Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RELIEF VALVES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Conversion of METL Diagnostic Flowmeters to Permanent Magnet Based Electromagnetic Flowmeters

The Mechanisms Engineering Test Loop (METL) uses three flowmeters to monitor sodium circulation through the main loop, the Cold Trap leg, and the Plugging Meter leg. When constructed, the Cold Trap flowmeter (CTFM) and Plugging Meter flowmeter (PMFM) were equipped with permanent magnets and Hall Sensors. By October of 2019, during normal operations, both the CTFM and PMFM failed, producing either erroneous or zero signals. Repairs to the flowmeters were attempted in January of 2020 but failed to resolve the issues. Therefore, starting in March of 2021, a plan was developed to convert the installed flowmeters to more robust permanent magnet based electromagnetic flowmeters (EMFMs). The Cold Trap EMFM (CT EMFM) and Plugging Meter EMFM (PM EMFM) were fully installed by August of 2021. Initial testing and commissioning were completed in November of 2021. Finally, the first calibration runs were finished in March of 2022. This report discusses the design, conversion, and calibration of the as-built CTFM and PMFM to robust permanent magnet based EMFMs. During the design phase, theoretical models were used to estimate the signal output and required magnet sizes. Then, the CTFM and PMFM were disassembled and converted to EMFMs. After commissioning, the CT EMFM and PM EMFM were calibrated using a ‘Time Transfer Procedure’ carried out with METL Expansion Vessels and Test Vessel Two. The accuracy of the calibration was estimated through an uncertainty analysis. Finally, the report describes some lessons learned for future flowmeter conversions and follow-up work. In total, both METL EMFM’s met the desired performance targets. Testing data showed that the METL EMFMs provide a output signal of roughly 2 mV at 1 GPM and 250 °C. During calibration, flowrates between 0.7 GPM and 2.4 GPM were achieved. In this flow range, calibration coefficients of 0.485 and 0.935 were measured as with errors ranging from 15-5% and 16-5% for the CT EMFM and PM EMFM, respectively. Above 1.5 GPM, the error was assumed to be about 5% for both METL EMFMs. Several points will be considered for future follow-up work on the METL EMFM’s. First, the signal noise issues in the PM EMFM will be addressed. It is likely the source of the noise is due to some stray EMF from a heater. Secondly, the NdFeB magnets will be replaced with a grade that has a Curie temperature above 80 °C. For example, a few grades of NeFeB magnets have Curie temperatures which exceed 150 °C and some SmCo magnets have Curie temperatures as high as 500 °C. Third, more calibration runs will be completed in the range of 0.5-2.5 GPM. This will further improve the accuracy of the calibration coefficient. Fourth, calibration runs will be completed up to 5 GPM. This requires a larger pressure relief valve to be installed on the Expansion Vessel and Test Vessel 2, as well as a revised calibration procedure. Lastly, calibration runs will be completed to account for cold spots in the system, which reduced the inlet temperature of the METL EMFMs. Overall, these points will improve the calibration coefficients derived in this work and also improve the performance of the METL EMFMs.

42 ENGINEERING↗

Lessons Learned: Summary of Insights From the HERO WEC and Waves to Water Deployments Between 2022 and 2024

In 2020, a team from the National Renewable Energy Laboratory (NREL) partnered with the East Carolina University Coastal Studies Institute to develop a small, modular, wave-powered point absorber desalination prototype. That prototype, known as the hydraulic and electric reverse osmosis wave energy converter (HERO WEC), was intended to de-risk the installation activities planned for the Waves to Water Prize sponsored by the Water Power Technologies Office. The NREL team was given approximately 18 months to design, build, bench test, and deploy the HERO WEC prototype. Since the initial HERO WEC development, it has been used for two in-lab test programs and three ocean deployments. The first in-lab test program focused on ensuring that the overall operation of the device occurred as expected and on validating the operation of safety systems such as pressure relief valves or electrical breakers for load mitigation. The second in-lab test program was the first time the NREL team leveraged NREL’s large-amplitude motion platform to characterize the performance of the HERO WEC. Of the three in-water deployments, the first deployment was effectively an installation and recovery practice with no meaningful wave activity during the time that it was installed. The second deployment was a 2-week effort that enabled both the electric and hydraulic configurations of the device to be in the water for approximately 5 days each. This deployment was also the first time that the team had the opportunity to perform a drivetrain swap on the Coastal Studies Institute research vessel. The third deployment had to be split into two separate installations due to minor damage incurred from the WEC spinning during the initial installation. This report summarizes the deployments, the challenges encountered with each deployment, and the lessons learned for future work.

