Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Sustainable Hydropower in Lower Mekong Countries: Technical Assessment and Training Travel Report Thailand

The U.S. Agency for International Development (USAID), through their partnership with the U.S. Department of the Interior (DOI), requested the support of Oak Ridge National Laboratory (ORNL) to provide specialized technical assistance as part of the Smart Infrastructure for the Mekong (SIM) Program in Thailand. Introduced in July 2013 by U.S. Secretary of State John Kerry, SIM is a U.S. Government Inter-Agency program that provides Lower Mekong partner countries with targeted, demand-driven technical and scientific assistance to support environmentally sound, climate conscious and socially equitable infrastructure, clean energy development, and water resources optimization. The U.S. Government is committed to supporting sustainable economic development within the region by providing tools, best practices, technical assistance, and lessons learned for the benefit of partner countries. In response to a request from the Electricity Generating Authority of Thailand (EGAT), a SIM project was developed with two main activities: 1) to promote hydropower sustainability and efficiency through technical assessment training at two existing hydropower assets in Thailand, and 2) the design and implementation of one national and two or three regional science and policy workshops, to be co-hosted with EGAT, to build common understanding of and commitment to environmental and social safeguards for Mekong Basin hydropower projects. The U.S. Department of Energy (DOE) is leading the technical assessment (Activity 1), and has contracted ORNL to provide expert technical assistance focused on increasing efficiency at existing projects, with the goal of increasing renewable energy generation at little to no capital cost. ORNL is the leading national laboratory in hydropower analysis, with a nationally recognized and highly qualified team of scientists addressing small to large-scale systems (basin-, regional-, and national-scale) energy generation optimization analysis for DOE. The mission of the ORNL Water Power Program is to develop technologies, decision-support tools, and methods of analysis that enable holistic management of water-dependent energy infrastructure and natural resources in support of the DOE Energy Efficiency and Renewable Energy Office (DOE-EERE), Federal hydropower agencies, Federal Energy Regulatory Commission (FERC), Nuclear Regulatory Commission (NRC), energy producers, and other entities. In support of SIM, ORNL completed technical assessments of two hydropower plants owned and operated by the Electricity Generating Authority of Thailand (EGAT): Vajiralongkorn (VRK), with an installed capacity of 300 MW, and Rajjaprabha (RPB), with an installed capacity of 240MW. Technical assessment is defined as the assessment of hydropower operation and performance, and the identification of potential opportunities for performance improvement through plant optimization. At each plant, the assessment included an initial analysis of hydropower operating and performance metrics, provided by dam owners. After this analysis, ORNL engaged with the plant management team in a skills exchange, where best practices, operational methods, and technical challenges were discussed. The technical assessment process was outlined to plant management followed by a presentation of preliminary results and analysis based on 50 days of operational data. EGAT has agreed to provide a full year of operational data so a complete and detailed assessment that captures seasonal variability can be completed. The results of these assessments and discussions will be used to develop a set of best practices, training, and procedure recommendations to improve the efficiency of the two assessed plants.

13 HYDRO ENERGY↗

Summary of Technical Peer Review on the Risk Assessment Framework proposed in Report INL/RPT-22-68656 for Digital Instrumentation and Control Systems

