Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Uncrewed”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

NASA's Space Launch System: A New Opportunity for CubeSats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. Together with the Orion crew vehicle and ground operations at NASA's Kennedy Space Center in Florida, SLS is a foundational capability for NASA's Journey to Mars. From the beginning of the SLS flight program, utilization of the vehicle will also include launching secondary payloads, including CubeSats, to deep-space destinations. Currently, SLS is making rapid progress toward readiness for its first launch in 2018, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight, Exploration Mission-1, SLS will launch an uncrewed test flight of the Orion spacecraft into distant retrograde orbit around the moon. Accompanying Orion on SLS will be 13 CubeSats, which will deploy in cislunar space. These CubeSats will include not only NASA research, but also spacecraft from industry and international partners and potentially academia. Following its first flight and potentially as early as its second, which will launch a crewed Orion spacecraft into cislunar space, SLS will evolve into a more powerful configuration with a larger upper stage. This configuration will initially be able to deliver 105 t to LEO and will continue to be upgraded to a performance of greater than 130 t to LEO. While the addition of the more powerful upper stage will mean a change to the secondary payload accommodations from Block 1, the SLS Program is already evaluating options for future secondary payload opportunities. Early discussions are also already underway for the use of SLS to launch spacecraft on interplanetary trajectories, which could open additional opportunities for CubeSats. This presentation will include an overview of the SLS vehicle and its capabilities, including the current status of progress toward first launch. It will also explain the opportunities the vehicle offers for CubeSats and secondary payloads, including an overview of the CubeSat manifest for Exploration Mission-1 in 2018.

Hitt, David↗

NASA Space Flight Vehicle Fault Isolation Challenges

The Space Launch System (SLS) is the new NASA heavy lift launch vehicle and is scheduled for its first mission in 2017. The goal of the first mission, which will be uncrewed, is to demonstrate the integrated system performance of the SLS rocket and spacecraft before a crewed flight in 2021. SLS has many of the same logistics challenges as any other large scale program. Common logistics concerns for SLS include integration of discrete programs geographically separated, multiple prime contractors with distinct and different goals, schedule pressures and funding constraints. However, SLS also faces unique challenges. The new program is a confluence of new hardware and heritage, with heritage hardware constituting seventy-five percent of the program. This unique approach to design makes logistics concerns such as testability of the integrated flight vehicle especially problematic. The cost of fully automated diagnostics can be completely justified for a large fleet, but not so for a single flight vehicle. Fault detection is mandatory to assure the vehicle is capable of a safe launch, but fault isolation is another issue. SLS has considered various methods for fault isolation which can provide a reasonable balance between adequacy, timeliness and cost. This paper will address the analyses and decisions the NASA Logistics engineers are making to mitigate risk while providing a reasonable testability solution for fault isolation.

Bramon, Christopher↗

Solar Versus Fission Surface Power for Mars

A multi-discipline team of experts from the National Aeronautics and Space Administration (NASA) developed Mars surface power system point design solutions for two conceptual missions to Mars using In-situ resource utilization (ISRU). The primary goal of this study was to compare the relative merits of solar- versus fission-powered versions of each surface mission. First, the team compared three different solar-power options against a fission power system concept for a sub-scale, uncrewed demonstration mission. This “pathfinder” design utilized a 4.5 meter diameter lander. Its primary mission would be to demonstrate Mars entry, descent, and landing techniques. Once on the Martian surface, the lander’s ISRU payload would demonstrate liquid oxygen propellant production from atmospheric resources. For the purpose of this exercise, location was assumed to be at the Martian equator. The three solar concepts considered included a system that only operated during daylight hours (at roughly half the daily propellant production rate of a round-the-clock fission design), a battery-augmented system that operated through the night (matching the fission concept’s propellant production rate), and a system that operated only during daylight, but at a higher rate (again, matching the fission concept’s propellant production rate). Including 30% mass growth allowance, total payload masses for the three solar concepts ranged from 1,128 to 2,425 kg, versus the 2,751 kg fission power scheme. However, solar power masses increase as landing sites are selected further from the equator, making landing site selection a key driver in the final power system decision. The team also noted that detailed reliability analysis should be performed on daytime-only solar power schemes to assess potential issues with frequent ISRU system on/off cycling.

