Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Recovery”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Special Report on the "Department of Energy's Efforts to Meet Accountability and Performance Reporting Objectives of the American Recovery and Reinvestment Act"

The purpose of the American Recovery and Reinvestment Act of 2009 (Recovery Act) was to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy will receive an unprecedented $38 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The Recovery Act requires transparency and accountability over these funds. To this end, the Office of Management and Budget (OMB) issued guidance requiring the Department to compile and report a wide variety of funding, accounting, and performance information. The Department plans to leverage existing information systems to develop accounting and performance information that will be used by program managers and ultimately reported to Recovery.gov, the government-wide source of Recovery Act information, and to OMB. The Department's iManage iPortal, a system that aggregates information from a number of corporate systems, will serve as the main reporting gateway for accounting information. In addition, the Department plans to implement a methodology or system that will permit it to monitor information reported directly to OMB by prime funding recipients. Furthermore, performance measures or metrics that outline expected outcomes are being developed, with results ultimately to be reported in a recently developed Department-wide system. Because of the significance of funds provided and their importance to strengthening the Nation's economy, we initiated this review to determine whether the Department had taken the steps necessary to ensure that Recovery Act funds can be appropriately tracked and are transparent to the public, and whether the benefits of the expenditures can be properly measured and reported clearly, accurately, and in a timely manner. Although not yet fully mature, we found that the Department's efforts to develop, refine, and apply the control structure needed to ensure accurate, timely, and reliable reporting to be both proactive and positive. We did, however, identify certain issues relating to Recovery Act performance management, accounting and reporting accuracy, and timeliness that should be addressed and resolved. In particular, at the time of our review: (1) Program officials had not yet determined whether existing information systems will be able to process anticipated transaction increases associated with the Recovery Act; (2) System modifications made to the Department's performance management system to accommodate Recovery Act performance measures had not yet been fully tested and verified; (3) The ability of prime and sub-recipients to properly segregate and report both accounting and performance information had not been determined; (4) There was a lack of coordination between Headquarters organizations related to aspects of Recovery Act reporting. For example, we observed that the Offices of Fossil Energy and Program, Analysis and Evaluation were both involved in developing job creation estimates that could yield significantly different results; and, (5) A significant portion (91 of 142, or 64 percent) of the performance measures developed for the Recovery Act activities were not quantifiable. In some instances, Project Operating Plans had not been finalized and we were not able to verify that all needed performance measures had been developed. Furthermore, the Department had not developed specific metrics to measure federal and contractor jobs creation and retention, an essential Recovery Act objective. The Department had devoted a great deal of time and resources to identifying and mitigating Recovery Act-related risks. For example, the Department developed a risk assessment tool that is intended to assist programs in identifying risks that can prevent its Recovery Act projects from meeting their intended goals. We also found that program staff and management officials at multiple levels were actively engaged in designing Recovery Act-related control and accountability programs. These efforts ranged from updating existing information systems to developing matrices designed to ensure that all required reporting and performance elements were addressed. Each of these activities required substantial effort and was accomplished within a relatively short period. Further, we noted that the Office of the Chief Financial Officer had been instrumental in helping impacted program elements identify issues that could adversely affect the Department's ability to execute its accounting, reporting, and performance monitoring responsibilities. While much has been done, additional work is necessary if the Department is to successfully manage Recovery Act-related risks. For example, as previously noted, OMB has issued guidance establishing Recovery Act monitoring and reporting requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Audit Report on "The Department of Energy's American Recovery and Reinvestment Act -- Florida State Energy Program"

The Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE) provides grants to states, territories, and the District of Columbia to support their energy priorities through the State Energy Program (SEP). The SEP provides Federal financial assistance to carry out energy efficiency and renewable energy projects that meet each state's unique energy needs while also addressing national goals such as energy security. Federal funding is based on a grant formula that takes into account population and energy consumption. The SEP emphasizes the state's role as the decision maker and administrator for the program. The American Recovery and Reinvestment Act of 2009 (Recovery Act) expanded the SEP, authorizing $3.1 billion in grants. Based on existing grant formulas and after reviewing state-level plans, EERE made awards to states. The State of Florida's Energy Office (Florida) was allocated $126 million - a 90-fold increase over Florida's average annual SEP grant of $1.4 million. Per the Recovery Act, this funding must be obligated by September 30, 2010, and spent by April 30, 2012. As of March 10, 2010, Florida had expended $13.2 million of the SEP Recovery Act funds. Florida planned to use its grant funds to undertake activities that would preserve and create jobs; save energy; increase renewable energy sources; and, reduce greenhouse gas emissions. To accomplish Recovery Act objectives, states could either fund new or expand existing projects. As a condition of the awards, EERE required states to develop and implement sound internal controls over the use of Recovery Act funds. Based on the significant increase in funding from the Recovery Act, we initiated this review to determine whether Florida had internal controls in place to provide assurance that the goals of the SEP and Recovery Act will be met and accomplished efficiently and effectively. We identified weaknesses in the implementation of SEP Recovery Act projects that have adversely impacted Florida's ability to meet the goals of the SEP and the Recovery Act. Specifically: (1) Florida used about $8.3 million to pay for activities that did not meet the intent of the Recovery Act to create new or save existing jobs. With the approval of the Department, Florida used these funds to pay for rebates related to solar energy projects that had been completed prior to passage of the Recovery Act; (2) State officials did not meet Florida's program goals to obligate all Recovery Act funds by January 1, 2010, thus delaying projects and preventing them from achieving the desired stimulative economic impact. Obligations were delayed because Florida officials selected a number of projects that either required a lengthy review and approval process or were specifically prohibited. In June 2009, the Department notified Florida that a number of projects would not be approved; however, as of April 1, 2010, the State had not acted to name replacement projects or move funds to other projects; (3) Florida officials had not ensured that 7 of the 18 award requirements for Recovery Act funding promulgated by the Department had been passed down to sub-recipients of the award, as required; and, (4) Certain internal control weaknesses that could jeopardize the program and increase the risk of fraud, waste and abuse were identified in the Solar Energy System Incentives Program during our September 2009 visit to Florida. These included a lack of separation of duties related to the processing of rebates and deficiencies in the written procedures for grant managers to review and approve rebates. From a forward looking perspective, absent aggressive corrective action, these weaknesses threaten Florida's efforts to meet future Recovery Act goals. In response to our review, Florida took corrective action to incorporate the additional award requirements in sub-recipient documents. It also instituted additional controls to correct the internal control weaknesses we identified. More, however, needs to be done with respect to Department oversight. This report details the circumstances surrounding these program issues and outlines actions that, in our opinion, will help Florida achieve its SEP Recovery Act-funded goals.

14 SOLAR ENERGY↗

Simulation-Based Recovery Action Analysis Using the EMRALD Dynamic Risk Assessment Tool

A recovery action is defined as the action that prevents deviant conditions from producing unwanted effects. It generally indicates a kind of countermeasure performed in response to a failure of human action. The recovery actions especially play an important role in complex systems like nuclear power plants (NPPs), which consist of highly sophisticated controllers to ensure that desired performance and safety must be achieved and maintained. This is because a combination of human error and its recovery failure may be able to cause a catastrophic effect on a system. Analyzing recovery actions has been a critical part of HRA, which is a technique to evaluate human errors and provide human error probabilities (HEPs) for application in probabilistic safety assessment (PSA). If recovery actions are not adequately analyzed and applied to PSA models, the PSA results may be under-estimated or be not able to reasonably account for the failure of human actions in the context of PSA. For this reason, some regulatory documents such as ASME/ANS RA-Sb-2013 by the American Society for Mechanical Engineers and the American Nuclear Society and NUREG-1792 by U.S. Nuclear Regulatory Commission have emphasized the importance of recovery analysis within the HRA. A couple of existing HRA methods, such as the Technique for Human Error-Rate Prediction (THERP), the Cause-Based Decision Tree (CBDT), and the Korean Standard HRA (K-HRA), have respectively suggested their own approaches to the HRA recovery analysis. However, there are a couple of limitations to treating recovery actions using only the current HRA methods available. The biggest limitation is that the existing recovery analysis does not explicitly consider a variety of recovery action types and recovery sequences as they occur in actual NPPs. To handle the limitations of existing recovery analysis, this study proposes a simulation-based recovery analysis method using the Event Modeling Risk Assessment Using Linked Diagram (EMRALD) software. The EMRALD software is a dynamic simulation tool for PSA. It supports realistic and dynamic modeling of human actions as they would be performed at NPPs. It is also favorable to simultaneously model the specific moment at which an action is performed, the time it takes to perform the action, and the failure probability of that action. In this paper, a detailed methodology for modeling recovery actions in the simulation platform is proposed with a couple of examples. Then, outputs from the simulation are discussed as reviewing if this novel approach can complement the challenges of existing recovery analyses.

