Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Regulatory Treatment of Non-Core Sources of Radioactivity for Advanced Reactor Designs

The recent resurgence in advance (non-light water) reactor development has been paralleled by the development of risk-informed performance-based (RIPB) licensing pathways. Specifically, the creation of the RIPB Licensing Modernization Project (LMP) approach and subsequent endorsement by the U.S. Nuclear Regulatory Commission (NRC) now provides advanced reactor vendors with a defined RIPB method to develop an affirmative safety case for licensing. In addition, the Technology Inclusive Content of Applications Project (TICAP) has published guidance on developing a license application based on the LMP approach. To support the utilization of risk information as part of advanced reactor design and licensing efforts, the American Society of Mechanical Engineers (ASME)/American Nuclear Society (ANS) Joint Committee on Nuclear Risk Management (JCNRM) has developed a probabilistic risk assessment (PRA) standard for advanced reactors. The standard, which was formerly approved by the American National Standards Institute (ANSI) in 2021 and recently endorsed by the NRC in trial use Regulatory Guide (RG) 1.247, is an integral standard, covering from initiating events to offsite consequence. A major feature of the standard is that it permits the inclusion of any source of radioactivity material at the site within the plant PRA. Therefore, non-core sources of radioactivity, such as fuel storage, fuel processing, and purification systems, can be included within a single comprehensive plant PRA. For those advanced reactor vendors utilizing a RIPB licensing approach, there is an opportunity to include the non-core sources of radioactivity within the RIPB framework for licensing decision-making, such as the categorization of events, classification of structures, systems, and components (SSCs), and evaluation of the adequacy of defense-in-depth (DID). For advanced reactor designs that contain multiple non-core sources of radioactivity, or for monolithic plant sites that include associated fuel facilities, this approach could potentially simplify licensing applications through the use of a single, uniform, and consistent decision-making framework across all radioactive sources at the site. In addition, a RIPB approach could provide additional insights regarding plant behavior, flexibility regarding licensing decision-making, and potentially allow the use of risk information as part of the plant oversight process. Risk-informing these aspects of advanced reactor licensing would also be consistent with the NRC’s risk policy statement. However, there is diverse regulation and guidance regarding the licensing of non-core sources of radioactivity and generally limited experience using RIPB approaches for the evaluation as part of licensing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cybersecurity for Distributed Wind: MIRACL Advisory Board Meeting 2022

This presentation for the MIRACL Industry Advisory Board summarizes the cybersecurity research for distributed wind that was performed during the project. Highlights include an overview of the distributed wind reference architecture, descriptions of the unique needs and challenges for securing distributed wind, the cyber risk management framework that was developed for this project, and key takeaways for various stakeholders.

17 WIND ENERGY↗

Solar, Wind, and Load Forecasting Dataset for MISO, NYISO, and SPP Balancing Areas

The Performance-based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) program is an initiative intended to foster "a fundamental shift in grid management rooted in an understanding of asset risk and system risk" (ARPA-E 2020). Launched by the Advanced Research Projects Agency-Energy (ARPA-E), the program supports efforts to incorporate uncertainty in electric power decision making. In support of PERFORM, the National Renewable Energy Laboratory (NREL) has produced a set of time-coincident forecasts of solar, wind, and load profiles. As part of Phase I of the PERFORM effort, NREL created a dataset that consists of one year of time-coincident load, wind, and solar actuals and probabilistic forecasts based on data from the Electric Reliability Council of Texas (ERCOT) (Bryce et al. 2023). In Phase II, NREL developed similar datasets for three other U.S. Independent System Operators (ISO): the Midcontinent Independent System Operator (MISO), the New York Independent System Operator (NYISO), and the Southwest Power Pool (SPP).

