At least 127 records · Page 7

Feedback on Forty-year Long Clean-up Operations of a Contaminated Soil for Environmental Purpose - 20026

One of the CEA facilities in France is the place of miscellaneous mapping and clean-up operations since the 1980's. The final purpose of the conducted work deals with the environmental remediation of the building. In France, the absence of a regulatory framework for the management of sites polluted by radioactive substances, especially as the lack of release thresholds, has led to develop different approaches of soil radiological characterization. The geostatistical approach is part of them. Preliminary investigations are an unavoidable step prior to clearance and remediation. First, historical analysis enables to define site perimeters to investigate as well as to precisely locate expected contaminated parts. For radioactive pollutants, the media (water, soil, air) and transfer routes participate in the definition of the investigation perimeter and thus also need to be identified through a geological study. At the same time, functional analysis leads to choose the best measurement means which could provide useful information when combined with visual inspection. An equipment well adapted to easy-to-measure radionuclides as gamma emitters, such as gamma probe or on-site gamma spectrometry, is usually selected as a non-destructive assay. Coupled with spatial positions, processed on-site radiological data can be mapped. Data processing consists in mapping and kriging before a geostatistical analysis in order to identify the zones of interest to be targeted. Selected zones are not only linked to high level count rates but also to low level ones so that a pollution-free reference is known in the area. This data processing also enables to categorize waste types according to their origin and contamination levels. An expected volume of different waste then follows as well as the waste characterization equipments. In-depth investigations, e.g. core drillings and samplings, naturally ensue to aim at remediation optimization through the assessment of environmental impact. After clean-up operations, non-destructive assays as well as destructive samplings enable to check the effective clearance. Following this methodology in the present remediation work, results of the first non-destructive assay campaign highlighted a long-lived transuranic radionuclides contamination in the concrete flagstone. Successive non-destructive assays were then performed in the defined zones of interest. Count rates measured with a surface probe were first mapped. The best localization of destructive assays, i.e. core drillings at a 1 meter depth, came from this surface mapping followed by a geostatistical analysis. The concrete flagstone was totally removed. Then, the depth of soil to remove under the flagstone was optimized from the results of radiological activities measured in core drillings samples. A new surface mapping was then drawn after this partial soil excavation. The sand and demolition rubble samples, homogeneously constituted from the flagstone fragments, were analyzed by gamma spectrometry. Meanwhile, waste drums and other containers were also measured by gamma spectrometry and passive neutron measurement devices. All these results have brought miscellaneous pieces of information. In this context, major issues appear in terms of physical constraints such as the premises tininess as well as of soil sampling techniques and in terms of measurement performances assessment and the representativeness of homogeneous samples. The choice of radiological soil and waste characterization devices is described in the light of enhanced performances by keeping in mind radiation protection requirements and a willing to always optimize waste categories (very low level waste) and volume. The improvement of the characterization methods appears through this forty-year long work while sharing the feedback of encountered difficulties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conventional and Next Generation Treatment Technologies for PFAS - 20067