99 GENERAL AND MISCELLANEOUS↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Idaho National Laboratory Site Natural Resources: Wildland Fire Recovery Framework

As pressures from invasive species, climate change, and anthropogenic impacts increase across the landscape in the western U.S., managing wildland fire recovery to promote healthy sagebrush steppe becomes an increasingly important stewardship responsibility. The Idaho National Laboratory (INL) has developed and implemented wildland fire recovery plans to hasten desirable vegetation re-establishment on several individual fires, but lacks an overarching wildland fire recovery strategy, or framework. The intent of this document is to develop the technical approach and scientific basis for wildland fire recovery at the INL Site and to evaluate the tools available to support it in a comprehensive and broadly applicable format. This wildland fire recovery framework will outline the process of assessing the potential impacts of wildland fire on natural resources, present a range of post-fire recovery options, outline an approach for post-fire monitoring, and provide a template for post-fire recovery plans designed to addresses the specific conditions of each wildland fire. There are numerous benefits to developing a wildland fire recovery framework for the INL Site. The first is streamlining the development of post-fire recovery plans for individual fires. A second benefit is more closely aligning INL’s post-fire planning processes with those of other federal agencies. The development of an INL Site fire recovery framework will also allow resource professionals to consider a broader set of recovery tools than they have before because all proposed tools included in the framework were vetted through the process of scoping and stakeholder review. Finally, this framework is a publicly available document that can be used as a basis for communicating and discussing post-fire natural resource recovery objectives with agency collaborators, conservation partners, and other stakeholders. Through the proactive land stewardship principles outlined in this framework, current INL sustainability initiatives can be enhanced, and future INL mission flexibility will be maintained.

99 GENERAL AND MISCELLANEOUS↗

A Markov framework for generalized post-event systems recovery modeling: From single to multihazards

State-dependent models can be used to represent the system recovery process as a series of stochastic transitions from lower to higher functional states. However, the applications of these models have been limited in scope and there is a lack of a generalized recovery modeling framework. A generalized framework would permit a robust forecasting of systems and system-of-systems recovery under multiple hazards, and more broadly, would contribute to community disaster preparedness. This paper develops a generalized post hazard-event recovery modeling framework based on state-dependent Markov-type processes. We then apply the proposed framework to solve a spectrum of problems that range from hind-casting single-system recovery following a single hazard event to forecasting post-event trajectories under multiple hazards and modeling the recovery of a system-of-systems. First, Markov chains are used to hind-cast the observed recovery for a portfolio of buildings affected by the 2014 South Napa, California, earthquake. Next, Markov processes are used to formulate a parametric post hazard-event recovery model, which can be updated using Bayesian statistics when relevant datasets become available. Semi-Markov processes are then used to develop a more general model of single hazard recovery, which accounts for the intensity of the loading and level of damage caused by the event. Semi-Markov processes with non-renewal features are then used to account for multihazard interactions in a post-event recovery model, and applied to a case study that involves a community in Charleston, South Carolina. Lastly, Markov-type processes are combined with Bayesian networks to model the recovery of residential, commercial, educational, and industrial buildings (system-of-systems) following a hazard event. Overall, these applications demonstrate the versatility of the Markov framework towards handling recovery problems with varying levels of complexity.

42 ENGINEERING↗

INFORMATION: Audit Report on "Accounting and Reporting for the American Recovery and Reinvestment Act by the Department of Energy's Funding Recipients"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was established to jumpstart the U.S. economy, create or save millions of jobs, and invest in the Nation's energy future. The Department of Energy received approximately $37 billion through the Recovery Act to support a variety of science, energy and environmental initiatives. The Office of Management and Budget (OMB) issued guidance for carrying out stimulus-related activities which requires, among other things, that recipients ensure funds provided by the Recovery Act are clearly distinguishable from non-Recovery Act funds in all reporting systems and that recipients' actions are transparent to the public. To meet these requirements, the Department's recipients must clearly and accurately track and report on 18 separate data elements. In addition, the Department was to develop and implement a process to ensure that recipient information reported to the public was free from material omissions and significant reporting errors. Our recent report (OAS-RA-10-01, October 2009) noted that the Department had developed a quality assurance process to facilitate the quarterly reviews of recipient data and planned to test it during the first quarterly reporting cycle. To determine whether the Department's quality assurance process was effective, we examined information reported by recipients of Departmental funding as of September 30, 2009. We also sought to determine whether the Department's prime contractors were prepared to track and report on Recovery Act activities. The Department had taken a number of actions designed to ensure the accuracy and transparency of reported Recovery Act results. This process identified potential anomalies with information reported by 1,113 of 2,038, or 55 percent of recipients. We view the Department's data quality assurance efforts as both timely and significant. As noted by our audit testing, however, opportunities exist to strengthen the process. In particular: (1) Site officials did not always ensure that anomalies, once identified during the quality assurance process, were actually resolved. For example, the Department's process identified that about 740 of the approximately 10,000 jobs reported in the first quarter of Fiscal Year 2010 as created/retained were for projects reported as having no funds spent. Although these problems were referred to site officials for follow-up and/or correction, the information was never actually changed; (2) The Department did not always utilize the correct basis when evaluating the accuracy of 'funds provided' data submitted by grant recipients. For example, in its analysis process, the Department used data reflecting 'funds obligated' rather than the correct amount of 'total grant awards'. This generated a number of potential false positives; and, (3) Duplicate reports by certain recipients, resulting in overstatements of as much as $137 million of the more than $18 billion obligated, were not corrected. We observed that the Department had taken prompt action to ensure that its prime facility management contractors could properly report Recovery Act information. Notably, the seven contractors in this category included in our review had modified their accounting systems, as necessary, to ensure that they could accurately track and report on Recovery Act activities. The systems at each of these entities had been restructured so that they: (i) could separate Recovery Act and non-Recovery Act funds; and, (ii) had adequate processing capacity to handle the projected increase in transactions. We found the Department's decision to limit its reviews to the four elements that it considered to be critical (award amount, invoiced amount, jobs created/retained, and project status) to be reasonable. We concluded, however, other elements or dependent relationships should not be completely excluded from review. Beyond its initial development and implementation of its quality assurance process, the Department had taken steps to improve its ability to ensure that Recovery Act information was both accurate and transparent to the public. Specifically, officials changed the quality assurance plan based on initial data reviews. Department officials also informed us that they are in the process of updating their quality assurance process to meet new OMB requirements. For example, recent guidance directed agencies to focus on certain data elements, such as award number and recipient name, during their quality assurance reviews. In addition, subsequent to our review, the Department added two more data elements and comparisons to its quarterly assurance process, including an analysis of costs/expenditures and a comparison of the recipient reported project status to the Department's data contained in its financial system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

