Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Remote Operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

AMORE Mo-99 Spike Test Results

With funding from the National Nuclear Security Administrations Material Management and Minimization Office, Argonne National Laboratory (Argonne) is providing technical assistance to help accelerate the U.S. production of Mo-99 using a non-highly enriched uranium (non-HEU) source. A potential Mo-99 production pathway is by accelerator-initiated fissioning in a subcritical uranyl sulfate solution containing low enriched uranium (LEU). As part of the Argonne development effort, we are undertaking the AMORE (Argonne Molybdenum Research Experiment) project, which is essentially a pilot facility for all phases of Mo-99 production, recovery, and purification. Production of Mo-99 and other fission products in the subcritical target solution is initiated by putting an electron beam on a depleted uranium (DU) target; the fast neutrons produced in the DU target are thermalized and lead to fissioning of U-235. At the end of irradiation, Mo is recovered from the target solution and separated from uranium and most of the fission products by using a titania column. The Mo is stripped from the column with an alkaline solution. After acidification of the Mo product solution from the recovery column, the Mo is concentrated (and further purified) in a second titania column. The strip solution from the concentration column is then purified with the LEU Modified Cintichem process. A full description of the process can be found elsewhere [1–3]. The initial commissioning steps for the AMORE project include performing a Mo-99 spike test with pH 1 sulfuric acid in the target vessel without a beam on the target to demonstrate the initial Mo separation-and-recovery process, followed by the concentration column process. All glovebox operations were tested with cold solutions prior to performing the Mo-99 spike tests. Two Mo-99 spike tests with pH 1 sulfuric acid have been performed to date. Figure 1 shows the flow diagram for the remotely operated Mo-recovery system for the AMORE project. There are two separate pumps and flow paths for the acid and base operations. The system contains three sample ladders with eight sample loops per ladder for target mixing; column loading, including acid and water washes; and column stripping, including the final water wash.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High Level Waste Remote Handling Equipment in the Melter Cave Support Handling System at the Hanford Waste Treatment Plant

Cold war plutonium production led to extensive amounts of radioactive waste stored in tanks at the Department of Energy's (DOE) Hanford site. Bechtel National, Inc. is building the largest nuclear Waste Treatment Plant in the world located at the Department of Energy's Hanford site to immobilize the millions of gallons of radioactive waste. The site comprises five main facilities; Pretreatment, High Level Waste vitrification, Low Active Waste vitrification, an Analytical Lab and the Balance of Facilities. The pretreatment facilities will separate the high and low level waste. The high level waste will then proceed to the HLW facility for vitrification. Vitrification is a process of utilizing a melter to mix molten glass with radioactive waste to form a stable product for storage. The melter cave is designated as the High Level Waste Melter Cave Support Handling System (HSH). There are several key processes that occur in the HSH cell that are necessary for vitrification and include: feed preparation, mixing, pouring, cooling and all maintenance and repair of the process equipment. Due to the cell's high level radiation, remote handling equipment provided by PaR Systems, Inc. is required to install and remove all equipment in the HSH cell. The remote handling crane is composed of a bridge and trolley. The trolley supports a telescoping tube set that rigidly deploys a TR 4350 manipulator arm with seven degrees of freedom. A rotating, extending, and retracting slewing hoist is mounted to the bottom of the trolley and is centered about the telescoping tube set. Both the manipulator and slewer are unique to this cell. The slewer can reach into corners and the manipulator's cross pivoting wrist provides better operational dexterity and camera viewing angles at the end of the arm. Since the crane functions will be operated remotely, the entire cell and crane have been modeled with 3-D software. Model simulations have been used to confirm operational and maintenance functional and timing studies throughout the design process. Since no humans can go in or out of the cell, there are several recovery options that have been designed into the system including jack-down wheels for the bridge and trolley, recovery drums for the manipulator hoist, and a wire rope cable cutter for the slewer jib hoist. If the entire crane fails in cell, the large diameter cable reel that provides power, signal, and control to the crane can be used to retrieve the crane from the cell into the crane maintenance area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE RETRIEVAL FROM HANFORD K WEST BASIN SETTLER TANKS

