Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE APPROVALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Summary of operations and performance of the Murdock site restoration project in 2007.

This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the second full year of system operation, from January 1 through December 31, 2007. Performance in June 2005 through December 2006 was reported previously (Argonne 2007). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A. A brief videorecording of the trees in high-wind conditions is on the compact disc (CD) inside the back cover of this document.

54 ENVIRONMENTAL SCIENCES↗

Summary of operations and performance of the Murdock site restoration project in 2008.

This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the third full year of system operation, from January 1 through December 31, 2008. Performance in June 2005 through December 2007 was reported previously (Argonne 2007, 2008). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A.

54 ENVIRONMENTAL SCIENCES↗

Site Management Guide (Blue Book)

The U.S. Department of Energy (Department) Office of Legacy Management (LM), established in 2003, manages the Department’s postclosure responsibilities and ensures the future protection of human health and the environment. During World War II and the Cold War, the Federal government developed and operated a vast network of industrial facilities for the research, production, and testing of nuclear weapons, as well as other scientific and engineering research. These processes left a legacy of radioactive and chemical waste, environmental contamination, and hazardous facilities and materials at well over 100 sites. Since 1989, the Department has taken an aggressive accelerated cleanup approach to reduce risks and cut costs. At most Departmental sites undergoing cleanup, some residual hazards will remain at the time cleanup is completed due to financial and technical impracticality. However, the Department still has an obligation to protect human health and the environment after cleanup is completed. LM fulfills DOE’s postclosure obligation by providing long-term management of postcleanup sites which do not have continuing missions. LM is also responsible for sites under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Currently, the U.S. Army Corps of Engineers (USACE) is responsible for site surveys and remediation at FUSRAP sites. Once remediation is completed, LM becomes responsible for long-term management. LM also has responsibility for uranium processing sites addressed by Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA). UMTRCA Title II sites are sites that were commercially owned and are regulated under a U.S. Nuclear Regulatory Commission (NRC) license. For license termination, the owner must conduct an NRC-approved cleanup of any on-site radioactive waste remaining from former uranium ore-processing operations. The site owner must also provide full funding for inspections and, if necessary, ongoing maintenance. Once site cleanup is complete, LM accepts title to these sites on behalf of the United States and assumes long-term management.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE's Environmental Management Site-Specific Advisory Board: The Roles, Work, and Assessment of the Constituent Local Boards - 13587

The charter for the Department of Energy's Environmental Management (EM) Site-Specific Advisory Board (SSAB) was approved under the Federal Advisory Committee Act (FACA) in 1994. With a unique mandate to provide public input on issues associated with the cleanup of nuclear legacy sites in the U.S., the EM SSAB comprises eight local boards, which are based at major EM sites. While each board is unique to the community in which it is located and reflects the diversity of the local population, the boards are governed by FACA, related regulations, and DOE policies that are intended to standardize agency advisory board operations. The EM SSAB local boards are made up of a diverse group of citizens who want to understand the mission and goals of the EM program and to help EM achieve those goals for the benefit of their communities. Some are quite passionate about their mission; others need to be coaxed into active participation. Maintaining productive relationships and a supportive environment for effective board operations is the challenge of board management for DOE EM and the board members themselves. DOE draws on research findings and best practices literature from academics and practitioners in the field of public involvement in its board management practices. The EM SSAB is also evaluated annually under the law to ensure that the investment of taxpayer dollars in the board is warranted in light of the contributions of the board. Further evaluation takes place at the agency and site levels in order to identify what aspects of board functioning the agency and board members find important to its success and to address areas where improvement is needed. Board contributions, compliance factors, and measurable outcomes related to board products and process areas are key to agency commitment to ongoing support of the boards and to participant satisfaction and thus continued member involvement. In addition to evaluation of these factors in improving board effectiveness, the agency draws on the experience of members to create best practices for the EM SSAB, as a unique form of public involvement. Four areas that have been identified by local board Chairpersons as important to their local board operations are - Enhancing communication between technical and non-technical board members; - Building on common ground toward recommendations; - Public involvement in EM SSAB local board activities; - The EM SSAB annual work plan process. The first three areas are addressed below by current or former chairpersons of the EM SSAB: Ralph Phelps, former Chairperson of the Northern New Mexico Citizens' Advisory Board; Susan Leckband, former Chairperson and current Vice Chairperson of the Hanford Advisory Board; and Val Francis, Vice Chairperson of the Portsmouth (PORTS) SSAB. In addition, Eric Roberts, facilitator of the PORTS SSAB, has contributed to the section on public involvement. In a separate paper for this session, Ralph Young, Chairperson of the Paducah Citizens' Advisory Board addresses the EM SSAB annual work plan process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

State Enabling Legislation for Commercial-Scale Wind Power Siting and the Local Government Role