This report summarizes the peer review activities initiated by Idaho National Laboratory (INL) during fiscal year (FY) 2023 for the evaluation and improvement of the methodology developed under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective and secure DI&C technologies for digital upgrades/designs. A framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the risk impact of plant modernization, considering the introduction of high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. The R&D efforts of this project from FY 2019 through FY 2022 were focused on methodology improvement and demonstration of the proposed framework for the risk assessment and design optimization of safety-critical DI&C systems. Collaborations with the nuclear industry have been initiated to support the reliability and risk assessment of their DI&C systems by using the proposed framework. In FY 2023, the framework has reached to a point for a technical peer review and obtain stakeholder feedback. This peer review activity includes coordination of the reviews performed by a group of industry stakeholders, documentation of the peer review suggestions, providing resolutions and responses to the peer review comments. The objective of this technical peer review is to obtain representative feedback on the proposed framework to improve the technical qualities of its methodology and readiness for deployment to the industry. Feedback may identify potential areas for improvement and further development. The Subject Matter experts were invited to review the latest project report documenting the methodology developed in the project and provide evaluations of the technical qualities of the proposed framework and relevant methods. The reviewed project report is “An Integrated Framework for Risk Assessment of High Safety-significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology and Demonstration” INL/RPT-22-68656 (short as “INL/RPT-22-68656” in this report). This peer review report documents the technical questions provided for technical peer review and introduces the technical peer reviewers from the stakeholders including nuclear utilities, regulators, and universities. Comments from technical peer reviewers and the resolutions and responses to these comments are outlined. Insights and lessons learned from the technical peer review are summarized in conclusions and future work. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists.

99 GENERAL AND MISCELLANEOUS↗

TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects.

99 GENERAL AND MISCELLANEOUS↗

Technical Risk Rating of DOE Environmental Projects - 9153

The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Establishing a Technical Assistance Network to Build Capacity in Southwest Alaska (Southwest Alaska Energy Network - Final Report)

The Southwest Alaska Municipal Conference (SWAMC) is a non-profit regional membership economic development organization that represents the Aleutian/Pribilof Islands, Bristol Bay, and Kodiak regions of southwest Alaska. SWAMC applied for the DOE-OIE Establishment of an Inter-Tribal Technical Assistance Energy Providers Network grant FOA to work with our partners to provide energy planning and project development technical assistance. The project team was made up of SWAMC, three regional organizations, a management consulting firm, and a panel of technical consultants. SWAMC sub-contracted with the three Alaska Native regional non-profit organizations – Aleutian Pribilof Islands Association (APIA), Bristol Bay Native Association (BBNA), and Kodiak Area Native Association (KANA) – to fund full or partial Regional Energy Coordinator (REC) positions. The project period ran from September 2016 to March 2020. The project goal was to help southwest Alaska regional tribal partners and communities to develop efficient and financially sustainable structures for identifying and developing energy projects that enhance community resiliency and energy sustainability. This project established energy coordinators and management structures in the Aleutian, Bristol Bay, and Kodiak regions to expand technical assistance capacity of regional residents; demonstrate this capacity by advancing energy efficiency, heat, and power supply projects; and secure long-term funding commitments to establish a sustained technical assistance structure. The project team expanded technical assistance capacity of energy coordinators and regional stakeholders in several ways: by providing funding for the SWAMC project manager to attend three Office of Indian Energy trainings; for energy coordinators to attend numerous energy conferences; for utility clerks from several villages to receive one-on-one reporting training on Alaska’s Power Cost Equalization electric subsidy program; and for the Kodiak REC to complete the Arctic Remote Energy Networks Academy and NREL’s Executive Energy Leadership Academy. The energy coordinators demonstrated and shared their increased capacity by hosting several public events: SWAMC hosted two full-day energy workshops in February 2017 and 2018; the Kodiak REC hosted seven Energy Committee meetings for Kodiak stakeholders and gave several presentations at other events; and SWAMC and BBNA organized a Bristol Bay Regional Energy Visioning Session in May 2019. The project team created platforms to both share and request information to involve energy stakeholders in this project, including an energy website, a Facebook group, a periodic newsletter, surveys, mass emails, and paper mailers. An increase in regional capacity was demonstrated through several grant awards, including a $1.2 million USDA grant for Akhiok for an electric distribution infrastructure replacement; an AHFC Kickstarter grant for Aleknagik to audit 2 Tribal and 3 City buildings; and installation of an Air Source Heat Pump demonstration project in Atka. Two communities and one region – Ouzinkie (May 2017), Ugashik (July 2017), and the Bristol Bay region (May 2019) – utilized DOE’s technical assistance services to hold Strategic Energy Planning sessions with NREL and DOE facilitation assistance. And in early 2018, SWAMC established a parallel program, funded through a USDA Energy Audit and Renewable Energy Development grant to provide subsidized energy audits for small businesses in the region. SWAMC and partners have now completed energy audits of over 60 businesses (buildings and fishing vessels) and are currently operating a third round of the USDA program. Fifteen of those business owners have now received additional grant funding to cover 25% of the cost of the energy efficiency upgrades identified in the audit. This technical assistance structure will be sustained beyond DOE grant funding in several forms. As a sign of increased grant writing and project management capacity, the Kodiak Regional Energy Coordinator applied for and received a USDA Community Facilities Technical Assistance and Training grant to continue work begun under this program. Energy coordination tasks have been folded into existing economic development positions at SWAMC and at BBNA, ensuring long-term outreach and support in the region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2011 Performance Assessment Community of Practice Technical Exchange – Summary

