Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SALT WASTE PROCESSING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Caustic-Side Solvent Extraction Full-Scale Test

A Full-Scale Test (FST) program was performed by Parsons and its team members General Atomics and Energy Solutions to assess the performance of full-scale centrifugal contactors specified for the Department of Energy Salt Waste Processing Facility (SWPF). The SWPF, to be located at the Savannah River Site (SRS) in Aiken, South Carolina, will remove highly radioactive waste constituents, principally actinides, strontium (Sr), and cesium (Cs) radionuclides, from salt waste solutions currently stored in SRS high-level waste tanks. Caustic-side Solvent Extraction (CSSX) removes Cs from waste feed that has been treated upstream to remove actinides and Sr. CSSX uses a custom solvent to extract Cs from the salt solution in a series of single stage centrifugal contactors. The test system comprised (a) eleven 25.4 cm (10'') full-scale contactors (versus 36 in SWPF) for the extraction, scrub, strip, and wash stages; (b) two solvent recovery coalescers; and (c) the associated hardware and control system, packaged in four skid mounted modules. This paper describes the results of tests performed to define both hydraulic performance parameters (maximum hydraulic capacity and phase carryover) and solvent extraction performance parameters (Cs mass transfer efficiencies) using simulated SWPF waste and actual CSSX solvent. The test results confirmed key design features of the CSSX process and, as a consequence, the use of CSSX in the SWPF. In conclusion: Total throughput was initially limited to 85% of maximum flow during FST. Minor system modifications performed prior to mass transfer testing series resulted in the realization of 100% throughput. The 100% flow equates to slightly more than 35.6 x 10{sup 6} L/yr (9.4 Mgal/yr) of waste processed in SWPF which is anticipated to be the peak plant throughput. To achieve the best hydraulic performance in extraction, it is recommended that the extraction contactors be operated at the highest reasonable speed possible (>2100 rpm). Vibration, hardware limitations, bearing life, and other factors should be considered prior to final selection of extraction contactor speeds in SWPF. In strip (also scrub and wash) aqueous carryover decreased and organic carryover increased as the rotor speeds increased. It is recommended that the strip, scrub, and wash contactors be operated at intermediate speeds (between 1500 and 2100 rpm) to achieve a performance compromise between aqueous and organic carryover. Curved-vane bottom plates showed a significant hydraulic performance (aqueous and organic carryover) advantage over straight-vane bottom plates in extraction. There was no significant mass transfer performance advantage for either plate type in extraction. Thus, curved-vane bottom plates in extraction may be the better option for use in SWPF. There was no significant hydraulic performance difference between the plate types in strip. Straight-vanes provided significantly better mass transfer performance in strip compared to curved-vanes. Based solely on mass transfer performance, straight-vane bottom plates in the strip, scrub, and wash contactors are recommended for use in SWPF. Utilizing straight-vanes in the stripping section, the overall SWPF CSSX performance is expected to meet or exceed the target DF of 40,000 with minimum extraction D{sub Cs} of 10. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Selection of Glasses to Confirm the 0.65 Weight Percent Sulfate Solubility Limit for Sludge Batch 10

In preparation for Sludge Batch 10 (SB10) processing, projections of sulfate (SO 4 2- ) in glass at 36% waste loading (WL) were calculated in May 2020 for Tank 40 blend projections representing 0.7M and 0.85M Na wash endpoints. The projected SO 4 2- ) concentrations for either sludge-only (SO) or coupled processing with the Salt Waste Processing Facility (SWPF) were either near or exceeded the current Sludge Batch 9 (SB9) limit of 0.65 weight percent (wt.%). Four nominal glass compositions were selected based on SO and coupled processing for the 0.85M Na wash endpoint Tank 40 blend projection to conduct an initial evaluation of the SB10 sulfate solubility behavior. A sulfate salt phase was absent from each of the prepared glasses, which provided preliminary results that supported the 0.65 wt.% SO 4 2- ) limit for SB10.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement Acceptance Region (MAR) Assessment Results Based on Confirmation Sample Sludge Batch 10 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the 0.65 Weight Percent Sulfate Solubility Limit for Sludge Batch 10 Based on November 2022 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System glass property models and their associated Measurement Acceptance Region constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement Acceptance Region (MAR) Assessment Results Based On Sludge Batch 10 Projections from December 2021, February 2022 and August 2022