In 2016, the United States Environmental Protection Agency (USEPA) established a Health Advisory Limit (HAL) for perfluorooctanoic acid (PFOA) and perfluorooctane sulfonic acid (PFOS) (individually and the summation) of 70 nanograms per liter (ng/L) based on developing toxicological information. These two compounds are among several thousand per- and polyfluoroalkyl substances (PFAS). Due to a multitude of commercially beneficial physical and chemical properties, the availability of PFAS-relevant and practical water treatment technologies is limited. The use of conventional adsorbents, such as activated carbon (AC) and anion exchange (AIX) resins, have become a 'de facto' interim measure to immediately address drinking water above this criterion. However, these adsorbents can have marginal long-term efficiency and are relatively unproven against the diversity of polyfluorinated compounds. Additionally, geochemical and/or co-contaminant competition can significantly impede adsorption based PFAS removal. These challenges may be addressed using engineered filtration, such as reverse osmosis or nanofiltration (RO/NF); however, for larger flow systems RO/NF may have unacceptable reject ratios as high as 35% and the capital cost may preclude these technologies. Extending these technologies to natural waters, which have various degrees of geochemical and co-contaminant competition, often requires a treatment train, combining conventional adsorbents or engineered filtration with pretreatment and more innovative and emerging remediation solutions for PFAS. Conventional and Next Generation water treatment technologies for PFAS generally employ one of three mechanisms (adsorption, separation, or destruction). These mechanisms include many types of technologies for both municipal drinking water and extracted natural water applications. The previously mentioned AC, AIX, and RO/NF are commercially available technologies that are actively being deployed for PFAS treatment. Research and development around these technologies is focused on optimization, and ultimate destruction of PFAS is achieved through incineration. Next Generation water treatment technologies include PFAS-specific flocculants, foam fractionation, novel AIX resins, new engineered adsorptive media, electrochemical treatment, sonolysis, and photolysis, radiation, and plasma (forms of advanced reductive processes [ARP]). Research and development around these technologies is focused on proof of concept and assimilation to real world applications. As the PFAS-relevant destructive technologies (such as incineration, electrochemical treatment, sonolysis, and ARP) are energy intensive, the state of the practice for PFAS water treatment is to focus adsorption/separation based technologies on reducing and concentrating the volume of water requiring destructive treatment. This enables more flexibility with respect to circulation frequency, residence time, and more control over energy usage. Water treatment for PFAS presently requires multiple technologies (i.e. a treatment train) to protect human health in a cost-conscious manner. An investment in research and development to explore new technologies is part of a key initiative for efficient protection of human health. This presentation attempts to review PFAS-relevant water treatment technologies and provide perspective as to their status with respect to applicability and commercial relevance. (authors)

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Advances in PFAS Monitoring and Remediation Using a Functionalized Material Approach - 20080

The growing global concerns about the effects to public health from human exposure to per- and polyfluoroalkyl substances (PFAS) motivates the development of strategies for reliable monitoring of PFAS in environmental streams, as well as for their rapid, effective removal if detected. For the continuous PFAS monitoring, an inexpensive, field-deployable, in situ sensor is urgently needed; yet the prevalent in situ techniques often struggle to strike a balance between the practical sensitivity and selectivity demands of the real world. Similarly, for effective PFAS removal, strategies for their fast, selective, and quantitative capture are desired, yet the present commercially available sorbents are unable to meet the requirements of rapid, quantitative capture of all PFAS components, and are notably inefficient in removing the more toxic smaller chains. To address these twin challenges, Pacific Northwest National Laboratory is developing strategies for improved detection and remediation of PFAS. For the rapid, selective, quantitative removal of PFAS from environmental streams, the strategy relies on designing capture probes with exclusively tailored electronic and spatial affinities for the PFAS that are able to selectively capture them from environmental streams. For the in situ detection and quantification of PFAS in complex, multicomponent matrices such as groundwater, the approach relies on the targeted capture of specific PFAS by these PFAS-specific capture probes immobilized on a platform. The platform acts as an electrode to directly measure PFAS concentration through a proportional change in electrical response upon their capture. A combination of optimization of platform design and incorporation of additional, sensitive detection modalities have allowed us to achieve detection limits as low as 0.5 ng/L for detection of PFAS compounds (compared to the 70 ng/L Health Advisory Limit of the U.S. Environmental Protection Agency). (authors)

47 OTHER INSTRUMENTATION↗

Development of an In-Situ Leaching Technology for Extracting Residual Uranium from Remediated Soil - 20099

Site-specific chemical solutions for extracting uranium were developed and evaluated for treating previously remediated soil at a former thorium mill tailings site, known as the Former Rare Earths Facility (REF), in West Chicago, Illinois. Prior remediation efforts had resulted in residual sand and gravel aggregate that met the soil cleanup standards. The target soil contains residual levels of uranium, which continues to leach into the site groundwater at levels exceeding groundwater protection standards (GWPS). A series of bench-scale tests were conducted to evaluate the efficacy and viability of in-situ leaching (ISL) technology to treat the target soil for the purposes of attaining uranium GWPS at the REF. Specific objectives of the bench-scale tests entailed identification and selection of optimal leaching, quantification of the extent and rate of uranium released as a function of chemical composition, chemical concentrations, chemical residence times, and obtaining critical data to estimate treatment costs. A combination of sodium bicarbonate and sodium carbonate reagent was the most effective leaching solution. In general, leaching solutions containing a higher concentration of sodium carbonate demonstrated superior uranium leaching capabilities. Removal of 50% of the uranium mass from the soil matrix was adequate for achieving compliance with the site-specific GWPS. After six to seven pore volume flushes (PVFs), the uranium leaching effectiveness of all leaching solutions was similar. The amount of initial uranium removed with each subsequent PVF was minimal, suggesting limited solubility of the remaining mass of uranium. The effects of leaching duration were significant and persisted through at least the first five consecutive PVFs. Leaching of uranium also resulted in leaching of several non-uranium constituents, many of which exceeded applicable National Pollutant Discharge Elimination System (NPDES) standards. Given historical operations and waste disposal practices at the site, leaching of non-uranium constituents was expected. Hydrochloric acid was used to stabilize treated soil. Savings of approximately $148 million in direct and indirect remediation costs are expected with an ISL alternative compared to the excavation and landfill disposal remediation option. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update to the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20124