The Performance Assessment Community of Practice (PA CoP) was developed in 2008 to improve consistency and quality in the preparation of performance assessments (PAs) and risk assessments across the Department of Energy (DOE) Complex. The term, PA, is used to represent all of these modeling applications in this report. The PA CoP goals are to foster the exchange of information among PA practitioners and to share lessons learned from PAs conducted for DOE, commercial disposal facilities, and international entities. Technical exchanges and workshops are a cornerstone of PA CoP activities. Previous technical exchanges have addressed Engineered Barriers (2009 - http://www.cresp.org/education/workshops/pacop/), the Advanced Simulation Capability for Environmental Management and the Cementitious Barriers Partnership (2010 - http://srnl.doe.gov/copexchange/links.htm). Each technical exchange also includes summary presentations regarding activities at DOE, the Nuclear Regulatory Commission (NRC) and other organizations (e.g., International Atomic Energy Agency (IAEA)) as well as a number of presentations from selected sites to provide insight and perspective from on-going modeling activities. Through the deployment of PA Assistance Teams, the PA CoP has also been engaged in the development of new PAs across the DOE Complex. As a way of improving consistency in the preparation of new PAs, the teams provide technical advice and share experiences, noteworthy practices, and lessons learned from previous Low-Level Waste Disposal Facility Federal Review Group (LFRG) reviews. Teams have provided support for PAs at Hanford, Idaho, Paducah and Portsmouth. The third annual PA CoP Technical Exchange was held on May 25-26, 2011 in Atlanta, GA. The PA CoP Steering Committee Meeting held its first meeting on May 24 prior to the Technical Exchange. Decision making using models and software quality assurance were the topical emphasis for the exchange. A new feature at the 2011 technical exchange was the use of panel discussions to solicit feedback from regulators and practitioners. This report summarizes discussions and recommendations from the steering committee meeting and presentations and feedback obtained at the technical exchange. Appendix I includes the steering committee meeting agenda and Appendix II includes the agenda for the technical exchange and a screenshot of the presentations and video files that are available online.

99 GENERAL AND MISCELLANEOUS↗

Leveraging Independent Management and Chief Engineer Hierarchy: Vertically and Horizontally-Derived Technical Authority Value

In the development of complex spacecraft missions, project management authority is usually extended hierarchically from NASA's highest agency levels down to the implementing institution's project team level, through both the center and the program. In parallel with management authority, NASA utilizes a complementary, but independent, hierarchy of technical authority (TA) that extends from the agency level to the project, again, through both the center and the program. The chief engineers (CEs) who serve in this technical authority capacity oversee and report on the technical status and ensure sound engineering practices, controls, and management of the projects and programs. At the lowest level, implementing institutions assign project CEs to technically engage projects, lead development teams, and ensure sound technical principles, processes, and issue resolution. At the middle level, programs and centers independently use CEs to ensure the technical success of their projects and programs. At the agency level, NASA's mission directorate CEs maintain technical cognizance over every program and project in their directorate and advise directorate management on the technical, cost, schedule, and programmatic health of each. As part of this vertically-extended CE team, a program level CE manages a continually varying balance between penetration depth and breadth across his or her assigned missions. Teamwork issues and information integration become critical for management at all levels to ensure value-added use of both the synergy available between CEs at the various agency levels, and the independence of the technical authority at each organization.