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Next Generation Solvent (NGS): Development for Caustic-Side Solvent Extraction of Cesium

This report summarizes the FY 2010 and 2011 accomplishments at Oak Ridge National Laboratory (ORNL) in developing the Next Generation Caustic-Side Solvent Extraction (NG-CSSX) process, referred to commonly as the Next Generation Solvent (NGS), under funding from the U.S. Department of Energy, Office of Environmental Management (DOE-EM), Office of Technology Innovation and Development. The primary product of this effort is a process solvent and preliminary flowsheet capable of meeting a target decontamination factor (DF) of 40,000 for worst-case Savannah River Site (SRS) waste with a concentration factor of 15 or higher in the 18-stage equipment configuration of the SRS Modular Caustic-Side Solvent Extraction Unit (MCU). In addition, the NG-CSSX process may be readily adapted for use in the SRS Salt Waste Processing Facility (SWPF) or in supplemental tank-waste treatment at Hanford upon appropriate solvent or flowsheet modifications. Efforts in FY 2010 focused on developing a solvent composition and process flowsheet for MCU implementation. In FY 2011 accomplishments at ORNL involved a wide array of chemical-development activities and testing up through single-stage hydraulic and mass-transfer tests in 5-cm centrifugal contactors. Under subcontract from ORNL, Argonne National Laboratory (ANL) designed a preliminary flowsheet using ORNL cesium distribution data, and Tennessee Technological University confirmed a chemical model for cesium distribution ratios (DCs) as a function of feed composition. Interlaboratory efforts were coordinated with complementary engineering tests carried out (and reported separately) by personnel at Savannah River National Laboratory (SRNL) and Savannah River Remediation (SRR) with helpful advice by Parsons Engineering and General Atomics on aspects of possible SWPF implementation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Solubility and Supernate Enrichment Testing for Accelerated Basin De-Inventory Discards to Concentration, Storage, and Transfer Facilities

After future Accelerated Basin De-inventory (ABD) enriched uranium discards into sludge batches (SB), portions of supernate decants during SB preparation will be blended into salt batches (StB) and the resulting feeds must meet the nuclear safety requirements for the Salt Waste Processing Facility (SWPF). During previous SB10 sampling and testing, which involved H-Canyon material containing enriched uranium being mixed with Tank 51 sludge shortly after the H-Canyon stream was neutralized, it was identified that the uranium isotopic enrichment in the supernate deviated from the uranium isotopic enrichment in the slurry. The higher uranium isotopic enrichment in the supernate introduced the risk of challenging the feed requirements of SWPF. The ABD material added to SB11 was isotopically diluted with depleted uranium, mitigating any downstream impacts. However, H-Canyon desires to eliminate or minimize future depleted uranium additions in order to meet the mission schedule.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation Of Chemical Additives For Glycolate Destruction In The Recycle Collection Tank

Savannah River National Laboratory (SRNL) has completed a work scope in support of the Savannah River Remediation (SRR) Nitric-Glycolic flowsheet. Glycolic acid will replace formic acid as a reducing agent in the pre-processing of High-Level Waste sludge performed at the Defense Waste Processing Facility (DWPF). Glycolic acid will perform the same function as formic acid, namely reduction of mercury and adjustment of feed rheology and melter oxidation/reduction potential, while significantly reducing the potential for hydrogen generation in DWPF processing. Development testing has demonstrated glycolic acid virtually eliminates hydrogen production in the pre-processing steps. The Nitric-Glycolic flowsheet significantly improves DWPF’s ability to address Savannah River Site’s key challenge - the incorporation of effluent received from the Salt Waste Processing Facility (SWPF). SWPF will deliver significant effluent volume to DWPF, resulting in a concurrent increase in DWPF effluent returned to the Concentration, Storage and Transfer Facilities (CSTF). This work scope demonstrates that glycolate can be destroyed under the Nitric-Glycolic flowsheet prior to returning the DWPF recycle stream to CSTF. To avoid potential flammability issues due to thermolysis of glycolate in CSTF, SRR tasked SRNL to quantify and mitigate glycolate returns via DWPF recycle stream. The development of a strategy for glycolic mitigation initiated with a system’s engineering workshop. Various chemical and/or physical solutions for how to and where to destroy glycolate were considered – consistent with DWPF operational capabilities and process requirements. The workshop identified chemical oxidation of glycolate within the DWPF Recycle Collection Tank (RCT)a as the most promising option with sodium permanganate and Fenton’s reagent (metallic ion catalyzed hydrogen peroxide) as the two most promising oxidants.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of chemical additives for glycolic destruction in the recycle collection tank

