Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

New mission requirements methodologies for services provided by the Office of Space Communications

The Office of Space Communications, NASA Headquarters, has recently revised its methodology for receiving, accepting and responding to customer requests for use of that office's tracking and communications capabilities. This revision is the result of a process which has become over-burdened by the size of the currently active and proposed missions set, requirements reviews that focus on single missions rather than on mission sets, and negotiations most often not completed early enough to effect needed additions to capacity or capability prior to launch. The requirements-coverage methodology described is more responsive to project/program needs and provides integrated input into the NASA budget process early enough to effect change, and describes the mechanisms and tools in place to insure a value-added process which will benefit both NASA and its customers. Key features of the requirements methodology include the establishment of a mechanism for early identification of and systems trades with new customers, and delegates the review and approval of requirements documents to NASA centers in lieu of Headquarters, thus empowering the system design teams to establish and negotiate the detailed requirements with the user. A Mission Requirements Request (MRR) is introduced to facilitate early customer interaction. The expected result is that the time to achieve an approved set of implementation requirements which meet the customer's needs can be greatly reduced. Finally, by increasing the discipline in requirements management, through the use of base lining procedures, a tighter coupling between customer requirements and the budget is provided. A twice-yearly projection of customer requirements accommodation, designated as the Capacity Projection Plan (CPP), provides customer feedback allowing the entire mission set to be serviced.

Holmes, Dwight P.↗

Requirements for company-wide management

Computing system requirements were developed for company-wide management of information and computer programs in an engineering data processing environment. The requirements are essential to the successful implementation of a computer-based engineering data management system; they exceed the capabilities provided by the commercially available data base management systems. These requirements were derived from a study entitled The Design Process, which was prepared by design engineers experienced in development of aerospace products.

Southall, J. W.↗

An “EPIIC” Vision to Evolve Project Integration, Innovation, and Collaboration with Broad Impact for How NASA Executes Complex Projects

Evolving Project Integration, Innovation, and Collaboration (EPIIC) is a vision defined to transform the way projects manage information to support real-time decisions, capture best practices and lessons learned, perform assessments, and manage risk across a portfolio of projects. The foundational project management needs for data and information will be revolutionized through innovations on how we manage and access that data, implement configuration control, and certify compliance. The embedded intelligence of new interactive data interfaces integrate technical and programmatic data such that near real time analytics can be accomplished to more efficiently and accurately complete systems engineering and project management tasks. The system-wide data analytics that are integrated into customized data interfaces allows the growing team of engineers and managers required to develop and implement major NASA missions the ability to access authoritative source(s) of system information while greatly reducing the labor required to complete system assessments. This would allow, for example, much of what is accomplished in a scheduled design review to take place as needed, between any team members, at any time. An intelligent data interface that rigorously integrates systems engineering and project management information in near real time can provide substantially greater insight for systems engineers, project managers, and the large diverse teams required to complete a complex project. System engineers, programmatic personnel (those who focus on cost, schedule, and risk), the technical engineering disciplines, and project management can realize immediate benefit from the shared vision described herein. Implementation of the vision also enables significant improvements in the performance of the engineered system being developed.

Moreland, Robert J.↗

NASA Space Flight Program and Project Management Handbook

This handbook is a companion to NPR 7120.5E, NASA Space Flight Program and Project Management Requirements and supports the implementation of the requirements by which NASA formulates and implements space flight programs and projects. Its focus is on what the program or project manager needs to know to accomplish the mission, but it also contains guidance that enhances the understanding of the high-level procedural requirements. (See Appendix C for NPR 7120.5E requirements with rationale.) As such, it starts with the same basic concepts but provides context, rationale, guidance, and a greater depth of detail for the fundamental principles of program and project management. This handbook also explores some of the nuances and implications of applying the procedural requirements, for example, how the Agency Baseline Commitment agreement evolves over time as a program or project moves through its life cycle.

Michael P Blythe↗

From Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challenge

The Dawn GDS Team met the SC Sim integration challenge in eight months. The GDS System Engineering approach in response to the SC Simintegration challenge, focused on a set of key practices: decomposition of project request into manageable requirements; integration of multiple ground disciplines and experts into a focused team effort; risk management thru management of expectations; and aggregation of intermediate products into a final product. By maintaining a a system-level focus, the overall systems engineering process unified team GDS Team members with a common goal: the success of the ground system as a whole and not just the success of their individual expert contributions. Incorporation of Agile-type development efforts were aligned with a risk strategy based on team-oriented principles and expectations management, thus achieving a more stable baseline solution without compromising the integrity of the GDS design.

