Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Steam compression”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Experimental and Computational Investigation of High Entropy Alloys for Elevated-Temperature Applications

To create and design novel structural materials with enhanced creep-resistance, fundamental studies have been conducted on high-entropy alloys (HEAs), using (1) thermodynamic calculations, (2) mechanical tests, (3) neutron diffraction, (4) characterization techniques, and (5) crystal-plasticity finite-element modeling (CPFEM), to explore future candidates for next-generation power plants. All the constituent binary and ternary systems of the Al-Cr-Cu-Fe-Mn-Ni and Al-Co-Cr-Fe-Ni systems were thermodynamically modeled within the whole composition range. Comparisons between the calculated phase diagrams and literature data are in good agreement. Seven types of HEAs were fabricated from Al-Cr-Cu-Fe-Mn-Ni and Al-Co-Cr-Fe-Ni systems. The Al x CrCuFeMnNi HEAs have disordered [face-centered cubic (FCC) + body-centered cubic (BCC)] crystal structures, not FCC or BCC single structure. Excessive alloying of the Al element results in the change of both microstructural and mechanical properties in Al x CoCrFeNi HEAs. There are mainly three structural features in Al x CoCrFeNi: (1) the morphology, (2) the volume fractions of the constitute phases, and (3) existing temperatures of all six phases. After homogenization, the Al 0.3 CoCrFeNi material is a pure FCC solid solution. After aging at 700 °C for 500 hours, the optimal microstructure combinations, the FCC matrix, needle-like B2 phase within grains, and granular σ phase along grain boundary, is achieved for Al 0.3 CoCrFeNi. The cold-rolling process is utilized to reduce the grain size of Al 0.1 CoCrFeNi and Al 0.3 CoCrFeNi. The chemical elemental partitioning of FCC, BCC, B2, and σphases at different temperatures, before and after mechanical tests, in Al-Cr-Cu-Fe-Mn-Ni and Al-Co-Cr-Fe-Ni systems are quantitatively characterized by both synchrotron X-ray diffraction, neutron diffraction with levitation, scanning electron microscopy (SEM), advanced atom probe tomography (APT), and transmission electron microscopy (TEM). In-situ neutron diffraction experiments were conducted to study the strengthening effect of B2 phase on tensile properties of Al 0.3 CoCrFeNi HEAs directly. The results shows the creep behavior of Al 0.3 CoCrFeNi is superior to conventional alloys, and the heat treatment introduces secondary B2 phase into the FCC matrix, which increase the yielding strength, decrease the ductility, diminish the serrated flow during compression tests at high temperatures. In summary, the outcomes of the development of the HEAs with creep resistance include: (1) Suitable candidates, for the application to boilers and steam and gas turbines at temperatures above 760 °C and a stress of 35 MPa. (2) Fundamental understanding on the precipitate stability and deformation mechanisms of both single-phase and precipitate-strengthened alloys at room and elevated temperatures, and (3) The demonstration of an integrated approach, coupling modeling [thermodynamic calculations and crystal-plasticity finite-element modeling (CPFEM)] and focused experiments, to identify HEAs that outperform conventional alloys for high-temperature applications, which will be applicable for the discovery and development of other high-temperature materials in the power-generating industry.

36 MATERIALS SCIENCE↗

Calculation of flow distribution in large radius ratio stages of axial flow turbines and comparison of theory and experiment

A method of calculating stage parameters and flow distribution of axial turbines is described. The governing equations apply to space between the blade rows and are based on the assumption of rotationally symmetrical, compressible, adiabatic flow conditions. Results are presented for stage design and flow analysis calculations. Theoretical results from the calculation system are compared with experimental data from low pressure steam turbine tests.

Herzog, J.↗

COMBUSTION-ASSISTED CO2 CAPTURE USING MECC MEMBRANES

Mixed Electron and Carbonate ion Conductor (MECC) membranes have been proposed as a means to separate CO{sub 2} from power plant flue gas. Here a modified MECC CO{sub 2} capture process is analyzed that supplements retentate pressurization and permeate evacuation as a means to create a CO{sub 2} driving force with a process assisted by the catalytic combustion of syngas on the permeate side of the membrane. The combustion reactions consume transported oxygen, making it unavailable for the backwards transport reaction. With this change, the MECC capture system becomes exothermic, and steam for electricity production may be generated from the waste heat. Greater than 90% of the CO{sub 2} in the flue gas may be captured, and a compressed CO{sub 2} product stream is produced. A fossil-fueled power plant using this process would consume 14% more fuel per unit electricity produced than a power plant with no CO{sub 2} capture system, and has the potential to meet U.S. DOE's goal that deployment of a CO{sub 2} capture system at a fossil-fueled power plant should not increase the cost of electricity from the combined facility by more than 30%.