Siting of commercial-scale wind facilities (>5MW) is determined primarily by state laws. State laws either leave siting regulation to local governments, prescribe and constrain the role for local governments, establish state standards, or preempt local governance by having state institutions govern siting. Siting regulation is extremely important to the advancement of wind generation in the United States. Major siting decisions lie ahead for state and local governments as the nation diversifies its energy portfolio. An increase in the number of new wind facilities, siting in more locations and in more heavily populated areas, will require attention to the laws and regulations that govern siting. Local governments exercise some authority over commercial-scale wind facility siting in 48 of the 50 states. In 34 states, local governments have substantial autonomy to regulate the siting of most or all commercial-scale wind facilities. A few states authorize local governments to regulate wind facility siting, but make the scope of local regulation subject to limitations defined by state law. Eleven states set size thresholds for state regulatory involvement – with local governments in these states regulating smaller facilities and state boards regulating larger ones (either exclusively or concurrently with local governments). In just under a third of the states, siting of most or all commercial-scale wind facilities requires approval by both state and local government bodies. Only a few states reserve the regulation of siting of all or virtually all commercial-scale wind facilities to state boards and commissions. The content of the applicable regulations is more important, in general, than the level of government responsible for the decision. Several states that assign siting responsibilities to local governments have specified some of the content and the limits of local regulation. About 1/5 of the states have directed boards and commissions to develop statewide regulations to deal with wind facility siting issues subject to state approval. These requirements most often specify standards for setbacks, wildlife, noise, decommissioning, and other issues.

17 WIND ENERGY↗

Information Exchange management site

Django site used to manage the approved information exchanges (content models) after creation and public comment at https://github.com/usgin-models.

Clark, Ryan↗

SWiFT Software Quality Assurance Plan.

This document describes the software development practice areas and processes which contribute to the ability of SWiFT software developers to provide quality software. These processes are designed to satisfy the requirements set forth by the Sandia Software Quality Assurance Program (SSQAP). APPROVALS SWiFT Software Quality Assurance Plan (SAND2016-0765) approved by: Department Manager SWiFT Site Lead Dave Minster (6121) Date Jonathan White (6121) Date SWiFT Controls Engineer Jonathan Berg (6121) Date CHANGE HISTORY Issue Date Originator(s) Description A 2016/01/27 Jon Berg (06121) Initial release of the SWiFT Software Quality Assurance Plan

97 MATHEMATICS AND COMPUTING↗

Validation of an Advanced High-Pressure PEM Electrolyzer and Composite Hydrogen Storage

One of the challenges associated with transitioning our nation’s transportation economy to any alternative fuel is bringing fuel production, storage, transportation, and end-customer delivery infrastructure online. There are challenges associated with planning and implementing hydrogen fueling stations at locations relevant to the parallel effort of bringing the related transportation vehicles into the market. There are additional challenges associated with the operation of hydrogen fueling stations and reducing operating costs through energy reduction. Through calculation and design efforts it was concluded that elevating the pressure of a PEM cell stack and further developing hydrogen processing equipment that support elevated pressures while maintaining similar characteristics to their current production counterparts will yield in energy savings and by extension cost reductions. In this report, the design of a 57-bar (827-psig) electrolysis system and electrolysis cell stack is described. Furthermore, the fabrication, component verification, and integrated testing are summarized. Prior to this development effort, Proton had demonstrated thousand of hours of durability on 30-bar (435-psig) differential pressure PEM electrolysis hardware. Proton has sold and installed many of these 30-bar devices at customer sites. Through this project, Proton has developed and tested 57-bar PEM electrolysis, thereby extending the proven capability of PEM electrolysis as a hydrogen generation and electrochemical compression device. A design and validation effort to arrange hydrogen processioning equipment for refueling OEM vehicles was also undertaken within this project. By arranging equipment within two 6-meter ISO shipping containers and further developing NFPA 2 Hydrogen Technologies Code to support containerized hydrogen equipment, efforts to site, install, and commission, and approve hydrogen fueling stations were reduced and now provide a groundwork for future installations.