End-Use Savings Shapes: Measure Documentation: Add Exhaust Air Heat/Energy Recovery

This documentation focuses on a single end-use savings shape measure—Add Exhaust Air Heat/Energy Recovery. This measure adds exhaust air energy recovery or heat recovery to existing air handling units (AHU) with outdoor air. Systems that already have energy/heat recovery are not modified. Furthermore, food service building types are also not modified by this measure due to the added complication of integrating cooking hood exhaust that could cause heat exchanger fouling from kitchen exhaust. In total, this measure is applicable airloops serving ~70% of the floor area in ComStock. In practice, energy/heat recovery systems are retrofitted to existing air delivery systems either as separate systems that provide outdoor air to the AHUs or are directly integrated to an AHU; the modeling approach used in this study is agnostic of the energy recovery type and simply accounts recovery effectiveness, added static pressure, and other controls which are described further in this document. Energy recovery with sensible and latent exchange gets added in humid climate zones, while heat recovery with sensible-only exchange gets added in drier climate zones. Energy recovery is modeled as a fixed membrane plate counterflow heat exchanger, while heat recovery is modeled as a sensible-only fixed aluminum plate counterflow heat exchanger. Both systems include a bypass (for temperature control and economizer lockout) and electric resistance preheat coil for frost prevention.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Long-Term Post-Disturbance Forest Recovery in the Greater Yellowstone Ecosystem Analyzed Using Landsat Time Series Stack

Forest recovery from past disturbance is an integral process of ecosystem carbon cycles, and remote sensing provides an effective tool for tracking forest disturbance and recovery over large areas. Although the disturbance products (tracking the conversion from forest to non-forest type) derived using the Landsat Time Series Stack-Vegetation Change Tracker (LTSS-VCT) algorithm have been validated extensively for mapping forest disturbances across the United States, the ability of this approach to characterize long-term post-disturbance recovery (the conversion from non-forest to forest) has yet to be assessed. Here in this study, the LTSS-VCT approach was applied to examine long-term (up to 24 years) post-disturbance forest spectral recovery following stand-clearing disturbances (fire and harvests) in the Greater Yellowstone Ecosystem (GYE). Using high spatial resolution images from Google Earth, we validated the detectable forest recovery status mapped by VCT by year 2011. Validation results show that the VCT was able to map long-term post-disturbance forest recovery with overall accuracy of ~80% for different disturbance types and forest types in the GYE. Harvested areas in the GYE have higher percentages of forest recovery than burned areas by year 2011, and National Forests land generally has higher recovery rates compared with National Parks. The results also indicate that forest recovery is highly related with forest type, elevation and environmental variables such as soil type. Findings from this study can provide valuable insights for ecosystem modeling that aim to predict future carbon dynamics by integrating fine scale forest recovery conditions in GYE, in the face of climate change. Lastly, with the availability of the VCT product nationwide, this approach can also be applied to examine long-term post-disturbance forest recovery in other study regions across the U.S.