24 POWER TRANSMISSION AND DISTRIBUTION↗

GIS-Based Modeling of Contaminated Soil Volumes at Multiple Sites in the Formerly Utilized Sites Remedial Action Program - 20149

The remediation of hazardous, toxic, and radioactive waste (HTRW) sites produces cost-related risks associated with the estimation of contaminated soil or debris volumes. Historical risk-management techniques include cost contingencies to cover volume uncertainties that affect project budgeting and decision-making. The Buffalo District teamed with project partners to lessen volume uncertainty and reduce project risks at multiple HTRW sites managed under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Historical remedial investigations under FUSRAP commonly identified the presence of radiological material in site media, the associated human health risk, and then areas of remediation. To manage remedial execution and reduce risk, pre-design or remediation-phase sampling essentially 'chased' contamination, which was not conducive to efficient predictive budgeting derived from Feasibility Study (FS) cost analyses. The Buffalo District first optimized their approach to better understand volume uncertainty by utilizing the Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software [1]. BAASS processed soft data (e.g., gamma walk-over data) and spatial sampling data to estimate the lateral extent of contaminated soil irrespective of depth (i.e., gross contamination extent) and define areas of contaminant uncertainty. The software performed a binary transformation of contaminant concentrations at all sampling points based upon remedial action goals or a sum of ratios approach (i.e., clean, impacted, or range of impacts in soil). The model produced two-dimensional (horizontal) contaminant probability contours and statistical uncertainty in the sampling coverage and resulting contaminant extents. This method was translated vertically by partitioning the sampling data into depth brackets that produced a stacked representation of contaminant extents and uncertainty in the subsurface (i.e., similar to construction lifts). The results commonly led to a better understanding of project uncertainty and the need for sampling strategies that produce high-confidence soil volumes, which control costs. The BAASS-based delineations were eventually replaced by Empirical Bayesian Kriging (EBK) methods available in ArcGIS Spatial or 3D Analysts [2]. The EBK method calculates contaminant probability zones derived from user-controlled semivariograms of the spatial datasets. The resulting probability zones (e.g., 50% or 80% of contaminant probability) represent the two-dimensional surface delineation of the overall horizontal remedial area, similarly to BAASS. However, unlike BAASS, the vertical sampling data within these probability zones became vertical control points to contour a subterranean surface that connects subsurface points to the land-surface delineations of contamination. The resulting representation of horizontal and vertical impacts within an enclosed envelop (volume) of soil included uncertainty distributions that are used to plan uncertainty-reduction sampling. These data-driven and math-based models of three-dimensional sampling results produced well-bounded remedial volumes for project planning and better uncertainty predictions during project budgeting. The EBK method was applied to several FUSRAP sites managed by the Buffalo District and compared to less rigorously modeled sites previously remediated by the District. The comparison of modeled to actual remediated volumes provide a basis for validating the volume-estimation method. This comparison is important to ensure modeled volumes match physical boundaries of site remediation. FUSRAP sites with denser investigative sampling and lesser volume uncertainty proved useful in remedial planning and contracting. The Buffalo District noted that historical sites with sparser sampling arrays had greater disparity between estimated volumes and final remedial volumes. The benefit achieved over the cost of detailed soil sampling appears positive for FUSRAP projects, especially where impacts vary widely and appear unbounded by investigation-phase sampling. The subsequent Empirical Bayesian Kriging of contamination coupled with vertical contouring for soil estimations reduces uncertainty in soil volumes or indicates where sampling is required to reduce uncertainty, which together optimize remedial planning and budgeting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling Cyber Supply Chain Incidents with Multilayered Graph Motifs

As noted within the literature, supply chain includes people and organizations---manufacturers, integrators, and third-party vendors---that are involved in one or more stages of a product lifecycle. Since supply chains, by definition, include organizations and people, supply chain risk management activities must consider dependencies between an organization's business processes and third-party resources. Just as adversarial tactics can be implemented via techniques implemented via networked computer systems, so can such tactics be expressed via legal business relationships. A cyber incident may have an exponential impact downstream, for example, by leveraging a product's distribution channel (e.g. malicious updates in SolarWinds, buggy updates in CrowdStrike). Similarly, legitimate and legal business relationships also affect the attack surface exposure of systems, enabling long-term persistence and/or unknown impacts to product quality that are hard to detect. This paper catalogs several recent digital supply chain incidents and applies a multilayered network formalism to develop structural indicators (graph motifs) that reflect potentially-adversarial behavior. Finally, we compare and contrast the characteristics of adversarial tactics (e.g. Loss of Availability, Data Collection) that leverage cyber-physical dependencies to those that leverage legal organizational relationships.