Dawn Mission↗

Reducing NPR 7120.5D to Practice: Preparing for a Life-Cycle Review

In March 2007, NASA issued revised rules for space flight project management, NPR 7120.5D, 'NASA Space Flight Program and Project Management Requirements.' Central to the new rules was the construct of Key Decision Points, maturity gates that the project team must pass in order to continue development. In order that the KDP decision be fully informed, the NPR required, as entrance criteria for the gate, the generation and delivery of specified planning, technical, and cost/schedule documents (gate products) and a life-cycle review, the Preliminary Design Review. Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. Key actions were taken to proactively interact with the SRB, produce high-quality gate products with stakeholder review, generate review presentation materials, and handle a myriad of supporting logistical functions. A review preparation team was established, including a Review Captain and leads for documentation, information systems, and logistics, and their roles, responsibilities and task assignments were identified. Aids were produced, including a detailed review preparation schedule and a comprehensive gate products production table. Institutional support was leveraged early and often. Implementation strategy reflected the needs of a nationally-distributed team, as well as applicable export control and IT security requirements. This paper gives a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project PMSR and PDR preparation and execution activities, including positive and negative lessons learned, and identifies recommendations for future NASA (and non-NASA) project teams.

NPR 7120.5D↗

Design of an advanced flight planning system

The demand for both fuel conservation and four-dimensional traffic management require that the preflight planning process be designed to account for advances in airborne flight management and weather forecasting. The steps and issues in designing such an advanced flight planning system are presented. Focus is placed on the different optimization options for generating the three-dimensional reference path. For the cruise phase, one can use predefined jet routes, direct routes based on a network of evenly spaced grid points, or a network where the grid points are existing navaid locations. Each choice has its own problem in determining an optimum solution. Finding the reference path is further complicated by choice of cruise altitude levels, use of a time-varying weather field, and requiring a fixed time-of-arrival (four-dimensional problem).

Sorensen, J. A.↗

Chooz-A steam generators characterization - 15205

EDF nuclear waste management requires a deep understanding of characterization, classification and waste sorting operations. In fact, French nuclear waste management defines several classes with specific management, treatment and storage facilities. Based on particular criteria, the more the radiological risk of the nuclear waste is important, the more its management will be complex and expensive. During the dismantling of the first French pressurized reactor Chooz-A, decontamination of the primary water circuits (not including the reactor vessel), the steam generators and the pressurizer have been carried out in order to reduce their activity levels. Thanks to these decontamination operations, and a specific characterization methodology, EDF was able to de-classify the 4 steam generators and store them in one piece at the ANDRA Very Low Level Activity disposal facilities instead of the Low and Intermediate Level activity one. This de-classification allowed EDF to avoid important cutting and packaging processes. Therefore, significant dose reductions for the operators and financial gain have been made. To characterize and declare Chooz-A SG activity, EDF-CIDEN uses a methodology defined by the French institute of atomic energy, CEA. The method is based on external gamma spectrometry measurements performed with NaI collimated detectors, associated with MERCURAD simulations providing the transfer functions for the detectors and activity sources. Internal measurements are carried out with a CZT (CdZnTe) probe inside the SG tubes to refine the 3D model. In fact, the primary side represents the main source of activity, and understanding its contamination distribution is important to reduce the model and calculation uncertainties. Measurements eventually provide SG {sup 60}Co global activity, from which the activities of other radionuclides of the spectrum are determined using scaling factors. The final activity declaration takes into account the standard deviation of the measurements in order to cover the uncertainties of the methodology. Thereby, the declaration is 'slightly over-estimative', enough to meet the waste storage facility acceptance criteria. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Step 1: Human System Integration Pilot-Technology Interface Requirements for Weather Management

This document involves definition of technology interface requirements for Hazardous Weather Avoidance. Technology concepts in use by the Access 5 Weather Management Work Package were considered. Beginning with the Human System Integration (HIS) high-level functional requirement for Hazardous Weather Avoidance, and Hazardous Weather Avoidance technology elements, HSI requirements for the interface to the pilot were identified. Results of the analysis describe (1) the information required by the pilot to have knowledge of hazardous weather, and (2) the control capability needed by the pilot to obtain hazardous weather information. Fundamentally, these requirements provide the candidate Hazardous Weather Avoidance technology concepts with the necessary human-related elements to make them compatible with human capabilities and limitations. The results of the analysis describe how Hazardous Weather Avoidance operations and functions should interface with the pilot to provide the necessary Weather Management functionality to the UA-pilot system. Requirements and guidelines for Hazardous Weather Avoidance are partitioned into four categories: (1) Planning En Route (2) Encountering Hazardous Weather En Route, (3) Planning to Destination, and (4) Diversion Planning Alternate Airport. Each requirement is stated and is supported with a rationale and associated reference(s).