1988 Yellowstone Fires↗

Elemental mercury neurotoxicity and clinical recovery of function: A review of findings, and implications for occupational health

Highlights: • Substantial human studies, both acute and chronic, are available for evaluation. • Elemental mercury induced toxicity often displays substantial recovery. • Numerous examples fail to show full recovery from elemental mercury toxicity. • Recovery from elemental mercury toxicity is affected by age and endpoint. • Few animal studies have been directed to elemental mercury toxicity recovery. This paper assessed approximately 30 studies, mostly involving occupationally exposed subjects, concerning the extent to which those who developed elemental mercury (Hg)-induced central and/or peripheral neurotoxicities from chronic or acute exposures recover functionality and/or performance. While some recovery occurred in the vast majority of cases, the extent of such recoveries varied considerably by individual and endpoint. Factors accounting for the extensive inter-individual variation in toxicity and recovery were not specifically assessed such as age, gender, diet, environmental enrichment, chelation strategies and dose-rate. While the data indicate that psychomotor endpoints often show substantial and relatively rapid (i.e., 2–6 months) recovery and that neuropsychological endpoints display slower and less complete recovery, generalizations are difficult due to highly variable study designs, use of different endpoints measured between studies, different Hg exposures based on blood/urine concentrations and Hg dose-rates, the poor capacity for replicating findings due to the unpredictable/episodic nature of harmful exposures to elemental Hg, and the inconsistency of the initiation of studies after induced toxicities and the differing periods of follow up during recovery periods. Finally, there is strikingly limited animal model literature on the topic of recovery/reversibility of elemental Hg toxicity, a factor which significantly contributes to the overall marked uncertainties for predicting the rate and magnitude of recovery and the factors that affect it.

54 ENVIRONMENTAL SCIENCES↗

Quantification of the resource recovery potential of municipal solid waste incineration bottom ashes

Highlights: • Ferrous and non-ferrous metals were quantified in MSWI bottom ashes. • Metal recovery system efficiencies for bottom ashes were estimated. • Total content of critical elements was determined in bottom ash samples. • Post-incineration recovery is not viable for most critical elements. - Abstract: Municipal solid waste incineration (MSWI) plays an important role in many European waste management systems. However, increasing focus on resource criticality has raised concern regarding the possible loss of critical resources through MSWI. The primary form of solid output from waste incinerators is bottom ashes (BAs), which also have important resource potential. Based on a full-scale Danish recovery facility, detailed material and substance flow analyses (MFA and SFA) were carried out, in order to characterise the resource recovery potential of Danish BA: (i) based on historical and experimental data, all individual flows (representing different grain size fractions) within the recovery facility were quantified, (ii) the resource potential of ferrous (Fe) and non-ferrous (NFe) metals as well as rare earth elements (REE) was determined, (iii) recovery efficiencies were quantified for scrap metal and (iv) resource potential variability and recovery efficiencies were quantified based on a range of ashes from different incinerators. Recovery efficiencies for Fe and NFe reached 85% and 61%, respectively, with the resource potential of metals in BA before recovery being 7.2%ww for Fe and 2.2%ww for NFe. Considerable non-recovered resource potential was found in fine fraction (below 2 mm), where approximately 12% of the total NFe potential in the BA were left. REEs were detected in the ashes, but the levels were two or three orders of magnitude lower than typical ore concentrations. The lack of REE enrichment in BAs indicated that the post-incineration recovery of these resources may not be a likely option with current technology. Based on these results, it is recommended to focus on limiting REE-containing products in waste for incineration and improving pre-incineration sorting initiatives for these elements.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Characterization of Recovery Human Action Mechanisms in Nuclear Power Plants

Recovery human action is defined as the action that prevents deviant conditions from producing unwanted effects. Analyzing recovery actions has been a critical part in human reliability analysis (HRA). However, there are a couple of limitations to treat recovery actions only depending on the current HRA methods. Representatively, the existing recovery analysis does not specifically consider recovery actions as are occurred in actual nuclear power plants (NPPs). The overall goal of this study aims to develop a novel recovery analysis method to account for human action recoveries in context of scenarios as well as complement the limitations of existing recovery analysis. In this paper, the recovery analysis in current HRA methods and their challenges are introduced. A strategy to achieve the goal is introduced with a modified recovery definition. Then, how we have researched the approach will be introduced in the paper.

99 GENERAL AND MISCELLANEOUS↗

Effectiveness of supercritical-CO 2 and N 2 huff-and-puff methods of enhanced oil recovery in shale fracture networks using microfluidic experiments

