Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Complex Decision-Making Applications for the NASA Space Launch System

The Space Shuttle program is ending and elements of the Constellation Program are either being cancelled or transitioned to new NASA exploration endeavors. The National Aeronautics and Space Administration (NASA) has worked diligently to select an optimum configuration for the Space Launch System (SLS), a heavy lift vehicle that will provide the foundation for future beyond low earth orbit (LEO) large-scale missions for the next several decades. Thus, multiple questions must be addressed: Which heavy lift vehicle will best allow the agency to achieve mission objectives in the most affordable and reliable manner? Which heavy lift vehicle will allow for a sufficiently flexible exploration campaign of the solar system? Which heavy lift vehicle configuration will allow for minimizing risk in design, test, build and operations? Which heavy lift vehicle configuration will be sustainable in changing political environments? Seeking to address these questions drove the development of an SLS decision-making framework. From Fall 2010 until Spring 2011, this framework was formulated, tested, fully documented, and applied to multiple SLS vehicle concepts at NASA from previous exploration architecture studies. This was a multistep process that involved performing figure of merit (FOM)-based assessments, creating Pass/Fail gates based on draft threshold requirements, performing a margin-based assessment with supporting statistical analyses, and performing sensitivity analysis on each. This paper discusses the various methods of this process that allowed for competing concepts to be compared across a variety of launch vehicle metrics. The end result was the identification of SLS launch vehicle candidates that could successfully meet the threshold requirements in support of the SLS Mission Concept Review (MCR) milestone.

Lyles, Garry↗

Complex Decision-Making Applications for the NASA Space Launch System

The Space Shuttle program is ending and elements of the Constellation Program are either being cancelled or transitioned to new NASA exploration endeavors. NASA is working diligently to select an optimum configuration for the Space Launch System (SLS), a heavy lift vehicle that will provide the foundation for future beyond LEO large ]scale missions for the next several decades. Thus, multiple questions must be addressed: Which heavy lift vehicle will best allow the agency to achieve mission objectives in the most affordable and reliable manner? Which heavy lift vehicle will allow for a sufficiently flexible exploration campaign of the solar system? Which heavy lift vehicle configuration will allow for minimizing risk in design, test, build and operations? Which heavy lift vehicle configuration will be sustainable in changing political environments? Seeking to address these questions drove the development of an SLS decisionmaking framework. From Fall 2010 until Spring 2011, this framework was formulated, tested, fully documented, and applied to multiple SLS vehicle concepts at NASA from previous exploration architecture studies. This was a multistep process that involved performing FOM-based assessments, creating Pass/Fail gates based on draft threshold requirements, performing a margin-based assessment with supporting statistical analyses, and performing sensitivity analysis on each. This paper discusses the various methods of this process that allowed for competing concepts to be compared across a variety of launch vehicle metrics. The end result was the identification of SLS launch vehicle candidates that could successfully meet the threshold requirements in support of the SLS Mission Concept Review (MCR) milestone.

Lyles, Garry↗

The Montana ALE (Autonomous Lunar Excavator) Systems Engineering Report

On May 2 1-26, 20 12, the third annual NASA Lunabotics Mining Competition will be held at the Kennedy Space Center in Florida. This event brings together student teams from universities around the world to compete in an engineering challenge. Each team must design, build and operate a robotic excavator that can collect artificial lunar soil and deposit it at a target location. Montana State University, Bozeman, is one of the institutions selected to field a team this year. This paper will summarize the goals of MSU's lunar excavator project, known as the Autonomous Lunar Explorer (ALE), along with the engineering process that the MSU team is using to fulfill these goals, according to NASA's systems engineering guidelines.

Lars Osborne↗

On-Orbit Propulsion System Performance of ISS Visiting Vehicles

The International Space Station (ISS) represents the culmination of over two decades of unprecedented global human endeavors to conceive, design, build and operate a research laboratory in space. Uninterrupted human presence in space since the inception of the ISS has been made possible by an international fleet of space vehicles facilitating crew rotation, delivery of science experiments and replenishment of propellants and supplies. On-orbit propulsion systems on both ISS and Visiting Vehicles are essential to the continuous operation of the ISS. This paper compares the ISS visiting vehicle propulsion systems by providing an overview of key design drivers, operational considerations and performance characteristics. Despite their differences in design, functionality, and purpose, all visiting vehicles must adhere to a common set of interface requirements along with safety and operational requirements. This paper addresses a wide variety of methods for satisfying these requirements and mitigating credible hazards anticipated during the on-orbit life of propulsion systems, as well as the seamless integration necessary for the continued operation of the ISS.

