Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STORAGE BATTERY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

The potential for battery energy storage to provide peaking capacity in the United States

Providing peaking capacity could be a significant U.S. market for energy storage. Of particular focus are batteries with 4-h duration due to rules in several regions along with these batteries' potential to achieve life-cycle cost parity with combustion turbines compared to longer-duration batteries. However, whether 4-h energy storage can provide peak capacity depends largely on the shape of electricity demand. Under historical grid conditions, beyond about 28 GW nationally the ability of 4-h batteries to provide peak capacity begins to fall. We find that the addition of renewable generation can significantly increase storage's potential by changing the shape of net demand patterns; for example, beyond about 10% penetration of solar photovoltaics, the national practical potential for 4-h storage to provide peak capacity doubles. Furthermore, the impact of wind generation is less clear and likely requires more detailed study considering the exchange of wind power across multiple regions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Building Battery Energy Storage System Performance Data into an Economic Assessment

Economic assessments of battery energy storage systems (BESSs) rely on optimal dispatch methods to capture temporal interdependency of BESS operations and coupling among different grid applications. Many existing BESS economic assessment studies are based on a simplified first-order scalar model using BESS nameplate numbers. Such a method cannot accurately capture varying capabilities and nonlinear dynamics of a BESS, leading to inaccurate assessment results. This paper presents a practical implementation of performance data into the economic assessment of the BESSs recently developed within the Snohomish Public Utility District system in Washington State. Extensive testing conducted over multiple seasons is used to assess the technical performance and develop high-fidelity models of the BESSs. A dynamic programming algorithm is proposed to optimally dispatch the BESSs and assess the potential benefits from stacked value streams. The proposed method can be adapted for the economic assessment of other BESSs with different applications.

Wu, Di↗

Analysis on the Influence of an Energy Storage System and its Impact to the Grid for a Wave Energy Converter

Reducing power fluctuations is essential for controlling the integration impacts of wave energy converter (WEC) plants in both distribution and transmission grids, and in stand-alone isolated power systems. This paper presents an analysis on the cost of and how a battery storage system can be used to further reduce the variation of power generated from the WEC due to the fluctuating nature of waves and its impact to the grid. The electrical power output from WEC-Sim simulations for the six sea states used in the Wave Energy Prize was analyzed to compute the peak power and power time history. The results were used to evaluate the battery storage capacity that is needed for a WEC system to provide reasonable power flow to the grid and estimate its cost based on the latest cost information for battery technologies published by the U.S. Energy Information Administration. Finally, a preliminary grid integration analysis was performed to demonstrate how WEC-generated power would contribute to a small island electricity system. As shown in the study, the instantaneous peak power is the primary cost driver for the battery storage and the power take-off system, and reducing the power fluctuations is essential for reducing the overall levelized cost of energy (LCOE). The power flow variation from WECs can be significantly reduced using battery storage without adding significant overall system costs, and the implementation of battery storage is essential for grid integration applications. There may also be additional opportunities to further investigate energy storage technologies that are specific to WEC applications to reduce these costs even further.

16 TIDAL AND WAVE POWER↗

Electrodes with fiber structure

An electrode framework with a fiber structure, universally applicable in alkaline storage battery systems, was developed and readied for production. Storage batteries with these electrodes present higher energy and power densities and are economical to produce. The design is applicable to all rechargable storage batteries and might replace the previous variety of designs.

Benczur-Uermoessy, G.↗

Hierarchical Control of Distributed Battery Energy Storage Systems in a DC Microgrid

Contents - NASA Future Power Systems - DC Microgrid with Distributed Battery Energy Storage - A simplified gateway power system - Droop Control (Primary Control) - Distributed battery units, droop control, and load sharing characteristics - Simulation results - Three-Level Hierarchical Control of Distributed Battery Units During Eclipse - Secondary Control - Objective and definition of unit control error - Implementation of secondary control - Simulation results - Tertiary Control - Schedule BU current sharing with the objective of equal SoC - Simulation results•Conclusions

Jing Zhang↗

Probabilistic Modeling of Climate Change Impacts on Renewable Energy and Storage Requirements for NM's Energy Transition Act (SAND Report)