In 2010, an innovative, remotely operated retrieval system was deployed to successfully retrieve over 99.7% of the radioactive sludge from ten submerged tanks in Hanford's K-West Basin. As part of K-West Basin cleanup, the accumulated sludge needed to be removed from the 0.5 meter diameter by 5 meter long settler tanks and transferred approximately 45 meters to an underwater container for sampling and waste treatment. The abrasive, dense, non-homogeneous sludge was the product of the washing process of corroded nuclear fuel. It consists of small (less than 600 micron) particles of uranium metal, uranium oxide, and various other constituents, potentially agglomerated or cohesive after 10 years of storage. The Settler Tank Retrieval System (STRS) was developed to access, mobilize and pump out the sludge from each tank using a standardized process of retrieval head insertion, periodic high pressure water spray, retraction, and continuous pumping of the sludge. Blind operations were guided by monitoring flow rate, radiation levels in the sludge stream, and solids concentration. The technology developed and employed in the STRS can potentially be adapted to similar problematic waste tanks or pipes that must be remotely accessed to achieve mobilization and retrieval of the sludge within.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

v9fb: a remote framebuffer infrastructure of linux

v9fb is a software infrastructure that allows extending framebufFer devices in Linux over the network by providing an abstraction to them in the form of a filesystem hierarchy. Framebuffer based graphic devices export a synthetic filesystem which offers a simple and easy-to-use interface for performing common framebuffer operations. Remote framebuffer devices could be accessed over the network using the 9P protocol support in Linux. We describe the infrastructure in detail and review some of the benefits it offers similar to Plan 9 distributed systems. We discuss the applications of this infrastructure to remotely display and run interactive applications on a terminal while ofFloading the computation to remote servers, and more importantly the flexibility it offers in driving tiled-display walls by aggregating graphic devices in the network.

97 MATHEMATICS AND COMPUTING↗

Enhanced Depolarized Electro-Membrane System (EDEMS) for Direct Capture of Carbon Dioxide from Ambient Air (Final Report)

The goal of this final project report is to summarize the work conducted on project DE-FE0031962. In accordance with the Statement of Project Objectives (SOPO), the University of Kentucky Center for Applied Energy Research (UK CAER) (Recipient) developed an intensified process to capture CO2 from ambient conditions (400 ppm CO2). The process combines low-temperature solvent-aided membrane capture with electrochemically-mediated solvent regeneration to simultaneously capture ambient CO2 while regenerating the solvent. The technology employs only two primary units (regenerator and absorber/contactor) while generating high purity hydrogen as a co-product that can be sold, used for energy storage, or cost-saving depolarization of the direct air capture (DAC) system during the grid peak demand, allowing for flexible operation. When depolarization is employed, the operating voltage is reduced by more than 1 V. Since the technology is powered directly by DC electricity, it can seamlessly tie in with power sources like solar cells without the need for AC/DC converters, therefore allowing for a remote operation to further mitigate greenhouse gas generation toward deploying a negative carbon emissions technology that is completely decoupled from the carbon emissions from the power source for the DAC unit. The project results verified that UK CAER’s integrated approach addressed the complexities of incumbent DAC systems by demonstrating at ambient conditions, including (1) low gas-side pressure-drop facile CO2 capture via a membrane contactor with in-situ generated hydroxide as capture solvent, (2) multi-functional electrochemical regenerator for hydroxide regeneration, CO2 concentration and hydrogen production, and (3) depolarization using cathode-produced hydrogen to reduce energy requirement. The EH&S Assessment of the process did not identify any obvious concern for the bench-scale operation and no apparent barriers to implementing UK CAER’s carbon capture and solvent regeneration system at a larger scale.