Barley, Bryan↗

Resolution of Technical Issues at the Waste Treatment and Immobilization Plant Pretreatment Facility - 17281

The U.S. Department of Energy's (DOE) Waste Treatment and Immobilization Plant (WTP) Pretreatment (PT) Facility has a number of first-of-a-kind technical challenges that have required additional expert analysis and testing activities to resolve. In 2006, an External Flowsheet Review Team identified 28 technical vulnerabilities with the plant design or future operability. Over a period of three months starting in September 2012, a number of top scientists and engineers conducted a review of the major technical issues associated with the design and operability of the WTP. These experts also provided independent advice on some of the broader challenges associated with completing the Hanford tank waste mission - highlighting the linkage between the physical and chemical properties of the tank waste and the PT Facility technical issues. In 2012 and early 2013, DOE's Office of River Protection (ORP) directed the WTP contractor to suspend production work on the PT Facility until the outstanding technical issues could be resolved and the nuclear safety basis could be updated and brought into alignment with any updates to the facility design and/or process flowsheet. By late 2016, DOE and the WTP contractor resolved three of the eight outstanding technical issues: - (T1) Hydrogen Gas in Vessels; - (T2) Criticality in PT Facility Vessels; - (T3) Hydrogen in Piping and Ancillary Vessels (HPAV). Resolving all three of these issues required a combination of engineering studies and updates to foundational PT Facility safety basis documents to ensure both the design features and safety control strategies were adequately developed and fully supportable. The five remaining unresolved technical issues are Pulse-Jet Mixing (PJM) of Vessels (T4), Erosion and Corrosion in WTP Vessels and Piping (T5), PT Facility Optimization (T6), Black Cell Vessel Structural Integrity (T7), and Facility Ventilation (T8). Specific plans for resolving each of the five remaining technical issues have been developed by the WTP contractor. This paper provides a synopsis of the status of PT Facility technical issue resolution, and how resolution of the issues will enable DOE to make an informed decision to establish a new performance baseline for the PT Facility at a future date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The SRNL technical assistance program: transferring lessons learned from two decades of remedial successes to the DOE complex - 15438

The Savannah River Site has an established history of developing implementable risk reduction strategies, developing and deploying innovative technological solutions, and collaboratively achieving realistic and protective environmental end states for complex environmental problems. Part of this success results from the strong historical collaboration between site environmental restoration groups and the Savannah River National Laboratory which results in the promulgation of innovative technical approaches and technologies from the laboratory to ongoing remediation campaigns. Much of the underlying research and development effort was funded by DOE's Office on Environmental Management through a series of applied technology demonstration projects (Integrated Demonstration Project, Integrated Programs and the Applied Field Research Site). Concomitant with the research efforts, SRNL has managed a dynamic and efficient national program that provides teams of technical experts with a broad experience base to recommend strategies that reduce risk and/or technical uncertainty for challenging environmental problems at other DOE facilities. At many of these sites, standard remedial approaches (e.g., excavation, pump and treat, soil vapor extraction) have either failed or proved to be too costly, inadequate, or ineffective. Alternatively, other sites struggle with implementation of innovative but less well understood approaches. The technical assistance teams use a structured process that based on several basic concepts, specifically, development of site specific technical frameworks, and careful matching of remedies to site-specific chemical, geological and physical conditions. Development of technical frameworks is a key strategy to apply basic science to an applied field problem. When directed toward understanding complex real-world environmental remediation challenges, frameworks are tools that support practical identification and incorporation of the key-controlling scientific processes and principles. Frameworks can also be used to minimize technical risks, encourage efficiency and effectiveness, and provide the basis for innovative and creative solutions. Efficient and effective environmental cleanup also requires matching the character of remediation and stabilization methods to the nature of the target zone of contamination as the nature of the target zone evolves through the life of the remedial project. A contaminant plume can be divided into the following zones: the source zone, the impact zone, and the transitional zone that then can be used to identify classes of technologies that are appropriate to that zone. For example, physical and chemical methods (e.g., trapping, immobilization, destruction, or isolation) that directly address the source contaminants are often appropriate for the disturbed zone during the remedial process. A variety of methods that include both active treatments (e.g., pump and treat or active bioremediation) and enhanced attenuation technologies (e.g., geochemical manipulation or reactive barriers) are often suitable for the primary contamination zone or impact zone. Various strategies based on natural attenuation processes may be applicable to the primary contamination zone and these methods are typically applied for the transition or baseline portions of the plume. Careful matching of remedies to site-specific conditions is critical to long-term success in environmental cleanup and restoration. The matching process facilitates selection of technologies with particular strengths that align with real-world needs and constraints, encourages strategic use of multiple or combined technologies to address major plume sub-domains, and supports transitioning technologies in space and time as remediation progresses. Since 2006, the SRNL Technical Assistance program has focused on providing support across the DOE complex. During this time, over 25 teams have visited eleven DOE sites and made recommendations that yielded an estimated cost savings of $100 M. Examples will be provided that illustrate key aspects and significant successes of the technical assistance program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Volume I. Introduction to DUNE