Current oil recovery methods in hydraulically fractured shale reservoirs have a low recovery efficiency of about 10%. The objective of this work is to investigate the effectiveness of nitrogen and supercritical carbon dioxide in the huff-and-puff method for enhanced oil recovery as a means to re-energize reservoirs and improve recovery rates. Here, we conduct direct visualization experiments with a microfluidic system to reveal the mechanisms and to quantify the recovery rates of oil from fracture networks. We compared the effectiveness of water, nitrogen and supercritical carbon dioxide at reservoir conditions in a process mimicking the huff-and-puff method in both dead-end and connected fracture systems. The microfluidic chips were made of glass and placed in a confining pressure system pressurized to 10 MPa, 50 °C. The system was allowed to equilibrate, and then depressurized to simulate huff-and-puff oil recovery. Fluorescence microscope images were continuously taken to visualize and calculate residual oil saturation as a function of pressure drawdown. As the system was depressurized from 10 MPa, gas exsolution from the oil liquid phase, including bubble nucleation, growth, and coalescence, appeared to be the main driver for mobilizing oil from the fracture networks. Injection of supercritical CO 2 resulted in the highest recovery rate with an average end-point recovery of about 90% in the connected fracture network and 60% in the dead-end fracture network. N 2 has lower solubility in oil and hence showed a lower recovery rate of 40% in the connected fracture network and 25% in the dead-end fracture network. Injection of water had no effect on oil mobilization since water is insoluble, immiscible and incompressible. The main mechanism of enhanced recovery was gas exsolution from the liquid phase as pressure was decreased below the bubble point pressure. Because the gas was distributed throughout the oil phase, bubble nucleation, growth, coalescence, and elongation occurred throughout the fracture network. Expansion of the gas forced oil out of the network through piston displacement in continuous oil areas and film flow in the dispersed oil areas. Bubbles began as spheres and grew until they touched the fracture walls where they elongated along the fracture length. The bubble growth rate depended on local mass transfer from liquid to gas phase and gas volume expansion due to pressure drop. The efficiency of the huff-and-puff process is dependent on the solubility and miscibility of the injection fluid with oil. High gas solubility allows for more bubble nucleation, growth and expansion during the depressurization cycle.

58 GEOSCIENCES↗

An acid baking approach to enhance heavy rare earth recovery from bituminous coal-based sources

The recovery of rare earth elements (REEs) from secondary resources, particularly coal-based materials, has recently received attention due to supply and demand imbalance. Research reported to date indicates that a high REE recovery can be realized when treating bituminous coal sources using strong acid solutions of approximately100 g/L or higher. This study introduces an approach to enhance the total rare earth recovery (TREE), especially for heavy rare earth elements (HREEs), from these coal sources at significantly lower acid concentrations. Based on the presence of REE minerals like monazite and xenotime, a detailed investigation was undertaken to quantify three pre-leach treatment methods, i.e., 1) roasting, 2) direct acid baking, and 3) acid baking after roasting. Roasting tests at 600°C revealed that the recovery of light REEs (LREEs) was enhanced while the recovery of HREEs remained relatively unaffected. LREE and HREE recovery values of 38.3% and 21.3%, respectively, were achieved using a 50 g/L (0.5 M) sulfuric acid solution at 5% solid concentration and a solution temperature of 75°C for 2 h. Comparatively, direct acid baking at 250°C provided substantial increases in LREE and HREE recovery values to approximately 49.4% and 53.0%, respectively, using an equivalent acid dosage. Recoveries were maximized to 77.0% and 79.6% for LREE and HREE, respectively, by roasting followed by acid baking. Similar results were obtained from the treatment of a second bituminous coal source. Due to strong correlations between REE and Al recovery values, tests were performed on kaolinite and illite, which were prominent clay minerals within the source coals. In conclusion, these experiments revealed that the REE recovery improvements were likely a result of dehydroxylation of clays and subsequent release and decomposition of REE-bearing minerals such as monazite, xenotime and zircon.

42 ENGINEERING↗

Measuring short-term post-fire forest recovery across a burn severity gradient in a mixed pine-oak forest using multi-sensor remote sensing techniques

Understanding post-fire forest recovery is pivotal to the study of forest dynamics and global carbon cycle. Field-based studies indicated a convex response of forest recovery rate to burn severity at the individual tree level, related with fire-induced tree mortality; however, these findings were constrained in spatial/temporal extents, while not detectable by traditional optical remote sensing studies, largely attributing to the contaminated effect from understory recovery. For this work, we examined whether the combined use of multi-sensor remote sensing techniques (i.e., 1m simultaneous airborne imaging spectroscopy and LiDAR and 2m satellite multi-spectral imagery) to separate canopy recovery from understory recovery would enable to quantify post-fire forest recovery rate spanning a large gradient in burn severity over large-scales. Our study was conducted in a mixed pine-oak forest in Long Island, NY, three years after a top-killing fire. Our studies remotely detected an initial increase and then decline of forest recovery rate to burn severity across the burned area, with a maximum canopy area-based recovery rate of 10% per year at moderate forest burn severity class. More intriguingly, such remotely detected convex relationships also held at species level, with pine trees being more resilient to high burn severity and having a higher maximum recovery rate (12% per year) than oak trees (4% per year). These results are one of the first quantitative evidences showing the effects of fire adaptive strategies on post-fire forest recovery, derived from relatively large spatial-temporal domains. Our study thus provides the methodological advance to link multi-sensor remote sensing techniques to monitor forest dynamics in a spatially explicit manner over large-scales, with important implications for fire-related forest management, and for constraining/benchmarking fire effect schemes in ecological process models.