Savannah River National Laboratory (SRNL) has completed a work scope in support of the Savannah River Remediation (SRR) Nitric-Glycolic flowsheet. Glycolic acid will replace formic acid as a reducing agent in the pre-processing of High-Level Waste sludge performed at the Defense Waste Processing Facility (DWPF). Glycolic acid will perform the same function as formic acid, namely reduction of mercury and adjustment of feed rheology and melter oxidation/reduction potential, while significantly reducing the potential for hydrogen generation in DWPF processing. Development testing has demonstrated glycolic acid virtually eliminates hydrogen production in the pre-processing steps. The Nitric-Glycolic flowsheet significantly improves DWPF’s ability to address Savannah River Site’s key challenge - the incorporation of effluent received from the Salt Waste Processing Facility (SWPF). SWPF will deliver significant effluent volume to DWPF, resulting in a concurrent increase in DWPF effluent returned to the Concentration, Storage and Transfer Facilities (CSTF). This work scope demonstrates that glycolate can be destroyed under the Nitric-Glycolic flowsheet prior to returning the DWPF recycle stream to CSTF. To avoid potential flammability issues due to thermolysis of glycolate in CSTF, SRR tasked SRNL to quantify and mitigate glycolate returns via DWPF’s recycle stream. The development of a strategy for glycolic mitigation was initiated with a system’s engineering workshop. Various chemical and/or physical solutions for how and where to destroy glycolate were considered – consistent with DWPF’s operational capabilities and process requirements. The workshop identified chemical oxidation of glycolate within the DWPF Recycle Collection Tank (RCT) a as the most promising option with sodium permanganate and Fenton’s reagent (metallic ion catalyzed hydrogen peroxide) as the two most promising oxidants.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Deployment of Performance Management Methodology as part of Liquid Waste Program at Savannah River Site - 12178

In 2009, Savannah River Remediation LLC (SRR) assumed the management lead of the Liquid Waste (LW) Program at the Savannah River Site (SRS). The four SRR partners and AREVA, as an integrated subcontractor are performing the ongoing effort to safely and reliably: - Close High Level Waste (HLW) storage tanks; - Maximize waste throughput at the Defense Waste Processing Facility (DWPF); - Process salt waste into stable final waste form; - Manage the HLW liquid waste material stored at SRS. As part of these initiatives, SRR and AREVA deployed a performance management methodology based on Overall Equipment Effectiveness (OEE) at the DWPF in order to support the required production increase. This project took advantage of lessons learned by AREVA through the deployment of Total Productive Maintenance and Visual Management methodologies at the La Hague reprocessing facility in France. The project also took advantage of measurement data collected from different steps of the DWPF process by the SRR team (Melter Engineering, Chemical Process Engineering, Laboratory Operations, Plant Operations). Today the SRR team has a standard method for measuring processing time throughout the facility, a reliable source of objective data for use in decision-making at all levels, and a better balance between engineering department goals and operational goals. Preliminary results show that the deployment of this performance management methodology to the LW program at SRS has already significantly contributed to the DWPF throughput increases and is being deployed in the Saltstone facility. As part of the liquid waste program on Savannah River Site, SRR committed to enhance production throughput of DWPF. Beyond technical modifications implemented at different location of the facility, SRR deployed performance management methodology based on OEE metrics. The implementation benefited from the experience gained by AREVA in its own facilities in France. OEE proved to be a valuable tool in order to support the enhancement program in DWPF by providing unified metrics to measure plant performances, identify bottleneck location, and rank the most time consuming causes from objective data shared between the different groups belonging to the organization. Beyond OEE, the Visual Management tool adapted from the one used at La Hague were also provided in order to further enhance communication within the operating teams. As a result of all the initiatives implemented on DWPF, achieved production has been increased to record rates from FY10 to FY11. It is expected that thanks to the performance management tools now available within DWPF, these results will be sustained and even improved in the future to meet system plan targets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Permanganate Oxidation of Defense Waste Processing Facility (DWPF) Recycle Collection Tank (RCT) Simulants – Protocol Runs for Nominal and Chemical Process Cell (CPC) Foamover Conditions