Rucker, Michelle A.↗

Toward Reduced Aircraft Community Noise Impact Via a Perception-Influenced Design Approach

This is an exciting time for aircraft design. New configurations, including small multi-rotor uncrewed aerial systems, fixed- and tilt-wing distributed electric propulsion aircraft, high-speed rotorcraft, hybrid-electric commercial transports, and low-boom supersonic transports, are being made possible through a host of propulsion and airframe technology developments. The resulting noise signatures may be radically different, both spectrally and temporally, than those of the current fleet. Noise certification metrics currently used in aircraft design do not necessarily reflect these characteristics and therefore may not correlate well with human response. Further, as operations and missions become less airport-centric, e.g., those associated with on-demand mobility or package delivery, vehicles may operate in closer proximity to the population than ever before. Fortunately, a new set of tools are available for assessing human perception during the design process in order to affect the final design in a positive manner. The tool chain utilizes system noise prediction methods coupled with auralization and psychoacoustic testing, making possible the inclusion of human response to noise, along with performance criteria and certification requirements, into the aircraft design process. Several case studies are considered to illustrate how this approach could be used to influence the design of future aircraft.

Rizzi, Stephen A.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Trajectory Design Considerations for Exploration Mission 1

Exploration Mission 1 (EM-1) will be the first mission to send an uncrewed Orion vehicle to cislunar space in 2018, targeted to a Distant Retrograde Orbit (DRO). Analysis of EM-1 DRO mission opportunities in 2018 help characterize mission parameters that are of interest to other subsystems (e.g., power, thermal, communications, flight operations, etc). Subsystems request mission design trades which include: landing lighting, addition of an Orion main engine checkout burn, and use of auxiliary thruster only cases. This paper examines the evolving trade studies that incorporate subsystem feedback and demonstrate the feasibility of these constrained mission trajectory designs and contingencies.

Dawn, Timothy F.↗

Spacecraft Charging Considerations and Design Efforts for the Orion Crew Module

The Orion Crew Module (CM) is nearing completion for the next flight, designated as Exploration Mission 1 (EM-1). For the uncrewed mission, the flight path will take the CM through a Perigee Raise Maneuver (PRM) out to an altitude of approximately 1800 km, followed by a Trans-Lunar Injection burn, a pass through the Van Allen belts then out to the moon for a lunar flyby, a Distant Retrograde Insertion (DRI) burn, a Distant Retrograde Orbit (DRO), a Distant Retrograde Departure (DRD) burn, a second lunar flyby, an Earth Insertion (EI) burn, and finally entry and landing. All of this, with the exception of the DRO associated maneuvers, is similar to the previous Apollo 8 mission in late 1968. In recent discussions, it is now possible that EM-1 will be a crewed mission, and if this happens, the orbit may be quite different from that just described. In this case, the flight path may take the CM on an out and back pass through the Van Allen belts twice, then out to the moon, again passing through the Van Allen belts twice, then finally back home. Even if the current EM-1 mission doesn't end up as a crewed mission, EM-2 and subsequent missions will undoubtedly follow orbital trajectories that offer comparable exposures to heightened vehicle charging effects. Because of this, and regardless of flight path, the CM vehicle will likely experience a wide range of exposures to energetic ions and electrons, essentially covering the gamut between low earth orbit to geosynchronous orbit and beyond. National Aeronautical and Space Administration (NASA) and Lockheed Martin (LM) engineers and scientists have been working to fully understand and characterize the vehicle's immunity level with regard to surface and deep dielectric charging, and the ramifications of that immunity level pertaining to materials and impacts to operational avionics, communications, and navigational systems. This presentation attempts to chronicle these efforts in a summary fashion, and attempts to capture the results of that work as they pertain to the electrical and avionic systems on-board the Orion CM.