Martin, Mary Regina M.↗

Nuclear Thermal Rocket Element Environmental Simulator (NTREES) Upgrade Activities

Over the past year the Nuclear Thermal Rocket Element Environmental Simulator (NTREES) has been undergoing a significant upgrade beyond its initial configuration. The NTREES facility is designed to perform realistic non-nuclear testing of nuclear thermal rocket (NTR) fuel elements and fuel materials. Although the NTREES facility cannot mimic the neutron and gamma environment of an operating NTR, it can simulate the thermal hydraulic environment within an NTR fuel element to provide critical information on material performance and compatibility. The first phase of the upgrade activities which was completed in 2012 in part consisted of an extensive modification to the hydrogen system to permit computer controlled operations outside the building through the use of pneumatically operated variable position valves. This setup also allows the hydrogen flow rate to be increased to over 200 g/sec and reduced the operation complexity of the system. The second stage of modifications to NTREES which has just been completed expands the capabilities of the facility significantly. In particular, the previous 50 kW induction power supply has been replaced with a 1.2 MW unit which should allow more prototypical fuel element temperatures to be reached. The water cooling system was also upgraded to so as to be capable of removing 100% of the heat generated during. This new setup required that the NTREES vessel be raised onto a platform along with most of its associated gas and vent lines. In this arrangement, the induction heater and water systems are now located underneath the platform. In this new configuration, the 1.2 MW NTREES induction heater will be capable of testing fuel elements and fuel materials in flowing hydrogen at pressures up to 1000 psi at temperatures up to and beyond 3000 K and at near-prototypic reactor channel power densities. NTREES is also capable of testing potential fuel elements with a variety of propellants, including hydrogen with additives to inhibit corrosion of certain potential NTR fuel forms. Additional diagnostic upgrades included in the present NTREES set up include the addition of a gamma ray spectrometer located near the vent filter to detect uranium fuel particles exiting the fuel element in the propellant exhaust stream to provide additional information any material loss occurring during testing. Other aspects of the upgrade included reworking NTREES to reduce the operational complexity of the system despite the increased complexity of the induction heating system. To this end, many of the controls were consolidated on fewer panels. As part of this upgrade activity, the Safety Assessment (SA) and the Standard Operating Procedures (SOPs) for NTREES were extensively rewritten. The new 1.2 MW induction heater consists of three physical units consisting of a transformer, rectifier, and inverter. This multiunit arrangement facilitated increasing the flexibility of the induction heater by more easily allowing variable frequency operation. Frequency ranges between 20 and 60 kHz can be accommodated in the new induction heater allowing more representative power distributions to be generated within the test elements.

Emrich, William J., Jr.↗

Request-Driven Schedule Automation for the Deep Space Network

The DSN Scheduling Engine (DSE) has been developed to increase the level of automated scheduling support available to users of NASA s Deep Space Network (DSN). We have adopted a request-driven approach to DSN scheduling, in contrast to the activity-oriented approach used up to now. Scheduling requests allow users to declaratively specify patterns and conditions on their DSN service allocations, including timing, resource requirements, gaps, overlaps, time linkages among services, repetition, priorities, and a wide range of additional factors and preferences. The DSE incorporates a model of the key constraints and preferences of the DSN scheduling domain, along with algorithms to expand scheduling requests into valid resource allocations, to resolve schedule conflicts, and to repair unsatisfied requests. We use time-bounded systematic search with constraint relaxation to return nearby solutions if exact ones cannot be found, where the relaxation options and order are under user control. To explore the usability aspects of our approach we have developed a graphical user interface incorporating some crucial features to make it easier to work with complex scheduling requests. Among these are: progressive revelation of relevant detail, immediate propagation and visual feedback from a user s decisions, and a meeting calendar metaphor for repeated patterns of requests. Even as a prototype, the DSE has been deployed and adopted as the initial step in building the operational DSN schedule, thus representing an important initial validation of our overall approach. The DSE is a core element of the DSN Service Scheduling Software (S(sup 3)), a web-based collaborative scheduling system now under development for deployment to all DSN users.

