Adaptively Switching Gradient Descent for Reliable PINN Training with Guarantees
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
The LAMP Low Energy Beam Transport (LEBT) transfers a continuous beam at 100 keV from the ion source to RFQ in LEBT. A LEBT buncher imposes an energy tilt to initiate velocy bunching in the chopped beam pulse about 25 ns long to form a short MPEG bunch. One possible option for the LEBT buncher based on a two-gap LC-circuit driven structure was considered, which is similar to the existing LANSCE low-frequncy buncher (LFB). Another possible option is a non-resonant element driven by a pulse-forming-network that provides a single pulse at the repetition frequency of MPEG beam, with a period of 1.8 µs. The LEBT operation is synchronized with the accelerator timing system.
The Low Energy Beam Transport (LEBT) chopper creates a required beam time structure by chopping out (removing by deflecting from the beam path) unwanted parts of a continuous beam transported from the ion source to RFQ in LEBT. The unchopped parts of the beam propagate through the LEBT, while the deflected parts are deposited on an absorbing target. The chopper system in general consists of a deflecting structure, where the beam-deflecting fields are created, and a pulse generator that feeds this structure with voltage pulses having the required time pattern. The system should turn deflection on and off within a short time interval, because the beam parts within the pulse front and end will be only partially deflected and will form unwanted tails of the beam pulse downstream. This can be achieved with traveling slow-wave chopper structures where the field propagates with the same velocity as the beam, as illustrated in Fig. 1.
The LAMP Medium Energy Beam Transport (MEBT) transfers bunched beam at the energy 3 MeV from RFQ to the Drift-Tube Linac (DTL) entrance. The beam particles (protons or H- ) in the LAMP MEBT have velocity β = v/c = 0.08, where v is the beam velocity, c is the speed of light. The MEBT bunchers keep beam bunches from spreading longitudinally as they propagate through the MEBT, where some unwanted bunches are removed by a chopper to create a required beam pattern. The MEBT bunchers are RF cavities operating at the frequency 201.25 MHz; possible design options were considered in.
The Medium Energy Beam Transport (MEBT) chopper removes unwanted beam bunches by deflecting them to a target from a bunched beam transported through the MEBT from RFQ to the Drift-Tube Linac (DTL) entrance. The unchopped bunches propagate through the MEBT to DTL, while the deflected bunches are deposited on a target downstream of chopper. The chopper system consists of a deflecting structure, where the beam-deflecting fields are created, and a pulse generator (pulser) that feeds this structure with voltage pulses having the required time pattern. Ideally, the system should turn deflection on and off in the time interval between the bunches to prevent partially chopped / deflected bunches. This usually requires traveling slow-wave chopper structures where the field propagates with the same velocity as the beam, as illustrated in Fig. 1.
This report summarizes recent work on estimating the transmission of LANSCE H- beams from the end of the present DTL to both the PSR stripper foil (LBEG) and WNR target 4 (MPEG). The LBEG beam might be considered a more typical LINAC beam and lends itself to continuous monitoring of transmission through the various stages of the accelerator. For the MPEG, however, the widely-spaced micropulses and lack of the requisite sensitivity current monitors throughout the accelerator make these measurements extremely difficult and more uncertain. Therefore, to assist in estimating the MPEG beam transmission, beam-dynamics simulations using HPSim were employed. These beam transmission estimates from the end of the Drift Tube Linac (DTL) to Target 4 (MPEG) and the PSR stripper foil (LBEG) are vital to determine the charge requirements for LAMP’s front end. In this technote, we demonstrate three major efforts in determining the transmission: (1) Convert the WNR beamline lattice from TRANSPORT to HPSim for use in the simulation; (2) Simulate the optimization process in the Central Control Room (CCR) that brings down the losses by up to a factor of 4000 between the end of the initial physics-based tuneup phase and production beam operation; (3) Analyze operational data to deduce measured transmissions. Table 1 shows the estimated losses with HPSim and operational analysis. Finally, a better measurement and other improvements to refine the results are also proposed.
Ensuring that the beam delivered from the upgraded Front-End (FE) meets the Key Performance Parameters (KPPs) at each user facility is critical to the success of the LANSCE Accelerator Modernization Project (LAMP). For a high-intensity, multi-user facility like LANSCE, compliance with beam loss and radiation thresholds is as important as the charge delivered to each target. While early LAMPF/LANSCE operations relied on iterative tuning to minimize losses from beam halo and tail particles, the new FE may introduce different beam distributions and loss modes—making predictive modeling essential. To manage this, the F2E (Front-End to End) effort is developing detailed particle-tracking models that reflect realistic beamline conditions, including halo formation and expected diagnostic readings. These "snapshot" simulations aim to benchmark live machine performance at a given moment. This will help quantify how beam quality from the new FE will propagate downstream through the facility. Only by validating these models can we confidently assess and mitigate the potential impacts of the LAMP FE on beam delivery. Post-DTL, the beam splits to serve five major user facilities. Historically, low-energy beam transport has been modeled using TRACE, and higher-energy sections with TRANSPORT. These have now been unified into MAD-X format and validated with codes such as Elegant, pyOrbit, XSuite, Impact-Z, and HPSim. The primary focus now is on accurate modeling of full particle distributions (including beam halo) as they traverse the accelerator and beamlines to each experimental station. All models are at various stages of validation with empirical data.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.