The preponderance of matter over antimatter in the early universe, the dynamics of the supernovae that produced the heavy elements necessary for life, and whether protons eventually decay -- these mysteries at the forefront of particle physics and astrophysics are key to understanding the early evolution of our universe, its current state, and its eventual fate. The Deep Underground Neutrino Experiment (DUNE) is an international world-class experiment dedicated to addressing these questions as it searches for leptonic charge-parity symmetry violation, stands ready to capture supernova neutrino bursts, and seeks to observe nucleon decay as a signature of a grand unified theory underlying the standard model. The DUNE far detector technical design report (TDR) describes the DUNE physics program and the technical designs of the single- and dual-phase DUNE liquid argon TPC far detector modules. This TDR is intended to justify the technical choices for the far detector that flow down from the high-level physics goals through requirements at all levels of the Project. Volume I contains an executive summary that introduces the DUNE science program, the far detector and the strategy for its modular designs, and the organization and management of the Project. The remainder of Volume I provides more detail on the science program that drives the choice of detector technologies and on the technologies themselves. It also introduces the designs for the DUNE near detector and the DUNE computing model, for which DUNE is planning design reports. Volume II of this TDR describes DUNE's physics program in detail. Volume III describes the technical coordination required for the far detector design, construction, installation, and integration, and its organizational structure. Volume IV describes the single-phase far detector technology. A planned Volume V will describe the dual-phase technology.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Technical Issues in the Comprehensive Nuclear Test Ban Treaty (CTBT) Ratification Debate: A 20 Year Retrospective