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement (DAS) from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance. In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. In accordance with the guidance and recommendations in US DoE's technical standard for DAS, deterministic and probabilistic analyses were performed to demonstrate the SDF system, which includes the engineered cover system, the SDUs, the waste form, and the natural features of the site, provides a reasonable expectation that saltstone disposal will meet performance objectives. Post-closure doses to future members of the public (MOP) were evaluated; dose estimates from the air pathway were well below the 1.0 E-04 Sv/yr (10 mrem/yr) performance objective within 1,000 years, and the calculated doses to the MOP from all exposure pathways, including the groundwater and air pathways, were well below the 2.5 E-04 Sv/yr (25 mrem/yr) performance objective within 1,000 years. Doses following an assumed intrusion event within the facility boundaries were well below the IHI performance objectives, where the acute IHI dose was below the acute IHI dose performance objective of 5.0 E-03 Sv (500 mrem) and the chronic IHI dose was below the chronic IHI dose performance objective of 1.0 E-03 Sv/yr (100 mrem/yr) within 1,000 years. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reducing Cost of Chlorinated Volatile Organic Compound Remediation by Transitioning from Active to Passive Soil Vapor Extraction - 20157

Areas of high chlorinated volatile organic compound (cVOC) contamination at the Savannah River Site (SRS) have been undergoing remediation via soil vapor extraction, sometimes coupled with thermal treatments to enhance extraction rates. These active systems are effective in removing large amounts of contaminant mass from the subsurface and mitigating the impacts to groundwater. However, as extraction rates decline, costs must be evaluated with respect to the benefit of continued active operation. A decision framework for identifying conditions when a transition to a more passive remediation is appropriate has been developed with state and federal regulatory agencies. Two remediation areas have recently been transitioned from active soil vapor extraction (ASVE) to passive soil vapor extraction (PSVE) at the SRS. Performance evaluation goals including plume stabilization, overall mass removal trends, environmental sustainability and costs were considered in transitioning from active remediation to passive technologies at both sites. At the Dynamic Underground Stripping (DUS) project at the M-Area Settling Basin, ASVE was combined with steam injection to extract cVOCs during active operations. Steam injection occurred from September 2005 to September 2009. DUS utilized 63 steam injection wells, 34 active vapor extraction wells, and 3 active soil vapor extraction units (SVEUs). Two active SVEUs had 60 horsepower blowers; the third had a 25-horsepower blower. Mass removal was closely tracked during DUS operations; over 181,437 kilograms (400,000 pounds) of cVOCs were removed while active steam injection occurred. After steaming was stopped, ASVE continued. The 34 active wells were evaluated in 2012. The ASVE wells were grouped into categories of high, medium, and low extraction rates. High producing wells remained connected to a single active SVEU. Low producing wells were abandoned, and the medium producing wells were transitioned to PSVE (Microblowers{sup TM}). Microblowers{sup TM} utilize a dedicated blower per well and are solar powered. This passive technology provides energy, maintenance, and operation costs savings while still providing an efficient reduction in cVOC migration to groundwater. In 2018, the remaining ASVE wells were evaluated again. The purpose of this testing was to identify which wells removed the most mass. An optimal well configuration was determined. The criteria to discontinue ASVE was removal of less than 18 kilograms (40 pounds) per week of cVOCs. After 3 months of shutdown (rebound conditions), 2.7 kilograms (5.9 pounds) of cVOCs per week were being removed. Data from the rebound test justified ending ASVE and transitioning wells with higher extraction rates to PSVE. Wells that had depleted the cVOC mass within their zone of influence were abandoned. Performance data from existing PSVE wells justified ending PSVE at wells with depleted extraction rates. Currently the system has 16 PSVE wells operating. Another ASVE system was being used to treat cVOC contaminated soil at the A-Area Miscellaneous Rubble Pile (AMRP) at SRS. System operation began in 2004, with 7 ASVE wells connected to a 60- horsepower blower. Mass removal rates and contaminant concentrations remained consistently low over the ASVE lifespan at AMRP. This indicated that mass removal was diffusion limited. With this data, the 7 ASVE wells were transitioned to PSVE in 2017. Twelve pressure monitoring points were also transitioned to PSVE wells. AMRP currently has 19 PSVE wells operating. Both transitions from active to passive remediation had concurrence from the United States Environmental Protection Agency and the South Carolina Department of Health and Environmental Control. These transitions ensure that only the necessary amount of energy is being exerted to remediate the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Full-Scale Implementation of Propane Biosparge System for In-Situ Remediation of 1,4-Dioxane - 20174