20 FOSSIL-FUELED POWER PLANTS↗

Biomass gasification for liquid fuel production

In our old fix-bed autothermal gasifier we tested wood chips and wood pellets. We make experiments for Czech company producing agro pellets - pellets made from agricultural waste and fastrenewable natural resources. We tested pellets from wheat and rice straw and hay. These materials can be very perspective, because they dońt compete with food production, they were formed in sufficient quantity and in the place of their treatment. New installation is composed of allothermal biomass fixed bed gasifier with conditioning and using produced syngas for Fischer - Tropsch synthesis. As a gasifying agent will be used steam. Gas purification will have two parts - separation of dust particles using a hot filter and dolomite reactor for decomposition of tars. In next steps, gas will be cooled, compressed and removed of sulphur and chlorine compounds and carbon dioxide. This syngas will be used for liquid fuel synthesis.

09 BIOMASS FUELS↗

Systems Analyses of Advanced Brayton Cycles

The main objective is to identify and assess advanced improvements to the Brayton Cycle (such as but not limited to firing temperature, pressure ratio, combustion techniques, intercooling, fuel or combustion air augmentation, enhanced blade cooling schemes) that will lead to significant performance improvements in coal based power systems. This assessment is conducted in the context of conceptual design studies (systems studies) that advance state-of-art Brayton cycles and result in coal based efficiencies equivalent to 65% + on natural gas basis (LHV), or approximately an 8% reduction in heat rate of an IGCC plant utilizing the H class steam cooled gas turbine. H class gas turbines are commercially offered by General Electric and Mitsubishi for natural gas based combined cycle applications with 60% efficiency (LHV) and it is expected that such machine will be offered for syngas applications within the next 10 years. The studies are being sufficiently detailed so that third parties will be able to validate portions or all of the studies. The designs and system studies are based on plants for near zero emissions (including CO{sub 2}). Also included in this program is the performance evaluation of other advanced technologies such as advanced compression concepts and the fuel cell based combined cycle. The objective of the fuel cell based combined cycle task is to identify the desired performance characteristics and design basis for a gas turbine that will be integrated with an SOFC in Integrated Gasification Fuel Cell (IGFC) applications. The goal is the conceptualization of near zero emission (including CO{sub 2} capture) integrated gasification power plants producing electricity as the principle product. The capability of such plants to coproduce H{sub 2} is qualitatively addressed. Since a total systems solution is critical to establishing a plant configuration worthy of a comprehensive market interest, a baseline IGCC plant scheme is developed and used to study how alternative process schemes and power cycles might be used and integrated to achieve higher systems efficiency. To achieve these design results, the total systems approach is taken requiring creative integration of the various process units within the plant. Advanced gas turbine based cycles for Integrated gasification Combined cycle (IGCC) applications are identified by a screening analysis and the more promising cycles recommended for detailed systems analysis. In the case of the IGFC task, the main objective is met by developing a steady-state simulation of the entire plant and then using dynamic simulations of the hybrid Solid Oxide Fuel Cell (SOFC)/Gas Turbine sub-system to investigate the turbo-machinery performance. From these investigations the desired performance characteristics and a basis for design of turbo-machinery for use in a fuel cell gas turbine power block is developed.

01 COAL, LIGNITE, AND PEAT↗

Engineering Study of Svante’s Solid Sorbent Post-Combustion CO 2 Capture Technology at a Linde Steam Methane Reforming H 2 Plant

An initial engineering design study was performed for an advanced post combustion CO 2 capture (PCC) technology to be installed at a commercial-scale steam methane reforming (SMR) hydrogen plant located in the US Gulf Coast. The PCC process integrated the VeloxoTherm™ structured adsorbent technology from Svante for the CO 2 separation and CO 2 compression and purification and balance of plant systems provided by Linde. This pre-FEED equivalent study included following: (1) design basis, (2) basic engineering, including development of process flow diagrams and heat & material balances, (3) inside the battery limit (ISBL) equipment and systems specification, (4) balance of plant outside the battery limit (OSBL) equipment and systems specifications, (5) technology maturation plan, (6) hazard identification (HAZID) review, (7) environmental, health and safety (EH&S) assessment and environmental permitting analysis, (8) constructability review, (9) ISBL and OSBL EPC cost estimation, and (10) commercial-scale techno-economic analysis including capital expenditures (CAPEX) and operating expenditures (OPEX) and CO 2 capture cost estimates.

