Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Strategic Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Central Bureau Status and Perspective

The Central Bureau continues to promote the IGS organization, data and data products as setting the world standard for GPS/GNSS geodetic applications as outlined in the IGS Strategic Plan. The Central Bureau was responsible for the organization of the strategic planning process, preparation of all documents, and the editing and publication of the plan. This was a major activity and the Board s consensus on the plan is a significant milestone in the evolution of the IGS. The Central Bureau is responsible for the day-to-day management of the Service. With 200 organizations in over 80 countries and a ground network of approx. 350 stations, this requires daily interfaces on many different levels globally. The separate summary of the IGS Network Coordinator is included in this annual report and demonstrates the vital technical tasks of the Central Bureau. The CB is also responsible to arrange and organize all Board activities and is involved in the supporting the planning and logistics of all IGS workshops and meetings.

Neilan, Ruth↗

Negotiation Model For Cooperative Operations in Upper Class E Airspace

This work proposes a negotiation model, built upon the sequential bargaining model, for strategic planning among high-altitude operations. The definition of cost/utility, the setup of time-dependent required cost, and the detailed negotiation structure and process are developed. The sensitivities of negotiation strategies or preferences, response time, and limited maneuverability are investigated to understand the behavior of the proposed negotiation model. Results show that the proposed model can serve the cooperative operation concept well: first, this model ensures an agreement can be reached within a predefined time window; second, operators can accurately express their priorities without exposing their private business information; third, the model encourages short response times and helps the negotiation process converge; finally, the limited and unbalanced maneuverability was found less of a concern for a fair negotiation due to the long lead time available for strategic planning.

Negotiation Model↗

Negotiation Model For Cooperative Operations in Upper Class E Airspace

This work proposes a negotiation model, built upon the sequential bargaining model, for strategic planning among high-altitude operations. The definition of cost/utility, the setup of time-dependent required cost, and the detailed negotiation structure and process are developed. The sensitivities of negotiation strategies or preferences, response time, and limited maneuverability are investigated to understand the behavior of the proposed negotiation model. Results show that the proposed model can serve the cooperative operation concept well: first, this model ensures an agreement can be reached within a predefined time window; second, operators can accurately express their priorities without exposing their private business information; third, the model encourages short response times and helps the negotiation process converge; finally, the limited and unbalanced maneuverability was found less of a concern for a fair negotiation due to the long lead time available for strategic planning.

Negotiation Model, Strategic Planning, Air Traffic↗

NASA Performance Plan

The Government Performance and Results Act (GPRA) passed by Congress and signed by the President in 1993 provides a new tool to improve the efficiency of all Federal agencies. The goals of GPRA are to: Improve citizen confidence in Government performance; Improve Federal program management, effectiveness, and public accountability; and Improve congressional decisionmaking on where to commit the Nation's financial and human resources. The Act directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The first plans were submitted in September 1998 as part of the Fiscal Year 1999 (FY99) budget process. These budget submissions were expected to support the goals expressed in the agency strategic plans. The Act also directs agencies to manage and measure results to justify congressional appropriations and authorizations. Six months after the completion of the fiscal year, agencies will report on the degree of success in achieving the goals and evaluation measures defined in the strategic and performance plans. The plans required by GPRA have been submitted to the Office of Management and Budget (OMB) and to Congress. Copies of NASA plans are available from the Office of Policy and Plans at NASA Headquarters and can be accessed on the i nterinet web sites identified in the Appendix.

Source record↗

Capability Investment Strategy to Enable JPL Future Space Missions

The Jet Propulsion Laboratory (JPL) formulates and conducts deep space missions for NASA (the National Aeronautics and Space Administration). The Chief Technologist of JPL has responsibility for strategic planning of the laboratory's advanced technology program to assure that the required technological capabilities to enable future missions are ready as needed. The responsibilities include development of a Strategic Plan (Antonsson, E., 2005). As part of the planning effort, a structured approach to technology prioritization, based upon the work of the START (Strategic Assessment of Risk and Technology) (Weisbin, C.R., 2004) team, was developed. The purpose of this paper is to describe this approach and present its current status relative to the JPL technology investment.

investment strategies↗

Controlling Rapid Change Through Systems Engineering the Organization

A new approach to change management has been developed and applied at the Jet Propulsion Laboratory (JPL). It's main focus is on aligning the organization with the strategic plan; and understanding the internal organizational relationships that impact change, which ultimately determine an organizations ability to be transformed and renewed The new approach regards the strategic plan of a company as the standard by which progress and achievement are measured. Purposeful interventions should generate a company movement along a strategic course, and tracking that movement is essential for managing change. This paper presents an overview of DYNOMO, or the DYNamic Organizational MOdel which was developed to assist in the measurement and analysis of organizational state. The paper concludes with summaries of two applications.