20 FOSSIL-FUELED POWER PLANTS↗

PROTEC TM TEAR-OFFS: RESULTS OF LONG TERM TESTING

The Savannah River National Laboratory (SRNL) has completed a series of tests (Phases 1 and 2) to assess the potential use of a Mylar{reg_sign} tear-off system as a primary or secondary protective barrier to minimize acid etching ('frosting'), accidental scratching, and/or radiation damage for shielded cells, glovebox, and/or chemical hood windows. Conceptually, thin, multi-layered sheets of Mylar (referred to throughout this report as the ProTec{trademark} tear-off system) can be directly applied to the shielded cell, glovebox, or hood sash window to serve as a secondary (or primary) barrier. Upon degradation of visual clarity due to accidental scratching, spills/splatters, and/or radiation damage, the outer layer (or sheet) of Mylar could be removed refreshing or restoring the view. Due to the multilayer aspect, the remaining Mylar layers would provide continued protection for the window from potential reoccurrences. Although the concept of using a tear-off system as a protective barrier is conceptually enticing, potential technical issues were identified and addressed as part of this phased study to support implementation of this type of system in the Defense Waste Processing Facility (DWPF). Specific test conditions of interest to the DWPF included the performance of the tear-off system exposed to or under the following conditions: (1) acid(s) (concentrated (28.9 M) HF, concentrated (15.9M) HNO{sub 3}, 6M HCl, and 0.6M H{sub 3}BO{sub 3}); (2) base (based on handling of radioactive sludges with pH of {approx}12-13); (3) gamma radiation (due to radioactive sources or materials being used in the analytical cells); (4) scratch resistance (simulating accidental scratching with the manipulators); and (5) in-situ testing (sample coupons exposed to actual field conditions in DWPF). The results of the Phase 1 study indicated that the ProTec tear-off concept (as a primary or secondary protective barrier) is a potential technical solution to prevent or retard excessive damage that would result from acid etching, base damage (as a result of a sludge spill or splatter), gamma radiation damage, and/or accidental scratching (due to manipulator/tool contact). Although identified as a potential solution, the Phase 1 testing was relatively short-term with exposure times up to 1-2 months for the acid and gamma radiation tests. Phase 2 testing included longer exposure times for the acid resistance (up to 456 days) and gamma radiation exposure (700 days with a cumulative gamma dose of {approx}3.1 x 10{sup 5} rad) assessments. The tear-off system continued to perform well in these longer-term acid resistance testing and gamma exposure conditions. Complete removal of the tear-offs after these long-term exposure times indicate that not only could visual clarity be restored but the mechanical integrity could be retained. The results also provided insight into the ability of the ProTec tear-off system to withstand the chemical and physical abuses expected in off-normal shielded cells operations. The conceptual erasing of scratches or marks by excessive manipulator abuse was demonstrated in the SRNL Shielded Cells mock-up facility through the removal of the outer layer tear-off with manipulators. In addition, the Phase 2 testing included an in-situ assessment of a prototype tear-off system in the DWPF Sampling Cells where the system was exposed to actual field conditions including radioactive sources, acidic and basic environments, dusting, and chemical cleaning solutions over a 5-6 month period. DWPF personnel were extremely satisfied with the performance (including the successful removal of 3 layers with manipulators) of the ProTec tear-off system under actual field conditions. The successful removal of the outer layer tear-offs with the manipulator, using tabs not specifically designed for remote operations, demonstrates that the system is 'manipulator-friendly' and could be implemented in a remote environment. The ability to remove the outer layer tear-off not only regains visual clarity but also reduces waste disposal volumes (i.e., disposal of a thin sheet of Mylar which is 'collapsible' versus the bulk disposal of a rigid Lexan{reg_sign} sheet (alpha shield) or glovebox/sash window) which is more cost effective. The tear-off system could also reduce the number of cell entries needed to replace the Lexan sheet and increase the time interval between glovebox/sash window replacements, which can be costly and time consuming. Although the primary focus of this study addresses the application of the ProTec tear-off system to shielded cells windows, the concept is also potentially applicable to glovebox and hood sash windows. In fact, the tear-off concept is potentially applicable to any system where visual clarity is compromised given the environmental conditions of the test. In addition, the tear-offs could be applied to walls or shelves where a protective barrier would reduce deterioration or discoloration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cryocooled cold trap system for the SuperCDMS dilution refrigerator

Operating 6,800 feet underground at the SNOLAB facility in Sudbury, Ontario, Canada, the dilution refrigerator-cooled SuperCDMS SNOLAB (Super Cryogenic Dark Matter Search at the Sudbury Neutrino Observatory Laboratory) experiment has been designed for maximum cryogenic up-time and remote operations. A key element in achieving these goals is a pair cold traps in the helium circulation stream of the dilution refrigerator; the first operating near liquid nitrogen temperatures and the second operating near liquid helium temperatures. Previous experience with the CDMS experiment, located underground at the Soudan Under-ground Laboratory, has given significant operational experience with dilution refrigerator cold traps and has solidified the demand of a system of dual cold traps. Unlike the CDMS-era system, the new SuperCDMS system will feature a cryocooler powered liquid nitrogen re-liquefying system (as opposed to regular under-ground re-filling of cold trap dewars using portable nitrogen dewars) and a cryogen-free 4 K cold trap, which eliminates the need for a bath of liquid helium.