03 NATURAL GAS↗

Simulation of Peach Bottom turbine trip transient with RETRAN-3D using BXFGEN

The Peach Bottom 2 Turbine Trip transient is used to evaluate the capabilities and accuracy of coupled 3-D neutronics/thermal hydraulics best estimate calculations for support of safety analysis. Selected results, obtained with RETRAN-3D, are compared to available measurements and benchmark results. The comparisons are analyzed and the application of RETRAN-3D for a best estimate analysis approach within the safety analysis methodology is discussed. Overall, both the thermal-hydraulic and neutronic results show a good comparison to the experimental data, and the model is considered to accurately predict test data. In particular, the initial acoustic response of the main steam line and the subsequent main pressurization stages are well-predicted. During the main pressurization stage, the timing and magnitude of the in-core local pressurization and associated void compression are properly predicted based upon the agreement between local power range monitors (LPRM) predictions upwards, but the shift is slightly underpredicted. This indicates the methodology is well-posed for simulating this class of transient response.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Highly Efficient Six-Stroke Internal Combustion Engine Cycle with Water Injection for In-Cylinder Exhaust Heat Recovery

A concept is presented here that adds two additional strokes to the four-stroke Otto or Diesel cycle that has the potential to increase fuel efficiency of the basic cycle. The engine cycle can be thought of as a 4 stroke Otto or Diesel cycle followed by a 2-stroke heat recovery steam cycle. Early exhaust valve closing during the exhaust stroke coupled with water injection are employed to add an additional power stroke at the end of the conventional four-stroke Otto or Diesel cycle. An ideal thermodynamics model of the exhaust gas compression, water injection at top center, and expansion was used to investigate this modification that effectively recovers waste heat from both the engine coolant and combustion exhaust gas. Thus, this concept recovers energy from two waste heat sources of current engine designs and converts heat normally discarded to useable power and work. This concept has the potential of a substantial increase in fuel efficiency over existing conventional internal combustion engines, and under appropriate injected water conditions, increase the fuel efficiency without incurring a decrease in power density. By changing the exhaust valve closing angle during the exhaust stroke, the ideal amount of exhaust can be recompressed for the amount of water injected, thereby minimizing the work input and maximizing the mean effective pressure of the steam expansion stroke (MEPsteam). The value of this exhaust valve closing for maximum MEPsteam depends on the limiting conditions of either one bar or the dew point temperature of the expansion gas/moisture mixture when the exhaust valve opens to discard the spent gas mixture in the sixth stroke. The range of MEPsteam calculated for the geometry of a conventional gasoline spark-ignited internal combustion engine and for plausible water injection parameters is from 0.75 to 2.5 bars. Typical combustion mean effective pressures (MEPcombustion) of naturally aspirated gasoline engines are up to 10 bar, thus this concept has the potential to significantly increase the engine efficiency and fuel economy while not resulting in a decrease in power density.

6 stroke cycle↗

Kinetics of Moisture Absorption for Alkali Extracted Steam-Exploded Fiber Filled High-Density Polyethylene Composites

Acacia mangium wood fiber derived from steam-explosion and fiber fractionation treatment was used as fillers for high-density polyethylene (HDPE). The alkali extracted steam-exploded fibers (AEF) obtained were acetylated to produce acetylated fibers (AAEF) having three different weight percent gain (WPG). Composites of AEF or AAEF and HDPE were prepared via 2-roll mill, compression molded and cut into dumbbell specimens. All samples were immersed in water at room temperature for 30 days. The process of absorption of water by all composites followed the kinetics and mechanisms described by the Fick's theory. Diffusion coefficient (D) values increased with filler loading but decreased with increasing WPG of the AAEF fiber. Further decrease was observed when maleated polyethylene (MAPE) was added to the composite system. This was due to improved fiber-matrix adhesion that restricts movement of water molecules from further penetrate inside the composite structures.