Johnston, Mark D.↗

Flexible-Path Human Exploration

In the fourth quarter of 2009 an in-house, multi-center NASA study team briefly examined "Flexible Path" concepts to begin understanding characteristics, content, and roles of potential missions consistent with the strategy proposed by the Augustine Committee. We present an overview of the study findings. Three illustrative human/robotic mission concepts not requiring planet surface operations are described: assembly of very large in-space telescopes in cis-lunar space; exploration of near Earth objects (NEOs); exploration of Mars' moon Phobos. For each, a representative mission is described, technology and science objectives are outlined, and a basic mission operations concept is quantified. A fourth type of mission, using the lunar surface as preparation for Mars, is also described. Each mission's "capability legacy" is summarized. All four illustrative missions could achieve NASA's stated human space exploration objectives and advance human space flight toward Mars surface exploration. Telescope assembly missions would require the fewest new system developments. NEO missions would offer a wide range of deep-space trip times between several months and two years. Phobos exploration would retire several Marsclass risks, leaving another large remainder set (associated with entry, descent, surface operations, and ascent) for retirement by subsequent missions. And extended lunar surface operations would build confidence for Mars surface missions by addressing a complementary set of risks. Six enabling developments (robotic precursors, ISS exploration testbed, heavy-lift launch, deep-space-capable crew capsule, deep-space habitat, and reusable in-space propulsion stage) would apply across multiple program sequence options, and thus could be started even without committing to a specific mission sequence now. Flexible Path appears to be a viable strategy, with meaningful and worthy mission content.

Augustine↗

Exploration of Near-Term Potential Routes and Procedures for Urban Air Mobility

Urban air mobility is gaining interest as the need for On Demand Mobility in today's congested traffic is becoming high in metropolitan areas. Urban Air Mobility (UAM) is envisioned as a concept to transport passengers and cargo safely and efficiently using innovative aircraft in the urban areas. It is expected to improve mobility for the general public, decongest road traffic, reduce transport time and reduce the strain on existing public transport networks. There exist several challenges to Urban Air Mobility (UAM) such as integration of procedures with airspace and the airport, noise levels that are acceptable to the general public, public safety, public acceptance, vehicle certification, and more. Most of the research in the United States and European skies (DLR - German Aerospace Center) related to urban areas has focused on small UAS (Unmanned Aircraft Systems) flights (NASA's UTM (UAS Traffic Management) research) and their integration with the airspace and building safe operations in densely populated areas. Previous studies on UAM have focused on fast time simulations of the routes that are separated via a separation service and network of routes. Similarly, research in Europe has focused on the approach profile for these innovative aircraft, vertiports and battery life among others. UAM as a part of the On-Demand Mobility effort has provided some guidelines for operations as shown below: Does not require additional ATC (Air Traffic Control) infrastructure; Does not impose additional workload on ATC; Does not restrict operations of traditional airspace users; Will meet appropriate safety thresholds and requirements; Will prioritize operational scalability; Will allow flexibility where possible and structure where necessary. This paper explores potential routes and procedures in a Human-In-The-Loop (HITL) experiment that could be applied in the near-term to allow integration of UAM flights into the airspace as well as a large airport. The airspace that was explored was Dallas Fort Worth (DFW) airspace managed by the DFW East Tower in South Flow only. In addition, Dallas Love Field (DAL) and Addison (ADS) airspace were also part of the testbed. The initial set of routes investigated in this study were published helicopter routes in the DFW area. Figure 1 shows class B airspace in DFW area and the origin/destination city pairs where UAM flights flew along with helicopter routes shown in blue. The research focused on exploring procedures for integrating UAM flights into Class Bravo and Class Delta airspace. Three different communication procedures, evaluated with three different levels of UAM traffic, are shown in Table 1. The current day routes were evaluated with current day communication procedures were explored as the first condition. The current day routes were also evaluated in the second condition with reduced communications, which was assumed due to the presence of a Letter Of Agreement (LOA). The purpose of the LOA was to reduce the verbiage associated with pilots getting clearance to Class B airspace from the controllers, pre-assigning beacons codes to the UAM flights, separate routes by assigning altitudes and speeds to flights going in any one direction. Flights were expected to automatically change frequency when exiting Class B airspace, thus transition points for entry and exit points were also specified in the LOA.