Two decades after the U.S. Senate declined in 1999 to give its consent to ratification of the Comprehensive Nuclear Test Ban Treaty (CTBT), the treaty remains in legal and political limbo. Legally, the treaty cannot enter into force without U.S. ratification. However, the Senate’s rejection does not strip the treaty of its force as an element of customary international law or alter the will of other signatories to see it enter into force. Politically, the debate over the virtues and flaws of the treaty remains as strong as ever, with some CTBT advocates pushing energetically for U.S. re-review while some opponents seek ways to “un-sign” the treaty. Meanwhile, despite the Senate’s rejection of the treaty, the United States acts in a manner consistent with its main obligations by maintaining a moratorium on explosive nuclear testing and providing financial support (as well as technical expertise) to the CTBT Organization (CTBTO)—in particular the CTBTO’s International Monitoring System (IMS). The CTBT may well remain in such limbo for a long time to come, unless some catalytic event comes along to re-shape national perceptions and priorities, one way or the other. The treaty’s future, whatever it might be, will be determined in part by how much perspectives might have changed in light of interim developments. Our purpose is to shed light on some of those developments and to assess their relevance. The 1999 ratification debate addressed a large number of issues. Rejection was driven by various policy and technical judgments. The purpose of this paper is to re-examine those technical judgments in light of what has been learned over the following two decades. On some technical matters, there was explicit recognition of extant uncertainties, as well as a conviction and hope that time would dispel them. To be doubly clear, our purpose is not to recommend a way forward on CTBT ratification. The policy judgments of 1999 and 2020 are beyond the scope of this paper. This technical re-examination proceeds as follows. It begins with a short background section to introduce the key technical matters in discussion in the U.S. ratification process. Then it moves systematically through each of those topics with a review of relevant background information, a discussion of key points in debate, an analysis of subsequent experience, and a current assessment. The historical analysis draws on many sources including the primary documents of the Congressional debate, the official article-by-article interpretation by the Department of State, and the statements of key players in the process. We also relied on key technical reports and publications by subject matter experts that have addressed in more detail many of the issues in our focus. These sources include the 2002 and 2012 reports of the National Academy of Sciences as well as publications by senior technical staff of Lawrence Livermore National Laboratory (LLNL) who were actively involved in the ratification debate, including then-Laboratory Director Bruce Tarter. We also conducted several interviews with government officials from the 1990s, past laboratory directors, and other members of the scientific community. But, except where individuals are specifically cited by name, the judgments offered here are our own and should not be attributed to any other individual or to LLNL as such.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

NASA/DOD Aerospace Knowledge Diffusion Research Project. Paper 21: Technological innovation and technical communications: Their place in aerospace engineering curricula. A survey of European, Japanese, and US Aerospace Engineers and Scientists

Aerospace engineers and scientists from Western Europe, Japan, and the United States were surveyed as part of the NASA/DoD Aerospace Knowledge Diffusion Research Project. Questionnaires were used to solicit their opinions regarding the following: (1) the importance of technical communications to their profession; (2) the use and production of technical communications; and (3) their views about the appropriate content of an undergraduate course in technical communications. The ability to communicate technical information effectively was very important to the aerospace engineers and scientists who participated in the study. A considerable portion of their working week is devoted to using and producing technical information. The types of technical communications used and produced varied within and among the three groups. The type of technical communication product used and produced appears to be related to respondents' professional duties. Respondents from the three groups made similar recommendations regarding the principles, mechanics, and on-the-job communications to be included in an undergraduate technical communications course for aerospace majors.

Pinelli, Thomas E.↗

Development of NASA Technical Standards Program Relative to Enhancing Engineering Capabilities

The enhancement of engineering capabilities is an important aspect of any organization; especially those engaged in aerospace development activities. Technical Standards are one of the key elements of this endeavor. The NASA Technical Standards Program was formed in 1997 in response to the NASA Administrator s directive to develop an Agencywide Technical Standards Program. The Program s principal objective involved the converting Center-unique technical standards into Agency wide standards and the adoption/endorsement of non-Government technical standards in lieu of government standards. In the process of these actions, the potential for further enhancement of the Agency s engineering capabilities was noted relative to value of being able to access Agencywide the necessary full-text technical standards, standards update notifications, and integration of lessons learned with technical standards, all available to the user from one Website. This was accomplished and is now being enhanced based on feedbacks from the Agency's engineering staff and supporting contractors. This paper addresses the development experiences with the NASA Technical Standards Program and the enhancement of the Agency's engineering capabilities provided by the Program s products. Metrics are provided on significant aspects of the Program.