36 MATERIALS SCIENCE↗

Development of a plant-wide dynamic model of an integrated gasification combined cycle (IGCC) plant

In this presentation, development of a plant-wide dynamic model of an advanced Integrated Gasification Combined Cycle (IGCC) plant with CO2 capture will be discussed. The IGCC reference plant generates 640 MWe of net power using Illinois No.6 coal as the feed. The plant includes an entrained, downflow, General Electric Energy (GEE) gasifier with a radiant syngas cooler (RSC), a two-stage water gas shift (WGS) conversion process, and two advanced 'F' class combustion turbines partially integrated with an elevated-pressure air separation unit (ASU). A subcritical steam cycle is considered for heat recovery steam generation. Syngas is selectively cleaned by a SELEXOL acid gas removal (AGR) process. Sulfur is recovered using a two-train Claus unit with tail gas recycle to the AGR. A multistage intercooled compressor is used for compressing CO2 to the pressure required for sequestration. Using Illinois No.6 coal, the reference plant generates 640 MWe of net power. The plant-wide steady-state and dynamic IGCC simulations have been generated using the Aspen Plus{reg_sign} and Aspen Plus Dynamics{reg_sign} process simulators, respectively. The model is generated based on the Case 2 IGCC configuration detailed in the study available in the NETL website1. The GEE gasifier is represented with a restricted equilibrium reactor model where the temperature approach to equilibrium for individual reactions can be modified based on the experimental data. In this radiant-only configuration, the syngas from the Radiant Syngas Cooler (RSC) is quenched in a scrubber. The blackwater from the scrubber bottom is further cleaned in the blackwater treatment plant. The cleaned water is returned back to the scrubber and also used for slurry preparation. The acid gas from the sour water stripper (SWS) is sent to the Claus plant. The syngas from the scrubber passes through a sour shift process. The WGS reactors are modeled as adiabatic plug flow reactors with rigorous kinetics based on the mid-life activity of the shift-catalyst. The SELEXOL unit consists of the H2S and CO2 absorbers that are designed to meet the stringent environmental limits and requirements of other associated units. The model also considers the stripper for recovering H2S that is sent as a feed to a split-flow Claus unit. The tail gas from the Claus unit is recycled to the SELEXOL unit. The cleaned syngas is sent to the GE 7FB gas turbine. This turbine is modeled as per published data in the literature. Diluent N2 is used from the elevated-pressure ASU for reducing the NOx formation. The heat recovery steam generator (HRSG) is modeled by considering generation of high-pressure, intermediate-pressure, and low-pressure steam. All of the vessels, reactors, heat exchangers, and the columns have been sized. The basic IGCC process control structure has been synthesized by standard guidelines and existing practices. The steady-state simulation is solved in sequential-modular mode in Aspen Plus{reg_sign} and consists of more than 300 unit operations, 33 design specs, and 16 calculator blocks. The equation-oriented dynamic simulation consists of more than 100,000 equations solved using a multi-step Gear's integrator in Aspen Plus Dynamics{reg_sign}. The challenges faced in solving the dynamic model and key transient results from this dynamic model will also be discussed.

97 MATHEMATICS AND COMPUTING↗

Mitchell FEED Study Summary Report (Unlimited Rights Version) (Rev. D)

Heidelberg Materials (HM), Sargent & Lundy (S&L), and Mitsubishi Heavy Industries (MHI) completed a Front End Engineering Design (FEED) study for deployment of an amine-based CO 2 capture system at the Mitchell Cement Plant in Indiana. The project includes compression of captured CO 2 to a supercritical state for geological sequestration. The flue gases from 7,000 mtpd clinker plant combined with auxiliary boiler flue gases into the capture system. Auxiliary boiler supplies steam for solvent regeneration. The study developed an AACE Class 3 capital cost estimate (+30%/-20%) at approximately 30% design completion to evaluate the technical and economic feasibility of capturing up to 2 million tonnes of CO 2 per year.