43 PARTICLE ACCELERATORS↗

LaserSnake2: Remote High Powered Laser Cutting in Confined Hazardous Spaces - 16161

LaserSnake2, a UK collaborative project, seeks to deliver remotely operated cutting techniques into high hazard nuclear environments. This paper describes the developments and results of combining proven robotic manipulators with high-powered laser cutting tools, to allow for selective dismantling within complex nuclear process cells. Decommissioning old and poorly catalogued nuclear plant is a problem faced the world over. Designed with little consideration for decommissioning, or adapted significantly from the original drawings, legacy plant and infrastructure is full of spaces where it is undesirable or impossible to send people. Typically, a process cell or cave will require modification to ensure suitability for human entry or deployment of heavy duty equipment to complete the decontamination processes. The process of widening access routes, or selectively moving sections of highly contaminated material, is ideally suited to remote handling technology. The results of TWI's research into fibre-delivered laser cutting techniques, and integration with a dexterous snake-arm robot, are presented. Coupled with novel laser process head design and diffractive optical elements, the result is an integrated system capable of cutting up to 100 mm thick C-Mn steel plate at significant stand-off distances, encompassing the range of infrastructure found in a typical nuclear plant. Two options have been considered for deployment of the laser cutting tool. The first is focused on a fixed installation using a standard industrial robot. The second is a large, highly flexible snake-arm robot capable of entering cluttered cells through existing penetrations. Designed to operate through a standard 11'' MSM port, the 4.5 m snake-arm robot has the capacity to carry grippers, sensors or the laser cutting tool at the tip. The snake-arm is sealed and housed within a glove box for contamination control, allowing operation within a radioactive environment. Significant technical developments and material research are presented which have led to improved operational life, payload and bend. This paper describes the series of inactive trials which have been conducted to demonstrate the LaserSnake2 system's capabilities. These include: horizontal and vertical deployment, underwater operation, object manipulation and laser cutting. With global nuclear decommissioning costs running in to the $trillions, safe and cost efficient tools such as the LaserSnake2 system are essential as part of the decommissioning toolbox. Remote handling can account for up to 20% of a decommissioning project's costs, however significant time and financial savings can be made by utilising this new technology to reduce operator exposure and reach previously inaccessible areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Retrieval, Disruption and Processing of Legacy Nuclear Waste - 16179

The UK National Nuclear Laboratory (NNL) is currently undertaking, in conjunction with Sellafield Ltd, a series of high profile trials of robotic equipment on a full scale test facility at their Workington Laboratory in England. These trials are designed to underpin and substantiate the processes proposed for the remote retrieval, disruption and processing of legacy Miscellaneous Beta Gamma Waste (MBGW) from a number of different donor plants on the Sellafield site, including some of the older fuel storage ponds and storage silos. These processes will be conducted inside the new Box Encapsulation Plant (BEP) which is due to be commissioned at Sellafield by 2020. These processes will subsequently enable Sellafield Ltd to safely recover legacy Intermediate Level Waste (ILW) from the older storage facilities on site and process it into a safer form which is more suitable for long term storage and then ultimately final disposal in a Geological Disposal Facility. As part of this legacy waste processing within the BEP plant, MBGW waste items will have to be remotely removed from a variety of different types of import skips. This waste will then be transferred, using robots, into the export container, which is a 3 m{sup 3} box liner, where the processed waste will be flood grouted to produce an encapsulated waste package. As part of this processing, any MBGW items consisting of sealed containers will have to be remotely disrupted before being grout encapsulated. This disruption is in order to (a) release any trapped liquors or gases from the containers and (b) ensure full grout infiltration of the container contents, thus minimising the amount of free liquors and voids within the final waste product. The NNL are conducting this technical work to confirm the viability of the proposed concept, processes and equipment. The developed solution consists of a linear layout of processing equipment with a pair of heavy duty, standard industrial, 'commercially off the shelf' (COTS) robots positioned around a Waste Handling Table. These robots have a 500 kg payload capacity and are operated remotely to handle all of the various types of MBGW waste, including the heavy and bulky items. The robots can be operated in manual tele-operation mode as well as pre-programmed automatic mode and have a range of primary and secondary tooling in order to perform the waste processing and disruption tasks as well as undertake general house-keeping and cleaning duties within the cell. The main tools include two types of hydraulic grab for the main waste recovery and handling tasks and a hydraulic shear for the waste disruption activities, but a number of other tools have also been designed and built for ancillary activities, such as a set of general purpose gripper jaws, drilling tool, bolt removal tool, pump tool, spray tool and a number of different housekeeping tools etc. The robot trials were started in November 2014, and have attracted a significant degree of high level stakeholder interest, including the UK Nuclear Decommissioning Authority (NDA), Office for Nuclear Regulation (ONR), Environment Agency (EA) and Radioactive Waste Management Limited (RWML) witnessing a number of the critical demonstration trials. Robots of the type selected are readily available, robust, reliable and easy to use. The trials have been very successful in proving the retrieval, processing and disruption operations, reducing the burden in the legacy waste facilities. Utilising robots to perform these tasks will lower the probability of producing non-compliant waste packages. In addition the robots can increase the consolidation of incoming waste skips into outgoing 3 m{sup 3} box liners, significantly increasing packing efficiencies and reducing the overall number of export containers produced thus lowering the decommissioning and waste storage/disposal costs. The trials have also enabled an assessment of the optimum way to operate the robots, as well as their reliability and maintainability issues. Engineering work associated with recovering failed robots and removing them from a typical Sellafield plant environment and then subsequently replacing them with functioning robots has also been undertaken and further work is now planned. The success of the trials, completed safely to a very challenging timescale, has enabled the use of robots in BEP to be endorsed as a viable option by the key stakeholders. Following a robust decision making process, this was a clear cut decision. The technical development and testing of the robot technology is currently continuing in order to investigate areas such as robot reliability, failure recoveries, human factors, ease of waste identification, optimisation of throughput rates, nuclearisation modifications etc. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Remote Development Process and Platform for Power Electronic Systems