97 - MATHEMATICS AND COMPUTING↗

Modeling interconnections of safety and financial performance of nuclear power plants, part 3: Spatiotemporal probabilistic physics-of-failure analysis and its connection to safety and financial performance

Here, this paper is a byproduct of a line of research by the authors to analyze interrelationships of safety and financial performance of nuclear power plants (NPPs). The result of this line of research is summarized in three parts: Part 1 covers a categorical review of relevant literature and the theoretical bases that support the methodological developments in Part 2. Part 2 introduces an Integrated Enterprise Risk Management (I-ERM) methodological framework to quantify the interconnections of safety and financial performance with a focus on operation and maintenance (O&M) of NPPs. Part 2 has also demonstrated the applicability and values of the I-ERM methodology through an NPP case study. This paper is Part 3, where detailed development and implementation of one of the I-ERM modules, i.e., probabilistic physics-of-failure (PPoF) analysis, and its connection with safety and financial performance is reported. In this article, the physical failure modeling for hardware components is advanced by incorporating finite element analysis (FEA) into PPoF analysis and coupling the FEA-based PPoF with the maintenance performance through a renewal process model. This article covers two scientific contributions: (i) first-of-its-kind incorporation of FEA into the PPoF model of thermal fatigue for NPP components; and (ii) advancing the interface between the PPoF analysis and the renewal process model in order to deal with spatiotemporal FEA outputs and to efficiently estimate the physical transition rates even when the PPoF outputs are dominated by success data. Through the incorporation of FEA, the resolution of the PPoF analysis is enhanced as spatiotemporal conditions such as stress and temperature can be considered explicitly instead of relying on simplified assumptions or analytical models with reduced spatiotemporal dimensions. To demonstrate an application of the FEA-based PPoF analysis and its coupling with maintenance through the renewal process model, a case study is conducted using excess letdown elbow piping in the chemical and volume control system of a Pressurized Water Reactor.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Managing Cyber Supply Chain Risk for Renewable Energy Technologies

On July 1, 2021, the U.S. Department of Energy (DOE) Office of Cybersecurity, Energy Security, and Emergency Response (CESER) hosted a virtual workshop facilitated by the National Renewable Energy Laboratory (NREL). Cybersecurity supply chain experts, researchers, and leaders in government and industry came together to share information on current and future challenges in securing emerging technologies and technical architecture. From a cybersecurity perspective, we need to move from a cybersecurity approach that focuses principally on legacy asset owners to one that incorporates more emphasis on end-point device manufacturers and third-party integrators. Cybersecurity for the global digital supply chain for manufacturers of consumer end-point devices—such as smart solar inverters and smart electric vehicle (EV) chargers—will be critical to the future cyber health of the grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Method for Evaluating and Tracking Production-Sample Test (PST) Delay Risk

This report describes a method for evaluating risk from delayed Production Sample Testing (PST), and strategies for reducing test backlogs. Risk contributions to overall risk from delayed PST include a Steady State Risk (SSR) contribution that is inherent in the qualified design and manufacturing processes, and a Non-Homogenous Production Risk (NHPR) contribution from production variation. Both definitions and evaluation techniques for these risk contributions are provided along with correlation to the standard Quality Assurance Process, QA001.2, risk ranking matrix. Methods for tracking test backlogs, and reducing backlogs are also discussed. The delayed PST evaluation method described here includes the merger of both slightly quantitative methods for tracking defect levels and the propensity for production variation with general risk management tracking tools like the likelihood vs. consequence risk ranking matrix. This merger is important because it allows more effective evaluation and communication with regards to delayed PST.

42 ENGINEERING↗

The Publication and Endorsement of the ASME/ANS Probabilistic Risk Assessment Standard for Advanced Non-Light Water Reactor Nuclear Power Plants

Due to growing interest in non-light water reactor (NLWR) concepts, the predecessor to the American Nuclear Society (ANS)/American Society of Mechanical Engineers (ASME) Joint Committee on Nuclear Risk Management (JCNRM) initiated development of a NLWR probabilistic risk assessment (PRA) standard in 2006. The developed standard, released for trial use in 2013, was the first integral PRA standard created by the JCNRM, containing requirements ranging from the development of initiating events to the analysis of offsite radiological consequence. Based on feedback from pilot applications of the trial standard, a revised version of the standard was developed and balloted in 2020, with unanimous passage by the JCNRM and formal publication as an American National Standards Institute (ANSI) standard in 2021. The paper provides an overview of the standard and its development process. In addition, the paper reviews the latest status of U.S. Nuclear Regulatory Commission endorsement efforts through Regulatory Guide 1.247.