16 TIDAL AND WAVE POWER↗

HANFORD DOUBLE SHELL TANK THERMAL AND SEISMIC PROJECT BUCKLING EVALUATION METHODS AND RESULTS FOR THE PRIMARY TANKS

This report documents a detailed buckling evaluation of the primary tanks in the Hanford double-shell waste tanks (DSTs), which is part of a comprehensive structural review for the Double-Shell Tank Integrity Project. This work also provides information on tank integrity that specifically responds to concerns raised by the Office of Environment, Safety, and Health (ES&H) Oversight (EH-22) during a review of work performed on the double-shell tank farms and the operation of the aging waste facility (AWF) primary tank ventilation system. The current buckling review focuses on the following tasks: (1) Evaluate the potential for progressive anchor bolt failure and the appropriateness of the safety factors that were used for evaluating local and global buckling. The analysis will specifically answer the following questions: (a) Can the EH-22 scenario develop if the vacuum is limited to -6.6-inch water gage (w.g.) by a relief valve? (b) What is the appropriate factor of safety required to protect against buckling if the EH-22 scenario can develop? (c) What is the appropriate factor of safety required to protect against buckling if the EH-22 scenario cannot develop? (2) Develop influence functions to estimate the axial stresses in the primary tanks for all reasonable combinations of tank loads based on detailed finite element analysis. The analysis must account for the variation in design details and operating conditions between the different DSTs. The analysis must also address the imperfection sensitivity of the primary tank to buckling. (3) Perform a detailed buckling analysis to determine the maximum allowable differential pressure for each of the DST primary tanks at the current specified limits on waste temperature, height, and specific gravity. Based on the concrete anchor bolt loads analysis and the small deformations that are predicted at the unfactored limits on vacuum and axial loads, it is very unlikely that the EH-22 scenario (i.e., progressive anchor bolt failure leading to global buckling of the tank under increased vacuum) could occur. After releasing Revision 0 of this report, an independent review of the Double Shell Tanks (DST) Thermal and Operating Loads Analysis (TaLA) combined with the Seismic Analysis was conducted by Dr. Robert P. Kennedy of RPK Structural Mechanics Consulting and Dr. Anestis S. Veletsos of Rice University. Revision I was then issued to address their review comments (included in Appendix D). Additional concerns involving the evaluation of concrete anchor loads and allowables were found during a second review by Drs. Kennedy and Veletsos (see Appendix G). Extensive additional analysis was performed on the anchors, which is detailed by Deibler et al. (2008a, 2008b). The current report (Revision 2) references this recent work, and additional analysis is presented to show that anchor loads do not concentrate significantly in the presence of a local buckle.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis - Simulated Wave