Urban Air Mobility↗

Infrared Telescopes: An Invaluable Resource to Unravel the Mysteries of the Universe

Infrared telescopes are a powerful tool to probe a wide range of environments in the universe in order to understand how galaxies evolved over billions of years, how stars and planets form, and how life came to be. Observing in the infrared enables detecting the faint heat signals emitted by these far-distant objects, providing unique insights into the physical processes leading to the evolution of the universe and its contents.This presentation will provide an overview of some of the NASA missions under development, which aim to design, build and operate state-of-the art telescopes to address such scientific questions. Emphasis will be given to the James Webb Space Telescope, the technological challenges encountered during its realization and the countless spin-offs it has generated, which benefit life on Earth every day. My specific contributions to this project, as well as those from some ISAE-SUPAERO students who have worked with me, will be briefly highlighted.

Cataldo, Giuseppe↗

The Space Superhighway: A Cost Analysis of an In-Space Logistics Resupply Network

The Space Superhighway is a concept for an in-space logistics network for payload delivery and propellant resupply within the Earth-Moon system. It is expected that in the next several years the number of spacecraft in cislunar space will increase significantly. Commercial launch service providers have significantly reduced the cost of access to space and reduced the barrier to entry for private companies to build and operate their own satellites. Many of these newer satellites are being designed to take advantage of future In-space Servicing, Assembly, and Manufacturing (ISAM) capabilities. In addition, the National Aeronautics and Space Administration (NASA) intends to develop and maintain a sustained human presence in cislunar space and on the surface of the Moon. The sustained lunar presence will then serve as a steppingstone for human missions to Mars. The combined demand for propellant resupply and payload delivery in cislunar space for NASA's Moon to Mars campaign in addition to commercial ventures will likely exceed 1,000 t in the upcoming decades. This work presents a concept for an in-space logistics network to fulfill that demand. The network consists of commercial launch vehicles, propellant tankers, orbital depots, and in-space electric propulsion tugs. This work specifically analyzes the cost of developing, producing, and operating such a network at varying levels of customer demand.

nrho↗

The Space Superhighway: A Cost Analysis of an In-Space Logistics Resupply Network

The Space Superhighway is a concept for an in-space logistics network for payload delivery and propellant resupply within the Earth-Moon system. It is expected that in the next several years the number of spacecraft in cislunar space will increase significantly. Commercial launch service providers have significantly reduced the cost of access to space and reduced the barrier to entry for private companies to build and operate their own satellites. Many of these newer satellites are being designed to take advantage of future In-space Servicing, Assembly, and Manufacturing (ISAM) capabilities. In addition, the National Aeronautics and Space Administration (NASA) intends to develop and maintain a sustained human presence in cislunar space and on the surface of the Moon. The sustained lunar presence will then serve as a steppingstone for human missions to Mars. The combined demand for propellant resupply and payload delivery in cislunar space for NASA's Moon to Mars campaign in addition to commercial ventures will likely exceed 1,000 t in the upcoming decades. This work presents a concept for an in-space logistics network to fulfill that demand. The network consists of commercial launch vehicles, propellant tankers, orbital depots, and in-space electric propulsion tugs. This work specifically analyzes the cost of developing, producing, and operating such a network at varying levels of customer demand.

space superhighway↗

Design and operation of a solar heating and cooling system for a residential size building

The first year of operation of solar house is discussed. Selected design information, together with a brief system description is included. The house was equipped with an integrated solar heating and cooling system which uses fully automated state-of-the art. Evaluation of the data indicate that the solar house heating and cooling system is capable of supplying nearly 100 percent of the thermal energy required for heating and approximately 50 percent of the thermal energy required to operate the absorption cycle air conditioner.

