Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “adaptive test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

NASA's Space Launch System Development Status

Development of the National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than 3 years after formal program establishment. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of core stage test barrels and domes; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for RS- 25 core stage engine testing; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. The Program successfully completed Preliminary Design Review in 2013 and will complete Key Decision Point C in 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS Program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

Software tools for operations and maintenance planning at Jefferson Lab

Time for maintenance, repair and testing is a precious commodity. A queue of pre-planned work is critical to taking advantage of unplanned repair downtime to squeeze in extra work. Jefferson Lab has a web-based tool called ATLis (Accelerator Task List) that collects work plans and routes them for review. By means of templates, requests for software installation and beam studies are also planned through ATLis. The entire list of ATLis work plans is available to all authenticated users who may append comments and additional information to any task at any time. ATLis is also integrated into the Operations Electronic Logbook and Operations Reporting system, so it is possible to see at a glance if a work plan is pending in ATLis to address an outstanding problem report. Following the successful adoption of ATLis by the Operations department, the software has been installed for and adapted to the work planning of additional groups at Jefferson Lab including Cryogenics and the Free Elect

43 PARTICLE ACCELERATORS↗

Mitigating Impact Through Community-Engaged Flood Modeling

Urban pluvial flooding poses a growing threat to the city of Baltimore, driven by heavy rainfall, increased impervious area, and aging infrastructure. Adapting to the risks posed by pluvial flooding is critical for building greater climate resiliency in Baltimore's Inner Harbor Watershed. This study addresses these challenges through community-informed decision analysis, which uses hydrologic modeling and optimization tools to identify robust flooding adaptation pathways. We will collaborate with community partners to identify key concerns and objectives regarding flooding. These concerns have been purposefully built in to a combined surface-subsurface dynamic flow simulation model. Model outputs are used to identify flooding locations within the Inner Harbor, and to test adaptation methods. Machine learning will be used search for solutions which meet diverse environmental, financial, and social goals, and solution performance will be examined under a wide range of potential future climatic conditions and integrated with an adaptive planning approach. This novel set of adaptation pathways will enhance the City's capacity to respond to evolving pluvial flood risk.

climate resilience↗

Comparative evaluation of ERTS-A imagery for resource inventory in land-use planning

There are no author-identified significant results in this report. The overall objectives of this program are: (1) use of multidiscipline team approach to determine features that can be successfully monitored by ERTS-1 imagery for resource inventory, planning, land use zoning, and resource development; and (2) using carefully selected sample areas, develop a comprehensive resource inventory mapping system for use in planning, zoning, and resource development. Progress has included compilation and organization of ground truth data and observations in the primary study area of Crook County; resource inventory legend development; assembly and testing of color enhancement equipment; development and adaption of programs for digital data processing; and quick-look evaluations of initial ERTS-1 imagery for Oregon.

Simonson, G. H.↗

Man in space - The use of animal models

The use of animal surrogates as experimental subjects in order to provide essential missing information on the effects of long-term spaceflights, to validate countermeasures, and to test medical treatment techniques is discussed. Research needs also include the definition of biomedical adaptations to flight, and the developments of standards for safe space missions to assure human health and productivity during and following flight. NASA research plans in this area are outlined. Over the next 40 years, NASA plans to concentrate on the use of rodents and nonhuman primates as the models of choice for various physiological responses observed in humans during extended stays in space. This research will include flights on the Space Shuttle, unmanned biosatellites, and the Space Station Freedom.

Ballard, Rodney W.↗

Space Launch System Development Status

Development of NASA's Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than three years after formal program approval. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of Core Stage test panels; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for testing the RS-25 Core Stage engine; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. Objectives of this Earth-orbit flight include validating the performance of Orion's heat shield and the MSA design, which will be manufactured again for SLS missions to deep space. The Program successfully completed Preliminary Design Review in 2013 and Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

SU-G-TeP1-06: Fast GPU Framework for Four-Dimensional Monte Carlo in Adaptive Intensity Modulated Proton Therapy (IMPT) for Mobile Tumors