This report provides a study of the potential impacts of climate change on intermittent renewable energy resources, battery storage, and resource adequacy in Public Service Company of New Mexico’s Integrated Resource Plan for 2020 – 2040. Climate change models and available data were first evaluated to determine uncertainty and potential changes in solar irradiance, temperature, and wind speed in NM in the coming decades. These changes were then implemented in solar and wind energy models to determine impacts on renewable energy resources in NM. Results for the extreme climate-change scenario show that the projected wind power may decrease by ~13% due to projected decreases in wind speed. Projected solar power may decrease by ~4% due to decreases in irradiance and increases in temperature in NM. Uncertainty in these climate-induced changes in wind and solar resources was accommodated in probabilistic models assuming uniform distributions in the annual reductions in solar and wind resources. Uncertainty in battery storage performance was also evaluated based on increased temperature, capacity fade, and degradation in round-trip efficiency. The hourly energy balance was determined throughout the year given uncertainties in the renewable energy resources and energy storage. The loss of load expectation (LOLE) was evaluated for the 2040 No New Combustion portfolio and found to increase from 0 days/year to a median value of ~2 days/year due to potential reductions in renewable energy resources and battery storage performance and capacity. A rank-regression analyses revealed that battery round-trip efficiency was the most significant parameter that impacted LOLE, followed by solar resource, wind resource, and battery fade. An increase in battery storage capacity to ~25,000 – 30,000 MWh from a baseline value of ~14,000 MWh was required to reduce the median value of LOLE to ~0.2 days/year with consideration of potential climate impacts and battery degradation.

54 ENVIRONMENTAL SCIENCES↗

Battery Energy Storage for Electric Vehicle Charging Stations

This help sheet provides information on how battery energy storage systems can support electric vehicle (EV) fast charging infrastructure. It is an informative resource that may help states, communities, and other stakeholders plan for EV infrastructure deployment, but it is not intended to be used as guidance, set policy, or establish or replace any standards under state or federal law.

ADVANCED PROPULSION SYSTEMS↗

Machine Learning Derived Dynamic Operating Reserve Requirements in High-Renewable Power Systems

Accurately forecasting wind and solar power output poses challenges for deeply decarbonized electricity systems. Grid operators must commit resources to provide reserves to ensure reliable operations in the face of forecast errors, a process which can increase fuel consumption and emissions. We apply neural network-based machine learning to expand the usefulness of median point forecast data by creating probabilistic distributions of short-term uncertainty in demand, wind, and solar forecasts that adapt to prevailing grid conditions. Machine learning derived estimates of forecast errors compare favorably to estimates based on incumbent methods. Reserves derived from machine learning are usually smaller than values derived using incumbent methods, which enables fuel savings during most hours. Machine learning reserves are generally larger than incumbent reserves during times of higher forecast error, potentially improving system reliability. Performance is tested using multi-stage production simulation modeling of the California Independent System Operator (CAISO) system. Machine learning reserves provide production cost and greenhouse gas (GHG) emission reductions of approximately 0.3% relative to historical 2019 requirements. Savings in the 2030 timeframe are highly dependent on battery storage capacity. At lower levels of battery capacity, savings of 0.4% from machine learning reserves are shown. Significant quantities of battery storage are expected to be added to meet California's resource adequacy needs and GHG reduction targets. Addition of these batteries saturate reserve needs and results in minimal within-hour balancing costs in 2030.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Toroidal cell and battery

A toroidal storage battery designed to handle relatively high amp-hour loads is described. The cell includes a wound core disposed within a pair of toroidal channel shaped electrodes spaced apart by nylon insulator. The shape of the case electrodes of this toroidal cell allows a first planar doughnut shaped surface and the inner cylindrical case wall to be used as a first electrode and a second planar doughnut shaped surface and the outer cylindrical case wall to be used as a second electrode. Connectors may be used to stack two or more toroidal cells together by connecting substantially the entire surface area of the first electrode of a first cell to substantially the entire surface area of the second electrode of a second cell. The central cavity of each toroidal cell may be used as a conduit for pumping a fluid through the toroidal cell to thereby cool the cell.

Nagle, W. J.↗

Industrial battery operation and utilization in the presence of electrical load uncertainty using Bayesian decision theory

Behind the meter battery storage is becoming increasing popular in all sectors, though enthusiasm has recently lagged in the industrial sector. Even though there may be many factors contributing to this including lack of innovation, prohibitive costs, and undesirable rate structures, a difficulty arises in accounting for uncertainty of electrical load in industrial facilities while still attempting to utilize battery storage as much as possible all while trying to achieve fiscal profitability. Here this study utilizes Gaussian process regression and Bayesian decision theory to organize load data and quantify electrical load uncertainty to properly and effectively discharge industrial battery storage. The study employs a simulation model to set battery load setpoints for the span of the utility billing period according to the degree of risk aversion. This combination of economic analysis according to utility billing period and utilization of degree of risk aversion to make decisions on the uncertainty of the data has not before been applied to battery storage. The method resulted in an annual average reduction of peak demand by 3.8 % at the lowest amount of savings and lowest risk aversion. The highest risk aversion resulted in an annual average reduction of peak demand of 7.5 %. The maximum reduction of peak load in any month was 13.8 % in the month of December with a relatively high risk aversion. With a the highest amount risk aversion tested, the model reduced demand ten of the twelve months of the year.