1,4-Dioxane is a common co-contaminant with chlorinated solvents but is not readily remediated via similar treatment approaches (e.g., sorption, reductive dechlorination). However, 1,4-dioxane can be cometabolically biodegraded in the presence of alkane gases and oxygen. At Vandenberg Air Force Base in California, USA, historical use of chlorinated solvents resulted in 1,4-dioxane in groundwater across three vertical groundwater zones. Between April 2013 and December 2016, laboratory testing and various field demonstrations were conducted by us, and others. The results from these tests showed in-situ propane biosparging as a promising technology for reduction of both chlorinated solvent and 1,4-dioxane concentrations, with up to 99 percent reduction in groundwater concentrations. Stable isotope probing (SIP) was also used in 2015 to verify that biodegradation was a (destructive) mechanism occurring in the subsurface.). The success of the propane biosparge demonstrations, and confirmation of the biodegradation mechanism via SIP, has led to the full-scale implementation of a propane biosparge treatment system at Site 24 at Vandenberg Air Force Base. The treatment area is a relatively small footprint (e.g., less than 61 meters (200 feet) long), with 83 new wells installed simultaneously across the three groundwater zones. Ultimately 93 wells will be connected to an above-ground treatment system the includes an air compressor, a propane tank, controls to ensure safe operating conditions, and nutrient amendment elements. This full-scale system is currently known to be among the first of its kind. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of FREMES to Characterize and Sort Soil During Site Remediation - 20182

During decommissioning of buildings and the related release of nuclear sites, large amounts of bulk materials such as soil must be measured for clearance. These measurements are required to demonstrate that for example potentially contaminated soil is below the respective radiological limits. Doing so also helps to minimize the amount of bulk material which has to be disposed of as nuclear waste. NUKEM Technologies Engineering Services GmbH (NUKEM) applies their FREMES technology in a project at the former fuel element factory of FBFC International at Dessel, Belgium. The purpose is to measure and check for potential contamination within the excavated soil. The project started in 2017 with design and procurement of the necessary equipment. In October 2017 the FREMES system was installed at the site. After installation and an extensive test program the FREMES facility went fully into operation in July 2018. Original foreseen to measure between 4.000 and 8.000 tons of material, it has currently (mid 2019) measured 23.600 tons. It is expected that another 5.000 tons still have to be measured before the project successfully ends. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The HRA/Solarium Project: Feedback Based on 20 Years of Experience in Treatment of Medium Level Waste - 20185