Purpose: To demonstrate the feasibility of fast Monte Carlo (MC) treatment planning and verification using four-dimensional CT (4DCT) for adaptive IMPT for lung cancer patients. Methods: A validated GPU MC code, gPMC, has been linked to the patient database at our institution and employed to compute the dose-influence matrices (Dij) on the planning CT (pCT). The pCT is an average of the respiratory motion of the patient. The Dijs and patient structures were fed to the optimizer to calculate a treatment plan. To validate the plan against motion, a 4D dose distribution averaged over the possible starting phases is calculated using the 4DCT and a model of the time structure of the delivered spot map. The dose is accumulated using vector maps created by a GPU-accelerated deformable image registration program (DIR) from each phase of the 4DCT to the reference phase using the B-spline method. Calculation of the Dij matrices and the DIR are performed on a cluster, with each field and vector map calculated in parallel. Results: The Dij production takes ∼3.5s per beamlet for 10e6 protons, depending on the energy and the CT size. Generating a plan with 4D simulation of 1000 spots in 4 fields takes approximately 1h. To test the framework, IMPT plans for 10 lung cancer patients were generated for validation. Differences between the planned and the delivered dose of 19% in dose to some organs at risk and 1.4/21.1% in target mean dose/homogeneity with respect to the plan were observed, suggesting potential for improvement if adaptation is considered. Conclusion: A fast MC treatment planning framework has been developed that allows reliable plan design and verification for mobile targets and adaptation of treatment plans. This will significantly impact treatments for lung tumors, as 4D-MC dose calculations can now become part of planning strategies.

60 APPLIED LIFE SCIENCES↗

Developing a small participant framework: An investigation of mode choice influential factors

An in-depth comprehension of the changing impact of mode choice influencing factors is essential in planning for behavior-adaptive mode shift policies. This study developed a framework to investigate a method of evaluation of the changes in mode choice using a small participation pool. A field application in Pima County, Arizona was developed to test the developed framework to evaluate the impact of a real transit experience. Twenty-two participants were recruited and repeated measurements were taken before and after their transit trip. The results revealed that people are less susceptible to their mental biases after a transit trip and consider more objective elements such as walking time. The developed framework resulted in successful evaluation methods that are reproducible for other application study designs. Thus, the results further present that low participant recruitment in application-based field studies can be accomplished using this developed methodology, for other regions and studies.

99 GENERAL AND MISCELLANEOUS↗

Adaptive wall research with two- and three-dimensional models in low speed and transonic tunnels

This paper summarises recent research at the University of Southampton into adaptive wall technology and outlines the direction of current efforts. The work is aimed at developing techniques for use in test sections where the top and bottom walls may be adjusted in single curvature. Wall streamlining eliminates, as far as experimentally possible, the top and bottom wall interference in low speed and transonic aerofoil testing. A streamlining technique has been developed for low speeds which allows the testing of swept wing panels in low interference environments. At higher speeds, a comparison of several two-dimensional transonic streamlining algorithms has been made and a technique for streamlining with a choked test section has also been developed. Three-dimensional work has mainly concentrated on tests of sidewall mounted half-wings and the development of the software packages required to assess interference and to adjust the flexible walls. It has been demonstrated that two-dimensional wall adaptation can significantly modify the level of wall interference around relatively large three-dimensional models. The residual interferences are small and are probably amenable to standard post-test correction methods. Tests on a calibrated wing-body model are planned in the near future to further validate the proposed streamlining technique.

Lewis, M. C.↗

Robust and Opportunistic Autonomous Science for a Potential Titan Aerobot

We are developing onboard planning and execution technologies to provide robust and opportunistic mission operations for a potential Titan aerobot. Aerobot have the potential for collecting a vast amount of high priority science data. However, to be effective, an aerobot must address several challenges including communication constraints, extended periods without contact with Earth, uncertain and changing environmental conditions, maneuverability constraints and potentially short-lived science opportunities. We are developing the AerOASIS system to develop and test technology to support autonomous science operations for a potential Titan Aerobot. The planning and execution component of AerOASIS is able to generate mission operations plans that achieve science and engineering objectives while respecting mission and resource constraints as well as adapting the plan to respond to new science opportunities. Our technology leverages prior work on the OASIS system for autonomous rover exploration. In this paper we describe how the OASIS planning component was adapted to address the unique challenges of a Titan Aerobot and we describe a field demonstration of the system with the JPL prototype aerobot.