47 OTHER INSTRUMENTATION↗

Low-Temperature Plasma Treatment for Enhanced Recovery of Highly Valued Critical REEs from Coal (Final Report)

The principle objective of this project was to develop a novel process flowsheet using low-temperature plasma treatment (LTP) integrated with conventional hydrometallurgical processes to recover rare earth elements (REEs), especially highly valued REEs (i.e. scandium and critical REEs), from coal and coal byproducts. LTP treatment was used to pretreat the solid feed material prior to leaching in an effort to improve the leaching characteristics of the REEs and potentially reduce acid consumption. Initially, a detailed experimental program was performed on a laboratory LTP furnace to identify a set of process parameter values to be used for assessing the enhanced leaching performance achieved on four specific gravity fractions of West Kentucky No. 13 and Fire Clay coarse coal refuse materials. High-temperature oxidation (HTO)) was also evaluated as a means for improving REE leachability on the same fractions of both coal sources. The lixiviants used to assess leachability improvements included: i) untreated water, ii) 0.1 M ammonium sulfate solution and iii) 1.2 M sulfuric acid solution at a temperature of 75°C. The laboratory data was used to develop multiple process flow sheets using HTO only to produce a rare earth oxide mix concentrate or utilizing both LTP and HTO treatment processes to generate a high purity heavy REO mix concentrate and a light REO mix concentrate. A techno-economic analysis was performed on each circuit. Low-temperature plasma oxidation was found to enhance REE leaching characteristics for all specific gravity (SG) fractions of the West Kentucky No. 13 coarse refuse material. The leaching recovery improvement was preferentially achieved for the heavy REEs with higher values obtained when treating the lower density fraction material. For example, the leaching recovery for the heavy REEs in the untreated 1.6 SG Float fraction material was 8% in a 0.1 M ammonium sulfate solution. After LTP treatment for 32 hours, heavy REE recovery increased to 33%. The corresponding recovery value for the light REEs was 10%. These findings indicate a strong affinity of the heavy REEs with the organic material, which is the component being reduced in content during the LTP treatment. Scanning electron micrographs showed the development of a honeycomb structure with increased LTP treatment with higher surface area as confirmed from BET measurements. Higher surface area promotes improved leaching efficiency due to enhance chemical interactions. When using 1.2 M sulfuric acid, the LTP treatment was found to provide a heavy REE recovery increase from 23% to 53% for the 1.6 SG Float fraction which corresponded to an ash content increase from around 20% to 35%. However, LTP treatment provided no improvement in leaching characteristic for the 2.2 SG sink material in the acid solution, which was likely due to the low organic content. The LTP treatment of the Fire Clay SG fractions provided no improvement in REE leaching characteristic, which may be due to the association with REE minerals such as monazite and REE-associated mineral matter such as clays. High temperature oxidation using temperatures in the range of 600-750OC was found to significantly enhance the leaching characteristics of both the light and heavy REEs for all density fractions in both coarse coal refuse materials. Generally, the increase in light REE recovery for the West Kentucky material was from 15% for the untreated material to 90% for the HTO treated material at 600°C. Recovery values dropped significantly when using temperatures below 600°C and above 750°C. The impact of the excessive temperatures was most likely a result of sintering. For the heavy REEs, HTO significantly improved recovery in the lighter SG fractions, which may be due to an affinity with the organic content. Only limited heavy REE recovery improvement was obtained for the denser SG fractions. Another benefit of HTO is the conversion of calcium-based minerals to a very soluble calcium oxide, which is removable using a mild acid solution, and the conversion of Fe minerals to relatively insoluble minerals such as hematite and magnetite. The pregnant leaching solution produced from the leaching of all SG fractions obtained from both coal sources was treated using two stages of solvent extraction procedurally modeling a rougher-cleaner circuit followed by oxalic acid precipitation. Rare earth oxide products having a purity greater than 97% was produced from nearly all of the SG fractions. A novel process flowsheet was developed based on the selective leaching of heavy REEs that was made possible through LTP treatment of West Kentucky No. 13 coarse refuse followed by salt leaching. In the flowsheet, coal refuse material is ground to a top size of 1mm and then treated by LTP. The treated material is mixed into a 0.1 M ammonium sulfate solution and then filtered to produce a heavy REE enriched pregnant leach solution. The heavy REEs are concentrated by two stages of selective precipitation to produce a heavy REE mix oxalate and then roasted to obtain a heavy REO mix concentrate. The solid residues remaining after salt leaching is dried and then subjected to HTO treatment followed by concentration using selective precipitation and roasting to produce a light REO mix concentrate. An alternative circuit was developed using HTO treatment only to treat 100% of the coarse refuse material followed by selective precipitation and roasting to generate a high purity REO mix product. A techno-economic analysis performed for the treatment of West Kentucky No. 13 and Fire Clay coarse refuse based on a hypothetical 500-tph plant revealed that the net present value for all scenarios was significantly negative. Primary reasons include: i) a substantial decrease in the basket value of the final product relative to the feed and ii) high chemical costs relative to the amount of product generated. The basket value reduction was primarily due to little to no scandium recovery due to poor leaching characteristics when using low acid concentrations as necessitated by the low feed grades. Operating costs were primarily influenced by the chemical costs relative to the kilograms of concentrate produced and feed grade. For the Fire Clay coarse refuse material, the total operating cost was estimated to be $354 per kg of REO produced which was higher than the basket value of the REO product ($276/kg). Approximately 37% of the total cost was the sulfuric acid used during the leaching process. A comparative analysis performed to assess the economic viability of using low-temperature plasma furnaces found that market value enhancement for the generation of both heavy REO and light REO concentrates will be needed in addition to significant technology advancements to reduce the cost of plasma furnaces.