The U.S. Department of Energy and the National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis, hydrogen compression and storage, and variable hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) initiative. This dataset represents part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure nationwide. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with various energy technologies. Future datasets will demonstrate how existing hydrogen fuel cell technologies can provide controllable, dispatchable, and variable power output for artificial intelligence (AI) data centers and other variable loads. This dataset entry describes hydrogen production using a single, simulated wave energy conversion device. The electrolyzer is a 1.25-MW proton exchange membrane type MC250 system manufactured by Nel Hydrogen. While the unit supports up to 2.5 MW of electrolysis, NLR only has a single 1.25-MW electrolysis stack. For the wave energy, NLR used a wave energy converter model from PacWave. These devices can be equipped with accumulators and pressure relief values to smooth the power output by storing and releasing hydraulic energy. Using a peak power output of 10 MW, the model created two 25-minute profiles: one with and one without the accumulators and pressure relief valves. To down select the profile data from the native resolution of 20 Hz to 1 Hz, NLR took the mean of every 20 data points. NLR experimented with two simulated wave energy power plants: one that peaks at 10 MW, and one that peaks at 5 MW. These profiles were scaled for the physical 1.25 MW electrolyzer by multiplying the original profiles by one eighth and one quarter, respectively. The first profile matches the capacity rating of eight of the 1.25 MW electrolyzers, while the second matches four electrolyzers. Finally, NLR experimented with two settings for the electrolyzer power supply minimum and maximum current ramp rates (gain and slew): 200 and 400 amperes per second. The simulated profiles were translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1-Hz frequency. These datasets report relevant hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. Each .zip file represents a single wave electrolysis experiment and is formatted as follows: {technology}-{accumulator?}_{number of 1.25 MW electrolyzers connected}-{electrolyzer ramp rate in amperes/second} For instance, “wavePacWave-Noacc_4-400.zip” represents the 25 minute-long experiment using the PacWave’s wave energy converter model, equipped with no accumulator, connected to four 1.25-MW electrolyzers with their power supplies set to a maximum current ramp rate (gain and slew) of 400 A/s. Each .zip folder contains the following files: A .csv file containing raw data. An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production in kilograms per hour, electrolysis power consumption, and input wave power. An experiment, labeled “characterization_200.zip”, demonstrates the MC250 electrolyzer steady-state response with 30 minute load steps for a total duration of 5 hours. Finally, a .csv file is provided with all wave profiles combined into one dataset labeled "combined_wave_experiments.csv". NLR also built an AI/machine-learning predictive model based on these datasets. The model ingests the electrolyzer current command in amperes, as well as various pressures and temperatures across the system, and predicts hydrogen output in kilograms per hour. The complete model can be found at https://huggingface.co/NatLabRockies/ptmelt-hydrogen-electrolysis.

08 HYDROGEN↗

Proposed gas generation assembly would recover deeply submerged objects

Gas generation system, used for recovery of submerged objects, generates hydrogen gas by the reaction of sodium with sea water. The assembly consists of flooded flotation tanks cabled together, equipped with relief valves to equalize pressure as the array ascends and hydrostatic pressure diminishes, and carrying remotely activated welding units.

Sprague, C. W.↗

An explosion-proof battery case

Battery case, equipped with relief valve, connector, and two covers, separates the explosive mixture from all potential spark sources. Bottom ends of vent tubes are cemented into cell vents and upper ends fit through the gas barrier cover. This arrangement isolates generated gases from the electric power.

Keathley, W. H.↗

Wind-simulation tester for solar modules

Tester induces cyclic pressure loads across module surface, guaranteeing its mechanical integrity. Module to be tested is sandwiched between stiffened aluminum layers covered with rubber sheets. Automatic front and back pressure loading is cycled by pneumatic system on separate stand. Relief valves prevent overpressuring. Fixture operates at high speed, completing cycle in 5 seconds, and typically applies 2,400 pascals.

Griffith, J. S.↗

Helium hammer in superfluid transfer

Large transient pressure pulses, referred to as a helium hammer, which occurred in the transfer line of the main cryogenic tank during the development tests of the Infrared Astronomical Satellite, launched on January 25, 1983, are analyzed, and the measures taken to prevent a failure described. The modifications include an installation of a 2.3-liter surge tank upstream, and a back-up relief valve downstream, of a burst disk. The surge tank is designed to attenuate a 0.33-MPa pressure pulse at the inlet down to 0.092 MPa at the outlet. A mechanism of the pulse generation is suggested, which involves flashing and rapid recondensation of the small amount of liquid entering the warm section of a transition to room temperature.