autonomous science↗

Level of effort

The generation of a planar model of the ground test experiment structure is examined. This was done by adapting an in-house modal analysis code (Gimbalflex) to allow placement of sensors and actuators at certain locations on the structure. The next step in the development of this model was to adapt if for use with the control pole placement algorithm. The uncontrollable rigid body mode was removed from the model. This uncontrollable mode was due to the pointing of the gimbal. Control system design for the planar model was also initiated. A digital controller was planned utilizing the Control Pole Placement technique. The existence of rate of state feedback was assumed. Once this controller and other control algorithms were developed, it became necessary to conduct speed tests. A study was then made of additional hardware/software necessary to meet the speed requirement.

Source record↗

Aluminum Clad Spent Nuclear Fuel Task 4: Performance of Aluminum SNF in Dry Storage Experiment Test Plan

This document presents the activities to be performed in support of understanding the performance of aluminum spent nuclear fuel (ASNF) in dry storage. These activities will visually examine and acquire baseline samples of as-irradiated ATR fuel assembly components to determine fuel condition and the morphology of the aluminum oxyhydroxides present on the fuel external surfaces. Because the boehmite phase of oxyhydroxide is projected to be a significant contributor to radiolytic hydrogen production and general corrosion, being able to quantify its presence is of major importance to long term storage of aluminum spent nuclear fuel. Baseline samples will be taken from irradiated end adapters, removed from ATR SNF elements, stored in the ATR Canal. These will be transferred to Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) to perform non-destructive and destructive testing to determine the degree of hydration of the wet-stored aluminum components prior to drying and air storage. Examination of the dry stored SNF at Idaho Nuclear Technology and Engineering Center (INTEC) in CPP-603 Irradiated Fuel Storage Facility (IFSF) will allow the opportunity to identify gross degradation and as conditions permit, sample the surface oxide on fueled and un-fueled portions of the stored assemblies. The information resulting from analysis of the ATR Canal samples will be used to support validation of surrogate samples prepared under Task 6, sample surrogate preparation, and used in Task 1, oxyhydroxide layer behavior and chemistry, Task 2, oxide layer radiolytic gas generation, and Task 5, oxide layer response to drying. Surface oxide samples collected from SNF in IFSF dry storage will SNF dry storage prediction modeling from Task 3, sealed and vented system episodic breathing and gas generation prediction.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Irradiation Planning for Fully-Ceramic Micro-encsapsulated fuel in ATR at LWR-relevant conditions: year-end report on FY-2011

This report presents the estimation of required ATR irradiation levels for the DB-FCM fuel design (fueled with Pu and MAs). The fuel and assembly designs are those considered in a companion report [R. S. Sen et al., FCR&D-2011- 00037 or INL/EXT-11-23269]. These results, pertaining to the DB-FCM fuel, are definitive in as much as the design of said fuel is definitive. In addition to the work performed, as required, for DB-FCM fuel, work has started in a preliminary fashion on single-cell UO2 and UN fuels. These latter activities go beyond the original charter of this project and although the corresponding work is incomplete, significant progress has been achieved. However, in this context, all that has been achieved is only preliminary because the corresponding fuel designs are neither finalized nor optimized. In particular, the UO2 case is unlikely to result in a viable fuel design if limited to enrichment at or under 20 weight % in U-235. The UN fuel allows reasonable length cycles and is likely to make an optimal design possible. Despite being limited to preliminary designs and offering only preliminary conclusions, the irradiation planning tasks for UO2 and UN fuels that are summarized in this report are useful to the overall goal of devising and deploying FCM-LWR fuel since the methods acquired and tested in this project and the overall procedure for planning will be available for planning tests for the finalized fuel design. Indeed, once the fuel design is finalized and the expected burnup level is determined, the methodology that has been assembled will allow the prompt finalization of the neutronic planning of the irradiation experiment and would provide guidance on the expected experimental performance of the fuel. Deviations from the expected behavior will then have to be analyzed and the outcome of the analysis may be corrections or modifications for the assessment models as well as, possibly, fuel design modifications, and perhaps even variation of experimental control for future experimental phases. Besides the prediction of irradiation times, preliminary work was carried out on other aspects of irradiation planning. In particular, a method for evaluating the interplay of depletion, material performance modeling and irradiation is identified by reference to a companion report. Another area that was addressed in a preliminary fashion is the identification and selection of a strategy for the physical and mechanical design of the irradiation experiments. The principal conclusion is that the similarity between the FCM fuel and the fuel compacts of the Next Generation Nuclear Plant prismatic design are strong enough to warrant using irradiation hardware designs and instrumentation adapted from the AGR irradiation tests. Modifications, if found necessary, will probably be few and small, except as pertains to the water environment and its implications on the use of SiC cladding or SiC matrix with no additional cladding.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