Scully, Bob↗

NASA's Space Launch System: Deep-Space Delivery for SmallSats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering more than 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight, an uncrewed test of the Orion spacecraft into distant retrograde orbit around the moon, accompanying Orion on SLS will be 13 small-satellite secondary payloads, which will deploy in cislunar space. These secondary payloads will include not only NASA research, but also spacecraft from industry and international partners and academia. The payloads also represent a variety of disciplines including, but not limited to, studies of the moon, Earth, sun, and asteroids. The Space Launch System Program is working actively with the developers of the payloads toward vehicle integration. Following its first flight and potentially as early as its second, SLS will evolve into a more powerful configuration with a larger upper stage. This configuration will initially be able to deliver 105 t to LEO, and will continue to be upgraded to a performance of greater than 130 t to LEO. While the addition of the more powerful upper stage will mean a change to the secondary payload accommodations from those on the first launch, the SLS Program is already evaluating options for future secondary payload opportunities. Early discussions are also already underway for the use of SLS to launch spacecraft on interplanetary trajectories, which could open additional opportunities for small satellites. This presentation will include an overview of the SLS vehicle and its capabilities, including the current status of progress toward first launch. It will also explain the opportunities the vehicle offers for small satellites, including an overview of the CubeSat manifest for Exploration Mission-1 in 2018 and a discussion of future capabilities.

Robinson, Kimberly F.↗

Trajectory Design Considerations for Exploration Mission 1

Exploration Mission 1 (EM-1) will be the first mission to send an uncrewed Orion Multi-Purpose Crew Vehicle (MPCV) to cislunar space in the fall of 2019. EM-1 was originally conceived as a lunar free-return mission, but was later changed to a Distant Retrograde Orbit (DRO) mission as a precursor to the Asteroid Redirect Mission. To understand the required mission performance (i.e., propellant requirement), a series of trajectory optimization runs was conducted using JSC's Copernicus spacecraft trajectory optimization tool. In order for the runs to be done in a timely manner, it was necessary to employ a parallelization approach on a computing cluster using a new trajectory scan tool written in Python. Details of the scan tool are provided and how it is used to perform the scans and post-process the results. Initially, a scan of daily due east launched EM-1 DRO missions in 2018 was made. Valid mission opportunities are ones that do not exceed the useable propellant available to perform the required burns. The initial scan data showed the propellant and delta-V performance patterns for each launch period. As questions were raised from different subsystems (e.g., power, thermal, communications, flight operations, etc.), the mission parameters or data that were of interest to them were added to the scan output data file. The additional data includes: (1) local launch and landing times in relation to sunrise and sunset, (2) length of eclipse periods during the in-space portion of the mission, (3) Earth line of sight from cislunar space, (4) Deep Space Network field of view looking towards cislunar space, and (5) variation of the downrange distance from Earth entry interface to splashdown. Mission design trades can also be performed based on the information that the additional data shows. For example, if the landing is in darkness, but the recovery operations team desires a landing in daylight, then an analysis is performed to determine how to change the mission design to meet this request. Also, subsystems request feasibility of alternate or contingency mission designs, such as adding an Orion main engine checkout burn or Orion completing all of its burns using only its auxiliary thrusters. This paper examines and presents the evolving trade studies that incorporate subsystem feedback and demonstrate the feasibility of these constrained mission trajectory designs and contingencies.