Fleming, K.↗

Characterizing Uncertainty in Synthetic Tropical Cyclone Hazard Models for U.S. Energy Infrastructure Resilience

Tropical Cyclones (TCs) are intense storms that pose a persistent and considerable risk to coastal communities and infrastructure in the global tropics and subtropics, including the United States (US). With known limitations associated with observations and high-resolution earth system models, synthetic TC models that capture a wide spectrum of storm possibilities have been developed to robustly quantify TC risk. Here we examine the simulation of various TC features in the North Atlantic relevant for US coastal risk in three synthetic TC models forced with ERA5 reanalysis: MIT, CHAZ and RAFT. While there is a broad agreement among these models in terms of their representation of salient TC characteristics, certain differences do exist. To connect these modeling uncertainties with energy infrastructure resilience, we apply fragility curves that link simulated TC intensities to damage probabilities, demonstrating how uncertainty in storm states may translate into that in coastal impacts. Our study indicates that acknowledging and accounting for inter-model uncertainty leads to more reliable risk assessments, strengthening science-to-action pathways for managing risks associated with TCs.

Baby John, Effy↗

Advancing process-based flood frequency analysis for assessing flood hazard and population flood exposure

Recent studies have showcased the use of process-based hydrological models with Stochastic Storm Transposition (SST) techniques to conduct Flood Frequency Analysis (FFA). This framework, referred hereby FFA-SST, has proved to be a robust strategy to estimate peak flows of specific annual exceedance probability (e.g., 100-year peak flow) that can reflect natural and anthropogenic disturbances, including changes in land use and meteorological patterns. With the objective of advancing the FFA-SST framework, this study presents for the first time the use of an Integrated Surface-Subsurface Hydrological Model (ISSHM) to conduct FFA-SST by extending the analysis from peak flow responses to flood extent, enabling a unique view and analysis of flood hazard and population flood exposure at the basin scale. As a proof-of-concept, we used the ISSHM, Advanced Terrestrial Simulator (Amanzi-ATS) model, and the SST model, RainyDay, to conduct FFA-SST by simulating the flood response to 5,000 annual synthetic storm events in a 2,227 $km^2$ Southeast Texas watershed. We demonstrate that ATS, without site-specific calibration, provides a robust process-based representation of peak flows, flood extent, streamflow, evapotranspiration, soil moisture content, and water storage changes. Our results and analyses, covering frequency curves up to a 500-year return period for peak flows, basin inundation fractions, and the number of people exposed to flooding, offer a unique perspective to analyze flood impacts across spatial scales. Overall, this study provides critical insights for flood risk management by extending the FFA-SST framework to include both flood hazard and population flood exposure analyses at the basin scale. Such an approach will empower stakeholders and disaster emergency agencies with a more comprehensive understanding of flood impacts across the entire basin domain, facilitating informed decision-making for flood risk assessment and management.

58 GEOSCIENCES↗

Recommended Practices for Managing Induced Seismicity Risk Associated with Geologic Carbon Storage