Since the 1980's the management of the historical site of Mol has been transferred to the National Agency for Radioactive Waste and Enriched Fissile Materials (ONDRAF/NIRAS). Belgoprocess is entrusted by ONDRAF/NIRAS with the operational waste management and site remediation. One of the major challenges has been the characterization, treatment and conditioning of approximately 200 m{sup 3} of medium level waste. These waste packages were stored in poor conditions in storage vaults ('HRA') or concrete containers ('Solarium'). They have been produced in various research programs and reactor operations at the Belgian nuclear energy research centre SCK.CEN, isotope production, decontamination and dismantling operations from the 1960's up to the 1980's. Despite the limited volume, this historical waste consists of a great variation of waste characteristics and waste configurations. To tackle these liabilities, a new processing facility was built in the 1990's to allow safe transfers, handling, characterization and treatment of these packages. Also some auxiliary facilities have been built to deal with the by-products, like emptied concrete containers. The engineering of the installation, safety procedures and (characterization) methodology that has been developed generically have been proved to be successful. Nevertheless, the specific nature of some items made it necessary to organize a step-by-step treatment in distinct campaigns in which some relevant extra (safety) measures had to be taken into account. This dynamic approach made it possible to process a great variety of waste types in order to to ensure that this legacy is no longer left for subsequent generations. After about 20 years of operations, there has been a great build-up of experience and feed-back concerning the waste management of these specific waste streams. Some cases will be highlighted to specify the approach followed for treatment of e.g.: - Na/NaK containing equipment; - spent radioactive sources; - fuel element residues; - medium level waste originating from activation experiments; - radium bearing medium level waste originating from Ac-227 production research. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

The Use of Silver Chloride Injection in Remediation of Iodine-129 by In Situ Capture as Silver Iodide at the F-Area Seepage Basin - 20225

The Savannah River Site (SRS) produced tritium, plutonium, and special nuclear materials for national defense, medicine, and the space programs. As part of operations, the F-Area Seepage Basins operated until 1988 for the disposition of deionized acidic wastewater from the F Separations Facility. The wastewater contained dilute nitric acid and low concentrations of non-radioactive metals, and radionuclides, with the major isotopes being Cs-137, Sr-90, U-235, U-238, Pu-239, Tc-99, I-129, and tritium. The seepage basins were closed in 1988 and backfilled and capped by 1991. The groundwater emanating from beneath the closed and capped seepage basins is acidic and contains elevated levels of both chemical and radiological contaminants. Releases from the groundwater plumes sourced from the F-Area Seepage Basins have impacted the water quality of Fourmile Branch, which is a small tributary to the Savannah River, a regional water source. A large pump-and-treat system was constructed in 1997 and operated until 2003 in an attempt to capture the releases to Fourmile Branch. The system in F Area and a similar system in H Area were expensive (∼$1.3 M/month) to operate and produced large quantities of radioactive waste, with concentrations of I- 129 too high to be disposed of at the SRS. In 2004, SRS replaced pump-and-treat with a funnel and gate system that along with operation of a base injection system at the gates reduces the flux of contaminants to the wetlands adjacent to Fourmile Branch. The alkaline solution injected into the aquifer neutralizes the acidic plume and immobilizes many of the cationic constituents. However, base injection is not effective in managing the release of iodine-129, an anionic contaminant. To address iodine-129 SRS and the Savannah River National Laboratory developed an in situ technology that uses ultra-fine ground silver chloride (AgCl) as an injectable capture medium for the sequestration of iodine-129. The AgCl amendment has a very small particle size and is designed to be injected into the contaminated aquifer to capture iodine-129. Dissolved iodine-129 forms a stable and highly insoluble solid (silver iodide) upon contact with AgCl. Laboratory studies, a field scale pilot test (2009), and three deployments (2011, 2015 and 2019) of AgCl have been successfully performed at the F-Area Seepage Basins. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk to Ecological Resources on Burial Waste Sites on the Hanford Site, Washington - 20248