Hihn, Jairus↗

United States Weather Research Program (USWRP)

After more than a decade of development by a broad cross-section of the U.S. atmospheric research community involved in planning for the National STORM Program, the Subcommittee on Atmospheric Research (SAR) of the Committee on Earth and Environmental Science (CEES) led the development of a strategic plan to realize the objectives of STORM so as to improve our nation's capability to provide accurate short-term forecasts of weather. This strategic plan will guide the planning and implementation of what is now called the United States Weather Research Program (USWRP). The USWRP is charged with achieving operational atmospheric prediction based on mesoscale observations and model results and establishing the scientific and technological basis for global atmospheric mesoscale prediction by the year 2000. The key scientific questions that are addressed under USWRP are discussed.

Bhumralkar, Chandrakant↗

In-Situ Resource Utilization: Laying the Foundation for "Living off the Land"

The technology to manufacture rocket propellants, breathing and life-support gases, fuel cell reagents, and other consumables on Mars using indigenous Martian resources as feedstock in the production process is known as In-Situ Resource Utilization (ISRU). Several studies of the long-term, committed exploration of Mars by humans show that ISRU is essential ... an enabling technology. The recognized value of ISRU to human exploration is reflected in the NASA Strategic Plan. In the description of the "Strategies and Outcomes" of the Human Exploration and Development of Space (HEDS) Enterprise, the NASA Strategic Plan states: The [HEDS] Enterprise relies on the robotic missions of the Space Science Enterprise to provide extensive knowledge of the geology, environment, and resources of planetary bodies. The Space Science Enterprise missions will also demonstrate the feasibility of utilizing local resources to "live off the land."

Kaplan, D. I.↗

Integrated Traffic Flow Management Decision Making

A generalized approach is proposed to support integrated traffic flow management decision making studies at both the U.S. national and regional levels. It can consider tradeoffs between alternative optimization and heuristic based models, strategic versus tactical flight controls, and system versus fleet preferences. Preliminary testing was accomplished by implementing thirteen unique traffic flow management models, which included all of the key components of the system and conducting 85, six-hour fast-time simulation experiments. These experiments considered variations in the strategic planning look-ahead times, the replanning intervals, and the types of traffic flow management control strategies. Initial testing indicates that longer strategic planning look-ahead times and re-planning intervals result in steadily decreasing levels of sector congestion for a fixed delay level. This applies when accurate estimates of the air traffic demand, airport capacities and airspace capacities are available. In general, the distribution of the delays amongst the users was found to be most equitable when scheduling flights using a heuristic scheduling algorithm, such as ration-by-distance. On the other hand, equity was the worst when using scheduling algorithms that took into account the number of seats aboard each flight. Though the scheduling algorithms were effective at alleviating sector congestion, the tactical rerouting algorithm was the primary control for avoiding en route weather hazards. Finally, the modeled levels of sector congestion, the number of weather incursions, and the total system delays, were found to be in fair agreement with the values that were operationally observed on both good and bad weather days.

Grabbe, Shon R.↗

Marshall Space Flight Center Propulsion Systems Department (PSD) Knowledge Management (KM) Initiative

NASA Marshall Space Flight Center's Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities within the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center of Excellence (AISCE), lntergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KNI implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to suppo~th e planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have beon pedormed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural1KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level svstems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, - evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

Caraccioli, Paul↗

Marshall Space Flight Center Propulsion Systems Department (PSD) KM Initiative

NASA Marshall Space Flight Center s Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities with in the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center Of Excellence (AISCE), Intergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KM implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to support the planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have been performed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural/KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level systems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

Caraccioli, Paul↗

NASA Enterprise Digital Transformation Initiative Strategic Framework & Implementation Approach