Littles, J. W.↗

NASA's Next Generation Space Geodesy Program

Requirements for the ITRF have increased dramatically since the 1980s. The most stringent requirement comes from critical sea level monitoring programs: a global accuracy of 1.0 mm, and 0.1mm/yr stability, a factor of 10 to 20 beyond current capability. Other requirements for the ITRF coming from ice mass change, ground motion, and mass transport studies are similar. Current and future satellite missions will have ever-increasing measurement capability and will lead to increasingly sophisticated models of these and other changes in the Earth system. Ground space geodesy networks with enhanced measurement capability will be essential to meeting the ITRF requirements and properly interpreting the satellite data. These networks must be globally distributed and built for longevity, to provide the robust data necessary to generate improved models for proper interpretation of the observed geophysical signals. NASA has embarked on a Space Geodesy Program with a long-range goal to build, deploy and operate a next generation NASA Space Geodetic Network (SGN). The plan is to build integrated, multi-technique next-generation space geodetic observing systems as the core contribution to a global network designed to produce the higher quality data required to maintain the Terrestrial Reference Frame and provide information essential for fully realizing the measurement potential of the current and coming generation of Earth Observing spacecraft. Phase 1 of this project has been funded to (1) Establish and demonstrate a next-generation prototype integrated Space Geodetic Station at Goddard's Geophysical and Astronomical Observatory (GGAO), including next-generation SLR and VLBI systems along with modern GNSS and DORIS; (2) Complete ongoing Network Design Studies that describe the appropriate number and distribution of next-generation Space Geodetic Stations for an improved global network; (3) Upgrade analysis capability to handle the next-generation data; (4) Implement a modern survey system to measure inter-technique vectors for co-location; and (5) Develop an Implementation Plan to build, deploy and operate a next-generation integrated NASA SGN that will serve as NASA's contribution to the international global geodetic network. An envisioned Phase 2 (which is not currently funded) would include the replication of up to ten such stations to be deployed either as integrated units or as a complement to already in-place components provided by other organizations. This talk will give an update on the activities underway and the plans for completion.

Merkowitz, S. M.↗

NASA's Next Generation Space Geodesy Program

Requirements for the ITRF have increased dramatically since the 1980s. The most stringent requirement comes from critical sea level monitoring programs: a global accuracy of 1.0 mm, and 0.1mm/yr stability, a factor of 10 to 20 beyond current capability. Other requirements for the ITRF coming from ice mass change, ground motion, and mass transport studies are similar. Current and future satellite missions will have ever-increasing measurement capability and will lead to increasingly sophisticated models of these and other changes in the Earth system. Ground space geodesy networks with enhanced measurement capability will be essential to meeting the ITRF requirements and properly interpreting the satellite data. These networks must be globally distributed and built for longevity, to provide the robust data necessary to generate improved models for proper interpretation of the observed geophysical signals. NASA has embarked on a Space Geodesy Program with a long-range goal to build, deploy and operate a next generation NASA Space Geodetic Network (SGN). The plan is to build integrated, multi-technique next-generation space geodetic observing systems as the core contribution to a global network designed to produce the higher quality data required to maintain the Terrestrial Reference Frame and provide information essential for fully realizing the measurement potential of the current and coming generation of Earth Observing spacecraft. Phase 1 of this project has been funded to (1) Establish and demonstrate a next-generation prototype integrated Space Geodetic Station at Goddard s Geophysical and Astronomical Observatory (GGAO), including next-generation SLR and VLBI systems along with modern GNSS and DORIS; (2) Complete ongoing Network Design Studies that describe the appropriate number and distribution of next-generation Space Geodetic Stations for an improved global network; (3) Upgrade analysis capability to handle the next-generation data; (4) Implement a modern survey system to measure inter-technique vectors for co-location; and (5) Develop an Implementation Plan to build, deploy and operate a next-generation integrated NASA SGN that will serve as NASA s contribution to the international global geodetic network. An envisioned Phase 2 (which is not currently funded) would include the replication of up to ten such stations to be deployed either as integrated units or as a complement to already in-place components provided by other organizations. This talk will give an update on the activities underway and the plans for completion.

Pearlman, M. R.↗

Simulated Tiltrotor Aircraft Operation in Close Proximity to a Building in Wind and Ground-Effect Conditions

A mid-fidelity computational fluid dynamics tool called RotCFD specifically developed to aid in rotorcraft studies has been applied to the study of wake interactions of civiltiltrotor aircraft in the immediate vicinity of buildings, in- and out-of-ground-effect, with and without winds, consistent with notional tiltrotor operations from urban vertiports. Such civil tiltrotor operations from urban vertiports could potentially enable city-center-to-city center commercial transport. However, in order to one day realize such civil tiltrotor operations, though, it is necessary to better understand the wake interaction and interactional aerodynamic operating environment of urban vertiports. In the early 2000s, a series of 7-by-10 Ft. wind tunnel tests were conducted at NASA Ames Research Center that began to explore some of these civil tiltrotor and vertiport wake interactioninteractional aerodynamics issues. This study seeks to validate computation fluid dynamic predictions against these early wind tunnel experimental results and, thereby, continue exploration of this important research area.