42 ENGINEERING↗

A graphite oxide (GO)-based remote readable tamper evident seal

Here, this paper presents a prototype of a remotely readable graphite oxide (GO) paper-based tamper evident seal. The proposed device combines the tunable electrical properties offered by reduced graphite oxide (RGO) with a compressive sampling scheme. The benefit of using RGO as a tamper evident seal material is the sensitivity of its electrical properties to the common mechanisms adopted to defeat tamper-evident seals. RGO’s electrical properties vary upon local stress or cracks induced by mechanical action (e.g., produced by shimming or lifting attacks). Further, modification of the seal’s electrical properties can result from the incidence of other defeat mechanisms, such as temperature changes, solvent treatment and steam application. The electrical tunability of RGO enables the engraving of a circuit on the area of the tamper evident seal intended to be exposed to malicious attacks. The operation of the tamper evident seal, as well as its remote communication functionality, is supervised by a microcontroller unit (MCU). The MCU uses the RGO-engraved circuitry to physically implement a compressive sampling acquisition procedure. The compressive sampling scheme provides the seal with self-authentication and self-state-of-health awareness capabilities. Finally, the prototype shows potential for use in low-power, embedded, remote-operation nonproliferation security related applications.

36 MATERIALS SCIENCE↗

Transient studies of an Integrated Gasification Combined Cycle (IGCC) plant with CO2 capture

Next-generation coal-fired power plants need to consider the option for CO2 capture as stringent governmental mandates are expected to be issued in near future. Integrated gasification combined cycle (IGCC) plants are more efficient than the conventional coal combustion processes when the option for CO2 capture is considered. However, no IGCC plant with CO2 capture currently exists in the world. Therefore, it is important to consider the operability and controllability issues of such a plant before it is commercially built. To facilitate this objective, a detailed plant-wide dynamic simulation of an IGCC plant with 90% CO2 capture has been developed in Aspen Plus Dynamics{reg_sign}. The plant considers a General Electric Energy (GEE)-type downflow radiant-only gasifier followed by a quench section. A two-stage water gas shift (WGS) reaction is considered for conversion of CO to CO2. A two-stage acid gas removal (AGR) process based on a physical solvent is simulated for selective capture of H2S and CO2. Compression of the captured CO2 for sequestration, an oxy-Claus process for removal of H2S and NH3, black water treatment, and the sour water treatment are also modeled. The tail gas from the Claus unit is recycled to the SELEXOL unit. The clean syngas from the AGR process is sent to a gas turbine followed by a heat recovery steam generator. This turbine is modeled as per published data in the literature. Diluent N2 is used from the elevated-pressure ASU for reducing the NOx formation. The heat recovery steam generator (HRSG) is modeled by considering generation of high-pressure, intermediate-pressure, and low-pressure steam. All of the vessels, reactors, heat exchangers, and the columns have been sized. The basic IGCC process control structure has been synthesized by standard guidelines and existing practices. The steady state results are validated with data from a commercial gasifier. In the future grid-connected system, the plant should satisfy the environmental targets and quality of the feed to other sections, wherever applicable, without violating the operating constraints, and without sacrificing the efficiency. However, it was found that the emission of acid gases may far exceed the environmental targets and the overshoot of some of the key variables may be unacceptable under transient operation while following the load. A number of operational strategies and control configurations is explored for achieving these stringent requirements. The transient response of the plant is also studied by perturbing a number of key inputs.

97 MATHEMATICS AND COMPUTING↗

Secondary Waste Form Screening Test Results—THOR® Fluidized Bed Steam Reforming Product in a Geopolymer Matrix

Screening tests are being conducted to evaluate waste forms for immobilizing secondary liquid wastes from the Hanford Tank Waste Treatment and Immobilization Plant (WTP). Plans are underway to add a stabilization treatment unit to the Effluent Treatment Facility to provide the needed capacity for treating these wastes from WTP. The current baseline is to use a Cast Stone cementitious waste form to solidify the wastes. Through a literature survey, DuraLith alkali-aluminosilicate geopolymer, fluidized-bed steam reformation (FBSR) granular product encapsulated in a geopolymer matrix, and a Ceramicrete phosphate-bonded ceramic were identified both as candidate waste forms and alternatives to the baseline. These waste forms have been shown to meet waste disposal acceptance criteria, including compressive strength and universal treatment standards for Resource Conservation and Recovery Act (RCRA) metals (as measured by the toxicity characteristic leaching procedure [TCLP]). Thus, these non-cementitious waste forms should also be acceptable for land disposal. Information is needed on all four waste forms with respect to their capability to minimize the release of technetium. Technetium is a radionuclide predicted to be in the secondary liquid wastes in small quantities, but the Integrated Disposal Facility (IDF) risk assessment analyses show that technetium, even at low mass, produces the largest contribution to the estimated IDF disposal impacts to groundwater.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Destructive Examination of a FeCrAl-UO 2 Irradiation Test

