Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ROOM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

SU-D-BRE-03: Dosimetric Impact of In-Air Spot Size Variations for Commissioning a Room-Matched Beam Model for Pencil Beam Scanning Proton Therapy

Purpose: To quantitatively evaluate dosimetric consequence of spot size variations and validate beam-matching criteria for commissioning a pencil beam model for multiple treatment rooms. Methods: A planning study was first conducted by simulating spot size variations to systematically evaluate dosimetric impact of spot size variations in selected cases, which was used to establish the in-air spot size tolerance for beam matching specifications. A beam model in treatment planning system was created using in-air spot profiles acquired in one treatment room. These spot profiles were also acquired from another treatment room for assessing the actual spot size variations between the two treatment rooms. We created twenty five test plans with targets of different sizes at different depths, and performed dose measurement along the entrance, proximal and distal target regions. The absolute doses at those locations were measured using ionization chambers at both treatment rooms, and were compared against the calculated doses by the beam model. Fifteen additional patient plans were also measured and included in our validation. Results: The beam model is relatively insensitive to spot size variations. With an average of less than 15% measured in-air spot size variations between two treatment rooms, the average dose difference was −0.15% with a standard deviation of 0.40% for 55 measurement points within target region; but the differences increased to 1.4%±1.1% in the entrance regions, which are more affected by in-air spot size variations. Overall, our single-room based beam model in the treatment planning system agreed with measurements in both rooms < 0.5% within the target region. For fifteen patient cases, the agreement was within 1%. Conclusion: We have demonstrated that dosimetrically equivalent machines can be established when in-air spot size variations are within 15% between the two treatment rooms.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Bridging the gap: adapting advanced display technologies for use in hybrid control rooms

The Institute for Energy Technology (IFE), runs the OECD Halden Reactor Project (HRP), featuring a state-of-the-art research simulator facility in Halden, Norway, called HAMMLAB. HAMMLAB serves two main purposes: the study of human behaviour in interaction with complex process systems; and the development, test and evaluation of prototype control centres and their individual systems. By studying operator performance in HAMMLAB and integrating the knowledge gained into new designs, the HRP contributes to improving operational safety, reliability, efficiency and productivity. The U.S. Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Program has contracted IFE to assist DOE national laboratory staff at Idaho National Laboratory (INL) in adapting HAMMLAB design concepts for the purpose of control room modernization at nuclear power plants in the U.S. In support of this effort, the DOE has built a simulator research facility at INL called the Human Systems Simulation Laboratory (HSSL). The HSSL is centered on control room modernization, in which industry provided plant instrumentation and controls are modified for upgrade opportunities. The HSSL houses the LWRS simulator, which is a reconfigurable full-scale and full-scope control room simulator. Consisting of 45 large touchscreens on 15 panels, the LWRS simulator is currently using this glass top technology to digitally represent and replicate the functionality of the analog I&C systems in existing control rooms. The LWRS simulator is reconfigurable in that different plant training simulator models obtained from the utilities can be run on the panels, and the panels can be physically moved and arranged to mimic the layout of those control rooms. The glass top technology and reconfigurability capabilities allow the LWRS simulator to be the research platform that is necessary to design, prototype, and validate human-system interface (HSI) technologies that can replace existing analog I&C. IFE has recently assisted INL in establishing the technical infrastructure for implementation of HSI prototypes from HAMMLAB into the HSSL to demonstrate relevant control room replacement systems in support of the LWRS program. In March, 2014, IFE delivered the first HSI prototype utilizing this infrastructure — a large screen overview display for INL's simulator. The co-operation now continues by developing Procedure Support Displays targeted for operators in hybrid control room settings. These prototypes are being validated with U.S. reactor operators in the HSSL and optimized to enhance their performance. This research serves as a crucial stepping stone toward incorporation of advanced display technologies into conventional main control rooms.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Comparison of Mutual Awareness in Analog vs. Digital Control Rooms