01 COAL, LIGNITE, AND PEAT↗

Slow Wake Recovery and Low Turbulence Behind Wind Farms Parameterized in Mesoscale Simulations

Numerical weather prediction (NWP) and climate models equipped with wind-farm parameterizations (WFPs) can simulate cluster wake effects affecting downstream wind farms in both onshore and offshore environments. This study evaluates wake recovery behind a wind farm represented by the NWP-WFP approach in the Weather Research and Forecasting (WRF) model using either the Fitch et al. (2012) or Ma et al. (2022a, b) WFPs. Results are benchmarked against large-eddy simulations (LES) of an idealized offshore wind farm with aligned and staggered layouts under neutral atmospheric stability. Near-farm wake recovery is underestimated in NWP-WFP simulations due to its representation on a coarse mesoscale grid. This limitation leads to slow wake recovery through two interconnected mechanisms: (i) spatial gradients in the wind velocity field are weaker compared to LES and (ii) turbulence kinetic energy (TKE) remains low not because of excessive dissipation but due to insufficient shear production caused by these weakened gradients. For the scenario considered here, a wind-speed bias develops in the near-farm wake and persists into the far wake. Differences between the NWP-WFP simulations and LES emerge within a short distance downstream of the farm exit, where the mesoscale simulations recover too slowly. This reduced recovery contributes approximately 0.15-0.50 m s-1 to the near-farm wind-speed bias. The bias established in this region is not subsequently compensated for downstream but instead propagates into the far wake, where wind-speed differences of approximately 0.4-0.6 m s-1 remain up to 50 km downstream. Higher-resolution mesoscale simulations partially reduce this bias. Increasing turbine-added TKE or including subgrid wake effects provides additional improvement, but neither fully addresses the underlying cause. The slow wake recovery is not caused by limitations of the WFPs themselves, as it also occurs outside their region of influence, and adding subgrid wake effects does not significantly impact recovery. Rather, the slow wake recovery is a consequence of mesoscale flow representation. This behavior is not limited to regions downstream of the wind farm but is less visible within the farm, where wake recovery occurs simultaneously with turbine-induced momentum extraction. These results highlight the need for improved representations of wake recovery both within and downstream of wind farms. While enhanced subgrid modeling, shear-driven TKE production, and refined WFP formulations may improve intra-farm dynamics, accurately capturing near-farm wake recovery downstream remains challenging, as WFPs do not act in this region.

17 WIND ENERGY↗

Degradation and Accelerated Recovery of Surface Passivation in n+ Poly-Si/SiOx Passivating Contacts for TOPCon Solar Cells

We studied the surface degradation and recovery of fired poly-Si/SiOx passivating contacts during subsequent dark and illuminated annealing. We report on an industrially-viable path for accelerated recovery of surface passivation. The degradation is influenced by the type of doping in the poly-Si. Phosphorus doped n+ poly-Si/SiOx contacts show degradation followed by recovery, undoped poly-Si/SiOx contacts only show recovery during annealing. Boron doped p+ poly-Si/SiOx contacts show neither degradation nor improvement with annealing. Both degradation and recovery are thermally-activated processes and are completely reversible and cyclic in nature. The activation energy of degradation and recovery in dark for n+ poly-Si/SiOx contacts are 1.27 and 1.33 eV respectively. Dark annealing at elevated temperatures is effective for complete recovery but takes a long time (~30 min at 350 degrees C) due to higher activation energies. Annealing under 7.5 Suns of illumination lowers the activation energy for degradation and recovery to 0.88 and 0.90 eV, respectively. Using this data, we have developed an industrially viable post-firing treatment for accelerated recovery of TOPCon cells by annealing them at elevated temperatures and under intense illumination for a few minutes.

14 SOLAR ENERGY↗