Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

CMS Tier-0 data processing during the detector commissioning in Run 3

The CMS Tier-0 system is responsible for the prompt processing and distribution of the data collected by the CMS Experiment. A number of upgrades were implemented during the long shutdown 2 of the Large Hadron Collider, which improved the performance and reliability of the system. In this report, these upgrades are discussed and a more detailed description of the Tier-0 system is given. The experience of the data taking during Run 3 detector commissioning as well as the performance of the system are highlighted.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning and operation of a real-time multi-point Thomson scattering evaluation system at Wendelstein 7-X

A real-time multi-point Thomson scattering (rtMPTS) evaluation system has recently been installed and commissioned at the Wendelstein 7-X (W7-X) stellarator during the 2024 -2025 operational phases. This system has demonstrated successful evaluation of Thomson scattered spectra on millisecond timescales. We discuss initial results from this system, consisting of a comparison of different evaluation techniques, assessment of system evaluation times, and proof-of-principle control experiments carried out with the W7-X poloidal correlation reflectometer (PCR) system. This diagnostic represents the first step towards the development of a density profile controller at W7-X, which can be leveraged to support steady-state operation.

Mohammed, Ameer [Princeton Plasma Physics Laborato↗

Installation and Commissioning of the GLUEX DIRC

The GlueX experiment takes place in experimental Hall D at Jefferson Lab (JLab). With a linearly polarized photon beam of up to 12 GeV energy, GlueX is a dedicated experiment to search for hybrid mesons via photoproduction reactions. The low-intensity (Phase I) of GlueX was recently completed; the high-intensity (Phase II) started in 2020 including an upgraded particle identification system, known as the DIRC (Detection of Internally Reflected Cherenkov light), utilizing components from the decommissioned BaBar experiment. The identification and separation of the kaon final states will significantly enhance the GlueX physics program, by adding the capability of accessing the strange quark flavor content of conventional (and potentially hybrid) mesons. Here, we report that the installation and commissioning of the DIRC detector has been successfully completed.

47 OTHER INSTRUMENTATION↗

Construction and commissioning of CMS CE prototype silicon modules

As part of its HL-LHC upgrade program, the CMS collaboration is developing a High Granularity Calorimeter (CE) to replace the existing endcap calorimeters. The CE is a sampling calorimeter with unprecedented transverse and longitudinal readout for both electromagnetic (CEE) and hadronic (CE-H) compartments. The calorimeter will be built with ~30,000 hexagonal silicon modules. Prototype modules have been constructed with 6-inch hexagonal silicon sensors with cell areas of 1.1 cm 2 , and the SKIROC2-CMS readout ASIC. Beam tests of different sampling configurations were conducted with the prototype modules at DESY and CERN in 2017 and 2018. This paper describes the construction and commissioning of the CE calorimeter prototype, the silicon modules used in the construction, their basic performance, and the methods used for their calibration.

Calorimeters↗

The design, construction, and commissioning of the KATRIN experiment

The KArlsruhe TRItium Neutrino (KATRIN) experiment, which aims to make a direct and model-independent determination of the absolute neutrino mass scale, is a complex experiment with many components. More than 15 years ago, we published a technical design report (TDR) to describe the hardware design and requirements to achieve our sensitivity goal of 0.2 eV at 90%C.L. on the neutrino mass. Since then there has been considerable progress, culminating in the publication of first neutrino mass results with the entire beamline operating. In this paper, we document the current state of all completed beamline components (as of the first neutrino mass measurement campaign), demonstrate our ability to reliably and stably control them over long times,and present details on their respective commissioning campaigns.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Configuration, Performance, and Commissioning of the ATLAS b-jet Triggers for the 2022 and 2023 LHC data-taking periods

In 2022 and 2023, the Large Hadron Collider produced approximately two billion hadronic interactions each second from bunches of protons that collide at a rate of 40 MHz. The ATLAS trigger system is used to reduce this rate to a few kHz for recording. Selections based on hadronic jets, their energy, and event topology reduce the rate to 𝒪(10) kHz while maintaining high efficiencies for important signatures resulting in b-quarks, but to reach the desired recording rate of hundreds of Hz, additional real-time selections based on the identification of jets containing b-hadrons (b-jets) are employed to achieve low thresholds on the jet transverse momentum at the High-Level Trigger. The configuration, commissioning, and performance of the real-time ATLAS b-jet identification algorithms for the early LHC Run 3 collision data are presented. These recent developments provide substantial gains in signal efficiency for critical signatures; for the Standard Model production of Higgs boson pairs, a 50% improvement in selection efficiency is observed in final states with four b-quarks or two b-quarks and two hadronically decaying τ-leptons.

