Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “accelerator control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Embedded EPICS server for PowerPMAC motion controllers

An embedded server layer of Experimental Physics and Industrial Control System (EPICS) for PowerPMAC motion controllers has been developed and deployed at two undulator beamlines of the National Institute of General Medical Sciences and the National Cancer Institute (GM/CA) Structural Biology Facility at the Advanced Photon Source (APS). This compact, open source solution makes the power and versatility of PowerPMAC motion controls directly accessible to distributed EPICS clients. At GM/CA the system controls about 200 servo and stepper motors — both encoded and unencoded — and multiple digital and analog I/O accessories. The server stack comprises two sublayers: a lower-level driver and database that communicates directly with PowerPMAC, and a facility-specific soft sublayer built on top. The paper describes installing EPICS on PowerPMAC, the implementation of both layers and client examples, including on-the-fly scanning.

EPICS↗

Polarization and phase control of electron injection and acceleration in the plasma by a self-steepening laser pulse

Abstract We describe an interplay between two injection mechanism of background electrons into an evolving plasma bubble behind an intense laser pulse: one due to the overall bubble expansion, and another due to its periodic undulation. The two mechanisms occur simultaneously when an intense laser pulse propagating inside a plasma forms a shock-like steepened front. Periodic undulations of the plasma bubble along the laser propagation path can either inhibit or conspire with electron injection due to bubble expansion. We show that carrier-envelope-phase (CEP) controlled plasma bubble undulation induced by the self-steepening laser pulse produces a unique electron injector—expanding phase-controlled undulating bubble (EPUB). The longitudinal structure of the electron bunch injected by the EPUB can be controlled by laser polarization and power, resulting in high-charge (multiple nano-Coulombs) high-current (tens of kilo-amperes) electron beams with ultra-short (femtosecond-scale) temporal structure. Generation of high-energy betatron radiation with polarization- and CEP-controlled energy spectrum and angular distribution is analyzed as a promising application of EPUB-produced beams.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Mitigation of Beam Losses in LANSCE Linear Accelerator

Suppression of beam losses is essential for successful operation of high-intensity accelerator facility. The LANSCE accelerator started routine operation in 1972 as a 0.8 MW average proton beam power facility for meson physics research, and delivered highpower beam for a quarter century. The accelerator currently delivers 100 MeV proton beam to Isotope Production Facility (IPF) and 800 MeV H- beams to various experimental areas. The accelerator is equipped with two independent injectors for H + and H - beams, merging at the entrance of a 201.25 MHz Drift Tube Linac (DTL). The DTL performs acceleration up to the energy of 100 MeV. After the DTL, the Transition Region beamline directs a 100 MeV proton beam to the Isotope Production Facility, while the H - beam is accelerated up to the final energy of 800 MeV in an 805- MHz Coupled Cavity Linac. The H - beams, created with different time structure by a lowenergy chopper, are distributed in the Switch Yard (SY) to four experimental areas: the Lujan Neutron Scattering Center equipped with a Proton Storage Ring (PSR), the Weapons Neutron Research facility (WNR), the Proton Radiography facility (pRad), and the Ultra-Cold Neutron facility (UCN). Multi-beam operation requires careful control of accelerator tune to minimize beam losses. In this paper we review main effects affecting beam losses in LANSCE linear accelerator and discuss methods to reduce them.

43 PARTICLE ACCELERATORS↗

A compact low-level RF control system for advanced concept compact electron linear accelerator

A compact low-level RF (LLRF) control system based on RF system-on-chip (RFSoC) technology has been designed for the Advanced Concept Compact Electron Linear-accelerator (ACCEL) program, which has challenging requirements in both RF performance and size, weight, and power consumption (SWaP). The compact LLRF solution employs the direct RF sampling technique of RFSoC, which samples the RF signals directly without any analog upconversion and downconversion. Compared with the conventional heterodyne based architecture used for the LLRF system of a linear accelerator (LINAC), the elimination of analog mixers can significantly reduce the size and weight of the system, especially with LINAC requiring a larger number of RF channels. Based on the requirements of ACCEL, a prototype LLRF platform has been developed, and the control schemes have been proposed. The prototype LLRF system demonstrated magnitude and phase fluctuation levels below 1% and 1° on the flattop of a 2 μs RF pulse. The LLRF control schemes proposed for ACCEL are implemented with a prototype hardware platform. In conclusion, this paper will introduce the new compact LLRF solution and summarize a selection of experimental test results of the prototype itself and with the accelerating structure cavities designed for ACCEL.

Liu, C. [SLAC National Accelerator Laboratory (SLA↗

Demonstration of a tandem lens for producing shaped laser-ionized plasmas for plasma wakefield acceleration

We demonstrate a tandem lens optical setup, comprising two diffractive optics, that focuses a high-power ultrafast laser with a shaped on-axis intensity profile, producing a meter-long Bessel focus. The intended use of the optical setup is to produce a laser-ionized plasma source for plasma wakefield acceleration. By controlling the on-axis intensity, the density profile of the plasma ramps at the entrance and exit of the plasma can be tailored to optimize the matching of the electron beam into the plasma. In addition to demonstrating the optical system, we describe the algorithm used to calculate the lens phases and present detailed calculations of the lenses’ expected performance.

