Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “backup power systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

112 records · Page 7

Advanced High-Performance Computational Modeling of the Seismic Response of High-Hazard and/or Nuclear Facilities and Critical Infrastructure at the NNSS

New methods for predicting the amplitude and variability of ground shaking from earthquakes (and explosions) are needed for seismic hazard analysis for buildings, nuclear power plants, and critical infrastructure at the NNSS. We are comparing existing 1-D and new 3-D geophysical methods for estimating the shear-wave velocity structure in the upper 30 meters of the ground surface (Vs30), which plays a major role in ground motion amplification and seismic response of buildings. We evaluate the performance of these methodologies at the U1a Complex at the NNSS and develop simple 1-D and high-resolution 3-D Vs30 models. We then emplace these high-resolution models into a background seismic velocity model. We will collaborate with Lawrence Livermore National Laboratory (LLNL) to conduct numerical modeling of the ground shaking at the NNSS using their high-performance computing technology and state-of-the-art ground motion simulation methodology. The primary work that was completed in FY 2019 was to acquire the seismic systems and familiarize staff at the NNSS with their use. We also worked on developing a collection plan with the Device Assembly Facility (DAF) at the NNSS, but due to time constraints and other ongoing projects at the DAF, we had to use U1a as a backup. We were able to coordinate the seismic survey, and we will complete the collection of seismic data in FY 2020. Additionally, during FY 2019, we completed the geologic framework model (GFM) for the U1a Complex and modeled the Yucca fault. LLNL worked with us through FY 2019 to prepare the data files for their modeling software and tested the software for reliability. In FY 2020 we will develop the end-to-end capability so that any facility could easily be modeled and the expected shaking from a local earthquake understood. The work in FY 2020 will include building fault models from the GFM and finalizing the velocity model analysis. The final simulations will be run for multiple rupture models, and final assessments will demonstrate the seismic hazard at the U1a Complex.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Applications of Measuring and Valuing Resilience in Energy Systems

The electricity sector is vulnerable to numerous hazards that are being exacerbated by climate change, which can cause an increase in the hazards' frequency and intensity. Consumers, system regulators, system operators, and communities are now preparing to mitigate the increased risks posed by climate change. New York State's energy infrastructure resilience can be increased with targeted investments including but not limited to installing emergency backup systems, integrating microgrid solutions, weatherizing buildings, increasing energy efficiency, adding redundancy, investing in restoration and recovery, and hardening critical components. Such investments can reduce the likelihood, impact, and consequences of disruptive events but can also increase capital and operating costs. A barrier to prioritizing investments in resilience is that there is no widely established method for quantifying and assigning the benefits of resilience investments across various stakeholders. Decision-makers need better information detailing the value of resilience improvements. Developing methods to quantify, value, and price resilience helps meet resilience needs in an effective manner that also supports broader societal welfare. This report lays out considerations for quantifying and valuing resilience, discusses the current state of resilience valuation tools, and provides case studies of resilience projects that demonstrate how resilience attributes could be measured while highlighting broader, project-specific challenges to increasing resilience. Further, we present insights into methods and challenges to measuring, valuing, and enacting resilience investments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Digital Grid Twin–Direct Communication Scheme Test Bed for Assessing Relay-to-Relay Radio Antenna and Optical Fiber Performance and Misoperations

This study introduces a novel “Digital Grid Twin–Direct Communication Scheme” test bed. This advanced platform evaluates point-to-point communication between transmitter and receiver relays with optical fiber and radio omnidirectional antenna systems, implemented at the Advanced Protection lab in the Grid Research Innovation and Development Center at Oak Ridge National Laboratory. The increased diversity of energy sources has led to more protective relay misoperations. In North America, microgrid protection schemes now use point-to-point communication along distribution lines between relays to implement advanced logic in nonradial grids that include both high- and low-inertia generators. This trend challenges utilities to minimize misoperations while ensuring rapid fault clearance and accurate selectivity coordination between primary and backup relays. This study assesses relay-to-relay communication schemes by introducing an advanced testing platform based on a digital grid twin protection test bed using a synchronized time source system. The platform evaluates the communication system using radio antennas or optical fiber links by integrating protective relays that operate breakers within the digital twin and record relay events and communication signals. In the experiments, transmitter and receiver relays were configured with inverse time overcurrent and breaker trip detection logic to assess the total time of the communication protection schemes based on the sum of the relay protection element operating time, radio latency, propagation delay, baud rate delay, and relay processing time. These delays were derived from recorded relay events and communication signals from the interface of a real-time simulator set as a digital grid twin. The test bed successfully simulated various electrical faults along a distribution line while ensuring effective and reliable point-to-point communication between transmitter and receiver relays. The radio antenna communication system exhibited latency because of the radio. This latency depends on the baud rate setting and type of radio application; in general, the higher the baud rate, the lower the radio latency. The measured radio latency (for Mirrored Bits with an encryption card at 9,600 bps) was about 9–10 ms. Additionally, calculated propagation delay per mile for radio antennas and optical fiber was 5.36 µs/mi and 8.04 µs/mi, respectively. Optical fiber communication did not demonstrate radio latency. Instead, the protection element operating time depends mainly on the protection logic function set in the relay, and the relay processing time depends on the processing rate of the relay in samples per power system cycle.

24 POWER TRANSMISSION AND DISTRIBUTION↗