47 OTHER INSTRUMENTATION↗

Commissioning of an MPGD-based Drift Chamber for Heavy-ion Tracking in FRIB's Sweeper magnet system

A newly developed drift chamber equipped with an innovative hybrid Micro-Pattern Gaseous Detector based readout was commissioned at FRIB. The detector consists of a Multi-layer Thick Gas Electron Multiplier (M-THGEM) mounted over a high-granularity, position-sensitive readout board. Denoted as the Micro-Pattern Drift Chamber (MPDC), the new device is used to provide tracking capability as part of the detectors of the Sweeper magnet system for neutron-invariant-mass spectrometry at the Facility for Rare Isotope Beams (FRIB). The localization of impinging ions in a 30 × 30 cm 2 drift area is derived by processing the charge-avalanche distribution induced on the segmented readout board. The signals induced on the readout pads are processed by a compact, multi-channel Data Acquisition System (DAQ) based on the Scalable Readout System (SRS). To facilitate synchronization with other detector systems of the Sweeper magnet system, the SRS has been configured to accept an external trigger.

Gaseous detectors↗

LCLS-II Helium Refrigeration System Commissioning Results

SLAC National Accelerator Laboratory has upgraded to LCLS-II, featuring a 4 GeV superconducting linear accelerator composed of 37 cryomodules and two large helium refrigeration systems with a cooling capacity of 4 kW at 2.0 K. The LCLS-II Helium Refrigeration System (HRS) consists of two compressor stations, each with a power of approximately 4.5 MW, two 4.5 K cold boxes, each with a power of 18 kW equivalent at 4.5 K, and two sets of cold compressors that can each produce a flow of 230 g/s at 31 mbar (2.0K). Performance tests of the HRS were meticulously planned and successfully carried out, with results demonstrating that it exceeded the process requirements for LCLS-II operations. This paper provides a detailed presentation of the LCLS-II HRS performance and the challenges encountered during the commissioning phase.

42 ENGINEERING↗

Commissioning Results of the ESR2 Compressors at JLab

Abstract The future operation of the 4 kW 15 Kelvin MOLLER experiment at Jefferson lab necessitates an increase of cryogenic capacity at the End Station Refrigerator. The current plant is the former 1.5 kW (4.5 K) ESCAR plant that has been operating at Jefferson Lab since 1995. The existing 1.5 kW plant is not able to support the load for MOLLER and will be replaced with a refurbished plant comprised of the cold box and compressors of the 4 kW ASST-A plant from the Superconducting Super Collider in Texas. This paper reports the commissioning results of the warm compressor system. We compare the compressors’ current and past performance, specifically examining their Isothermal and Volumetric efficiency. The results indicate that the refurbished equipment’s efficiency is comparable to its original performance, proving that the reuse and refurbishment of old systems is a worthwhile endeavor.

Perry, C. [Thomas Jefferson National Accelerator F↗

EC-Bench: A Benchmark for Enzyme Commission Number Prediction

Enzymes are proteins that catalyze specific biochemical reactions in cells. Enzyme Commission (EC) numbers are used to annotate enzymes in a four-level hierarchy that classifies enzymes based on the specific chemical reactions they catalyze. Accurate EC number prediction is essential for understanding enzyme functions. Despite the availability of numerous methods for predicting EC numbers from protein sequences, there is no unified framework for evaluating and studying such methods systematically. This gap limits the ability of the community to identify the most effective approaches for enzyme annotation. We introduce EC-Bench, a benchmark for EC number prediction, consisting of 1) an initial representative set of existing methods (including homology-based, deep learning, contrastive learning, and language model methods), 2) existing and novel accuracy and efficiency performance metrics, and 3) selected datasets to allow for comprehensive comparative study. EC-Bench is open-source and provides a framework for researchers to not only compare among existing methods objectively under uniform conditions, but also to introduce and effectively evaluate performance of new methods in a comparative framework. To demonstrate the utility of EC-Bench, we perform extensive experimentation to compare the existing EC number prediction methods and establish their advantages and disadvantages in a variety of prediction tasks, namely “exact EC number prediction”, “EC number completion” and (partial or additional) “EC number recommendation”. We find wide variation in the performance of different methods, but also subtle but potentially useful differences in the performance of different methods across tasks and for different parts of the EC hierarchy.

59 BASIC BIOLOGICAL SCIENCES↗

Commissioning of the Power Supplies and Coils of the SMART Tokamak

The small aspect ratio tokamak (SMART) is a spherical tokamak (ST) that offers unique capabilities for studying the potential of negative triangularity. It has been designed, constructed, and is currently being operated by the Plasma Science Fusion Technology (PSFT) Laboratory at the University of Seville. SMART has a total of 21 coils, organized into seven independent circuits and driven by five modular power supplies (PS). The PS operation relies on switching converter technology based on IGBT and supercapacitors (SCs). The PS delivers predefined current waveforms to the copper coil system consisting of the central solenoid (CS), 12 toroidal field (TF) coils, three series pairs of poloidal field (PF) coils, and two independent PF coils. This study details the commissioning and validation of the PS toroidal and solenoid coils, as well as the assembly of coils in SMART. The maximum rated current and slope were measured, along with the series impedance of the coils, the output current ripple, and the noise levels. The internal parameters of the SCs were measured, and optimized current profiles were proposed to enhance overall performance. A comparison has been made between the theoretical values and the experimental results, providing insight into the performance of the PS and areas for improvement.