Control rooms in nuclear power plants are complex, collaborative working environments rife with potential for human error. As control rooms evolve from analog to digital interface environments, crew communication strategies must change as well. Operators in the analog control room operate the plant and communicate with each other with the help of control boards with large control panels, meters, and switches. Reactor operators could choose a particular set of controls on the particular control board which corresponds to the part of the system of interest. Visual display units (VDU), which became a fixture in the control rooms with the shift to digital human-machine interfaces (HMI), bring benefits for safety and flexibility combining information from various sources. With the increase in automation and the use of digital HMIs operators received their personal sitting workstations where they are able to navigate and operate the plant. The amount of information increased as well as the complexity of monitoring and analyzing the system states. Also computerized systems cause operators to get absorbed by their personal screens and reduce interaction between the crew members. Therefore, the collaboration and coordination of task demands requires vigilance and mutual awareness. The level of automation has an influence on the level of mutual awareness experienced by operators in the control rooms. Teams function to carry out highly interdependent tasks, requiring synthesis and sharing of information to achieve common goals. Improving the performance of the team necessitates the operators to focus on the system, the surrounding environment, and situational awareness about the system states. Collaboration of team members is critical when employing the digital operating systems as the acute awareness of the overall progress of the group and individual activities of the operators drives the team to the desired end-states of the plant operations. Out-of-the loop (OOTL) performance problems can be referred to as the lack of supervisory control, system monitoring, and information processing in the digital HMIs. Under some circumstances Senior Reactor Operators (SRO) struggle to follow the actions of other Reactor Operators (RO) because with the new digital interfaces SROs lose track of how the procedures are carried out by ROs, which results in the loss of three way communication. Mutual awareness plays a significant role in keeping the SROs in the loop of plant operations. This paper will investigate, through literature review and expert interviews, the impact and human errors attributed to the increasing complexity of new digital main control rooms. Comparison of the new digital interfaces with the analog interfaces in nuclear power plants has the potential to shed light on increasing mutual awareness and three way communications between the SROs and ROs. Further, identification of the human errors and human actions can provide beneficial information, suggesting significant and critical improvements that can be implemented in the main control rooms to increase safety and reliability of new technology. Additionally, insights on mutual awareness for analog vs. digital control rooms can serve to improve human reliability.

99 GENERAL AND MISCELLANEOUS↗

Benefits of Advanced Control Room Technologies: Phase One Upgrades to the HSSL, Research Plan, and Performance Measures

Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control room. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes the initial upgrades to the HSSL and outlines the methodology for a pilot test of the HSSL configuration.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SU-F-T-217: A Comprehensive Monte-Carlo Study of Out-Of-Field Secondary Neutron Spectra in a Scanned-Beam Proton Therapy Treatment Room

Purpose: To simulate secondary neutron radiation-fields produced at different positions during phantom irradiation inside a scanning proton therapy gantry treatment room. Further, to identify origin, energy distribution and angular emission as function of proton beam energy. Methods: GEANT4 and FLUKA Monte-Carlo codes were used to model the relevant parts of the treatment room in a gantry-equipped pencil beam scanning proton therapy facility including walls, floor, metallic gantry-components, patient table and the homogeneous PMMA target. The proton beams were modeled based on experimental beam ranges in water and spot shapes in air. Neutron energy spectra were simulated at 0°, 45°, 90° and 135° relative to the beam axis at 2m distance from isocenter, as well as 11×11 cm2 fields for 75MeV, 140MeV, 200MeV and for 118MeV with 5cm PMMA range-shifter. The total neutron energy distribution was recorded for these four positions and proton energies. Additionally, the room-components generating secondary neutrons in the room and their contributions to the total spectrum were identified and quantified. Results: FLUKA and GEANT4 simulated neutron spectra showed good general agreement in the whole energy range of 10{sup −}9 to 10{sup 2} MeV. Comparison of measured spectra with the simulated contributions of the various room components helped to limit the complexity of the room model, by identifying the dominant contributions to the secondary neutron spectrum. The iron of the bending magnet and counterweight were identified as sources of secondary evaporation-neutrons, which were lacking in simplified room models. Conclusion: Thorough Monte-Carlo simulations have been performed to complement Bonner-sphere spectrometry measurements of secondary neutrons in a clinical proton therapy treatment room. Such calculations helped disentangling the origin of secondary neutrons and their dominant contributions to measured spectra, besides providing a useful validation of widely used Monte-Carlo packages in comparison to experimental data. Cluster of Excellence of the German Research Foundation (DFG) “Munich-Centre for Advanced Photonics (MAP)”.