TESTING OF ENHANCED CHEMICAL CLEANING OF SRS ACTUAL WASTE TANK 5F AND TANK 12H SLUDGES

Forty three of the High Level Waste (HLW) tanks at the Savannah River Site (SRS) have internal structures that hinder removal of the last approximately five thousand gallons of waste sludge solely by mechanical means. Chemical cleaning can be utilized to dissolve the sludge heel with oxalic acid (OA) and pump the material to a separate waste tank in preparation for final disposition. This dissolved sludge material is pH adjusted downstream of the dissolution process, precipitating the sludge components along with sodium oxalate solids. The large quantities of sodium oxalate and other metal oxalates formed impact downstream processes by requiring additional washing during sludge batch preparation and increase the amount of material that must be processed in the tank farm evaporator systems and the Saltstone Processing Facility. Enhanced Chemical Cleaning (ECC) was identified as a potential method for greatly reducing the impact of oxalate additions to the SRS Tank Farms without adding additional components to the waste that would extend processing or increase waste form volumes. In support of Savannah River Site (SRS) tank closure efforts, the Savannah River National Laboratory (SRNL) conducted Real Waste Testing (RWT) to evaluate an alternative to the baseline 8 wt. % OA chemical cleaning technology for tank sludge heel removal. The baseline OA technology results in the addition of significant volumes of oxalate salts to the SRS tank farm and there is insufficient space to accommodate the neutralized streams resulting from the treatment of the multiple remaining waste tanks requiring closure. ECC is a promising alternative to bulk OA cleaning, which utilizes a more dilute OA (nominally 2 wt. % at a pH of around 2) and an oxalate destruction technology. The technology is being adapted by AREVA from their decontamination technology for Nuclear Power Plant secondary side scale removal. This report contains results from the SRNL small scale testing of the ECC process using SRS sludge tank sample material. A Task Technical and Quality Assurance Plan (TTQAP) details the experimental plan as outlined by the Technical Task Request (TTR). The TTR identifies that the data produced by this testing and results included in this report will support the technical baseline with portions having a safety class functional classification. The primary goals for SRNL RWT are as follows: (1) to confirm ECC performance with real tank sludge samples, (2) to determine the impact of ECC on fate of actinides and the other sludge metals, and (3) to determine changes, if any, in solids flow and settling behavior.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

Application of Condition-Based Monitoring Techniques for Remote Monitoring of a Simulated Gas Centrifuge Enrichment Plant

This paper presents research into the adaptation of monitoring techniques from maintainability and reliability (M&R) engineering for remote unattended monitoring of gas centrifuge enrichment plants (GCEPs) for international safeguards. Two categories of techniques are discussed: the sequential probability ratio test (SPRT) for diagnostic monitoring, and sequential Monte Carlo (SMC or, more commonly, particle filtering ) for prognostic monitoring. Development and testing of the application of condition-based monitoring (CBM) techniques was performed on the Oak Ridge Mock Feed and Withdrawal (F&W) facility as a proof of principle. CBM techniques have been extensively developed for M&R assessment of physical processes, such as manufacturing and power plants. These techniques are normally used to locate and diagnose the effects of mechanical degradation of equipment to aid in planning of maintenance and repair cycles. In a safeguards environment, however, the goal is not to identify mechanical deterioration, but to detect and diagnose (and potentially predict) attempts to circumvent normal, declared facility operations, such as through protracted diversion of enriched material. The CBM techniques are first explained from the traditional perspective of maintenance and reliability engineering. The adaptation of CBM techniques to inspector monitoring is then discussed, focusing on the unique challenges of decision-based effects rather than equipment degradation effects. These techniques are then applied to the Oak Ridge Mock F&W facility a water-based physical simulation of a material feed and withdrawal process used at enrichment plants that is used to develop and test online monitoring techniques for fully information-driven safeguards of GCEPs. Advantages and limitations of the CBM approach to online monitoring are discussed, as well as the potential challenges of adapting CBM concepts to safeguards applications.