Ariniello, Robert [SLAC National Accelerator Labor↗

Up up down down left right left right B A Start for the catalytic hackers of programmable materials

Catalysts have advanced over the last century to accelerate and control reactions based on static active sites. More effective catalysis can be achieved using catalysts that change with time over the course of a reaction, providing a dynamic free energy landscape that is tailored to each step in the reaction sequence. Here, the catalyst is modulated via an input program that directs the surface to change physically or electronically with time, providing information regarding the extent and duration of change optimized for specific combinations of chemistry and programmable catalyst surfaces. While in its infancy, programmable catalysis is advancing with parallel efforts to establish fundamental principles of dynamic catalysts, design of programmable materials, and strategies to design input programs that will control catalysis for faster and more selective reactions.

catalyst↗

Heavy ion beam physics at Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams (FRIB) will be the world's premier rare-isotope beam facility. Experiments with the majority (~80%) of the isotope predicted to exist will become available. The FRIB facility is based on a superconducting (SC) heavy ion linac with output energy above 200 MeV/u for any ions at beam power of 400 kW. FRIB includes a target facility for in-flight production of rare isotopes. A three-stage fragment separator will be used to prepare fast rare isotope beams with high-purity for nuclear physics experiments. The installation work of the accelerator and experimental systems is approaching completion and multi-stage beam commissioning activities started in summer 2017 with expected project completion in early 2022. In conclusion, the commencement of operation for users' experiments is planned immediately following the project completion.

43 PARTICLE ACCELERATORS↗

Electron-ion collider transverse instabilities due to the crab cavity fundamental impedance

The electron-ion collider crab Cavities will present a significant transverse impedance to the beam. The low-level radio frequency system will have to reduce the crab cavity impedance to prevent transverse instabilities, while regulating the crabbing voltage and minimizing the radio frequency noise levels injected into the beam. This work presents an estimate of the crab cavity impedance in the presence of feedback and the resulting stability margins using simplified stability criteria. Generalized stability criteria are also presented in this work and are used to more accurately estimate stability margins.

43 PARTICLE ACCELERATORS↗

Single Shot Characterization of High Transformer Ratio Wakefields in Nonlinear Plasma Acceleration

We report that plasma wakefields can enable very high accelerating gradients for frontier high energy particle accelerators, in excess of 10 GeV/m. To overcome limits on single stage acceleration, specially shaped drive beams can be used in both linear and nonlinear plasma wakefield accelerators (PWFA), to increase the transformer ratio, implying that the drive beam deceleration is minimized relative to acceleration obtained in the wake. In this Letter, we report the results of a nonlinear PWFA, high transformer ratio experiment using high-charge, longitudinally asymmetric drive beams in a plasma cell. An emittance exchange process is used to generate variable drive current profiles, in conjunction with a long (multiple plasma wavelength) witness beam. The witness beam is energy modulated by the wakefield, yielding a response that contains detailed spectral information in a single-shot measurement. Using these methods, we generate a variety of beam profiles and characterize the wakefields, directly observing transformer ratios up to R=7.8. Lastly, a spectrally based reconstruction technique, validated by 3D particle-in-cell simulations, is introduced to obtain the drive beam current profile from the decelerating wake data.

43 PARTICLE ACCELERATORS↗

Design and feasibility of a novel program of cervical screening in Nigeria: self-sampled HPV testing paired with visual triage

Background: Accelerated global control of cervical cancer would require primary prevention with human papillomavirus (HPV) vaccination in addition to novel screening program strategies that are simple, inexpensive, and effective. We present the feasibility and outcome of a community-based HPV self-sampled screening program. Methods: In Ile Ife, Nigeria, 9406 women aged 30–49 years collected vaginal self-samples, which were tested for HPV in the local study laboratory using Hybrid Capture-2 (HC2) (Qiagen). HPV-positive women were referred to the colposcopy clinic. Gynecologist colposcopic impression dictated immediate management; biopsies were taken when definite acetowhitening was present to produce a histopathologic reference standard of precancer (and to determine final clinical management). Retrospective linkage to the medical records identified 442 of 9406 women living with HIV (WLWH). Results: With self-sampling, it was possible to screen more than 100 women per day per clinic. Following an audio-visual presentation and in-person instructions, overall acceptability of self-sampling was very high (81.2% women preferring self-sampling over clinician collection). HPV positivity was found in 17.3% of women. Intensive follow-up contributed to 85.9% attendance at the colposcopy clinic. Of those referred, 8.2% were initially treated with thermal ablation and 5.6% with large loop excision of transformation zone (LLETZ). Full visibility of the squamocolumnar junction, necessary for optimal visual triage and ablation, declined from 68.5% at age 30 to 35.4% at age 49. CIN2+ and CIN3+ (CIN- Cervical intraepithelial neoplasia), including five cancers, were identified by histology in 5.9 and 3.2% of the HPV-positive women, respectively (0.9 and 0.5% of the total screening population), leading to additional treatment as indicated. The prevalences of HPV infection and CIN2+ were substantially higher (40.5 and 2.5%, respectively) among WLWH. Colposcopic impression led to over- and under-treatment compared to the histopathology reference standard. Conclusion: A cervical cancer screening program using self-sampled HPV testing, with colposcopic immediate management of women positive for HPV, proved feasible in Nigeria. Based on the collected specimens and images, we are now evaluating the use of a combination of partial HPV typing and automated visual evaluation (AVE) of cervical images to improve the accuracy of the screening program.