Like many areas in research and development, power electronic and distributed energy resource research and development slowed during the COVID pandemic. While the presence of the virus has reduced and workers are returning to shared offices, uncertainty of potential future challenges are still present. This work proposes a development and testing network that provides researchers the ability to operate remotely and coordinate control and debug activities for power electronic systems. This development and testing network has been demonstrated in both controller hardware-in-the-loop (C-HIL) and hardware testing.

Starke, Michael↗

Design and Evaluation of a Ring Tension Test Grip for Remote Mechanical Testing of Irradiated Tubular Specimens

Here, the ring tension test (RTT) is a mechanical testing method for determining bulk mechanical behavior in the circumferential or hoop direction for tubular materials. The test is especially useful for testing materials with anisotropic mechanical properties, such as zirconium alloys, which are commonly used as nuclear fuel cladding. Anisotropy requires direction-specific testing to determine the hoop strength. Historically, several RTT methods and grips have been used, each method has its strengths and weaknesses, and, in all cases, the measured strength is subject to uncertainty due to variations of the testing geometry and experimental tolerances. Recent analysis has shown that grips with a hemicylindrical mandrel configuration are recommended as the most robust configuration. The two strictest aspects to be controlled are the ability to determine gage region orientation and closely matching the size of the mandrels to the test specimen. This last requirement is particularly challenging when the dimensions of the specimen vary because of environmental effects such as dimensional changes due to irradiation. This paper presents a new RTT grip designed to incorporate this mandrel shape, hold the gage at the desired orientation, be suitable for remote operation in a hot-cell environment, and be adaptable for different sizes or variations in the specimen size. The general description and the unique design features of the test specimen and grips are given in detail. The performance of the grips in mechanical testing, including in a remote hot-cell environment, is also provided.

42 ENGINEERING↗

Cross-Facility Orchestration of Electrochemistry Experiments and Computations

Instrument-computing ecosystems supporting automated electrochemical workflows typically require the integration of disparate instruments such as syringe pump, fraction collector, and potentiostat, all connected to an electrochemical cell. These specialized instruments with custom software and interfaces are not typically designed for network integration and remote automation. We developed a networked ecosystem of these instruments and computing platforms, which includes software to enable automated workflow orchestration from remote computers. Specifically, we developed Python wrappers of APIs and custom Pyro client-server modules to support remote operation of these instruments over the ecosystem network. Herein, we describe a specific workflow for generating and validating voltammogram (I-V) measurements of an electrolyte solution pumped into the electrochemical cell. We demonstrate the orchestration of this workflow which is composed using a Jupyter notebook and executed on a remote computer.