Dawn, Timothy F.↗

Robonaut 2 and Watson: Cognitive Dexterity for Future Exploration

Future exploration missions will dictate a level of autonomy never before experienced in human spaceflight. Mission plans involving the uncrewed phases of complex human spacecraft in deep space will require a coordinated autonomous capability to be able to maintain the spacecraft when ground control is not available. One promising direction involves embedding intelligence into the system design both through the employment of state-of-the-art system engineering principles as well as through the creation of a cognitive network between a smart spacecraft or habitat and embodiments of cognitive agents. The work described here details efforts to integrate IBM's Watson and other cognitive computing services into NASA Johnson Space Center (JSC)'s Robonaut 2 (R2) anthropomorphic robot. This paper also discusses future directions this work will take. A cognitive spacecraft management system that is able to seamlessly collect data from subsystems, determine corrective actions, and provide commands to enable those actions is the end goal. These commands could be to embedded spacecraft systems or to a set of robotic assets that are tied into the cognitive system. An exciting collaboration with Woodside provides a promising Earth-bound testing analog, as controlling and maintaining not normally manned off-shore platforms have similar constraints to the space missions described.

Badger, Julia M.↗

Collaborative Systems Engineering in the Ascent Abort-2 Crew Module/Separation Ring Project

Generally speaking, systems engineering (SE) tool-sets face a dilemma balancing power and accessibility. High-powered SE tools (MagicDraw, Cradle, Core, etc.) tend to be specialized and are available only to highly trained Systems Engineers, and/or through the use of a 'back room' developer team making the output products available to the broader team. On the other hand, highly accessible tools (MS Word, Excel, etc.) do not have the power to implement SE in a rigorous manner. NASA has to test all aspects of the new human-rated Orion Multi-Purpose Crew Vehicle spacecraft prior to its first crewed mission. The test program includes uncrewed launch abort flight tests to demonstrate the capability to save the crew in the event that a launch failure occurs. Orion's second abort flight test will be a low-altitude flight test known as "Ascent Abort 2 (AA-2)." This test is currently scheduled to be carried out at Cape Canaveral Air Force Station's Space Launch Complex 46 (SLC-46) in Florida in 2019. NASA's in-house AA-2 Crew Module and Separation Ring (CSR) Team is producing the crew module and separation ring. Operating jointly as both an Advanced Exploration Systems (AES) Project and an Orion Project, the CSR project charter includes development of innovative, streamlined and generally more efficient practices for creation of flight hardware and software. One result of this tasking has been development of a collaborative and data-centric systems engineering environment within the team's shared web environment (Microsoft SharePoint). Through the use of built-in, 'out of the box capabilities' present in MS SharePoint, the CSR Systems Engineering team has created (with some limited developer support) a data-centric architecture for the project's SE implementation, including functional and interface analysis, requirements development and management, risk management, verification planning and management, test results, and end item management. Data elements are linked between data structures so as to define and control relationships between item types, link requirements to parents and children, and link tests to the requirements that they verify. The overall project team integration is increased by also linking SE content to project management content over the project life cycle, including team communication, action items, configuration management, decisional and meeting materials, and life cycle reviews. This presentation will provide an overview of the collaborative SE environment, showing how it provides the power for a number of SE tasks while still providing the accessibility and transparency to allow the full project team to collaborate and succeed. Given the project phase, we'll be able to present a nearly full lifecycle discussion, from concept through verification and approaching delivery.

Systems Engineering environments↗

A Prototype Tool for Assessing Forward Contamination from Space Suits

Crewed exploration missions dramatically increase the capability for large-scale sample collection and return activities, but they also increase the possibility and likelihood of forward contamination. Systematic research on forward contamination from uncrewed spacecraft has steadily progressed since the Viking missions, but parallel research on contamination from space suits has not. Current space suits have leakage rates as high as 100 cc gas/min., but it is unclear how many or what types of microbes are exiting the suits along with this gas. The Human Forward Contamination Assessment team at NASA's Johnson Space Center (JSC) has developed a prototype swab tool that is capable of maintaining sterility during pressure changes associated with entering and exiting vacuum. The primary objective of recent Extravehicular Activity (EVA) Swab Kit testing is to characterize the type of microorganisms typically found on spacesuit external surfaces under suit differential pressure conditions. Most human-associated microorganisms can fit through a 0.5 to 1.0 μm gap. Understanding potential leak paths will inform future hardware design decisions. Knowing which types of microorganisms may leak from EVA suits provides a basis for subsequent studies to characterize the viability of those organisms under destination conditions, as well as how far they might spread through natural or human-influenced processes. The results of EVA suit molecular microbial community analyses will inform NASA exploration mission operations and hardware design, and help close Strategic Knowledge Gap B5, Forward Contamination to Mars.