60 APPLIED LIFE SCIENCES↗

Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

Room D was an in-situ, isothermal, underground experiment conducted at theWaste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

Room D was an in-situ, isothermal, underground experiment conducted at the Waste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under-predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under-predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initial Simulations of Empty Room Collapse and Reconsolidation at the Waste Isolation Pilot Plant

The Waste Isolation Pilot Plant (WIPP) is a geologic repository for defense-related nuclear waste. If left undisturbed, the virtually impermeable rock salt surrounding the repository will isolate the nuclear waste from the biosphere. If humans accidentally intrude into the repository in the future, then the likelihood of a radionuclide release to the biosphere will depend significantly on the porosity and permeability of the repository itself. Room ceilings and walls at the WIPP tend to collapse over time, causing rubble piles to form on floors of empty rooms. The surrounding rock formation will gradually compact these rubble piles until they eventually become solid salt, but the length of time for a rubble pile to reach a certain porosity and permeability is unknown. This report details the first efforts to build models to predict the porosity and permeability evolution of an empty room as it closes. Conventional geomechanical numerical methods would struggle to model empty room collapse and rubble pile consolidation, so three different meshless methods, the Immersed Isogeometric Analysis Meshfree, Reproducing Kernel Particle Method (RKPM), and the Conformal Reproducing Kernel method, were assessed. First, the meshless methods and the finite element method each simulated gradual room closure, without ceiling or wall collapse. All three methods produced equivalent room closure predictions with comparable computational speed. Second, the Immersed Isogeometric Analysis Meshfree method and RKPM simulated two-dimensional empty room collapse and rubble pile consolidation. Both methods successfully simulated large viscoplastic deformations, fracture, and rubble pile rearrangement to produce qualitatively realistic results. In addition to geomechanical simulations, the flow channels in damaged salt and crushed salt were measured using micro-computed tomography, and input into a computational fluid dynamics simulation to predict the salt's permeability. Although room for improvement exists, the current simulation approaches appear promising.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reconstruction of the Room D, B, G, and Q Closure Histories at the Waste Isolation Pilot Plant

Experimental measurements of room closure in salt repositories are valuable for understanding the evolution of the underground and for validating geomechanical models. Room closure was measured during a number of experiments at the Waste Isolation Pilot Plant (WIPP) during the 1980's and 1990's. Most rooms were excavated using a multi-pass mining sequence, where each pass necessarily destroyed some of the mining sequence closure measurement points. These destroyed points were promptly reinstalled to capture the closure after the mining pass. After the room was complete, the mining sequence closure measurement stations were supplemented with remotely read closure measurement stations. Although many aspects of these experiments were thoroughly documented, the digital copies of the closure data were inadvertently destroyed, the non-trivial process of zeroing and shifting the raw closure measurements after each mining pass was not precisely described, the various closure measurements within a given room were not directly compared on the same plot, and the measurements were collected for several years longer than previously reported. Consequently, the hand-written mining sequence closure measurements for Rooms D, B, G, and Q were located in the WIPP archives, digitized, and reanalyzed for this report. The process of reconstructing the mining sequence closure histories was documented in detail and the raw data can be found in the appendices. Within the mid-section of a given room, the reconstructed closure histories were largely consistent with other mining sequence and remotely read closure histories, which builds confidence in the experiments and suggests that plane strain is an appropriate modeling assumption. The reconstructed closure histories were also reasonably consistent with previously published results, except in one notable case: the reconstructed Room Q closure histories 30 days after excavation were about 45 % less than the corresponding closures reported in Munson's 1997 capstone paper.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Navier-Stokes Simulation of Airconditioning Facility of a Large Modem Computer Room