Al Najjar, Anees↗

Performance of a Low Activity Beta-Sensitive SR{sup 90} Water Monitor for Fukushima

There are large volumes of contaminated water from the stabilization efforts at the damaged Fukushima Nuclear Power Plants. This water is being processed to remove radioactivity for eventual release to the environment. An on-line continuously operating system to confirm that the clean-up system is working properly, and to provide prompt feedback of the results is required by the system operator. While gamma emitting nuclides allow for the straight forward approach of gamma spectroscopy to identify and quantify radioactivity in water, pure beta emitting nuclides such as Sr{sup 90} pose a challenging problem. The relatively short range of beta radiation in water requires optimization of the measurement geometry in terms of the source-detector distance and source-detector interface while retaining a background sensitivity low enough to meet the Minimum Detectable Concentration (MDC) of 10 Bq/kg in 180 minutes. This issue is complicated by the continuum nature of the beta spectrum which does not allow for simple nuclide identification. The use of the Monte-Carlo code MCNP to estimate system performance before prototyping vastly increases the success of the end product. Various parameters such as detector size and thickness, water chamber size, water chamber construction materials were evaluated to help choose the optimum geometry. The final design was a system consisting of two large-area (16 x 35 cm) and thin (0.15 mm) plastic scintillators placed very close to a sealed a water chamber. The size of the chamber was optimized to obtain the maximum efficiency for the nuclide being measured (Sr/Y{sup 90}) but to minimize the efficiency for possible interferences (Ru/Rh{sup 106}, Cs{sup 137}). A thin carbon fiber window was selected with adequate material and thickness to contain the water under pressure, but also thin enough (0.5 mm) to allow enough beta radiation to pass through to the active detector volume. The entire measurement geometry is then housed in a thick lead shield to reduce contributions from external sources to an acceptable level. Data acquisition is accomplished through customized application-specific software that allows for long counting times to attain a low MDC, but also simultaneously provides alarms on short averaging times to achieve a fast response to sudden changes in activity concentration. Multiple monitors are then linked to supervisory software where real time data and alarms are available for analysis in remote locations. The system also allows for remote operation of the unit; check sources, background checks, systems settings and more may be accessed remotely. Testing of the production devices has shown that we can achieve the 10 Bk/kg MDC requirement for Sr{sup 90} in equilibrium with Y{sup 90} with a count time of approximately 20 minutes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cybersecurity Considerations and Research Pathways for Grid-Interactive Efficient Buildings

Federal facilities serve critical missions and functions that require safe, reliable, and efficient operations. Digitization of several facility operations has increased the cost-effectiveness of energy usage and optimization of energy system performance. As the building controls landscape shifts to become more connected and smarter, building operators now face unique opportunities and challenges to adopt smart enabled devices that can lower energy usage while also optimizing building system performance. The grid-interactive efficient buildings (GEB) initiative aims to make buildings cleaner and more flexible through these smart devices. Smart enabled devices allow greater connectivity and control through remote operations and provide crucial data for analytics and increased efficiency. GEBs enable demand flexibility that has the potential to reduce electrical costs and transform the grid edge where buildings connect to power grids. This operation of interconnected systems, if not designed with cybersecurity practices, causes security gaps and introduces potential attack paths by adversarial and non-adversarial entities leading to disruption of operations.

building controls↗

Generating Models of the Flattop Critical Assembly for Benchmark Experiments with Python

Los Alamos National Laboratory has been performing nuclear criticality experiments since 1946 at the Pajarito site, starting the Los Alamos Critical Experiments Facility in 1948. A transition period occurred between 2004 and 2011 as operations moved to the National Criticality Experiments Research Center (NCERC), where criticality experiments are now performed. Criticality experiments are essential for determination and verification of nuclear data used in calculations and modeling—such as radiation transport codes—throughout the industry, enhancing nuclear criticality safety. In addition to nuclear data validation and benchmarking, the remotely operated critical assemblies at NCERC are used for a variety of experiments and training classes supporting criticality safety.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Concepts and Tests for the Remote-Controlled Dismantling of the Biological Shield and Form work of the KNK Reactor - 13425