The US and other nations have a large nuclear and chemical waste remediation task remaining from World War II, the Cold War, and industrial activities. The US Department of Energy (DOE) has the largest task in the U.S., with Hanford (Washington State) being the most contaminated site, with the longest and most costly cleanup program projected to extend to the end of the century. One of the greatest remediation problems at Hanford are the burial waste facilities, some of which are inside the 200 Areas on the Central Plateau, while others are outside the 200 Areas. These areas are associated with waste sites, pipes, and contaminated trenches, posing technical cleanup challenges to meet DoE's remediation goals, including protection of human health and the environment commensurate with Tri- Party Agreement and current regulatory requirements. In this paper we select one of the legacy waste sites (the BC Cribs and Trenches) as a case study to explore how risk to ecological resources varies during and as a consequence of remediation on sites primarily considered legacy waste sites. We used the risk methodology developed by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) during the Hanford Site-wide Risk Review. The CRESP methodology included evaluating the risk to receptors, including human health, the Columbia River, groundwater, and ecological and cultural resources. The risk evaluation process for ecological receptors included defining the boundaries of each evaluation unit (EU) to be remediated, definition of a suitable buffer area that might be affected, and consideration of the known resource value based on field work. This information, coupled with known remediation options or strategies, allowed us to develop a risk rating for ecological resources. Site risks were evaluated on a scale of 'not discernible' to 'very high' risk. Consideration of the risks at the buried waste sites was complicated by uncertainties in remediation methods and the degree of restoration that would occur as part of the remediation process. We use the BC Cribs and Trenches as a case study to explore why the risks are low currently but increase during remediation. The current 'not discernible to low' risk rating is due to the lack of high quality ecological resources on the BC Cribs and Trenches EU, except for edge areas (with some state-listed species). During remediation the risks increase to 'medium', mainly due to high quality resources on adjacent buffer lands, which could be disrupted during active remediation. Medium and high quality resources on the edge of the site are continuous with higher quality native shrub-steppe habitat on the buffer. Ecological resources on some of the areas surrounding the 200 East and West Areas are some of the highest quality shrub-steppe areas on the Hanford Site, and risk to these resources could be prevented by planning before and during remediation to minimize disruption. For example, lay down areas for the BC Cribs and Trenches can be minimized by careful planning. Heavy truck and other vehicular traffic can be minimized. Spread of the noxious weeds now on some of the site can be prevented, and the spread of invasive species into the site (particularly near undisturbed shrub-steppe habitat) can be reduced. Further, the areas around and between the 200 East and West Areas have been largely undisturbed and can serve as a source of seeds and propagules for any revegetation that occurs as part of the remediation process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Temporary Storage Sites in Support of the Port Hope Area Initiative - 20295

The Port Hope Area Initiative is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope which is located in Ontario, Canada. The Eldorado refinery, on the north shore of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium. Through the history of the operation, LLRW was deposited throughout the town of Port Hope as a result of fugitive emissions from the plant and/or through the re-use of process residues as building material and backfill. Historical clean-up activities conducted in the late 1970's involved the remediation of approximately 400 properties and the relocation of 100,000 cubic metres of contaminated soil to a disposal facility in Chalk River operated by Atomic Energy of Canada Limited (AECL). Owing to space limitations at that disposal facility, any LLRW identified through construction monitoring since that time has been stored in the community at three temporary storage sites located throughout the town. These include: the Centre Pier mound that contained approximately of 19,800 m{sup 3} of LLRW-impacted soil that originated from the construction of a new water treatment plant; two mounds located at a licensed storage facility containing LLRW obtained from residential clean-up activities (11,000 m{sup 3}); and a small pad adjacent to the municipal sewage treatment plant containing 2200 m{sup 3} of LLRW-containing sludge. With the construction of a new long-term waste management facility (LTWMF) that has been designed to house all of the LLRW identified within Port Hope, the three sites were early candidates for remediation. The clean-up of the three temporary storage sites was a significant milestone for the Port Hope Area Initiative. After a decade of planning and consultation, this work represents the first sites in the municipality to be remediated with the waste being safety removed and transferred to the newly constructed LTWMF. This paper discusses the challenges associated with the clean-up activities for these three sites and the strategies employed to address those challenges. These included weather-related challenges, owing to the seasons over which the work was conducted as well as those associated with working within a closely-knit community. Canadian Nuclear Laboratories (CNL), working on behalf of the federal government, has worked diligently to develop a positive and trusting relationship with the community. Consequently, the successful execution of this project needed to be sensitive to, and respectful of the needs of the community. In addition to the usual Health, Safety and Environment training, project staff received community awareness training that spoke to the history of this community-based initiative and the expected behavior when working within the community. Transportation routes were defined based on safety and the need to minimize disruption to local traffic while haul-times where scheduled around school bus hours to enhance public safety. The successful completion of this first of many remediation projects to be completed under the Port Hope Area Initiative reflected years of careful planning. Nevertheless, there were a number of 'lessons learned' that have been applied on other ongoing projects be completed under the Port Hope Area Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Data Review of Analytical Laboratory Results at Los Alamos National Laboratory - 20299