NASA recently assembled one of the world's fastest operational supercomputers to meet the agency's new high performance computing needs. This large-scale system, named Columbia, consists of 20 interconnected SGI Altix 512-processor systems, for a total of 10,240 Intel Itanium-2 processors. High-fidelity CFD simulations were performed for the NASA Advanced Supercomputing (NAS) computer room at Ames Research Center. The purpose of the simulations was to assess the adequacy of the existing air handling and conditioning system and make recommendations for changes in the design of the system if needed. The simulations were performed with NASA's OVERFLOW-2 CFD code which utilizes overset structured grids. A new set of boundary conditions were developed and added to the flow solver for modeling the roomls air-conditioning and proper cooling of the equipment. Boundary condition parameters for the flow solver are based on cooler CFM (flow rate) ratings and some reasonable assumptions of flow and heat transfer data for the floor and central processing units (CPU) . The geometry modeling from blue prints and grid generation were handled by the NASA Ames software package Chimera Grid Tools (CGT). This geometric model was developed as a CGT-scripted template, which can be easily modified to accommodate any changes in shape and size of the room, locations and dimensions of the CPU racks, disk racks, coolers, power distribution units, and mass-storage system. The compute nodes are grouped in pairs of racks with an aisle in the middle. High-speed connection cables connect the racks with overhead cable trays. The cool air from the cooling units is pumped into the computer room from a sub-floor through perforated floor tiles. The CPU cooling fans draw cool air from the floor tiles, which run along the outside length of each rack, and eject warm air into the center isle between the racks. This warm air is eventually drawn into the cooling units located near the walls of the room. One major concern is that the hot air ejected to the middle isle might recirculate back into the cool rack side and cause thermal short-cycling. The simulations analyzed and addressed the following important elements of the computer room: 1) High-temperature build-up in certain regions of the room; 2) Areas of low air circulation in the room; 3) Potential short-cycling of the computer rack cooling system; 4) Effectiveness of the perforated cooling floor tiles; 5) Effect of changes in various aspects of the cooling units. Detailed flow visualization is performed to show temperature distribution, air-flow streamlines and velocities in the computer room.

Source record↗

Tritium Removal System for Airtight Room in High-flux Advanced Neutron Application Reactor (HANARO) - 12110

An Airtight room was installed to prevent the diffusion of tritium from the instrument room to other areas in HANARO. It was isolated by a robust structure and the inside was closed tightly. A Tritium removal system located outside the instrument room was connected to the airtight room to lower the tritium concentration when the workers enter the room for maintenance of the instruments. The tritium concentration and the dew point in the airtight room were continuously measured during the operation of the tritium removal system. The data were analyzed by using a model. There was a difference between the measured tritium concentration and the one obtained by the model. It is believed that the difference is due to the change of the generation rate of tritium which would increase as the dew point becomes lower. Based on this assumption, the previous equation was revised to better express the performance of the tritium removal system. It was re-estimated that the change of tritium concentration in an airtight room could be predicted well by using a model and equation proposed in the previous study. It was confirmed that there was a definite difference between the measured tritium concentration and the one obtained by equation from the model. It is believed that the difference is due to the change of the generation rate of tritium which would increase as the dew point becomes lower. Based on this assumption, the generation rate of tritium was controlled to have higher value and the change of tritium concentration in airtight room could be more correctly predicted. By using the revised equation, the tritium removal system would be operated more effectively. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Efficiency in Small Server Rooms: Field Surveys and Findings