The geologic storage of carbon dioxide (CO 2 ) is one method to help reduce or eliminate atmospheric CO 2 emissions. The sequestered CO 2 is originally captured from the atmosphere or from a stationary industrial source and subsequently injected into a deep subsurface porous rock formation. To facilitate the successful deployment of field scale carbon storage projects, the U.S. Department of Energy (DOE) is developing tools and protocols for defensible, science-based frameworks to quantify and mitigate risks associated with the long-term storage of CO 2 . This protocol specifically addresses the risk of induced seismicity due to injection in a geologic carbon storage (GCS) site. This integrated and risk-based protocol is a product of the U.S. DOE Fossil Energy’s National Risk Assessment Partnership (NRAP), a multi-year collaborative research effort of Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), National Energy Technology Laboratory (NETL), and Pacific Northwest National Laboratory (PNNL). These recommended practices describe a set of 7 steps to evaluate, manage, communicate, and mitigate the risk of induced seismicity at GCS sites. The base methodology of the recommended practices follows a framework similar to the Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems (Majer et al., 2012), developed for the Geothermal Technology Office of the U.S. DOE. These recommended practices present a framework to systematically assess the induced seismicity risk and quantify the associated uncertainties. These recommendations are based on current research and are sufficiently general to allow for modification and application to a variety of different types of sites. The substance of the recommended practices contained herein includes both technical and non-technical issues, and covers all operational stages of the GCS project lifecycle. They start at the preliminary risk assessment phase, continue through site assessment and characterization, include best practice communication and seismic monitoring plan methodologies, discuss the evaluation and mitigation of seismic hazard and risk, and closes with an exploration of operational management plans, which conclude when the induced seismicity risk abates back to background level. The focus of these recommendations is on actively managing the risks associated with induced seismicity by developing an actionable risk management plan that starts at the project proposal stage and continues through site closure through an iterative assessment and improvement process. The audience of this document is expected to include all interested stakeholders (e.g., operators, project developers, regulators, and the general public) and is expressly written to be accessible to this broad range of partners. This document is intended to disseminate knowledge gained through recent advances in the science of induced seismicity hazard and risk assessments, to provide updates based on recent experience gained by similar corollary injection-induced seismicity cases, and most importantly to establish a uniform framework to carry out a successful induced seismicity risk management plan for carbon storage projects in the future. These recommendations do not directly address any domestic or international regulations or standards. A complementary NRAP report makes recommendations for the assessment and management of environmental subsurface risks associated with unwanted fluid migration at GCS sites (Thomas et al., 2021) and should be referred to in order to address those additional GCS site risks.

54 ENVIRONMENTAL SCIENCES↗

Recommended Practices for Managing Induced Seismicity Risk Associated with Geologic Carbon Storage

The geologic storage of carbon dioxide (CO 2 ) is one method to help reduce or eliminate atmospheric CO 2 emissions. The sequestered CO 2 is originally captured from the atmosphere or from a stationary industrial source and subsequently injected into a deep subsurface porous rock formation. To facilitate the successful deployment of field scale carbon storage projects, the U.S. Department of Energy (DOE) is developing tools and protocols for defensible, science-based frameworks to quantify and mitigate risks associated with the long-term storage of CO 2 . This protocol specifically addresses the risk of induced seismicity due to injection in a geologic carbon storage (GCS) site. This integrated and risk-based protocol is a product of the U.S. DOE Fossil Energy’s National Risk Assessment Partnership (NRAP), a multi-year collaborative research effort of Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), National Energy Technology Laboratory (NETL), and Pacific Northwest National Laboratory (PNNL). These recommended practices describe a set of 7 steps to evaluate, manage, communicate, and mitigate the risk of induced seismicity at GCS sites. The base methodology of the recommended practices follows a framework similar to the $\textit{Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems}$ (Majer et al., 2012), developed for the Geothermal Technology Office of the U.S. DOE. These recommended practices present a framework to systematically assess the induced seismicity risk and quantify the associated uncertainties. These recommendations are based on current research and are sufficiently general to allow for modification and application to a variety of different types of sites. The substance of the recommended practices contained herein includes both technical and non-technical issues, and covers all operational stages of the GCS project lifecycle. They start at the preliminary risk assessment phase, continue through site assessment and characterization, include best practice communication and seismic monitoring plan methodologies, discuss the evaluation and mitigation of seismic hazard and risk, and closes with an exploration of operational management plans, which conclude when the induced seismicity risk abates back to background level. The focus of these recommendations is on actively managing the risks associated with induced seismicity by developing an actionable risk management plan that starts at the project proposal stage and continues through site closure through an iterative assessment and improvement process. The audience of this document is expected to include all interested stakeholders (e.g., operators, project developers, regulators, and the general public) and is expressly written to be accessible to this broad range of partners. This document is intended to disseminate knowledge gained through recent advances in the science of induced seismicity hazard and risk assessments, to provide updates based on recent experience gained by similar corollary injection-induced seismicity cases, and most importantly to establish a uniform framework to carry out a successful induced seismicity risk management plan for carbon storage projects in the future. These recommendations do not directly address any domestic or international regulations or standards. A complementary NRAP report makes recommendations for the assessment and management of environmental subsurface risks associated with unwanted fluid migration at GCS sites (Thomas et al., 2021) and should be referred to in order to address those additional GCS site risks