Newport News Nuclear BWXT-Los Alamos, LLC (N3B) collects samples in support of the U.S. Department of Energy's (DOE) Office of Environmental Management (EM) Los Alamos Legacy Cleanup Contract (LLCC). N3B receives and reviews over 1.6 million sample data points annually in support of various ongoing environmental monitoring and remediation projects of the LLCC. N3B must demonstrate and document that reported external analytical laboratory data produced for the LLCC are of sufficient quality to fulfill their intended purpose and to support defensible decision making as described in EPA QA/G4 Guidance for the Data Quality Objectives Process 1994. In 2018, N3B assumed management of the LLCC along with the Environmental Information Management (EIM) database that contains all historical and current environmental data associated with the LLCC. The entire EIM database is shared between N3B, Triad National Security, LLC (Triad), and New Mexico Environment Department (NMED). These three parties jointly manage the database, its configuration, and changes / updates. All environmental data that are entered into EIM are updated and available, on a daily basis, in the linked public database Intellus New Mexico (Intellus). The quality and defensibility of the environmental data generated from sampling activities is a key component of an effective remediation process. Providing quality data is accomplished through a data assessment process that includes examination, verification, and validation. Examination is the assessment of completeness of the deliverables, identification of any reporting errors, and determining the usability of the data based on the laboratory's evaluation of its data as described in the case narrative received with the data. Verification consists of an evaluation of the Electronic Data Deliverables (EDD) data report to determine the extent to which the external analytical laboratories met method and contract-specific quality control and reporting requirements. Validation consists of determining the data quality and the extent to which the external analytical laboratories accurately and completely reported all sample and quality control results and satisfied all contract requirements. EIM contains an automatic Data Validation Module which performs automated data review (DVM ADR). DVM ADR is a tool to assist in the validation process. When DVM ADR is used in conjunction with manual examination of sample data packages, the combination of the two will meet and exceed the requirements of verification. N3B recognized an opportunity for process improvement, focusing on DVM ADR configuration and enhancements in EIM. Testing EIM's configuration provided proof of the DVM ADR's capabilities and flexibility to accurately perform routine data checks based on analytical methods and regulatory requirements. In addition, the DVM ADR module was improved through enhancements for all analytes, particularly upgrades for radiochemistry data. Extensive testing of the DVM ADR module occurred using EDDs from actual laboratory analyses on the EIM testing site. During this process, N3B manipulated EDD information to verify that the actual outcomes matched the expected outcomes. The results of this testing were shared with the database architects, and configuration improvements were identified to address these results. During this process, N3B identified that the radiochemical DVM ADR capabilities were underutilized, and so enhanced the DVM ADR functionality with respect to radioanalytical assessment. N3B environmental data uploads to Intellus on a daily basis from EIM, once the analytical data undergoes examination and verification. As such, it is important to have a high level of confidence in the quality and defensibility of the data. The process of manual examination, along with the DVM ADR, in conjunction with full validation of a percentage the data specified through the Data Quality Objectives greatly increases efficiency of data review and confidence level of the quality of the data, and gives the project managers, governmental offices, and the public expedited access to high-quality data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation into Reductive Separation of Tc-99 from Low Activity Waste Off-Gas Condensate by Zero Valent Iron Materials - 20311