Fifty-seven percent of US servers are housed in server closets, server rooms, and localized data centers, in what are commonly referred to as small server rooms, which comprise 99percent of all server spaces in the US. While many mid-tier and enterprise-class data centers are owned by large corporations that consider energy efficiency a goal to minimize business operating costs, small server rooms typically are not similarly motivated. They are characterized by decentralized ownership and management and come in many configurations, which creates a unique set of efficiency challenges. To develop energy efficiency strategies for these spaces, we surveyed 30 small server rooms across eight institutions, and selected four of them for detailed assessments. The four rooms had Power Usage Effectiveness (PUE) values ranging from 1.5 to 2.1. Energy saving opportunities ranged from no- to low-cost measures such as raising cooling set points and better airflow management, to more involved but cost-effective measures including server consolidation and virtualization, and dedicated cooling with economizers. We found that inefficiencies mainly resulted from organizational rather than technical issues. Because of the inherent space and resource limitations, the most effective measure is to operate servers through energy-efficient cloud-based services or well-managed larger data centers, rather than server rooms. Backup power requirement, and IT and cooling efficiency should be evaluated to minimize energy waste in the server space. Utility programs are instrumental in raising awareness and spreading technical knowledge on server operation, and the implementation of energy efficiency measures in small server rooms.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design themes for future hybrid nuclear power plant control rooms - 383

As nuclear power plants (NPP) control rooms are updated and new technologies added, a new hybrid control room is set to emerge and with it new safety implications for design. This paper highlights two technologies determined to be highly relevant for control room modernization: overview displays and computer-based procedures. Control room operators were observed in the simulator, while conducting abnormal and emergency scenarios. Additionally, operators were observed and interviewed in the control room during normal operations. Design themes for both of the technologies are discussed. Results revealed ten main design themes for overview displays, including observations of the system used currently in order to provide overview information. The results revealed three main design themes for computer-based procedures that were more directed at an envisioned world, since these technologies are not deployed currently. This evaluation elicited considerations for requirements for future control room system designs and recommendations for hybrid NPP control rooms. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improbability of Post-Closure Criticality in Compacted Criticality Control Overpacks after Room Closure at Waste Isolation Pilot Plant

As part of its periodic re-certification of the Waste Isolation Pilot Plant (WIPP), an operating repository in bedded salt for the disposal of transuranic (TRU) waste from atomic energy defense activities, the United States Environmental Protection Agency expects a re-evaluation of features, events, and processes, such as post-closure nuclear criticality. Although salt creep beneficially encapsulates the TRU waste in the closed WIPP repository, the spacing between an array of waste packages is disrupted as the salt creep closes disposal rooms and containers lose structural integrity. For most TRU waste, the possibility of post-closure criticality is exceedingly small either because the salt neutronically isolates TRU waste canisters or because closure of a disposal room from salt creep does not sufficiently compact the low mass of fissile material. The criticality evaluation was updated, however, because of the introduction of criticality control overpack (CCO) containers, which may dispose up to 380 fissile gram equivalent plutonium-239 in each container. The criticality potential is evaluated through high-fidelity geomechanical modeling of a disposal room filled with CCO containers during two representative conditions: (1) large salt block fall, and (2) gradual disposal room closure from salt creep. Geomechanical models of roof fall demonstrate three tiers of CCO containers are not greatly disrupted. Geomechanical models of gradual room closure from salt creep (without brine seepage and subsequent gas generation to permit maximum room closure) were used to predict irregular arrays of closely packed CCOs after 1000 years, when room closure has asymptotically approached maximum compaction. Models of spheres or cylinders with 380 fissile gram equivalent of plutonium (as oxide) at the predicted irregular compacted spacing demonstrate that an array of CCO containers is not critical when surrounded by salt and magnesium oxide, provided the mass of hydrogenous material shipped in CCO containers (usually plastics) is controlled or boron carbide (a neutron poison) is mixed with the fissile contents.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Helmholtz resonance behavior of single and multiple rooms

The results of exploratory measurements of the noise fields inside rooms which are excited to resonance either acoustically or mechanically are presented. The data illustrate the nature and extent of the sound pressure level enhancements in single rooms and also how multiple rooms may resonate by means of either acoustic or mechanical coupling. Sound pressure level enhancements of about 5 dB were measured during resonance of rooms having flexible walls. For such conditions the sound pressure levels in the room were essentially uniform and in phase. Variability of up to 20 dB was measured in a room hallway complex having significant acoustic interactions. Resonant frequency prediction methods which work well at model scale, give only fair results for rooms.