Savannah River National Laboratory (SRNL) has completed a work scope in support of the Savannah River Remediation (SRR) Nitric-Glycolic flowsheet. Glycolic acid will replace formic acid as a reducing agent in the pre-processing of High-Level Waste sludge performed at the Defense Waste Processing Facility (DWPF). Glycolic acid will perform the same function as formic acid, namely reduction of mercury and adjustment of feed rheology and melter oxidation/reduction potential, while significantly reducing the potential for hydrogen generation in DWPF processing. Development testing has demonstrated glycolic acid virtually eliminates hydrogen production in the pre-processing steps. The Nitric-Glycolic flowsheet significantly improves DWPF’s ability to address one of the Savannah River Site’s key challenges - the incorporation of effluent received from the Salt Waste Processing Facility (SWPF). SWPF will deliver significant effluent volume to DWPF, resulting in a concurrent increase in DWPF effluent returned to the Concentration, Storage and Transfer Facilities (CSTF). This work scope demonstrates that glycolate can be destroyed under the Nitric-Glycolic flowsheet prior to returning the DWPF recycle stream to CSTF. To avoid potential flammability issues due to thermolysis of glycolate in CSTF, SRR tasked SRNL to quantify and mitigate glycolate returns via DWPF’s recycle stream. The development of a strategy for glycolic mitigation was initiated with a system’s engineering workshop. Various chemical and/or physical solutions for how and where to destroy glycolate were considered – consistent with DWPF’s operational capabilities and process requirements. The workshop identified chemical oxidation of glycolate within the DWPF Recycle Collection Tank (RCT) as the most promising option. (The RCT collects offgas condensate from pre-processing, vitrification, and other unit operations performed in DWPF and is the singular return vessel delivering recycle effluent back to CSTF.) A series of down-select experimental tests were performed that showed sodium permanganate was the most effective oxidant. This work was performed to identify an appropriate operational protocol for DWPF implementation. Building upon the downselect experiments, the work targeted an improved description of suitable RCT conditions prior to the strike (pH, etc.), permanganate addition rate, and destruction reaction kinetics. Data collected were also used to determine the best expression of reaction stoichiometry and the effective minimum permanganate addition required.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Mercury Compound Partitioning Through the Solvent Extraction System

Savannah River National Laboratory (SRNL) has been requested by Savannah River Mission Completion (SRMC)/ Salt Waste Processing Facility (SWPF) personnel to investigate the potential routes for titanium and mercury accumulations within the SWPF Flowsheet. This report documents work performed to examine how various forms of mercury can migrate through the multiple flowsheets of a solvent extraction system. This entailed 29 single stage distribution tests, a multi-stage Extraction-Scrub-Strip (ESS) test, and a detailed speciation analysis of several salt batch feed samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MEASUREMENT OF SPECIFIC HEAT CAPACITY OF SALTSTONE