Tward, E.↗

Three-Position Cryogenic Actuator

Linear actuator set at one of three positions by supplying gas at suitable pressure. Designed for use as part of relief valve in system storing liquid oxygen. Stops at any of three positions, depending on pressure at supply port. Seals made of polytetrafluorethylene for low friction at low temperatures. Use of polytetrafluoroethylene and large clearances reduces friction and makes possible operating over range of temperatures from -420 to 250 degree F (-251 to 121 degree C).

Allen, Peter B.↗

Vaporization Would Cool Primary Battery

Temperature of discharging high-power-density primary battery maintained below specified level by evaporation of suitable liquid from jacket surrounding battery, according to proposal. Pressure-relief valve regulates pressure and boiling temperature of liquid. Less material needed in cooling by vaporization than in cooling by melting. Technique used to cool batteries in situations in which engineering constraints on volume, mass, and location prevent attachment of cooling fins, heat pipes, or like.

Bhandari, Pradeep↗

Joule-Thomson Cooler Produces Nearly Constant Temperature

Improved Joule-Thomson cooler maintains nearly constant temperature. Absolute-pressure relief valve helps stabilize temperature of cold head despite variations in atmospheric pressure. Feedback-controlled electrical heater provides additional stabilization. Demand-flow Joule-Thomson valve requires less nitrogen than fixed-orifice Joule-Thomson valve providing same amount of cooling. Provides stable low temperatures required for operation of such devices as tunable diode lasers in laboratory and balloon-borne instruments detecting contaminants in atmosphere.

Bard, Steven↗

Passively Adaptive Inflatable Structure for the Shooting Star Experiment

An inflatable structural system is described for the Shooting Star Experiment that is a technology demonstrator flight for solar thermal propulsion. The inflatable structure is a pressurized assembly used in orbit to support a fresnel lens for focusing sunlight into a thermal storage engine. When the engine temperature reaches a preset level, the propellant is injected into the storage engine, absorbs heat from a heat exchanger, and is expanded through the nozzle to produce thrust. The inflatable structure is an adaptive system in that a regulator and relief valve are utilized to maintain pressure within design limits during the full range of orbital conditions. Further, the polyimide film material used for construction of the inflatable is highly nonlinear, with modulus varying as a function of frequency, temperature, and level of excitation. A series of tests is described for characterizing the structure in response to various operating conditions.

Tinker, Michael L..↗

Dynamic Characterization of an Inflatable Concentrator for Solar Thermal Propulsion

An inflatable structural system that is a technology demonstrator for solar thermal propulsion and other applications is characterized for structural dynamic behavior both experimentally and computationally. The inflatable structure is a pressurized assembly developed for use in orbit to support a Fresnel lens or inflatable lenticular element for focusing sunlight into a solar thermal rocket engine. When the engine temperature reaches a pre-set level, the propellant is injected into the engine, absorbs heat from an exchanger, and is expanded through the nozzle to produce thrust. The inflatable structure is a passively adaptive system in that a regulator and relief valve are utilized to maintain pressure within design limits during the full range of orbital conditions. Modeling and test activities are complicated by the fact that the polyimide film material used for construction of the inflatable is nonlinear, with modulus varying as a function of frequency, temperature, and level of excitation. Modal vibration testing and finite element modeling are described in detail in this paper. The test database is used for validation and modification of the model. This work is highly significant because of the current interest in inflatable structures for space application, and because of the difficulty in accurately modeling such systems.

Leigh, Larry↗

Lead-acid battery

A sealed, low maintenance battery (10, 100) is formed of a casing (14, 102) having a sealed lid (12, 104) enclosing cell compartments (22, 110) formed by walls (24, 132). The cells comprise a stack (26) of horizontally disposed negative active plates (30) and positive active plates (28) interspersed with porous, resilient separator sheets (30). Each plate has a set of evenly spaced tigs (40, 41) disposed on one side thereof; like polarity tigs being disposed on one side and opposite polarity tigs on the other. Columns of tigs are electrically and mechanically joined by vertical bus bars (46). The bus bars contain outwardly projecting arms (56) of opposite polarity which are electrically joined at each partition wall (24) to electrically connect the cells in series. The stack is compressed by biasing means such as resilient pad (58) attached to the lid or by joining the tigs (52) to the post (48) at a distance less than the thickness of the mat (124). The end bus bars (46) are joined to straps (60, 62) which connect to the terminals (16, 18). The negative plates contain more capacity than the positive plates and the starved electrolyte imbibed in the separator sheets permits pressurized operation during which oxygen diffuses through the separator sheet to the negative plate where it recombines. Excess pressure is relieved through the vent and pressure relief valve (20).