Hubbard, H. H.↗

The Aircraft Simulation Role in Improving Flight Safety Through Control Room Training

NASA Dryden Flight Research Center uses its six-degrees-of-freedom (6-DOF) fixed-base simulations for mission control room training to improve flight safety and operations. This concept is applied to numerous flight projects such as the F-18 High Alpha Research Vehicle (HARV), the F-15 Intelligent Flight Control System (IFCS), the X-38 Actuator Control Test (XACT), and X-43A (Hyper-X). The Dryden 6-DOF simulations are typically used through various stages of a project, from design to ground tests. The roles of these simulations have expanded to support control room training, reinforcing flight safety by building control room staff proficiency. Real-time telemetry, radar, and video data are generated from flight vehicle simulation models. These data are used to drive the control room displays. Nominal static values are used to complete information where appropriate. Audio communication is also an integral part of training sessions. This simulation capability is used to train control room personnel and flight crew for nominal missions and emergency situations. Such training sessions are also opportunities to refine flight cards and control room display pages, exercise emergency procedures, and practice control room setup for the day of flight. This paper describes this technology as it is used in the X-43A and F-15 IFCS and XACT projects.

Shy, Karla S.↗

True Cost of Amateur Clean rooms

This viewgraph document reviews the cost factors for clean rooms that are not professionally built, monitored or maintained. These amateur clean rooms are built because scientist and engineers desire to create a clean room to build a part of an experiment that requires a clean room, and the program manager is looking to save money. However, in the long run these clean rooms may not save money, as the cost of maintenance may be higher due to the cost of transporting the crews, and if the materials were of lesser quality, the cost of modifications may diminish any savings, and the product may not be of the same quality. Several examples are shown of the clean rooms that show some of the problems that can arise from amateur clean rooms.

Ramsey, W. Lawrence↗

Lessons Learned from Performing a Human Factors Engineering Validation of an Upgraded Digital Control System in a Nuclear Power Plant Control Room

The United States' fleet of nuclear power plants (NPPs) have exceeded their original 40-year licenses and many are seeking license renewals to continue operations into the future. To support continued operation the Department of Energy's (DOE) Light Water Reactor Sustainability Program (LWRS) provides support for utilities to maintain and upgrade their power production capabilities. Control room modernization is one focus area, which aims to modernization the analog control rooms with digital controls and human-system interfaces (HSIs). The Turbine Control System (TCS) is a non-safety related system undergoing modernization efforts at multiple plants and utilities. Considerable human factors research efforts, comprised of expert reviews and operator in the loop studies were performed to develop human factors compliant and usable TCS. This report documents the final phase of the human factors engineering program used to design and validate the new digital TCS. According to the NUREG-0711 review guide, one of the last steps of human factors engineering program prior to implementation is human factors validation. This report details the method, results and conclusions from the human factors validation study of a collaborating utilities TCS slated to be implemented in one of their plants. One control room team consisting of two control room supervisors and two reactor operators participated in the validation. All team members had participated in the BNP TCS training program foregoing the TCS validation. Performance measures included task performance, situation awareness and workload, expert observation of any negative influences of human-system interface features on control room team performance, and interviews with the participating operators. Performance criteria were based on the performance scores and the topics identified by interviews and expert observations. The results showed that the crew using the new TCS clearly could achieve their overall objectives in the test scenarios with sufficient situation awareness. The new TCS compared to the old system provided clear improvements of the control room work regarding shell and chest warming and regarding valve and other system testing. However, a number of Human Engineering Discrepancies (HEDs) were identified. HEDs were prioritized (level 1, 2 or 3) according to potential safety, plant availability, operability or personnel performance consequences. Since no priority 1 HEDs were identified there is no HFE reason not to continue implementation of the TCS. The TCS upgrade is acceptable if the Priority 2 HEDs are resolved and dispositioned in a satisfactory way. Priority 3 HEDs should be noted and considered for future modifications.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