08 HYDROGEN↗

Composite Analysis for Low-Level Waste Disposal in the Central Plateau of the Hanford Site (Annual Summary Report (FY 2023))

In accordance with DOE M 435.1-1 requirements and as implemented by DOE/RL-2000-29, the U.S. Department of Energy (DOE), Richland Operations Office has prepared this annual summary for fiscal year (FY) 2023 for maintenance of the Hanford Site Composite Analysis reported in DOE/RL-2019-52 (hereinafter referred to as the updated Hanford Site Composite Analysis). This is the first annual summary report to transition from maintenance of the initial Hanford Site Composite Analysis reported in PNNL-11800 and PNNL-11800, Addendum 1 to maintenance of the updated Hanford Site Composite Analysis following DOE approval of that update.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recommendations to Improve Nuclear Licensing: Update to INL/RPT-23-72206, Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process

In 2023, various stakeholders had asked for BEA’s thoughts and recommendations to improve the U.S. Nuclear Regulatory Commission’s (NRC) licensing review and approval process. This included an April 14, 2023 request from the House Committee on Energy and Commerce on “information and recommendations to improve the licensing review and approval process, . . . as well as the siting, licensing, construction, and oversight of advanced nuclear reactor technologies.” In response to these requests, BEA prepared and published INL/RPT-23-72206, Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process (2023 Report). The 2023 Report included 13 recommendations related to streamlining NRC hearings, expediting NRC safety and environmental reviews, otherwise improving NRC licensing, and providing financial benefits to new reactor projects. Many of these earlier recommendations were addressed through various legislative actions or changes made by the NRC. Section 2 of this report addresses the current status of those earlier recommendations. BEA recently received a new request from the House Committee on Energy and Commerce seeking any suggestions for additional areas to examine or potential reforms “that may assist in modernizing the licensing and regulatory process that affects civil nuclear deployment.” Additionally, the new Secretary of Energy has identified initial DOE actions to support unleashing the golden era of American energy dominance, including “Unleash Commercial Nuclear Power in the United States” and “Streamline Permitting and Identify Undue Burdens on American Energy.” Given these developments, BEA has prepared a new set of updated recommendations in this report. The recommendations include updated versions of recommendations from the 2023 Report which have not been fully adopted, as well as entirely new recommendations. This set of recommendations has a slightly broader focus with some recommendations focused on DOE authorizations and some recommendations related to nuclear licensing beyond new reactors. Each recommendation below also identifies whether the recommendation would require legislative action or could be addressed directly by the respective agency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Environmental Management System Plan

Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environment will be evaluated. Objectives and targets will be developed (or updated) for each aspect that is determined to have a significant impact. Environmental Management Programs (EMPs) will be prepared (or updated) to document actions necessary for reducing certain environmental impacts. Each EMP will identify responsible parties and associated target deadlines for each action. Quarterly, environmental programs will be reviewed for compliance issues and effectiveness. Annually, an internal assessment will be performed to evaluate the progress of the EMS, and LBNL senior management will review the results. In addition, at least once every 3 years a third-party audit will be performed to validate that the EMS is being implemented according to plan.

99 GENERAL AND MISCELLANEOUS↗

ADAPTING A CERTIFIED SHIPPING PACKAGE FOR STORAGE APPLICATIONS

For years shipping packages have been used to store radioactive materials at many DOE sites. Recently, the K-Area Material Storage facility at the Savannah River Site became interested in and approved the Model 9977 Shipping Package for use as a storage package. In order to allow the 9977 to be stored in the facility, there were a number of evaluations and modifications that were required. There were additional suggested modifications to improve the performance of the package as a storage container that were discussed but not incorporated in the design that is currently in use. This paper will discuss the design being utilized for shipping and storage, suggested modifications that have improved the storage configuration but were not used, as well as modifications that have merit for future adaptations for both the 9977 and for other shipping packages to be used as storage packages.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Information Exchange management site

Django site used to manage the approved information exchanges (content models) after creation and public comment at https://github.com/usgin-models.

Clark, Ryan↗

Management of Decommissioning on a Multi-Facility Site

The management of the decommissioning of multi-facility sites may be inadequate or inappropriate if based on approaches and strategies developed for sites consisting of only a single facility. The varied nature of activities undertaken, their interfaces and their interdependencies are likely to complicate the management of decommissioning. These issues can be exacerbated where some facilities are entering the decommissioning phase while others are still operational or even new facilities are being built. Multi-facility sites are not uncommon worldwide but perhaps insufficient attention has been paid to optimizing the overall site decommissioning in the context of the entire life cycle of facilities. Decommissioning management arrangements need to be established taking a view across the whole site. A site-wide decommissioning management system is required. This should include a project evaluation and approval process and specific arrangements to manage identified interfaces and interdependencies. A group should be created to manage decommissioning across the site, ensuring adequate and consistent practices in accordance with the management system. Decommissioning management should be aimed at the entire life cycle of facilities. In the case of multi facility sites, the process becomes more complex and decommissioning management arrangements need to be established with a view to the whole site. A site decommissioning management system, a group that is responsible for decommissioning on site, a site project evaluation and approval process and specific arrangements to manage the identified interfaces are key areas of a site decommissioning management structure that need to be addressed to ensure adequate and consistent decommissioning practices. A decommissioning strategy based on single facilities in a sequential manner is deemed inadequate.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Method for Implementing Subsurface Solid Derived Concentration Guideline Levels (DCGL) - 12331