Source record↗

Nondestructive Assay Technical Infrastructure Program Mission and Vision

The Nondestructive Assay Program (NDAP) mission and vision is achieved by identifying and accomplishing a set of programmatic goals that correspond with eight broad technical program elements. The NDAP was created as a result of Defense Nuclear Facility Safety Board Recommendation 2007-1, entitled “Safety-Related In Situ Nondestructive Assay of Radioactive Materials,” which emphasized the need to improve in situ measurements of radioactive material at US Department of Energy (DOE) defense nuclear facilities. An NDAP five-year plan will define tasks to accomplish specific goals identified in the NDAP mission and vision. This mission and vision is applicable for eight technical program elements: Hardware/Software Development, Algorithm Development and Nuclear Data, Uncertainty Quantification, Nuclear Materials, Staffing, Personnel, And Training, Data Management, Requirement and Standards, and Information Preservation and Dissemination. An additional program element is technical support, which provides daily execution management support for the NDAP, site scope, and deliverable tracking via site task managers, along with technical advisement and support from the technical support group. The NDAP mission and vision provides attributes with specific goals for each program element, and some goals benefit multiple program elements. The goals and attributes defined herein are implemented via an NDAP five-year execution plan that defines site work scope, budget, and deliverables, all of which are updated annually. The NDAP is designed to benefit nondestructive assay (NDA) needs to support DOE nuclear criticality safety programs, ensuring that NDA technology is sufficiently capable of guaranteeing the safety of those who handle, store, process, or transport fissionable materials in the complex. Especially important for the NDAP is to maximize capabilities to identify, characterize, and manage in situ fissile material deposits in process equipment to ensure nuclear criticality safety at processing facilities.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Taxonomic and functional restoration of tallgrass prairie soil microbial communities in comparison to remnant and agricultural soils

Abstract Restoring ecosystems requires the re-establishment of diverse soil microbial communities that drive critical ecosystem functions. In grasslands, restoration and management require the application of disturbances like fire and grazing. Disturbances can shape microbial taxonomic composition and potentially functional composition as well. We characterized taxonomic and functional gene composition of soil communities using whole genome shotgun metagenomic sequencing to determine how restored soil communities differed from pre-restoration agricultural soils and original remnant soils, how management affects soil microbes, and whether restoration and management affect the number of microbial genes associated with carbohydrate degradation. We found distinct differences in both taxonomic and functional diversity and composition among restored, remnant, and agricultural soils. Remnant soils had low taxonomic and functional richness and diversity, as well as distinct composition, indicating that restoration of agricultural soils does not re-create soil microbial communities that match remnants. Prescribed fire management increased functional diversity, which also was higher in more recently planted restorations. Finally, restored and post-fire soils included high abundances of genes encoding cellulose-degrading enzymes, so restorations and their ongoing management can potentially support functions important in carbon cycling.

Mason, Cayla N. (ORCID:0000000345983824)↗

UTM Safely Enabling UAS Operations in Low-Altitude Airspace

Conduct research, development and testing to identify airspace operations requirements to enable large-scale visual and beyond visual line of sight UAS operations in the low-altitude airspace. Use build-a-little-test-a-little strategy remote areas to urban areas Low density: No traffic management required but understanding of airspace constraints. Cooperative traffic management: Understanding of airspace constraints and other operations. Manned and unmanned traffic management: Scalable and heterogeneous operations. UTM construct consistent with FAAs risk-based strategy. UTM research platform is used for simulations and tests. UTM offers path towards scalability.