Gill, Paul S.↗

History and Logic Model NASA Goddard Space Flight Center Instrument and Payload Systems Engineering Technical Performance Study

Historically, some NASA missions have exceeded schedule and cost commitments. Studies suggest technical performance is a contributor. The 1980 NASA Project Management Study concluded, "one of the most significant contributors to cost and schedule growth is inadequate definition of technical and management aspects of a program..." (as cited in GAO/NSIAD-93-97, p. 11). The 1991 NASA Roles and Missions Report identified a "need for increased emphasis on technological readiness and requirements on the front end of a program" (as cited in GAO/NSIAD-93-97, p. 11). The 1992 NASA Program Costs Report stated that NASA officials identified, among other things, "insufficient definition studies... [and] program redesigns and technical complexities" as reasons for cost and schedule overruns (GAO/NSAID-93-97, p. 11). The 2002 Task Force on Acquisition of National Security Space Programs found "requirements definition and control issues, unhealthy cost bias in proposal evaluation, widespread lack of budget reserves required to implement high risk programs on schedule, and an overall underappreciation of the importance of appropriately staffed and trained system engineering staff to manage the technologically demanding and unique aspects of space programs" (DoD, 2003, p.i.) In 2007, The NASA Office of the Chief Engineer chartered the NASA Instrument Capability Study (NICS) “to determine whether NASA instrument developers are facing challenges that impact the capability to design and build quality instruments or whether there are flaws in the acquisition strategy evidenced by schedule delays, cost overruns, and increased technical risk via design deficiencies. The... team was also chartered to determine if occurrences [are]... isolated cases or if there are generic issues... If the issues [are] found to be generic, the team [is] to offer solutions to recover such capability" (NICS Report, 2008, p. vi). The 2008 NICS Report, led by Goddard Space Flight Center (GSFC), identified challenges to instrument technical performance consistent with findings from previous reports. In 2017, the Instrument Project Division (IPD) Implementation Study was initiated to determine if there was a change in meeting schedule and cost commitments after implementing certain NICS recommendations. In 2018, the Instrument Technical Performance Study was initiated to determine the current state of Instrument Technical Performance in the GSFC Payload & Instrument Systems Engineering Branch. The purpose of the combined studies is to answer the question, "Is there a relationship between meeting NASA scientific instrument technical success and meeting schedule and cost commitments? If yes, what is the relationship?" References Department of Defense Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics. (2003). The report of the defense science board/ air force scientific advisory board joint task force on acquisition of national security space programs. Washington DC. Government Accounting Office. (1992). NASA program costs: Space missions require substantially more funding than initially estimated. GAO/NSIAD-93-97. Washington DC. National Aeronautics and Space Administration, National Oceanic and Atmospheric Agency, Department of Defense. (2008). The NASA instrument capability study final report. NP-2008-11-058-GSFC. Washington DC.

Robbins, Geraldine↗

International Socio-Technical Challenges for Geological Disposal (InSOTEC): Project Aims and Preliminary Results - 12236

InSOTEC is a social sciences research project which aims to generate a better understanding of the complex interplay between the technical and the social in radioactive waste management and, in particular, in the design and implementation of geological disposal. It currently investigates and analyses the most striking socio-technical challenges to implementing geological disposal of radioactive waste in 14 national programs. A focus is put on situations and issues where the relationship between the technical and social components is still unstable, ambiguous and controversial, and where negotiations are taking place in terms of problem definitions and preferred solutions. Such negotiations can vary from relatively minor contestation, over mild commotion, to strong and open conflicts. Concrete examples of socio-technical challenges are: the question of siting, introducing the notion of reversibility / retrievability into the concept of geological disposal, or monitoring for confidence building. In a second stage the InSOTEC partners aim to develop a fine-grained understanding of how the technical and the social influence, shape, build upon each other in the case of radioactive waste management and the design and implementation of geological disposal. How are socio-technical combinations in this field translated and materialized into the solutions finally adopted? With what kinds of tools and instruments are they being integrated? Complementary to providing better theoretical insight into these socio-technical challenges/combinations, InSOTEC aims to provide concrete suggestions on how to address these within national and international contexts. To this end, InSOTEC will deliver insights into how mechanisms for interaction between the technical community and a broad range of socio-political actors could be developed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on Resolution of Technical Issues at the Hanford Waste Treatment And Immobilization Plant Project - 16285