Edwards, Dean B.↗

NASA Tech Briefs, August 2008

Customizable Digital Receivers for Radar Two-Camera Acquisition and Tracking of a Flying Target Visual Data Analysis for Satellites A Data Type for Efficient Representation of Other Data Types Hand-Held Ultrasonic Instrument for Reading Matrix Symbols Broadband Microstrip-to-Coplanar Strip Double-Y Balun A Topographical Lidar System for Terrain-Relative Navigation Programmable Low-Voltage Circuit Breaker and Tester Electronic Switch Arrays for Managing Microbattery Arrays Topics covered include: Lower-Dark-Current, Higher-Blue-Response CMOS Imagers; Fabricating Large-Area Sheets of Single-Layer Graphene by CVD; Support for Diagnosis of Custom Computer Hardware; Providing Goal-Based Autonomy for Commanding a Spacecraft; Dynamic Method for Identifying Collected Sample Mass; Optimal Planning and Problem-Solving; Attitude-Control Algorithm for Minimizing Maneuver Execution Errors; Grants Document-Generation System; Heat-Storage Modules Containing LiNO3 3H2O and Graphite Foam; Precipitation-Strengthened, High-Temperature, High-Force Shape Memory Alloys; Improved Relief Valve Would Be Less Susceptible to Failure; Safety Modification of Cam-and-Groove Hose Coupling; Using Composite Materials in a Cryogenic Pump; Using Electronic Noses to Detect Tumors During Neurosurgery; Producing Newborn Synchronous Mammalian Cells; Smaller, Lower-Power Fast-Neutron Scintillation Detectors; Rotationally Vibrating Electric-Field Mill; Estimating Hardness from the USDC Tool-Bit Temperature Rise; Particle-Charge Spectrometer; Automated Production of Movies on a Cluster of Computers; FIDO-Class Development Rover; and Tone-Based Command of Deep Space Probes Using Ground Antennas.

Source record↗

Predicting Ares I Reaction Control System Performance by Utilizing Analysis Anchored with Development Test Data

The Ares I launch vehicle is an integral part of NASA s Constellation Program, providing a foundation for a new era of space access. The Ares I is designed to lift the Orion Crew Module and will enable humans to return to the Moon as well as explore Mars.1 The Ares I is comprised of two inline stages: a Space Shuttle-derived five-segment Solid Rocket Booster (SRB) First Stage (FS) and an Upper Stage (US) powered by a Saturn V-derived J-2X engine. A dedicated Roll Control System (RoCS) located on the connecting interstage provides roll control prior to FS separation. Induced yaw and pitch moments are handled by the SRB nozzle vectoring. The FS SRB operates for approximately two minutes after which the US separates from the vehicle and the US Reaction Control System (ReCS) continues to provide reaction control for the remainder of the mission. A representation of the Ares I launch vehicle in the stacked configuration and including the Orion Crew Exploration Vehicle (CEV) is shown in Figure 1. Each Reaction Control System (RCS) design incorporates a Gaseous Helium (GHe) pressurization system combined with a monopropellant Hydrazine (N2H4) propulsion system. Both systems have two diametrically opposed thruster modules. This architecture provides one failure tolerance for function and prevention of catastrophic hazards such as inadvertent thruster firing, bulk propellant leakage, and over-pressurization. The pressurization system on the RoCS includes two ambient pressure-referenced regulators on parallel strings in order to attain the required system level single Fault Tolerant (FT) design for function while the ReCS utilizes a blow-down approach. A single burst disk and relief valve assembly is also included on the RoCS to ensure single failure tolerance for must-not-occur catastrophic hazards. The Reaction Control Systems are designed to support simultaneously firing multiple thrusters as required

