitrogen jacket to purify up to 240 g/s of helium gas. Fabrication by Ability Engineering Technology Inc. has been completed and the purifier delivered to Fermilab. It is the largest purifier to be used at Fermilab based on both capacity and size. A previous paper discussed the design of purifier for various operational conditions and horizontal shipping. The purifier is designed to withstand 5g force in vertical and 2g force in lateral and longitudinal directions. Transportation experience from vendor to Fermilab and within site is discussed. Integration of the purifier involved design and fabrication of a liquid nitrogen transfer line, regeneration system, and helium piping to connect it to Muon Campus cryogenic system. It also involved establishing electrical, instrumentation and controls connections to the system. Integration of the purifier is discussed in detail. The purifier is to be commissioned using up to 4 MYCOM helium compressors to supply helium and liquid nitrogen supplied by a 15,000 -gallon tank. Actual effectiveness of the 3-stream heat exchanger is to be estimated based on measured temperatures and flow rate. Impurity levels shall be monitored at inlet and outlet of the purifier. Theoretical adsorption capacity of the purifier is calculated based on the measured temperatures and flowrates and is compared to actual adsorption capacity over time.

Subedi, Jeewan [Fermilab]↗

Wire Plane Transparency: Commissioning the Time Projection Chambers for the Short-Baseline Near Detector

The Short Baseline Near Detector (SBND) serves as the near detector for Fermilab's Short Baseline Neutrino (SBN) programme. It is a 112-ton Liquid Argon Time Projection Chamber (LArTPC) designed to study neutrino-argon interactions and search for new physics phenomena such as sterile neutrinos. Situated just 110 m from the Booster Neutrino Beam (BNB), SBND just began its first physics run and is expected to record over two million neutrino interactions annually. Commissioning the time projection chambers of SBND is crucial for optimising detector performance. Each of the two anodes is composed of three charge-sensing wire planes which detect drifting ionisation electrons from charged particles traversing the detector. The wire planes, arranged with different 2D orientations, facilitate the 3D reconstruction of neutrino interactions. Electron transport induces signals on the first two planes, with the signal being collected by the rear plane. The first two induction planes require transparency to ensure all drift electrons reach the collection plane. This transparency depends on the bias voltages applied to the wires and the spacing between them. Fine-tuning these bias voltages ensures the optimisation of wire plane transparency. In this poster, I will demonstrate how transparency can be assessed by analysing the waveforms from cosmic-ray muon tracks traversing the detector at specific orientations.

McCusker, Bethany [Unlisted, US]↗

Commission < 5 µm spatial resolution x-ray imager for High Resolution Turbulence experiments

This report presents the successful development, commissioning, and deployment of the Scintillation-Based X-ray Imager (SBXI) for the High-Resolution Turbulence (HRT) campaign at the National Ignition Facility (NIF). The SBXI system was designed to overcome the spatial resolution and efficiency limitations of conventional x-ray imaging detectors. Through careful system engineering, rigorous laboratory characterization, and experimental validation at NIF, the SBXI has demonstrated spatial resolution at the object plane of 5 μm (±0.5 μm) and a detective quantum efficiency (DQE) of 34% at 7.2 keV, both of which surpass the requirements set by the campaign, and meeting the L2 milestone. The system’s deployment enables high-fidelity imaging of fine-scale hydrodynamic instabilities, directly supporting advanced turbulence model validation and future high energy density physics research.

42 ENGINEERING↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development (Final Report)

The National Renewable Energy Laboratory initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The National Labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

16 TIDAL AND WAVE POWER↗

State Spotlight on Resilience: The Michigan Public Service Commission and Data Informed Accountability

Resilience activities are an emerging area within regulatory utility policy. As resilience frameworks develop, many Public Utility Commissions (PUCs) are looking to initiate resilience activities and have identified enhancing grid reliability as a practical starting point. Reliability describes the grid’s ability to deliver electricity steadily and without interruptions under normal or “blue sky” conditions. Reliability is measured using industry standard metrics such as outage frequency (SAIFI) and outage duration (SAIDI). Resilience is broader, reflecting the grid’s ability to both withstand and recover from disruptions, particularly those caused by extreme events such as severe storms. A reliable grid minimizes routine disruptions; a resilient grid ensures the system can recover quickly when disruptions occur, preventing them from escalating into widespread or prolonged crises.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Retro-Commissioning Sensor Suitcase for Energy Efficiency (CRADA Final Report)