The U.S. Department of Energy's (DOE) Waste Treatment and Immobilization Plant (WTP) Pretreatment (PT) Facility has a number of first-of-a-kind technical challenges that have required additional expert analysis and testing activities to resolve. In 2006 an External Flowsheet Review Team identified 28 technical vulnerabilities with the plant design or future operability. Over a period of three months starting in September 2012, a number of top scientists and engineers conducted a review of the major technical issues associated with the design and operability of the WTP. These experts also provided independent advice on some of the broader challenges associated with completing the Hanford tank waste mission - highlighting the linkage between the physical and chemical properties of the tank waste and the PT Facility technical issues. In 2012 and early 2013 DOE's Office of River Protection (ORP) directed the WTP contractor to suspend production work on the Pretreatment Facility until the outstanding technical issues could be resolved and the nuclear safety basis could be updated and brought into alignment with any updates to the facility design and/or process flowsheet. Specific plans for resolving each the technical issues have been developed and significant progress has been made over the past year in identifying solution sets for each of the issues. The eight remaining technical issues (referred to as T1 to T8) are as follows: (T1) Hydrogen Gas Release from Vessel Solids; (T2) Potential Criticality in Pretreatment Facility Vessels; (T3) Hydrogen in Piping and Ancillary Vessels; (T4) Pulse-Jet Mixing and Control; (T5) Erosion and Localized Corrosion in WTP Vessels and Piping; (T6) Design Redundancy in Black Cells/In-Service Inspection; (T7) Black Cell Vessel Structural Integrity; (T8) Facility Ventilation. This paper provides a synopsis of the progress that has been made on resolving the Pretreatment technical issues over the past year, and how resolution of the issues will enable DOE to make an informed decision to resume design and production engineering for the Pretreatment Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Communicating Technical Information: Different Approaches for Different Audiences - 19399

The Canadian Nuclear Safety Commission (CNSC), Canada's independent nuclear regulator, has a 70- year history of regulating nuclear safety in Canada. Part of the CNSC's mandate is to disseminate objective scientific, technical and regulatory information to the public. The CNSC prides itself on being transparent with the public, and openly sharing scientific, technical and regulatory information on its regulatory activities with stakeholders. We value the public's feedback, and have a robust public participation program to allow for public involvement in the CNSC's activities. However, different audiences have different needs based on their level of technical knowledge and expertise. The CNSC's experience with stakeholder interactions has demonstrated the need to balance the dissemination of technical information through different communication platforms, in order to satisfy the needs of various intended audiences. This paper will focus on the radioactive waste management communications methods that the CNSC has implemented for two distinct audiences: 1. Audiences with little or no technical background: Communications with this audience requires techniques to make highly technical concepts more understandable. The focus is on educating about matters related to radioactive waste management, and informing about the safety aspects behind the regulation of radioactive waste. 2. Audiences with previous knowledge and experience with nuclear matters: Communications with this audience requires techniques to ensure that as much technical information and data as possible is available to inform stakeholders. The focus is on giving access to studies, research and raw data, in order to allow this audience to inform themselves, and potentially bring new perspectives to the CNSC's attention that could be used in regulatory oversight activities. In its capacity to disseminate scientific and technical information to the public as required by legislation, the CNSC holds a unique position compared with other Canadian regulatory bodies. The CNSC is one of the only Canadian regulators which: - Has a public hearing process which enables the public and Indigenous groups to express their issues and concerns directly to the decision-maker (the Commission) - Publishes regular regulatory oversight reports (report card on industry) that assess the safety performance of all its licensees - Publishes responses to all public comments received during consultation periods in our environmental assessment processes as well as our regulatory framework processes, including draft regulatory documents, discussions papers and proposed regulations - Has an independent environmental monitoring program, allowing the public access to environmental data. The program also seeks public and Indigenous input with respect to proposed environmental sampling campaigns, including suggestions on the samples to be taken and sampling locations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