Stein, William B.↗

Crew Survivability After a Rapid Cabin Depressurization Event

Anecdotal evidence acquired through historic failure investigations involving rapid cabin decompression (e.g. Challenger, Columbia and Soyuz 11) show that full evacuation of the cabin atmosphere may occur within seconds. During such an event, the delta-pressure between the sealed suit ventilation system and the cabin will rise at the rate of the cabin depressurization; potentially at a rate exceeding the capability of the suit relief valve. It is possible that permanent damage to the suit pressure enclosure and ventilation loop components may occur as the integrated system may be subjected to delta pressures in excess of the design to pressures. Additionally, as the total pressure of the suit ventilation system decreases, so does the oxygen available to the crew. The crew may be subjected to a temporary incapacitating, but non-lethal, hypoxic environment. It is expected that the suit will maintain a survivable atmosphere on the crew until the vehicle pressure control system recovers or the cabin has otherwise attained a habitable environment. A common finding from the aforementioned reports indicates that the crew would have had a better chance at surviving the event had they been in a protective configuration, that is, in a survival suit. Making use of these lessons learned, the Constellation Program implemented a suit loop in the spacecraft design and required that the crew be in a protective configuration, that is suited with gloves on and visors down, during dynamic phases of flight that pose the greatest risk for a rapid and uncontrolled cabin depressurization event: ascent, entry, and docking. This paper details the evaluation performed to derive suit pressure garment and ventilation system performance parameters that would lead to the highest probability of crew survivability after an uncontrolled crew cabin depressurization event while remaining in the realm of practicality for suit design. This evaluation involved: (1) assessment of stakeholder expectations to validate the functionality being imposed; (2) review/refinement of concept of operations to establish the potential triggers for such an event and define the response of the spacecraft and suit ventilation loop pressure control systems; and (3) assessment of system capabilities with respect to structural capability and pressure control. 1 Crew and Thermal Systems Division, NASA Johnson Space Center, Mail Code: AES29, 2101 NASA Parkway, Houston,

Sargusingh, Miriam J.↗

Crew Survivability After a Rapid Cabin Depressurization Event

Anecdotal evidence acquired through historic failure investigations involving rapid cabin decompression (e.g. Challenger, Columbia and Soyuz 11) show that full evacuation of the cabin atmosphere may occur within seconds. During such an event, the delta-pressure between the sealed suit ventilation system and the cabin will rise at the rate of the cabin depressurization; potentially at a rate exceeding the capability of the suit relief valve. It is possible that permanent damage to the suit pressure enclosure and ventilation loop components may occur as the integrated system may be subjected to delta pressures in excess of the design-to pressures. Additionally, as the total pressure of the suit ventilation system decreases, so does the oxygen available to the crew. The crew may be subjected to a temporarily incapacitating, but non-lethal, hypoxic environment. It is expected that the suit will maintain a survivable atmosphere on the crew until the vehicle pressure control system recovers or the cabin has otherwise attained a habitable environment. A common finding from the aforementioned reports indicates that the crew would have had a better chance at surviving the event had they been in a protective configuration, that is, in a survival suit. Making use of these lessons learned, the Constellation Program implemented a suit loop in the spacecraft design and required that the crew be in a protective configuration, that is suited with gloves on and visors down, during dynamic phases of flight that pose the greatest risk for a rapid and uncontrolled cabin depressurization event: ascent, entry, and docking. This paper details the evaluation performed to derive suit pressure garment and ventilation system performance parameters that would lead to the highest probability of crew survivability after an uncontrolled crew cabin depressurization event while remaining in the realm of practicality for suit design. This evaluation involved: (1) assessment of stakeholder expectations to validate the functionality being imposed; (2) review/refinement of concept of operations to establish the potential triggers for such an event and define the response of the spacecraft and suit ventilation loop pressure control systems; and (3) assessment of system capabilities with respect to structural capability and pressure control.

Sargusingh, Miriam J.↗