25 ENERGY STORAGE↗

Rapid Detection of Anomalies in Battery Energy Storage System Data

Data analytics is pivotal in assessing the technical characteristics and performance of Battery Energy Storage Systems (BESS), underpinning BESS modeling, optimization, and control. However, raw datasets frequently harbor anomalies from measurement errors and equipment malfunctions, impacting BESS reliability and analysis accuracy To address the challenge, this paper presents a novel methodology for the rapid detection of anomalous charge or discharge cycles within BESS operational data, expediting the cleaning process while ensuring data integrity. We’ve collected diverse and comprehensive real-world BESS operational datasets in collaboration with the Electric Power Research Institute and multiple Washington State utilities. These datasets serve dual roles: enabling comprehensive data exploration and analysis for understanding underlying challenges and method development, while also acting as a vital validation resource, demonstrating practical effectiveness. The proposed method detects anomalies and aids in their resolution, improving system performance characterization precision. It also reveals recurring data anomaly sources, offering insights for data collection and handling enhancement. Practitioners can gain valuable insights from the identified anomalous cycles in the real-world datasets along with the investigative process for root cause analyses and essential data cleaning steps.

Crawford, Aladsair J.↗

Hierarchical Control of Distributed Battery Energy Storage System in a DC Microgrid

This paper presents a novel hierarchical control approach of a DC microgrid (DCMG) which is supplied by a distributed battery energy storage system (BESS). With this approach, all battery units distributed in the BESS can be controlled to discharge with accurate current sharing and state-of-charge (SoC) balancing. Similar to other hierarchical control approaches used in DCMGs, this approach consists of three levels: (1) primary control, (2) secondary control and (3) tertiary control. This work includes defining a unit control error (UCE) at the secondary control level and evaluating current sharing weights at tertiary control level. A centralized controller at secondary control level is designed to detect the UCEs of each battery unit, and to restore the average voltage of a DCMG and control battery current sharing simultaneously. The distributed battery units share the load current in a DCMG based on weights. These weights are evaluated at the tertiary control level based on battery SoCs. The approach’s effectiveness was confirmed in digital simulation tests with the same simulation model as used in the NASA AMPS Modular Hardware Emulator.

Jing Zhang↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Comprehensive Strategy for Grid Forming Control in DC Coupled Photovoltaic and Battery Energy Storage Inverters

This paper presents an integrated DC-DC and DCAC grid-forming control strategy for DC-coupled photovoltaic (PV) plus battery energy storage systems, considering the effect of DC link voltage variations caused by direct PV connections. A power reference algorithm determines power distribution between the PV and battery to the grid while observing device power ratings to prevent the over-rating of components and keep the battery's state of charge within an acceptable range. The simulated utility-scale model in MATLAB/Simulink illustrates its ability against extreme phase angle variation contingencies in the grid while controlled through grid-forming control with a fast dynamic on DC link voltage. The simulation results confirm the effectiveness of the proposed control in integrating PV plus battery configurations with grid forming control and maintaining reliable grid operation under severe grid disturbances.

battery, boost, control, energy storage, grid form↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Optimal Power Management for Battery Energy Storage Systems: A Novel Accelerated Tracking ADMM Approach

Optimal power management (OPM) is critical for large-scale battery energy storage systems. Today’s methods often require formidable computational effort due to the design based on centralized numerical optimization. Thus, this paper investigates computationally distributed OPM where the agents based on the cells communicate over a network to cooperatively solve the OPM problem. We propose an accelerated tracking alternating direction method of multipliers (ADMM) algorithm to solve the distributed OPM. The proposed algorithm embeds dynamic average consensus and Nesterov’s acceleration technique in the ADMM algorithm. Not only is the proposed algorithm fully distributed without a need for fusion or aggregating nodes, but it also accelerates convergence. The paper formulates the OPM in a model predictive control framework where it seeks to regulate the charging/discharging power of each battery cell to minimize the total power losses and promote balanced use of the constituent cells while complying with the safety constraints. The paper provides ample simulation results to demonstrate the effectiveness and advantages of the proposed distributed OPM in terms of computation and convergence.

Farakhor, Amir↗