The U.S. Nuclear Regulatory Commission (NRC) and other federal agencies currently approve the Multi-Agency Radiation Site Survey and Investigation Manual (MARSSIM) as guidance for licensees who are conducting final radiological status surveys in support of decommissioning. MARSSIM provides a method to demonstrate compliance with the applicable regulation by comparing residual radioactivity in surface soils with derived concentration guideline levels (DCGLs), but specifically discounts its applicability to subsurface soils. Many sites and facilities undergoing decommissioning contain subsurface soils that are potentially impacted by radiological constituents. In the absence of specific guidance designed to address the derivation of subsurface soil DCGLs and compliance demonstration, decommissioning facilities have attempted to apply DCGLs and final status survey techniques designed specifically for surface soils to subsurface soils. The decision to apply surface soil limits and surface soil compliance metrics to subsurface soils typically results in significant over-excavation with associated cost escalation. MACTEC, Inc. has developed the overarching concepts and principles found in recent NRC decommissioning guidance in NUREG 1757 to establish a functional method to derive dose-based subsurface soil DCGLs. The subsurface soil method developed by MACTEC also establishes a rigorous set of criterion-based data evaluation metrics (with analogs to the MARSSIM methodology) that can be used to demonstrate compliance with the developed subsurface soil DCGLs. The method establishes a continuum of volume factors that relate the size and depth of a volume of subsurface soil having elevated concentrations of residual radioactivity with its ability to produce dose. The method integrates the subsurface soil sampling regime with the derivation of the subsurface soil DCGL such that a self-regulating optimization is naturally sought by both the responsible party and regulator. This paper describes the concepts and basis used by MACTEC to develop the dose-based subsurface soil DCGL method. The paper will show how MACTEC's method can be used to demonstrate that higher concentrations of residual radioactivity in subsurface soils (as compared with surface soils) can meet the NRC's dose-based regulations. MACTEC's method has been used successfully to obtain the NRC's radiological release at a site with known radiological impacts to subsurface soils exceeding the surface soil DCGL, saving both time and cost. Having considered the current NRC guidance for consideration of residual radioactivity in subsurface soils during decommissioning, MACTEC has developed a technically based approach to the derivation of and demonstration of compliance with subsurface soil DCGLs for radionuclides. In fact, the process uses the already accepted concepts and metrics approved for surface soils as the foundation for deriving scaling factors used to calculate subsurface soil DCGLs that are at least equally protective of the decommissioning annual dose standard. Each of the elements identified for consideration in the current NRC guidance is addressed in this proposed method. Additionally, there is considerable conservatism built into the assumptions and techniques used to arrive at subsurface soil scaling factors and DCGLs. The degree of conservatism embodied in the approach used is such that risk managers and decision makers approving and using subsurface soil DCGLs derived in accordance with this method can be confident that the future exposures will be well below permissible and safe levels. The technical basis for the method can be applied to a broad variety of sites with residual radioactivity in subsurface soils. Given the costly nature of soil surveys, excavation, and disposal of soils as low-level radioactive waste, MACTEC's method for deriving and demonstrating compliance with subsurface soil DCGLs offers the possibility of significant cost savings over the traditional approach of applying surface soil DCGLs to subsurface soils. Furthermore, while yet untested, MACTEC believes that the concepts and methods embodied in this approach could readily be applied to other types of contamination found in subsurface soils. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Independent Verification Report for Clearance Operation Roller Coaster Sites

The U.S. Department of Energy (DOE) is pursuing clearance of the Operation Roller Coaster sites under DOE O 458.1, Radiation Protection of the Public and the Environment. The clearance of property requirements in DOE O 458.1 must be implemented when DOE intends to facilitate future transfers of responsibility/control of real property. DOE O 458.1 prescribes that all radiological monitoring or surveys performed in support of clearance of property must use methods such as the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) or other methods approved by DOE. MARSSIM recommends using a series of surveys for collecting information required to demonstrate compliance. These surveys form the Radiation Survey and Site Investigation (RSSI) Process.

99 GENERAL AND MISCELLANEOUS↗

Guide for Joint Participation in a DOE Complex Wide SAVY-4000 Surveillance Program

This document describes LANL Storage Program best practices when working with other User Sites to implement DOE M441.1-1 Manual requirements through the use of the SAVY nuclear material packaging system. It is a Manual directive for Field Element Managers to review and approve the SAVY-4000 container series design (with supporting technical basis) as a packaging system for use at their respective sites. This review and approval incorporates an evaluation of the User Site methodology for SAVY surveillance and the process for documenting its nuclear materials storage program. This document aims to assist the Field Element Mangers and User Sites in the processes necessary to credit LANL SAVY surveillance for key elements of the User Site surveillance plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