Rucker, M.↗

Quality Assurance Surveillance Tool Designed for SLS EM-1 Certificate of Flight Readiness

Exploration Mission-1 (EM-1) is an uncrewed mission that is launching on the Space Launch System (SLS) Block 1 vehicle. This is a critical flight test for the agency's human deep space exploration goals. Exploration Ground Systems (EGS) Quality (SA-F2) is responsible for providing Quality Assurance Surveillance Plans (QASPs) for NASA contracts and facilities. A QASP assures products and services are provided to EGS in accordance with the contract requirements. In order to encapsulate the multiple KSC Safety and Mission Assurance surveillance and audit activities that need to be accomplished specifically for EM-1 Certificate of Flight Reediness (CoFR), a QASP tool needed to be implemented. This tool would be able to intuitively track Work Authorization Documents (WADs) under development by Test Operations Support Contract (TOSC), reviewed and accepted WADs, Government Mandatory Inspection Points (GMIPs), Nonconformances (NCs), Material Review Board (MRB) Status, Corrective Actions, Alterations, Deviations, and Waivers for flight hardware and Ground Support Equipment (GSE). This would help ensure that all SLS EM-1 flight hardware and related GSE surveillances and requirements are being recognized and completed with zero constraints identified for the mission.

Morris, Patrick↗

Enabling Technologies for Deep Space Motion Imagery

From the beginning of the Space Age, imagery, particularly motion imagery, has been a part of crewed and uncrewed missions. As technologies have evolved the imagery gets better, more compelling, and more useful for operations and monitoring of systems, crew, and spacecraft. Film, video and live television have engaged the public and sparked the imaginations of engineers, scientists, and artists alike. As we look forward now to crewed missions beyond low-Earth orbit, such as the Deep Space Gateway being considered as a pre-cursor to future crewed Mars missions, there are both opportunities and challenges in implementing a multi-faceted imaging system that advances mission capabilities and technology.This paper will present a vision for an imaging system that is relevant for operations of the ISS and future crewed missions in deep space, with a detailed look at some of the key innovative technologies required to enable such a system. In addition, impacts to Space Operations, video distribution to the public and to science investigators, and video system interoperability will be presented. Opportunities where standardization can enable interoperability are also identified for those imagery and communications functions planned for inclusion in the Consultative Committee for Space Data Systems (CCSDS) Blue Book.

Grubbs, Rodney↗

Nasa's Space Launch System: Exceptional Opportunities for Secondary Payloads to Deep Space

When NASA’s Space Launch System (SLS) launches for the first time from Kennedy Space Center, it will send the Orion crew vehicle farther into space than a human-rated spacecraft has ever traveled. The primary objectives of this first uncrewed mission, Exploration Mission-1 (EM-1), focus on verifying and validating the new technologies and integrated systems developed for SLS, Orion and Exploration Ground Systems (EGS), which together comprise NASA’s new deep space exploration system. EM-1 also provides the opportunity for 13 6U CubeSat secondary payloads to be deployed in deep space. As progress is being made toward that first launch, planning is also taking place for secondary payload opportunities on future missions. This paper will provide an overview of the status of the SLS Block 1 launch vehicle and an overview of the 6U payloads selected for EM-1. In addition, an overview of the EM-1 mission trajectories and the “bus stops” along the trajectory where the payloads will be deployed will be noted. Challenges and new workflows required in identifying and certifying potential payloads will be discussed. The paper will also discuss opportunities that will be presented by future evolutions of SLS.