Several destructive postirradiation examinations were performed on an irradiation specimen that coupled an early iron-chromium-aluminum (FeCrAl) candidate alloy cladding with UO2 pellets. This irradiation test was designed to investigate the early life performance and compatibility of the FeCrAl-UO 2 cladding-fuel system under prototypic light water reactor neutronic conditions. Additionally, these tests were expected to provide neutron irradiated samples for severe accident testing of this fuel system. The irradiation studied in this work was part of the ATF-1 series of drop-in style irradiations performed in the Idaho National Laboratory Advanced Test Reactor. The rodlet studied in this work is one of three similar rodlets irradiated in ATF-1 that had approximately 7.6 cm of cladding machined from a wrought FeCrAl alloy and fueled with a 6.1 cm stack of UO 2 pellets. The outer diameter of the cladding was ~0.94 cm and the inner diameter was ~0.83 cm. After irradiation and non-destructive examination in Idaho this rodlet was shipped to the Oak Ridge National Laboratory hot-cells for further examination. The irradiated rodlet was sectioned into several samples for microstructural, micromechanical, and severe accident testing. During sectioning, it was noted that the fuel was not firmly bonded to the cladding and could be readily removed from small cladding slices. Microstructural characterization of fuel cross sections also revealed no significant interaction between the fuel and the cladding. Samples were also prepared for microhardness testing. To prepare for high temperature oxidation testing, the fuel was dissolved from segments of the cladding. High temperature oxidation testing of cladding segments was performed at 1200°C and 1300°C in a steam environment. Comparisons between the oxidation of this FeCrAl alloy in its neutron irradiated state, as-fabricated state, and the oxidation of Zircaloy-2 are made. The oxidation testing will be followed by ring compression testing to evaluate ductility. The microstructure of the samples after oxidation and ring compression testing will also be analyzed.

Harp, Jason↗

Equations of State in Computational Physics: What, Why, and How

Summary: 1. Equations of state furnish thermodynamic properties of a material. 2. Usually involve P, p (or V), and T, or P, r, and E 3. Necessary ingredient to solve compressible flow problems. 4. Varieties: i. Analytical expressions (ideal gas, Grüneisen) – fast, convenient for verification and test problems ii. Graphs and charts – good for hand calculations iii. Tables and databases – generally most accurate, require interpolation i. Steam tables ii. NIST database iii. SESAME EOS Library 5. Constructed by using semi-empirical models from Statistical Mechanics and fitting to available data

36 MATERIALS SCIENCE↗

Hydriding, Oxidation, and Ductility Evaluation of Cr-Coated Zircaloy-4 Tubing

Accident-tolerant fuel concepts have been developed recently in diverse research programs. Recent research has shown clear advantages of Cr-coated Zr cladding over bare cladding tubes regarding oxidation behavior under the design basis loss-of-coolant accident condition. However, limited data are available about the hydriding behavior of the Cr coating. For that purpose, Cr-coated Zricaloy-4 tubes were tested to investigate the effects of hydriding, oxidation, and postquench ductility behavior on coated Zr cladding. A high-power impulse magnetron sputtering (HiPIMS) process was used to produce a high-density coating on the Zircaloy-4 tube surface. Coated and uncoated Zircaloy-4 tube specimens underwent one-sided hydriding in a tube furnace filled with pure hydrogen gas at 425 °C. The tubing specimen ends were sealed with Swagelok plugs before the hydriding runs. For uncoated specimens, H analysis of the hydrided specimens indicated that the H content increased as the test time and initial pressure increased. However, almost no change was observed for the coated specimens that were hydrided under the same test conditions. After one-sided hydriding, the hydrided coated and uncoated specimens were exposed to steam at high temperatures for two-sided oxidation studies to simulate accident conditions. The coated specimens showed a slower oxidation: oxygen pickup was 50% lower than the uncoated specimens tested under the same conditions. Ring compression testing was performed to evaluate the embrittlement behavior of the Cr-coated specimens after hydriding and oxidation. The results indicated that the HiPIMS coating provides excellent protection from hydriding and oxidation at high temperatures.

36 MATERIALS SCIENCE↗