Since 1958, NASA has delivered its enduring bold purpose, characterized in the 2022 NASA Strategic Plan as a mission to discover, explore, innovate, and advance solutions to the problems of flight, within and outside the Earth’s atmosphere, for the benefit of humankind. The NASA Strategic Plan also recognizes that this mission will be delivered differently as it looks to a future marked by radical global change, which is in part being driven by digital advances. For this reason, in late 2020 NASA established an Enterprise Digital Transformation (DT) agency-level strategic initiative to accelerate and coordinate leveraging digital advances to transform the way the Agency works, the experience of its workforce and the agility of its workplace. This paper documents NASA’s DT strategic framework and associated implementation approach, with the DT strategic initiative serving to ignite, connect, integrate, and facilitate DT progress across a federated organizational operating model.

digital transformation↗

ECHO Responds to NASA's Earth Science User Community

Over the past decade NASA has designed, built, evolved, and operated the Earth Observing System Data and Information System (EOSDIS) Information Management System (IMS) in order to provide user access to NASA's Earth Science data holdings. During this time revolutionary advances in technology have driven changes in NASA's approach to providing an IMS service. This paper will describe NASA's strategic planning and approach to build and evolve the EOSDIS IMS and to serve the evolving needs of NASA's Earth Science community. It discusses the original strategic plan and how lessons learned help to form a new plan, a new approach and a new system. It discusses the original technologies and how they have evolved to today.

Pfister, Robin↗

NASA Strategy for Technology Development

At the National Aeronautics and Space Administration (NASA), foresight is a coordinated, iterative, and continual process for making informed decisions. NASA faces diverse and relatively unique challenges and opportunities as the leading U.S. agency for aeronautics development, cutting-edge scientific discovery, and human space exploration. To address these challenges and leverage opportunities, NASA uses foresight to strategically plan technology development across four mission directorates: Aeronautics Research Mission Directorate, Space Technology Mission Directorate, Science Mission Directorate, and Human Exploration and Operations Mission Directorate. The mission directorates leverage a broad community of experts and partners to incorporate technology foresight into mission and program planning. Through this process NASA realizes tangible benefits to the agency’s science, technology, and exploration programs. As an independent office, NASA’s Office of the Chief Technologist (OCT) serves as a trusted authority to inform technology strategy and advocacy at the agency, enabling future missions and advancing U.S. economic competitiveness. Specifically, OCT coordinates and uses inputs from abroad community of experts, both internal and external to NASA, to inform decision making for technology plans, investments, and partnerships. OCT develops the NASA Technology Taxonomy to standardize communication across the agency’s diverse technology portfolio and the related Strategic Technology Investment Plan that integrates priorities and informs technology investment. Through these efforts, OCT has refined elements of foresight-informed strategic planning that may be applicable to other technology-driven industries where foresight is essential for resilience. This chapter describes the processes of foresight for technology development at NASA and provides insight into the value the agency derives from these processes. The chapter further describes the role of OCT as an independent advisory office that supports NASA’s efforts to capitalize on foresight and strategic technology planning. We present these examples with consideration for how organizations in defense, security, and other technology-driven industries can operationalize foresight in their own strategic technology development.

Erica Rodgers↗

Pathways to excellence: A Federal strategy for science, mathematics, engineering, and technology education

This Strategic Plan was developed by the Federal Coordinating Council for Science, Engineering, and Technology (FCCSET) through its Committee on Education and Human Resources (CEHR), with representatives from 16 Federal agencies. Based on two years of coordinated interagency effort, the Plan confirms the Federal Government's commitment to ensuring the health and well-being of science, mathematics, engineering, and technology education at all levels and in all sectors (i.e., elementary and secondary, undergraduate, graduate, public understanding of science, and technology education). The Plan represents the Federal Government's efforts to develop a five-year planning framework and associated milestones that focus Federal planning and the resources of the participating agencies toward achieving the requisite or expected level of mathematics and science competence by all students. The priority framework outlines the strategic objectives, implementation priorities, and components for the Strategic Plan and serves as a road map for the Plan. The Plan endorses a broad range of ongoing activities, including continued Federal support for graduate education as the backbone of our country's research and development enterprise. The Plan also identifies three tiers of program activities with goals that address issues in science, mathematics, engineering, and technology education meriting special attention. Within each tier, individual agency programs play important and often unique roles that strengthen the aggregate portfolio. The three tiers are presented in descending order of priority: (1) reforming the formal education system; (2) expanding participation and access; and (3) enabling activities.