The compact sodium-cooled nuclear reactor facility Karlsruhe (KNK), a prototype Fast Breeder, is currently in an advanced stage of dismantling. Complete dismantling is based on 10 partial licensing steps. In the frame of the 9. decommissioning permit, which is currently ongoing, the dismantling of the biological shield is foreseen. The biological shield consists of heavy reinforced concrete with built-in steel fitments, such as form-work of the reactor tank, pipe sleeves, ventilation channels, and measuring devices. Due to the activation of the inner part of the biological shield, dismantling has to be done remote-controlled. During a comprehensive basic design phase a practical dismantling strategy was developed. Necessary equipment and tools were defined. Preliminary tests revealed that hot wire plasma cutting is the most favorable cutting technology due to the geometrical boundary conditions, the varying distance between cutter and material, and the heavy concrete behind the steel form-work. The cutting devices will be operated remotely via a carrier system with an industrial manipulator. The carrier system has expandable claws to adjust to the varying diameter of the reactor shaft during dismantling progress. For design approval of this prototype development, interaction between manipulator and hot wire plasma cutting was tested in a real configuration. For the demolition of the concrete structure, an excavator with appropriate tools, such as a hydraulic hammer, was selected. Other mechanical cutting devices, such as a grinder or rope saw, were eliminated because of concrete containing steel spheres added to increase the shielding factor of the heavy concrete. Dismantling of the biological shield will be done in a ring-wise manner due to static reasons. During the demolition process, the excavator is positioned on its tripod in three concrete recesses made prior to the dismantling of the separate concrete rings. The excavator and the manipulator carrier system will be operated alternately. Main boundary condition for all the newly designed equipment is the decommissioning housing of limited space within the reactor building containment. To allow for a continuous removal of the concrete rubble, an additional opening on the lowest level of the reactor shaft will be made. All equipment and the interaction of the tools have to be tested before use in the controlled area. Therefore a full-scale model of the biological shield will be provided in a mock-up. The tests will be performed in early 2014. The dismantling of the biological shield is scheduled for 2015. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

STIDP: A US Department of Homeland Security program for countering explosives attacks at large public events and mass transit facilities

The Department of Homeland Security’s Standoff Technology Integration and Demonstration Program is designed to accelerate the development and integration of technologies, concepts of operations, and training to prevent explosives attacks at large public events and mass transit facilities. The program will address threats posed by suicide bombers, vehicle-borne improvised explosive devices, and leave-behind bombs. The program is focused on developing and testing explosives countermeasure architectures using commercial off-the-shelf and near-commercial standoff and remotely operated detection technologies in prototypic operational environments. An important part of the program is the integration of multiple technologies and systems to protect against a wider range of threats, improve countermeasure performance, increase the distance from the venue at which screening is conducted, and reduce staffing requirements. The program will routinely conduct tests in public venues involving successively more advanced technology, higher levels of system integration, and more complex scenarios. This paper describes the initial field test of an integrated countermeasure system that included infrared, millimeter-wave, and video analytics technologies for detecting person-borne improvised explosive devices at a public arena. The test results are being used to develop a concept for the next generation of integrated countermeasures, to refine technical and operational requirements for architectures and technologies, and engage industry and academia in solution development.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

A new MEMS-based system for ultra-high-resolution imaging at elevated temperatures

In recent years, an increasing number of laboratories have been applying in situ heating (and ultimately, gas reaction) techniques in electron microscopy studies of catalysts and other nanophase materials. With the advent of aberration-corrected electron microscopes that provide sub-Ångström image resolution, it is of great interest to study the behavior of materials at elevated temperatures while maintaining the resolution capabilities of the microscope. In this paper, in collaboration with Protochips Inc., our laboratory is developing an advanced capability for in situ heating experiments that overcomes a number of performance problems with standard heating stage technologies. The new heater device allows, for example, temperature cycling from room temperature to greater than 1000°C in 1 ms (a heating rate of 1 million Centigrade degrees per second) and cooling at nearly the same rate. It also exhibits a return to stable operation (drift controlled by the microscope stage, not the heater) in a few seconds after large temperature excursions. With Protochips technology, we were able to demonstrate single atom imaging and the behavior of nanocrystals at high temperatures, using high-angle annular dark-field imaging in an aberration-corrected (S)TEM. Finally, the new capability has direct applicability for remote operation and (ultimately) for gas reaction experiments using a specially designed environmental cell.

47 OTHER INSTRUMENTATION↗