The Sensor Suitcase project aimed to enable cost-effective, data-driven retro-commissioning (RCx) in small commercial buildings through a self-installable toolkit consisting of portable sensors and diagnostic software. Results showed that the Sensor Suitcase could identify common operational faults leading to 5–15% energy savings opportunities, with automated reports requiring minimal user interpretation. The project adhered closely to its Statement of Work (SOW) but evolved the reporting interface and sensor logging duration based on field feedback. The development and validation of diagnostics are documented in PNNL technical reports and internal analysis summaries.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commissioning of the Mu2e Data AcQuisition System and the Vertical Slice Test of the Straw Tracker

The report discusses the commissioning of the DAQ system of the Mu2e experiment. We studied how the tracker works and especially the tracker readout. We used a generator to send pulses and we tried to understand the output and non-output of the DTC, in order to validate the event and run format and all the failure modes. In section one, we describe Charged Lepton Flavour Violation, the main purpose of Mu2e, in section two we describe Mu2e experiment. Section three presents the tracker description and readout, meanwhile section four the DAQ system and event building. In section five, we start explaining the analysis we have done on events and all the failure modes we discovered. In section six, we have done an analysis of the logger and boardreader rate, we validated the generator frequency in section seven and studied the number of hits in function of the channel number in section eight. To conclude we investigated the channel to channel time differences in section nine and in section ten we explain our Monte Carlo simulation, reproducing ROCs readout.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Commissioning of the trigger system for the ICARUS T600 LAr-TPC detector in SBN Program

The ICARUS experiment at Fermilab is the far detector of the Short Baseline Neutrino Program (SBN), aimed at studing the neutrino oscillation to find a fourth type of neutrino, called sterile neutrino. A key component for this detector is the trigger system, which aims to identify and isolate the physical interactions from the background events. In this framework my internship program was dedicated to the development of trigger logic and trigger inhibit mechanism in order to select the genuine neutrino interaction and to guarantee a correct functioning of the readout system. These two steps, that represent a part of the commissioning of the trigger system, were implemented with LabVIEW Software. The obtained results are a fundamental step towards a succesful activation of the detector in the next few months.

43 PARTICLE ACCELERATORS↗

Pre-Commissioning of the Wide-Dynamic Range Halo Monitor to be Installed in the FERMILAB MI-8 Line

The beam halo can contribute to beam losses in accelerators and is very difficult to measure. With an increase in beam intensity following the PIP-II upgrade at Fermilab, the beam losses are expected to be higher with some coming from the beam halo. Therefore, it is important to measure the sources of beam halo to minimize the beam losses. A modified Halo Monitor developed by J-PARC will be installed in Fermilab MI-8 transfer line to measure the beam halo. In this paper, an update on the beam profile monitor fabrication is covered. The updates include the location selection for the Halo Monitor in the MI-8 transfer line, shielding options for instrumentation, and the next steps in commissioning.

Babacan, B. [IIT, Chicago; Fermilab]↗

Augmenting LLM-Based Agents for Improved Performance in Pentesting and Commissioning Operational Technology in Critical Infrastructure

Artificial intelligence (AI), and more specifically large language models (LLMs) have the potential for use in penetration testing (“pentesting”) against devices, networks, and computer systems in information technology (IT). We explore the possibility of extending pentesting from IT systems to operational technology (OT) systems, which are more obscure than IT systems in their protocols and design. A challenge therefore exists when applying pretrained LLMs to OT systems as corpora are likely to underrepresent OT systems in comparison to other more prevalent systems. We evaluate augmentations of LLMs with various methods, especially retrieval augmented generation (RAG), to improve performance of the LLMs in the OT domain. In addition to pentesting, some of the testing of these OT devices may include commissioning to ensure that the newly installed devices work correctly. Our framework may also be applied in such cases.

97 MATHEMATICS AND COMPUTING↗

Commissioning of the IOTA Proton Injector

The IOTA Proton Injector (IPI) at the Fermilab Accelerator Science and Technology facility (FAST) is a machine capable of delivering up to 14 mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. Its construction was completed in the fall of 2025, followed by a successful commissioning run scheduled to conclude at the end of May 2026. It operates alongside the existing electron injector beamline to facilitate further beam physics research and continued development of novel accelerator technologies at the IOTA ring. This report details the current operational profile, known challenges, and future plans for the proton program development at FAST.

Romanov, A. [Fermilab] (ORCID:0000000287065709)↗