Power electronics↗

Retro Commissioning Sensor Suitcase Plus v1

The Retro Commissioning Sensor Suitcase 2022 identifies four new energy efficiency opportunities (i.e., plug load energy savings potential, improve system operation schedule, improve setbacks on nights and weekends, and peak load reduction) and this codebase identifies those opportuntiies.

Fernandes, Samuel↗

Pacific Marine Energy Center Laser Doppler Velocimetry Commissioning

First commissioning data for the new laser doppler velocimetry (LDV) system that will be used at the Tyler Flume at the University of Washington. The LDV system can measure three components of velocity at a point. For this dataset the three components were operated in non-coincident mode and data were acquired at the center of the empty facility. Comparisons of freestream turbulence were made with a Vectrino slightly upstream of the LDV measurement location.

16 TIDAL AND WAVE POWER↗

1988 Delaware Valley Regional Planning Commission Household Travel Survey

The Delaware Valley Regional Planning Commission conducted household travel surveys in 1988 for the Delaware Valley region of Pennsylvania, which consists of Bucks, Chester, Delaware, Montgomery, and Philadelphia counties. The home interview travel survey was intended to measure the travel habits of area residents, and it generated needed information on trip generation rates, trip distribution, and model choice. This information was used for model calibration and validation on the trip generation, trip distribution, and model split models. The data includes demographic and socioeconomic details, as well as travel patterns, for 1,567 households. A total of 5,733 people reported a total of 18,899 trips. The survey was conducted on a weekday, Monday through Friday, and only ten survey locations contained weekend day travel.

1Hz data↗

2000 Delaware Valley Regional Planning Commission Household Travel Survey

This survey was conducted from March through December 2000 under the auspices of the Delaware Valley Regional Planning Commission and the Southern Jersey Transportation Planning Organization and funded through the Pennsylvania and New Jersey departments of transportation. Cambridge Systematics provided quality assurance under a subcontract to NuStats. The purpose of the survey was to obtain information about work and non-work trip generation, trip distribution, modal choice, and traffic assignment, as well as to obtain data on average vehicle occupancy. The dataset contains demographic and travel data on 5,677 households in the 14-county study area. Of those households, 4,217 were from the 10-county Delaware Valley region of Pennsylvania and New Jersey. The 4,217 Delaware Valley households, when weighted, represent 9,358 members and 6,069 vehicles, and reported a total of 31,631 trips.

1Hz data↗

1965 Bay Area Transportation Study Commission Travel Survey

The Bay Area Transportation Study (BATS) Commission collected data from 30,686 Bay Area households using a face-to-face, in-home survey for a regional travel study to better understand their transportation needs and preferences. These households represented about 2.1% of the 1,387,000 Bay Area households in 1965. All household members around five years old were asked to record their travel for one assigned travel day. Data from this survey were used in efforts to develop travel demand models from the mid-1960s to the late 1970s.

1Hz data↗

1981 Bay Area Metropolitan Transportation Commission Household Survey

The San Francisco Bay Area's Metropolitan Transportation Commission (MTC) conducted the study in 1981, collecting household and travel information by telephone from 6,209 households in the MTC's nine-county jurisdiction. The sample gave good geographic coverage and provided a good representation of the population groups in the Bay Area. The survey was primarily intended to measure weekday travel; however, the size of the weekend travel sample was sufficient to enable MTC to make inferences about weekend trip generation. Travel days in the sample were spread out evenly over the three-month interviewing period to eliminate seasonal bias.

1Hz data↗

The 1990 San Francisco Bay Area Metropolitan Transportation Commission Household Survey

The San Francisco Bay Area's Metropolitan Transportation Commission (MTC) and the regional transportation planning agency for the nine-county Bay Area conducted the survey. The basic purpose for the survey was for the development of travel demand models to simulate the various components of travel behavior: auto ownership, trip frequency (trip generation), and the distribution of trips between origins and destinations by travel mode. Planners at MTC envisioned the 1990 survey as the first wave of a multi-wave household panel survey designed to capture both short- and long-term changes in regional travel behavior. The 1990 survey collected single-weekday travel data from nearly 9,900 Bay Area households and multiple-weekday travel data from nearly 1,500 households. The 1990 survey effort also included a separate sub-project, funded by the Bay Area Rapid Transit (BART) District, to collect multiple-weekday travel data from 1,000 BART-using households. The BART survey and the MTC multiple-weekday survey were completed in the spring of 1990; the MTC single-weekday survey was continued and completed during the autumn of 1990.

1Hz data↗