One of the goals of the Saltstone variability study is to identify (and quantify the impact of) the operational and compositional variables that control or influence the important processing and performance properties of Saltstone grout mixtures. The heat capacity of the Saltstone waste form is one of the important properties of Saltstone mixes that was last measured at SRNL in 1997. It is therefore important to develop a core competency for rapid and accurate analysis of the specific heat capacity of the Saltstone mixes in order to quantify the impact of compositional and operational variations on this property as part of the variability study. The heat capacity, coupled with the heat of hydration data obtained from isothermal calorimetry for a given Saltstone mix, can be used to predict the maximum temperature increase in the cells within the vaults of the Saltstone Disposal Facility (SDF). The temperature increase controls the processing rate and the pour schedule. The maximum temperature is also important to the performance properties of the Saltstone. For example, in mass pours of concrete or grout of which Saltstone is an example, the maximum temperature increase and the maximum temperature difference (between the surface and the hottest location) are controlled to ensure durability of the product and prevent or limit the cracking caused by the thermal gradients produced during curing. This report details the development and implementation of a method for the measurement of the heat capacities of Saltstone mixes as well as the heat capacities of the cementitious materials of the premix and the simulated salt solutions used to batch the mixes. The developed method utilizes the TAM Air isothermal calorimeter and takes advantage of the sophisticated heat flow measurement capabilities of the instrument. Standards and reference materials were identified and used to validate the procedure and ensure accuracy of testing. Heat capacities of Saltstone mixes were {approx} 55% higher than the previous measurement of specific heat capacity on a reference Saltstone mix in 1997. Values of mixes prepared using Deliquification, Dissolution and Adjustment (DDA), Modular Caustic Side Solvent Extraction Unit (MCU) and Salt Waste Processing Facility (SWPF) simulants and premix at 0.60 w/cm ratio were {approx} 1.95 J/g/{sup o}C and were equivalent within experimental error. The simple law of mixtures was used to predict the heat capacities of the Saltstone and the results were in excellent agreement with experimental data. This simple law of mixtures can therefore be used to predict the heat capacities of Saltstone mixes in those cases where measurements have not been made. The time dependence of the heat capacity is important as an input to the modeling of temperature increase in Saltstone vaults. The heat capacity of a mix of MCU and premix at 0.60 w/cm ratio was measured immediately after initial mixing and then periodically up to times greater than 100 days. Within experimental error, the heat capacity did not change with time. Therefore, the modeling is not complicated by requiring a time dependent function for specific heat capacity. The water to cementitious material (w/cm) ratio plays a key role in determining the value of the heat capacity. Both experimental and predictive values for SWPF mixes as function of the w/cm ratio were obtained and presented in this report. Predictions of the maximum temperatures of the Saltstone mixes were made using the heat of hydration data from previous isothermal measurements and the newly measured heat capacities for DDA, MCU and SWPF mixes. The maximum temperature increase ranged from 37 to 48 C for these mixes. The presence of aluminate at 0.33 M produced a temperature increase of 68 C which is close to the adiabatic temperature rise of 74 C observed by Steimke and Fowler in 1997 for a mix containing 0.35 M aluminate. Aluminum dissolution of the sludge will increase the aluminate in the DSS which in turn will result in a larger temperature increase in the Saltstone vaults during the curing period. The initial temperature of the Saltstone mixes in the Saltstone Production Facility (SPF) can be predicted using the specific heat capacities of Decontaminated Salt Solutions (DSS), the specific heat capacities of cementitious materials, and the initial temperatures of the DSS and the premix. This initial mix temperature is dominated by the DSS temperature due to its high heat capacity relative to the cementitious materials. Therefore, controlling the initial temperature of the DSS to lower temperatures will lead to lower maximum temperatures in the vault for a given batch of Saltstone.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Submersible Blend Pump Mixing Evaluation