59 BASIC BIOLOGICAL SCIENCES↗

On operation and control of CW magnetrons for superconducting accelerators

CW magnetrons, developed for industrial RF heaters, were suggested to feed RF cavities of superconducting accelerators due to higher efficiency and lower cost of RF power than provide traditionally used klystrons, IOTs or solid-state amplifiers. RF amplifiers driven by a master oscillator serve as coherent RF sources. CW magnetrons are regenerative RF auto generators with a huge regenerative gain. This causes regenerative instability with a notable noise when a magnetron operates as an auto generator i.e., with the anode voltage above the threshold of self-excitation. Traditionally, an injection locking by a small signal is used for phase stabilization of magnetrons. In this case CW magnetrons with the injection-locked (coherent) oscillations generate a notable level of noise. This may preclude use of CW magnetrons in this mode in the Superconducting RF (SRF) accelerators. This paper reviews PIC modeling and previously obtained experimental results for the operation and control of CW magnetrons, which led to the development of techniques most suitable for various SRF accelerators using forced RF oscillation of magnetrons, when the magnetron is launched by an injected forcing signal, and regenerative noise is suppressed.

Kazakevich, G. [MUONS Inc., Batavia] (ORCID:000000↗

Adaptive Machine Learning for Robust Diagnostics and Control of Time-Varying Particle Accelerator Components and Beams

Machine learning (ML) is growing in popularity for various particle accelerator applications including anomaly detection such as faulty beam position monitor or RF fault identification, for non-invasive diagnostics, and for creating surrogate models. ML methods such as neural networks (NN) are useful because they can learn input-output relationships in large complex systems based on large data sets. Once they are trained, methods such as NNs give instant predictions of complex phenomenon, which makes their use as surrogate models especially appealing for speeding up large parameter space searches which otherwise require computationally expensive simulations. However, quickly time varying systems are challenging for ML-based approaches because the actual system dynamics quickly drifts away from the description provided by any fixed data set, degrading the predictive power of any ML method, and limits their applicability for real time feedback control of quickly time-varying accelerator components and beams. In contrast to ML methods, adaptive model-independent feedback algorithms are by design robust to un-modeled changes and disturbances in dynamic systems, but are usually local in nature and susceptible to local extrema. In this work, we propose that the combination of adaptive feedback and machine learning, adaptive machine learning (AML), is a way to combine the global feature learning power of ML methods such as deep neural networks with the robustness of model-independent control. We present an overview of several ML and adaptive control methods, their strengths and limitations, and an overview of AML approaches.

97 MATHEMATICS AND COMPUTING↗

VAN-DAMME: GPU-accelerated and symmetry-assisted quantum optimal control of multi-qubit systems

We present an open-source software package, VAN-DAMME (Versatile Approaches to Numerically Design, Accelerate, and Manipulate Magnetic Excitations), for massively-parallelized quantum optimal control (QOC) calculations of multi-qubit systems. To enable large QOC calculations, the VAN-DAMME software package utilizes symmetry-based techniques with custom GPU-enhanced algorithms. This combined approach allows for the simultaneous computation of hundreds of matrix exponential propagators that efficiently leverage the intra-GPU parallelism found in high-performance GPUs. In addition, to maximize the computational efficiency of the VAN-DAMME code, we carried out several extensive tests on data layout, computational complexity, memory requirements, and performance. These extensive analyses allowed us to develop computationally efficient approaches for evaluating complex-valued matrix exponential propagators based on Padé approximants. To assess the computational performance of our GPU-accelerated VAN-DAMME code, we carried out QOC calculations of systems containing 10 - 15 qubits, which showed that our GPU implementation is 18.4× faster than the corresponding CPU implementation. Our GPU-accelerated enhancements allow efficient calculations of multi-qubit systems, which can be used for the efficient implementation of QOC applications across multiple domains.

97 MATHEMATICS AND COMPUTING↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Subfemtosecond Wakefield Injector and Accelerator Based on an Undulating Plasma Bubble Controlled by a Laser Phase

Here, we demonstrate that a long-propagating plasma bubble executing undulatory motion can be produced in the wake of two copropagating laser pulses: a near-single-cycle injector and a multicycle driver. When the undulation amplitude exceeds the analytically derived threshold, highly localized injections of plasma electrons into the bubble are followed by their long-distance acceleration. While the locations of the injection regions are controlled by the carrier-envelope phase (CEP) of the injector pulse, the monoenergetic spectrum of the accelerated subfemtosecond high-charge electron bunches is shown to be nearly CEP independent.

43 PARTICLE ACCELERATORS↗