Robinson, Kimberly F.↗

Stationkeeping, Orbit Determination, and Attitude Control for Spacecraft in Near Rectilinear Halo Orbits

Final document is attached. From a Near Rectilinear Halo Orbit (NRHO), NASA's Gateway at the Moon is planned to serve as a proving ground and a staging location for human missions beyond Earth. Stationkeeping, Orbit Determination (OD), and attitude control are examined for uncrewed and crewed Gateway configurations. Orbit maintenance costs are investigated using finite maneuvers, considering skipped maneuvers and perturbations. OD analysis assesses DSN tracking and identifies OD challenges associated with the NRHO and crewed operations. The Gateway attitude profile is simulated to determine an effective equilibrium attitude. Attitude control propellant use and sizing of the required passive attitude control system are assessed.

Newman, Clark P.↗

Seeker Free-Flying Inspector GNC System Overview

Seeker is an ultra-low cost approach to highly automated extravehicular inspection of crewed or uncrewed spacecraft that has been designed and built in-house at the NASA Johnson Space Center (JSC). The first version of Seeker is intended to be an incremental development towards an advanced inspection capability. This effort builds on past free-flying inspector development efforts such as the Autonomous Extravehicular Activity Robotic Camera Sprint (AERCam Sprint) and Mini AERCam. Seeker was funded as an International Space Station (ISS) "X-by" Project, which required delivery of the vehicle approximately one year after authority to proceed and within the budget of $1.8 million. Seeker will fly onboard the NG-11 Cygnus mission in 2019 and will deploy after Cygnus' primary mission is completed. Seeker will perform inspection-like maneuvers within 50 meters of the target vehicle (Cygnus) and then dispose itself. The Seeker Guidance, Navigation, and Control (GNC) system is composed entirely of commercial off-the-shelf (COTS) and space-rated COTS items, an inertial-relative Multiplicative Extended Kalman Filter (MEKF), point-to-point guidance (with various additional modes such as stationkeeping), proportional-integral translational control, phase plane rotational control, and a state machine for automated mission moding with minimal ground input.

Navigation↗

Inserting New Technologies into Human-Computer Interfaces for Future Lunar and Mars Missions

Plans call for human cislunar operations and lunar surface access, to prepare for eventual Mars missions. NASA will also develop new opportunities in lunar orbit that provide the foundation and act as a gateway for human exploration deeper into the solar system. Current human spaceflight is complex and requires as many as fifty people to support the International Space Station (ISS) Mission Control Center (MCC) in Houston, Texas. These flight controllers in the front and back rooms of the MCC, serve as an extra pair of eyes overseeing the numerous station systems. Deep space missions - to the moon, Mars, and beyond - will be more complex and place challenging mission constraints on the crew. As the round-trip communication delays increase in deep space exploration, more on-board systems autonomy and functionality will be needed to maintain and control the vehicle. These mission constraints will change the Earth-based ground control approach and will demand efficient and effective human-computer interfaces (HCI) to control a highly complex vehicle or habitat system. All of this necessitates a different approach to designing and developing spacecraft and habitats. In the beginning of new human spaceflight programs, focus is typically on launch vehicle and uncrewed spacecraft design and development. The reasoning behind this focus to enable flight testing of an integrated launch vehicle and spacecraft system to ensure it will be safe enough to allow humans on board. This is an essential process for new spacecraft, however, the practical effect is a lack of funding for the spacecraft’s human interfaces development. It can be many years before the human interface development begins, putting it late in the spacecraft lifecycle, when almost all other spacecraft systems and subsystems are already in place. This forces the usage of existing and proven technologies for the HCI interfaces. We posit that putting the human first in a spacecraft design process will yield a more effective spacecraft for exploration and long duration missions. NASA Human Research Program (HRP) has identified inadequate HCI as a risk for future missions. New tools and procedures to aid the crew in operating a complex spacecraft will be required. This paper discusses ongoing activities in the development of the next generation HCI components and systems, and a new approach toward human interfaces for spacecraft.

Salazar, George A.↗