Savannah River Remediation (SRR) requested Savannah River National Laboratory (SRNL) to perform an engineering analysis to investigate the mixing behavior in feed blend tanks for the Salt Waste Processing Facility (SWPF). The baseline for mixing the feed blend tanks is a U 0 D of 5.1 ft 2 /s, a pump nozzle elevation of 165.86 inches above the sludge layer and 174 inches above the tank bottom, a liquid level 174.28 inches above the pump nozzle, and a blend time of 10.63 hours. The current Salt Batch Plan identifies Tanks 21, 26, 41, and 42 as the designated blend tanks. This supplemental study only addresses Type IIIA tanks (i.e., Tanks 26, 41, and 42). Using the Tank 41 current configuration as the baseline, the analysis considers the impact on blending if: 1) the distance between the pump discharge nozzle and the liquid surface increases above the baseline, 2) the distance between the pump discharge nozzle and the liquid surface decreases below the baseline, 3) the distance between the pump discharge nozzle and the sludge layer at the bottom of the tank increases above the baseline, or 4) the distance between the pump discharge nozzle and the sludge layer at the bottom of the tank decreases below the baseline, each while maintaining the minimum U 0 D of 5.1 ft 2 /s. Per subsequent direction from SRR, the minimum distance between the pump discharge nozzle and the sludge will be 165.86 inches. Hence, distances less than 165.86 inches between the pump discharge nozzle and the sludge were not included in the analysis. In addition, SRR requested SRNL to evaluate the impact of the abandoned in place, failed slurry pumps in Tank 42 on liquid blending.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MATRIX 2 RESULTS OF THE FY07 ENHANCED DOE HIGH-LEVEL WASTE MELTER THROUGHPUT STUDIES AT SRNL

High-level waste (HLW) throughput (i.e., the amount of waste processed per unit time) is a function of two critical parameters: waste loading (WL) and melt rate. For the Waste Treatment and Immobilization Plant (WTP) at the Hanford Site and the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS), increasing HLW throughput would significantly reduce the overall mission life cycle costs for the Department of Energy (DOE). The objective of this study was to generate supplemental validation data that could be used to determine the applicability of the current liquidus temperature (TL) model to expanded DWPF glass composition regions of interest based on higher WLs. Two specific flowsheets were used in this study to provide such insight: (1) Higher WL glasses (45 and 50%) based on future sludge batches that have (and have not) undergone the Al-dissolution process. (2) Coupled operations supported by the Salt Waste Processing Facility (SWPF), which increase the TiO{sub 2} concentration in glass to greater than 2 wt%. Glasses were also selected to address technical issues associated with Al{sub 2}O{sub 3} solubility, nepheline formation, and homogeneity issues for coupled operations. A test matrix of 28 glass compositions was developed to provide insight into these issues. The glasses were fabricated and characterized using chemical composition analysis, X-ray Diffraction (XRD), TL measurement and the Product Consistency Test (PCT). The results of this study are summarized below: (1) TiO{sub 2} concentrations up to {approx} 3.5 wt% were retained in DWPF type glasses, where retention is defined as the absence of crystalline TiO{sub 2} (i.e., unreacted or undissolved) in the as-fabricated glasses. Although this TiO{sub 2} content does not bound the projected SWPF high output flowsheet (up to 6 wt% TiO{sub 2} may be required in glass), these data demonstrate the potential for increasing the TiO{sub 2} limit in glass above the current limit of 2 wt% (based strictly on retention or solubility). (2) For those study glasses that had very close compositional overlap with the model development and/or model validation ranges of the current DWPF TL model (except TiO{sub 2} and MgO concentrations), there was very little difference in the predicted and measured TL values. Even though the TiO{sub 2} concentrations were above the 2 wt% upper limit, the results indicate that the current T{sub L} model is applicable in this compositional region with TiO{sub 2} contents up to approximately 3.5 wt%. (3) As the target glass compositions diverge from the model development and validation ranges, the T{sub L} data suggest that the model under-predicted the measured values. These discrepancies imply that there are individual oxides or oxide combinations that need to be accounted for in the model. These oxides include B{sub 2}O{sub 3}, SiO{sub 2}, MnO, TiO{sub 2} and/or their combinations. More data would be required to fill in these anticipated DWPF compositional regions for higher WL glasses so that the model coefficients could be refit to account for these differences. (4) Based on PCT response of HWL-21 and HWL-22 (two glasses that were prone to nepheline formation) it appears that increasing the B{sub 2}O{sub 3} concentration in glass does not consistently suppress the formation of nepheline in glasses with higher Al{sub 2}O{sub 3} and/or Na{sub 2}O content. Although the chemical durabilities of the quenched versions of these glasses were very acceptable, the canister centerline cooled (ccc) glasses exhibited a considerable decrease in durability and were found to contain nepheline via XRD. In fact, one of the glasses had a release that was 5 times greater than that of the Environmental Assessment (EA) benchmark glass. These results suggest a need for a more fundamental understanding of the compositional and kinetic effects of nepheline formation in high WL glasses. (5) Data have been generated in support of the replacement of the homogeneity constraint with the Al{sub 2}O{sub 3} and/or sum of alkali constraints for coupled operations as previously completed for sludge-only operations. This strategy should be pursued for either the compositional region anticipated for coupled operations or as part of the variability study for each sludge batch. The PCT responses of the study glasses suggest a high probability that this strategy could be defended at some later date.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ANALYSIS OF THE LEACHING EFFICIENCY OF INHIBITED WATER AND TANK SIMULANT IN REMOVING RESIDUES ON THERMOWELL PIPES