58 GEOSCIENCES↗

Production Agency Quality Assurance Management Execution Strategy [Thesis]

There are multiple federal directives that Los Alamos National Laboratory (LANL) must follow for the proper implementation of quality assurance, strategic planning, and execution of manufacturing and surveillance operations. Recent assessments identified that manufacturing in all processing areas is dynamic due to influencing scope changes, design modifications, funding adjustments, and staff attrition. In response, this project was started to develop a comprehensive PAQ execution strategy to support the success of LANL’s manufacturing mission. This project’s method for developing an updated architecture was to create an integrated, flexible, reliable, and agile strategic process. The execution plan has five deliverables: 1) an integrated schedule view of PAQ work scope, 2) a resource management plan that aligns with the required scope, 3) a metrics monitoring dashboard, 4) a project management plan for sustaining NAP 401.1A implementation, and 5) a risk management plan. The research design is a mixed-method approach focused on data collection for each deliverable. The methodology entails qualitative and quantitative research, metrics monitoring, data analysis, and the creation of a dashboard. The qualitative methods used include literature reviews and interviews. The quantitative methods include resource, financial, schedule and survey data analysis. Preliminary and final results were peer reviewed by subject matter experts both within the ALDWP organization and deployed support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Developing a Decision Support System for Regional Agricultural Nonpoint Salinity Pollution Management: Application to the San Joaquin River, California

Environmental problems and production losses associated with irrigated agriculture, such as salinity, degradation of receiving waters, such as rivers, and deep percolation of saline water to aquifers, highlight water-quality concerns that require a paradigm shift in resource-management policy. New tools are needed to assist environmental managers in developing sustainable solutions to these problems, given the nonpoint source nature of salt loads to surface water and groundwater from irrigated agriculture. Equity issues arise in distributing responsibility and costs to the generators of this source of pollution. This paper describes an alternative approach to salt regulation and control using the concept of “Real-Time Water Quality management”. The approach relies on a continually updateable WARMF (Watershed Analysis Risk Management Framework) forecasting model to provide daily estimates of salt load assimilative capacity in the San Joaquin River and assessments of compliance with salinity concentration objectives at key monitoring sites on the river. The results of the study showed that the policy combination of well-crafted river salinity objectives by the regulator and the application of an easy-to use and maintain decision support tool by stakeholders have succeeded in minimizing water quality (salinity) exceedances over a 20-year study period.

real-time management economics↗

The FLOod Probability Interpolation Tool (FLOPIT): A Simple Tool to Improve Spatial Flood Probability Quantification and Communication

Understanding flood probabilities is essential to making sound decisions about flood-risk management. Many people rely on flood probability maps to inform decisions about purchasing flood insurance, buying or selling real-estate, flood-proofing a house, or managing floodplain development. Current flood probability maps typically use flood zones (for example the 1 in 100 or 1 in 500-year flood zones) to communicate flooding probabilities. However, this choice of communication format can miss important details and lead to biased risk assessments. Here we develop, test, and demonstrate the FLOod Probability Interpolation Tool (FLOPIT). FLOPIT interpolates flood probabilities between water surface elevation to produce continuous flood-probability maps. FLOPIT uses water surface elevation inundation maps for at least two return periods and creates Annual Exceedance Probability (AEP) as well as inundation maps for new return levels. Potential advantages of FLOPIT include being open-source, relatively easy to implement, capable of creating inundation maps from agencies other than FEMA, and applicable to locations where FEMA published flood inundation maps but not flood probability. Using publicly available data from the Federal Emergency Management Agency (FEMA) flood risk databases as well as state and national datasets, we produce continuous flood-probability maps at three example locations in the United States: Houston (TX), Muncy (PA), and Selinsgrove (PA). We find that the discrete flood zones generally communicate substantially lower flood probabilities than the continuous estimates.

54 ENVIRONMENTAL SCIENCES↗