UTM low-altitude↗

Waste Processing Research and Technology Development at NASA Ames Research Center

The current "store and return" approach for handling waste products generated during low Earth orbit missions will not meet the requirements for future human missions identified in NASA s new Exploration vision. The objective is to develop appropriate reliable waste management systems that minimize maintenance and crew time, while maintaining crew health and safety, as well as providing protection of planetary surfaces. Solid waste management requirements for these missions include waste volume reduction, stabilization and storage, water recovery, and ultimately recovery of carbon dioxide, nutrients and other resources from a fully regenerative food production life support system. This paper identifies the key drivers for waste management technology development within NASA, and provides a roadmap for the developmental sequence and progression of technologies. Recent results of research and technology development activities at NASA Ames Research Center on candidate waste management technologies with emphasis on compaction, lyophilization, and incineration are discussed.

Fisher, John↗

Hanford Soil Inventory Model (SIM-v2) Calculated Radionuclide Inventory of Direct Liquid Discharges to Soil in the Hanford Site's 200 Areas

The Hanford soil inventory model (SIM) provides the basic radionuclide and chemical soil inventories from historical liquid discharges to about 400 sites at the Hanford Site. Although liquid discharge inventory for chemicals is part of the SIM implementation, only radionuclide inventory is discussed here since the focus of this ECF is on providing radionuclides inputs for the composite analysis (CA) per DOE Order 435.1, Radioactive Waste Management, requirements. Furthermore, discharged inventories are only estimated for the soluble portions of the liquid discharges to waste sites/waste management areas located on the 200 Area of the Hanford Site (Central Plateau).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Planning and Resource Management in an Intelligent Automated Power Management System

Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

Morris, Robert A.↗

Designing to Sample the Unknown: Lessons from OSIRIS-REx Project Systems Engineering

On September 8, 2016, the third NASA New Frontiers mission launched on an Atlas V 411. The Origins, Spectral Interpretation, Resource Identification, Security-Regolith Explorer (OSIRIS-REx) will rendezvous with asteroid Bennu in 2018, collect a sample in 2020, and return that sample to Earth in September 2023. The development team has overcome a number of challenges in order to design and build a system that will make contact with an unexplored, airless, low-gravity body. This paper will provide an overview of the mission, then focus in on the system-level challenges and some of the key system-level processes. Some of the lessons here are unique to the type of mission, like discussion of operating at a largely-unknown, low-gravity object. Other lessons, particularly from the build phase, have broad implications. The OSIRIS-REx risk management process was particularly effective in achieving an on-time and under-budget development effort. The systematic requirements management and verification and the system validation also helped identify numerous potential problems. The final assessment of the OSIRIS-REx performance will need to wait until the sample is returned in 2023, but this post-launch assessment will capture some of the key systems-engineering lessons from the development team.

Asteroid↗

Recommendations for Trust and Encryption in DER Interoperability Standards

Recently developed Distributed Energy Resource (DER) interoperability standards include communication and cyber security requirements. In 2018, the US national interconnection standard, IEEE 1547, was revised to require DER to include a Sun Spec Modbus, IEEE 2030.5 (Smart Energy Profile, SEP 2.0), or IEEE 1815 (DNP3) communication interface but does not include any normative overarching cybersecurity requirements. IEEE 2030.5 and associated implementation requirements for California, known as the California Smart Inverter Profile (CSIP), prescribe the greatest security features - including encryption, authentication, and key management requirements. Sun Spec Modbus and IEEE 1815 security requirements are not as comprehensive, leading to implementation questions throughout the industry. Further, while the security features in IEEE 2030.5 are commonly used in computing platforms, there are still questions of how well the technologies will scale in highly-distributed, computationally-limited inverter environments. In this paper, (a) the elements of IEEE 2030.5 encryption, authentication, and key management guidelines are analyzed, (b) potential scalability gaps are identified, and (c) alternative technologies are explored for possible inclusion in DER interoperability or cyber security standards.

42 ENGINEERING↗

Extending the Publish/Subscribe Abstraction for High-Performance I/O and Data Management at Extreme Scale

The Adaptable I/O System (ADIOS) represents the culmination of substantial investment in Scientific Data Management, and it has demonstrated success for several important extreme-scale science cases. However, looking towards the exascale and beyond, we see the development of yet more stringent data management requirements that require new abstractions. Therefore, there is an opportunity to attempt to connect the traditional realms of HPC I/O optimization with the Database / Data Management community. As such, in this paper we offer some specific examples from our ongoing work in managing data structures, services, and performance at the extreme scale for scientific computing. Using the publish/subscribe model afforded by ADIOS, we demonstrate a set of services that connect data format, metadata, queries, data reduction, and high-performance delivery. The resulting publish/subscribe framework facilitates connection to on-line workflow systems to enable the dynamic capabilities that will be required for exascale science.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