A key component for the accelerated implementation and operation of the Salt Waste Processing Facility (SWPF) is the recovery of Tank 48H. Tank 48H is a type IIIA tank with a maximum capacity of 1.3 million gallons. Video inspection of the tank showed that a film of solid material adhered to the tank internal walls and structures between 69 inch and 150 inch levels. From the video inspection, the solid film thickness was estimated to be 1mm, which corresponds to {approx}33 kg of TPB salts (as 20 wt% insoluble solids) (1). This film material is expected to be easily removed by single-rinse, slurry pump operation during Tank 48H TPB disposition via aggregation processing. A similar success was achieved for Tank 49H TPB dispositioning, with slurry pumps operating almost continuously for approximately 6 months, after which time the tank was inspected and the film was found to be removed. The major components of the Tank 49H film were soluble solids - Na{sub 3}H(CO{sub 3}){sub 2} (Hydrated Sodium Carbonate, aka: Trona), Al(OH){sub 3} (Aluminum Hydroxide, aka: Gibbsite), NaTPB (Sodium Tetraphenylborate), NaNO{sub 3} (Sodium Nitrate) and NaNO{sub 2} (Sodium Nitrite) (2). Although the Tank 48H film is expected to be primarily soluble solids, it may not behave the same as the Tank 49H film. There is a risk that material on the internal surfaces of Tank 48H could not be easily removed. As a risk mitigation activity, the chemical composition and leachability of the Tank 48H film are being evaluated prior to initiating tank aggregation. This task investigated the dissolution characteristics of Tank 48H solid film deposits in inhibited water and DWPF recycle. To this end, SRNL received four separate 23-inch long thermowell-conductivity pipe samples which were removed from the tank 48H D2 risers in order to determine: (1) the thickness of the solid film deposit, (2) the chemical composition of the film deposits, and (3) the leaching behavior of the solid film deposit in inhibited water (IW) and in DWPF recycle simulant (3).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation Of Glass Density to Support the Estimation of Fissile Mass Loadings in Sludge Batch 10 Glasses

Per a directive from the Department of Energy Savannah River Operations Office (DOE-SR) in 2008, the fissile mass loading concentration must remain below 897 g/m 3 in each high-level waste (HLW) glass canister produced by the Defense Waste Processing Facility (DWPF). To support Sludge Batch 5 (SB5) processing, the Savannah River National Laboratory (SRNL) developed a technical basis that facilitates the evaluation of fissile mass loading of the glass product. The calculation is based on the iron (Fe) concentration in the glass as determined by measurements from the Slurry Mix Evaporator acceptability analysis as well as the glass density. In April 2022, a subsequent DOE-SR directive increased the fissile mass loading limit to 2500 g/m 3 beginning with Sludge Batch 11. Thus, the 897 g/m 3 limit still applies to Sludge Batch 10 (SB10) processing. For SB5 through initial Sludge Batch 9 (SB9) processing prior to coupled operation with the Salt Waste Processing Facility (SWPF), SRNL provided DWPF a bounding glass density value that was based on a statistical evaluation of density measurements. To eliminate the need for experimental work, a composition-based density model for HLW glasses was developed at SRNL in 2019. The objective of this report is to present the bounding glass density determined with the composition-based density model for SB10 sludge-only (SO) and coupled processing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

