Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Regulatory Research Development Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

110 records · Page 7

Digitalization mapping and assessment process supporting ION strategic transformation activities

The existing fleet of commercial nuclear power plants (NPPs) are an important asset in the nation’s portfolio of electrical generating resources. Their continued safe and reliable operation are critical to providing a large source of carbon-free electricity to power the nation’s economy. The United States Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Program develops the scientific bases, methods, and tools, for the continued safe and economical operation of the nation's commercial NPPs. The Plant Modernization Pathway within LWRS Program focuses on providing guidance to industry on the full-scale implementation of modernization solutions for NPPs that significantly reduce the technical and financial risks associated with modernization. This research is focused on helping the nuclear industry understand how to digitize and digitalize their NPPs so that they can design their modernization solutions to be scalable, sustainable, and integrated both laterally and horizontally within their organization. That is, this research creates a digital transformation in NPPs by reshaping cultural mindsets and by identifying business efficiencies. In partnership with industry, and using four previously established guiding principles for digitalization, this research supported NPP modernization through assessing readiness for digitalization as a means to achieve integrated operations for nuclear. Specifically, this research created an assessment to review an entire organization’s work processes to gather information about the digitalization health of the plant. The assessment tools were administered to plant employees, and the results were used to develop a digitalization plan. The survey assessment identified the optimal candidate processes that would most benefit from a digitalization initiative which were revealed through analytical frameworks. One analysis calculated mean digitalization health indicator scores for all endorsed activities which allowed the researchers to rank and color code the results for easy identification. Individual health indicator scores are also provided, should our industry partner wish to understand these findings according to their own organizational priorities, business considerations and desired end-state. The results were also analyzed from the perspective that organizations are comprised of different types of innovators (e.g., generators, optimizers, conceptualizers, and implementers), which differentially affects the organization’s ability to comprehend and adapt to change (i.e., opportunities to innovate). Understanding the relative composition of innovator types at an NPP allows them to gather insights into the strengths and weaknesses they have in innovating how work is performed. For the utility that partnered with this research team, the results showed that implementers make up the largest portion of respondents and conceptualizers the smallest portion. Knowing the proportion of innovator types gave this organization insights on how they can effectively implement their innovation solutions. Additionally, the results were analyzed from a technical, economic, and risk perspective to identify and quantify work reduction opportunities (WROs). Recognizing that not all cost-saving opportunities are the same, a Technical, Economic and Risk Assessment (TERA) was performed to evaluate WROs to identify areas of greatest potential and lowest risk. The key results from TERA included a digitalization opportunity score for each activity, and a calculation of potential cost savings. These two outputs formed the bases for calculating a priority index and rank for the activities/processes assessed. From the prioritization calculations, TERA can then help the utility 1) decide what digitalization priorities to invest money in implementing and then 2) calculates how much should be invested in the digitalization initiatives selected to achieve cost savings and/or an acceptable return on investment. Last, onsite interviews revealed several inefficiencies in the standard work processes that occur cross-departmentally that are due to the absence of digitized and digitalized processes. Examples of these include time spent scanning paper documents and then uploading the documents electronically, obtaining signatures, and searching for desired information. This represents a digital but not digitalized process. Over 15 opportunities to improve work processes were identified through this multi-method digitalization assessment. The various analytical assessments used (e.g., TERA, digitalization health indicator scores), as well as discussions with the utility partner, corroborated that all the opportunities identified had a strong potential to make work processes more efficient and to improve overall performance of the NPP.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Williston Basin Resource Study for Commercial-Scale Subsurface Hydrogen Storage