Source record↗

The Vision for Space Exploration

With last year's budget, NASA released a new Strategic Plan outlining a new approach to space exploration using a 'building block' strategy to explore scientifically valuable destinations across our solar system. At the same time that we released the Strategic Plan, our Nation and the NASA family also suffered the loss of the seven brave astronauts aboard the Space Shuttle Columbia. The report of the Columbia Accident Investigation Board emphasized the need for a clearer direction from which to drive NASA's human exploration agenda. On January 14, 2004, the President articulated a new vision for space exploration. You hold in your hands a new, bolder framework for exploring our solar system that builds upon the policy that was announced by the President after months of careful deliberations within the Administration. This plan does not undertake exploration merely for the sake of adventure, however exciting that may be, but seeks answers to profound scientific and philosophical questions, responds to recent discoveries, will put in place revolutionary technologies and capabilities for the future, and will genuinely inspire our Nation, the world, and the next generation. Our aim is to explore in a sustainable, affordable, and flexible manner. We believe the principles and roadmap set down in this document will stand the test of time. Its details will be subject to revision and expansion as new discoveries are made, new technologies are applied, and new challenges are met and overcome. This plan is guided by the Administration's new space exploration policy, 'A Renewed Spirit of Discovery: The President's Vision for U.S. Space Exploration,' a copy of which is provided on the following pages. NASA is releasing this plan simultaneously with NASA's FY 2005 Budget Justification. This plan is fiscally responsible, consistent with the Administration s goal of cutting the budget deficit in half within the next five years. I cannot overstate how much NASA will change in the coming years as this plan is implemented. I also cannot overstate how profound the rewards will be on this new course. With the support of Congress, the science community, the NASA civil and contractor workforce, and most importantly, the American public, we will embark on this very exciting future. When Christopher Columbus made his voyages across the Atlantic in the 15th and 16th centuries, his ships carried the inscription 'Following the light of the sun, we left the Old World.' I look forward to joining you as we follow the light of the planets and the stars into the new worlds of the 21st century.

Source record↗

Risk-Hedged Approach for Re-Routing Air Traffic Under Weather Uncertainty

This presentation corresponds to: our paper explores a new risk-hedged approach for re-routing air traffic around forecast convective weather. In this work, flying through a more likely weather instantiation is considered to pose a higher level of risk. Current operational practice strategically plans re-routes to avoid only the most likely (highest risk) weather instantiation, and then tactically makes any necessary adjustments as the weather evolves. The risk-hedged approach strategically plans re-routes by minimizing the risk-adjusted path length, incorporating multiple possible weather instantiations with associated likelihoods (risks). The resulting model is transparent and is readily analyzed for realism and treated with well-understood shortest-path algorithms. Risk-hedged re-routes are computed for some example weather instantiations. The main result is that in some scenarios, relative to an operational-practice proxy solution, the risk-hedged solution provides the benefits of lower risk as well as shorter path length. In other scenarios, the benefits of the risk-hedged solution are ambiguous, because the solution is characterized by a tradeoff between risk and path length. The risk-hedged solution can be executed in those scenarios where it provides a clear benefit over current operational practice.

air traffic routing↗

EVA Systems Technology Gaps and Priorities 2017

Performance of Extra-Vehicular Activities (EVA) has been and will continue to be a critical capability for human space flight. Human exploration missions beyond LEO will require EVA capability for either contingency or nominal activities to support mission objectives and reduce mission risk. EVA systems encompass a wide array of products across pressure suits, life support systems, EVA tools and unique spacecraft interface hardware (i.e. EVA Translation Paths and EVA Worksites). In a fiscally limited environment with evolving transportation and habitation options, it is paramount that the EVA community's strategic planning and architecture integration products be reviewed and vetted for traceability between the mission needs far into the future to the known technology and knowledge gaps to the current investments across EVA systems. To ascertain EVA technology and knowledge gaps many things need to be brought together, assessed and analyzed. This includes an understanding of the destination environments, various mission concept of operations, current state of the art of EVA systems, EVA operational lessons learned, and reference advanced capabilities. A combined assessment of these inputs should result in well-defined list of gaps. This list can then be prioritized depending on the mission need dates and time scale of the technology or knowledge gap closure plan. This paper will summarize the current state of EVA related technology and knowledge gaps derived from NASA's Exploration EVA Reference Architecture and Operations Concept products. By linking these products and articulating NASA's approach to strategic development for EVA across all credible destinations an EVA could be done in, the identification of these gaps is then used to illustrate the tactical and strategic planning for the EVA technology development portfolio. Finally, this paper illustrates the various "touch points" with other human exploration risk identification areas including human health and performance.

Johnson, Brian J.↗