Condition-Based Monitoring↗

TH-A-19A-09: Towards Sub-Second Proton Dose Calculation On GPU

Purpose: To achieve sub-second dose calculation for clinically relevant proton therapy treatment plans. Rapid dose calculation is a key component of adaptive radiotherapy, necessary to take advantage of the better dose conformity offered by hadron therapy. Methods: To speed up proton dose calculation, the pencil beam algorithm (PBA; clinical standard) was parallelised and implemented to run on a graphics processing unit (GPU). The implementation constitutes the first PBA to run all steps on GPU, and each part of the algorithm was carefully adapted for efficiency. Monte Carlo (MC) simulations obtained using Fluka of individual beams of energies representative of the clinical range impinging on simple geometries were used to tune the PBA. For benchmarking, a typical skull base case with a spot scanning plan consisting of a total of 8872 spots divided between two beam directions of 49 energy layers each was provided by CNAO (Pavia, Italy). The calculations were carried out on an Nvidia Geforce GTX680 desktop GPU with 1536 cores running at 1006 MHz. Results: The PBA reproduced within ±3% of maximum dose results obtained from MC simulations for a range of pencil beams impinging on a water tank. Additional analysis of more complex slab geometries is currently under way to fine-tune the algorithm. Full calculation of the clinical test case took 0.9 seconds in total, with the majority of the time spent in the kernel superposition step. Conclusion: The PBA lends itself well to implementation on many-core systems such as GPUs. Using the presented implementation and current hardware, sub-second dose calculation for a clinical proton therapy plan was achieved, opening the door for adaptive treatment. The successful parallelisation of all steps of the calculation indicates that further speedups can be expected with new hardware, brightening the prospects for real-time dose calculation. This work was funded by ENTERVISION, European Commission FP7 grant 264552.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SU-E-J-73: Extension of a Clinical OIS/EMR/R&V System to Deliver Safe and Efficient Adaptive Plan-Of-The-Day Treatments Using a Fully Customizable Plan-Library-Based Workflow

Purpose: To extend a clinical Record and Verify (R&V) system to enable a safe and fast workflow for Plan-of-the-Day (PotD) adaptive treatments based on patient-specific plan libraries. Methods: Plan libraries for PotD adaptive treatments contain for each patient several pre-treatment generated treatment plans. They may be generated for various patient anatomies or CTV-PTV margins. For each fraction, a Cone Beam CT scan is acquired to support the selection of the plan that best fits the patient’s anatomy-of-the-day. To date, there are no commercial R&V systems that support PotD delivery strategies. Consequently, the clinical workflow requires many manual interventions. Moreover, multiple scheduled plans have a high risk of excessive dose delivery. In this work we extended a commercial R&V system (MOSAIQ) to support PotD workflows using IQ-scripting. The PotD workflow was designed after extensive risk analysis of the manual procedure, and all identified risks were incorporated as logical checks. Results: All manual PotD activities were automated. The workflow first identifies if the patient is scheduled for PotD, then performs safety checks, and continues to treatment plan selection only if no issues were found. The user selects the plan to deliver from a list of candidate plans. After plan selection, the workflow makes the treatment fields of the selected plan available for delivery by adding them to the treatment calendar. Finally, control is returned to the R&V system to commence treatment. Additional logic was added to incorporate off-line changes such as updating the plan library. After extensive testing including treatment fraction interrupts and plan-library updates during the treatment course, the workflow is running successfully in a clinical pilot, in which 35 patients have been treated since October 2014. Conclusion: We have extended a commercial R&V system for improved safety and efficiency in library-based adaptive strategies enabling a wide-spread implementation of those strategies. This work was in part funded by a research grant of Elekta AB, Stockholm, Sweden.

60 APPLIED LIFE SCIENCES↗