The Energy & Environmental Research Center (EERC), in partnership with the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), the EERC’s State Energy Research Center (SERC), MPLX Operations LLC, and TC Energy Development Holdings Inc. (a subsidiary of TC Energy Corporation), studied the potential for subsurface hydrogen storage and recovery in the Williston Basin of western North Dakota. The project’s goal was to evaluate the feasibility of large-scale, secure geologic H 2 storage to support future hydrogen generation, storage, and use. This work included laboratory testing, H 2 –rock–fluid exposure experiments, literature reviews on H 2 embrittlement, and reservoir modeling and simulations. The study included an assessment of storage potential across three types of storage reservoirs using both reservoir simulation and DOE’s web-based tool SHASTA-HELP (Subsurface Hydrogen Assessment, Storage, and Technology Acceleration – Hydrogen Estimator for Logistical Planning), as well as investigation of potential H 2 production and markets for commercial-scale deployment. Building on prior EERC gas storage research, three storage options were selected for detailed evaluation: the Broom Creek Formation (a clastic saline reservoir), the Dickinson Lodgepole Mounds (DLM) complex (carbonate mud mound structures) of the Lodgepole Formation (an active oil and gas producing reservoir), and the Dunham Salt Interval of the Piper Formation (to be used for engineered salt cavern development). These targets were prioritized based on prior EERC research using datasets related to seal capacity, reservoir quality, mechanical integrity, and injectivity. Exposure tests on Broom Creek and DLM samples showed mineral dissolution and precipitation that increased brine salinity and altered reservoir rock surfaces. Although these results provide useful insight, they are limited by small sample sizes and short-term (30-day) exposure, requiring further study to assess long-term storage integrity. Salt formations were not tested because of their known nonreactivity and established mechanical stability. Results of reservoir simulations performed for a single site demonstrated that the Broom Creek Formation may be capable of receiving up to 42,000 tonnes of injected H 2 over 7 months via one well. H 2 recovery took place over 5 months, resulting in approximately 26,000 tonnes (~62% without cushion gas [CG]). This work suggests water production may be important and subsequent cycles of injection and production may perform more efficiently; however, significant site-specific work in the future is needed to assess actual reservoir performance of injection and withdrawal of H 2 storage. For oil reservoir potential, a multiple-well model was used to simulate injection of approximately 32,000 tonnes of H 2 into a single wellbore while simultaneously producing in place reservoir fluids from four offset wells to maintain reservoir pressure. The simulation results suggested a high recovery (~98%); in addition, cost advantages through existing infrastructure could be realized. Challenges in this reservoir include vi managing gas purity and leakage risks. In both scenarios, production of H 2 takes place in a single-well scenario with 10 cycles (7 months of injection and 5 months of production) over 10 years. Finally, the use of engineered caverns in the Dunhan Salt was evaluated, and the results suggest that while they have a smaller capacity (<1000 tonnes per cavern), they exhibit nearly complete gas recovery (>99%), fast response times, and low purity risk. While caverns in North Dakota may be smaller in capacity, fields can be developed in galleries to accommodate the volumetric needs and rapid turnaround times necessary to meet market demands. Geographic limitations and thin salt intervals in North Dakota may represent less total storage potential than salt domes elsewhere, but significant opportunities exist to expand this market for gas storage in North Dakota. A basinwide assessment was performed to estimate a first-of-its-kind value for H 2 storage on a large scale. DOE’s SHASTA-HELP, combined with EERC simulation work, was used to perform the assessment. Estimated H 2 storage potential varied widely for each formation type. The Broom Creek saline formation was estimated to have a storage potential of approximately 1.7–90.5 million tonnes (MMt). The DLM oil reservoirs were estimated to have 0.07–0.19 MMt of capacity. Notably, each of these estimates relies on significant assumptions regarding reservoir thickness, porosity, permeability, and CG needed for operation. Much research is needed to understand the true site-specific storage resource potential of each formation. Using the Dunham Salt Interval for cavern development may result in as much as 4.79 MMt (up to 2.87 MMt working gas) of H 2 storage potential. An important note for consideration is that the values presented here need significantly more geological characterization and engineering assessments prior to gaining confidence in performance. This will be a focal point for future research and development needs. The basinwide evaluation also indicated that North Dakota has significant H 2 generation potential, with estimates up to a possible 13 MMt annually, suggesting a substantial opportunity for H 2 market development and thus the need for commercial-scale H 2 storage to facilitate growth and resilience. Key Recommendations 1. Conduct detailed site characterization (3D seismic, well logs, core sampling) to reduce geologic uncertainty. 2. Perform techno-economic analyses incorporating market, regulatory, and incentive frameworks. 3. Investigate long-term interactions among H 2 , CGs, well materials, and formations to assess risks. 4. Develop pilot- and field-scale demonstrations to validate models and establish best practices.

03 NATURAL GAS↗