PAPER STUDY EVALUATIONS OF THE INTRODUCTION OF SMALL COLUMN ION EXCHANGE WASTE STREAMS TO THE DEFENSE WASTE PROCESSING FACILITY

The objective of this paper study is to provide guidance on the impact of Monosodium Titanate (MST) and Crystalline Silicotitanate (CST) streams from the Small Column Ion Exchange (SCIX) process on the Defense Waste Processing Facility (DWPF) flowsheet and glass waste form. A series of waste processing scenarios was evaluated, including projected compositions of Sludge Batches 8 through 17 (SB8 through SB17), MST additions, CST additions to Tank 40 or to a sludge batch preparation tank (Tank 42 or Tank 51, referred to generically as Tank 51 in this report), streams from the Salt Waste Processing Facility (SWPF), and two canister production rates. A wide array of potential glass frit compositions was used to support this assessment. The sludge and frit combinations were evaluated using the predictive models in the current DWPF Product Composition Control System (PCCS). The results were evaluated based on the number of frit compositions available for a particular sludge composition scenario. A large number of candidate frit compositions (e.g., several dozen to several hundred) is typically a good indicator of a sludge composition for which there is flexibility in forming an acceptable waste glass and meeting canister production rate commitments. The MST and CST streams will significantly increase the concentrations of certain components in glass, such as Nb{sub 2}O{sub 5}, TiO{sub 2}, and ZrO{sub 2}, to levels much higher than have been previously processed at DWPF. Therefore, several important assumptions, described in detail in the report, had to be made in performing the evaluations. The results of the paper studies, which must be applied carefully given the assumptions made concerning the impact of higher Ti, Zr, and Nb concentrations on model validity, provided several observations: (1) There was difficulty in identifying a reasonable number of candidate frits (and in some cases an inability to identify any candidate frits) when a waste loading of 40% is targeted for Sludge Batches 8, 16, and 17, regardless of the addition of SCIX or SWPF streams. This indicates that the blending strategy for these sludge batches should be reevaluated by Savannah River Remediation (SRR). (2) In general, candidate frits were available to accommodate CST additions to either Tank 40 or Tank 51. A larger number of candidate frits were typically available for the sludge batches when CST is added to Tank 51 rather than Tank 40, meaning that more compositional flexibility would be available for frit selection and DWPF operation. Note however that for SB8 and SB17, no candidate frits were available to accommodate CST going to Tank 40 with and without SWPF streams. The addition of SWPF streams generally improves the number of candidate frits available for processing of a given sludge batch. (3) The change in production rate from 40 Sludge Receipt and Adjustment Tank (SRAT) batches per year (i.e., the current production rate) to 75 SRAT batches per year, without SWPF streams included, had varied results in terms of the number of candidate frits available for processing of a given sludge batch. Therefore, this variable is not of much concern in terms of incorporating the SCIX streams. Note that the evaluation at 75 SRAT batches per year (approximately equivalent to 325 canisters per year) is more conservative in terms of the impact of SCIX streams as compared to a production rate of 400 canisters per year. Overall, the outcome of this paper study shows no major issues with the ability to identify an acceptable glass processing window when CST from the SCIX process is transferred to either Tank 40 or Tank 51. The assumptions used and the model limitations identified in this report must be addressed through further experimental studies, which are currently being performed. As changes occur to the planned additions of MST and CST, or to the sludge batch preparation strategy, additional evaluations will be performed to determine the potential impacts. As stated above, the issues with Sludge Batches 8, 16, and 17 should be further evaluated by SRR. A review of Chemical Process Cell (CPC) processing identified no changes to the recommendations from the previous review of the SCIX process impacts. Recommendations for testing were made during the previous review to evaluate the impact of CST on the rheological properties of DWPF process streams and evaluate the impact of CST on catalytic hydrogen generation during CPC processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