Rotorcraft↗

Environmental Assessment for Central Campus Complex John F. Kennedy Space Center, Florida

This Environmental Assessment addresses the Proposed Action to consolidate multiple facilities in the Kennedy Space Center (KSC) Industrial Area by constructing two new buildings in the existing headquarters area between NASA Parkway, 3rd Street, C Avenue, and D Avenue. Under the Proposed Action, the historic Headquarters Building will be demolished and a new building will be constructed closer to the Operations and Checkout Building by centering it on D A venue (Hunton Brady Architects, P A and Jones Edmunds and Associates, Inc. 2011). This option was selected from a group of 15 initial sketches as the most viable option during a Central Campus Complex Siting Study completed in February 2011. A No-Action Alternative is also presented in which no demolition or construction of new facilities would occur. Implementing the Proposed Action will have major impacts to cultural resources, while the remaining environmental impacts will be minor.

Dankert, Donald↗

MMIC-I: A Robotic Platform for Assembly Integration and Internal Locomotion through Mechanical Meta-Material Structures

In-space assembly is crucial to creating large-scale space structures and enabling long term space missions. Natural limitations in the size of transportation vehicles and ISRU production facilities necessitate an additive strategy with the size of the typical structural unit being essentially fixed and inversely proportional to the final assembly size. In prior robotic and space assembly examples, reversible mechanical integration of structural modules is typically achieved with actuated alignment and fastening mechanisms onboard every structural module. Additive assembly or manufacturing planning approaches often feature a “build front” that receives new materials or parts and progresses gradually across the target geometry. The system we describe here places much of the alignment and fastener actuation systems onboard a mobile robot that can operate at a build front while companion robots (Scaling Omni-directional Lattice Locomoting Explorer, SOLLE) provide part or material transportation. The design and evaluation of this Mobile Meta-Material Interior Co-Integrator (MMIC-I), an inchworm-style locomoting robotic assembler, is described here with an emphasis on ease of assembly and a low number of unique parts for a simple design. It is designed to assist in alignment of cuboctahedron structural unit cells with captive fasteners, defining the build front in operation. Adjacent structural unit cells are locked together with specified axial and rotational actuation of the fasteners. Hardware prototypes show that the robot is able to successfully locomote to any indexed location within a lattice structure and bolt together each set of fasteners on any interface.

Robotics↗

Long-Term Groundwater Monitoring Report Industrial Area Kennedy Space Center, Florida

This report presents the 2023 groundwater sampling results from the National Aeronautics and Space Administration (NASA) Industrial Area (IA) Long-Term Monitoring (LTM) activities. Due to the project contract ending in 2023, this report presents one year of LTM activities instead of the two-year timeframe presented in previous reports. The NASA IA LTM Program includes the following 12 sites: - Ransom Road Landfill (RRLF) – Solid Waste Management Unit (SWMU) 003 - Building M7-0505 Treatment Tank Area (M505) – SWMU 039 - Operations and Checkout Building (O&C) – SWMU 076 - Vertical Processing Facility (VPF) – SWMU 077 - Environmental Health Facility (EHF) – SWMU 079 - Kennedy Athletic, Recreation, and Social Park 1 (KARS Park 1) – SWMU 084 - Engineering Development Laboratory (EDL) – SWMU 085 - Launch Equipment Test Facility (LETF) – SWMU 091 - Mobil Service Station (MOBIL) – SWMU 093 - General Services Administration Seized Property (GSSP) – SWMU 095 - Space Station Processing Facility (SSPF) – SWMU 098 - Fuel Storage Area #1 Underground Storage Tank [Building 1044] (FSA1) – Potential Release Location (PRL) 157 Sampling events for the IA LTM Program are conducted seasonally during the dry and wet seasons, which occur in May and November, respectively. The sites in the NASA IA LTM Program are sampled on annual, biennial, or 5-year sampling frequencies based on historical trends. The current sampling frequencies for the NASA IA LTM sites are as follows: - FSA1 is sampled annually, alternating between wet and dry seasons. - GSSP is sampled annually during the wet season. - Seven sites are sampled biennially, alternating between the wet and dry seasons (RRLF, M505, O&C, VPF, LETF, MOBIL, and SSPF). - EHF and EDL are sampled biennially during the wet season. - KARS Park 1 is sampled once every 5 years.

remediation↗