This study is investigating the potential for reductive separation of technetium-99 (Tc) from off-gas condensate generated from vitrification of legacy tank waste at the Hanford Tank Waste Treatment and Immobilization Plant. Management of Tc is a high-priority activity for the U.S. Department of Energy (DOE) Office of Environmental Management (EM) complex, which must be addressed based on knowledge gaps and technology development needs outlined in the DOE-EM Technetium Management Program Plan [1]. Technetium is one of the main risk drivers in the permanent disposal of low activity waste (LAW) by vitrification at the Hanford Site due to its high volatility and only fractional incorporation into borosilicate glass. Volatilized Tc will be captured by an off-gas treatment system, and the current plan is to continuously recycle generated condensate back to the LAW glass melter feed. Off-gas recycling is effective at increasing Tc loading in the LAW glass, but it also disproportionately increases concentrations of sulfate, halides, and other volatile compounds impeding overall LAW processing leading to significantly greater waste glass volume requirements. Removal of Tc from secondary liquid waste offers an alternative disposal route to continuous off-gas recycling which may result in significant reduction of the volumes of LAW waste glass and substantial cost savings. The objective of this research funded by the DOE-EM Minority Serving Institutions Partnership Program (MSIPP) is to determine the suitability of zero valent iron (ZVI) as a separation technology to remove Tc from the off-gas condensate stream to minimize its recycle. While ZVI has been proposed for various remediation applications with Tc, it has not been studied for its suitability for removing Tc from the LAW off-gas condensate. The goal is to identify the optimal conditions for which Tc{sup (VII)} will be reduced to Tc{sup (IV)} species and incorporated into an iron matrix. This paper presents a programmatic overview of our evaluation of commercial ZVI materials for their efficiency towards Tc{sup (VII)} reductive removal from simplified off-gas simulant solutions under aerobic conditions. Tc concentrations in solutions were monitored for up to 30 days to determine efficiency and kinetics of reductive removal of Tc. The best performing candidate materials were selected for further experiments evaluating the effects of (1) variable ionic strength, (2) the presence of chromium and corrosive anions, and (3) ZVI aging on Tc{sup (VII)} reductive removal in batch experiments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TCCR Operational Summary and Optimization for Tank 9 Processing - 20314

Savannah River Remediation (SRR) manages and operates the liquid waste facilities at Savannah River Site (SRS) for the Department of Energy (DOE). Stored liquid waste is a complex mixture of insoluble solids (sludge) and soluble salts in an alkaline solution. SRR has deployed the Tank Closure Cesium Removal (TCCR) system, a tank-side ion exchange process, to remove radioactive cesium from salt waste and enable onsite disposal of the resulting decontaminated salt solution as low-level waste at the Saltstone facilities. The TCCR system consists of two prefilters, four ion exchange (IX) columns, one resin trap, and a ventilation system. The IX process uses a form of inorganic crystalline silicotitanate (CST), which has a high affinity for cesium and other alkali metals, strontium, and actinides. This process is currently deployed utilizing salt feed from Tank 10, with future plans to dissolve solid salt in Tank 9 and transfer the salt solution to Tank 10 for processing through TCCR. The feed for TCCR must be created from salt-cake in Tank 10 through a dissolution process. Once enough salt has been dissolved, a qualification process is entered. This process characterizes the feed and ensures the cesium loading on the columns will not cause boiling of waste within the columns during or after processing. Once the batch has been qualified, salt waste is fed to the TCCR system through a transfer pump in the center of the tank. The waste is filtered through a set of two shielded, dead-end prefilters that prevent solids buildup in the columns. The filtered salt solution then travels to the shielded IX columns, which can be operated individually or in series, where the cesium is sorbed on the CST media. The decontaminated salt solution (DSS) then travels through a resin trap and out of the module to Tank 11. TCCR has successfully processed approximately 795,000 L of Tank 10H radioactive salt waste over two batches to date. There has not yet been a system induced shutdown. The prefilters performed as expected with only minor degradation in recovery of differential pressure after a backflush sequence. The time between backflushes decreased as each batch reached the end of processing. The hydraulics in the IXCs mostly performed as expected at all flow rates, except for one IXC that will be further investigated during Batch 3 processing. The TCCR system has shown some opportunities for more efficient processing during the length of the demonstration so far. For future processing of material from Tank 9H through Tank 10H and the TCCR unit, TCCR 1A will implement changes to the prefilters and the IXCs. The prefilters will have an increased surface area and a new filter media in an effort to increase time between filter swaps and improve backwashing cleaning capability. The IXCs will have a reduced diameter to allow for increased heat transfer out of the column and increased loading of Cs-137. Additionally, a new form of CST with an increased kinetic performance is being investigated for use during TCCR 1A operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative - Port Granby Project: Managing Highly Heterogeneous Low-Level Radioactive Waste - 20327

The Port Granby Project is a large remediation project currently approximately 95% complete. Initial waste characterization was provided through a borehole sampling program. As the waste was excavated, it was found to be highly heterogeneous, ranging from essentially 'clean' material to hundreds of Bq/g. This heterogeneity resulted in constantly changing site conditions. Methods to adapt to these conditions are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