Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RECONNAISSANCE SPACECRAFT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Observing Mode Attitude Controller for the Lunar Reconnaissance Orbiter

The Lunar Reconnaissance Orbiter (LRO) mission is the first of a series of lunar robotic spacecraft scheduled for launch in Fall 2008. LRO will spend at least one year in a low altitude polar orbit around the Moon, collecting lunar environment science and mapping data to enable future human exploration. The LRO employs a 3-axis stabilized attitude control system (ACS) whose primary control mode, the "Observing mode", provides Lunar Nadir, off-Nadir, and Inertial fine pointing for the science data collection and instrument calibration. The controller combines the capability of fine pointing with that of on-demand large angle full-sky attitude reorientation into a single ACS mode, providing simplicity of spacecraft operation as well as maximum flexibility for science data collection. A conventional suite of ACS components is employed in this mode to meet the pointing and control objectives. This paper describes the design and analysis of the primary LRO fine pointing and attitude re-orientation controller function, known as the "Observing mode" of the ACS subsystem. The control design utilizes quaternion feedback, augmented with a unique algorithm that ensures accurate Nadir tracking during large angle yaw maneuvers in the presence of high system momentum and/or maneuver rates. Results of system stability analysis and Monte Carlo simulations demonstrate that the observing mode controller can meet fine pointing and maneuver performance requirements.

Calhourn, Philip C.↗

Observing Mode Attitude Controller for the Lunar Reconnaissance Orbiter

The Lunar Reconnaissance Orbiter (LRO) mission is the first of a series of lunar robotic spacecraft scheduled for launch in Fall 2008. LRO will spend at least one year in a low altitude polar orbit around the Moon, collecting lunar environment science and mapping data to enable future human exploration. The LRO employs a 3-axis stabilized attitude control system (ACS) whose primary control mode, the "Observing mode", provides Lunar Nadir, off-Nadir, and Inertial fine pointing for the science data collection and instrument calibration. The controller combines the capability of fine pointing with that of on-demand large angle full-sky attitude reorientation into a single ACS mode, providing simplicity of spacecraft operation as well as maximum flexibility for science data collection. A conventional suite of ACS components is employed in this mode to meet the pointing and control objectives. This paper describes the design and analysis of the primary LRO fine pointing and attitude re-orientation controller function, known as the "Observing mode" of the ACS subsystem. The control design utilizes quaternion feedback, augmented with a unique algorithm that ensures accurate Nadir tracking during large angle yaw maneuvers in the presence of high system momentum and/or maneuver rates. Results of system stability analysis and Monte Carlo simulations demonstrate that the observing mode controller can meet fine pointing and maneuver performance requirements.

Calhoun, Philip C.↗

How Can We Efficiently Build A Spacecraft That Has Longevity? Experiences From the GSFC Perspective to Inform Lunar Exploration and Science Orbiter’s Architecture

Recent successes in NASA planetary science missions has shown that long-lived missions can yield significant science return. These missions, despite their longevity, were not planned to operate beyond their deign life. For example, the Lunar Reconnaissance Orbiter has a design life of 2-3 years, and yet we are entering its 14th year on orbit. Spacecraft longevity in practice has been related to: 1) mission class; 2) did we test it long enough and resolve all the anomalies to be beyond the early failure curve; 3) consumables budgets, and 4) how components are de-signed and tested. Mission class has been perceived as one of the primary ways to drive longevity. But higher mission class is a significant cost and mission driver. Parts selection only from the limited military standard parts and extensive parts qualification adds to development time and cost. Largely redundant (often erroneously interpreted as fully redundant) adds to launch mass and increases testing complexity (which may reduce the amount of testing in the nominal con-figuration). Lower Risk Posture (reflected in a higher mission class) drives significant additional processes and quality assurance analyses. Higher mission class also drives significantly greater sparing and life testing costs. This discussion focuses on whether this is indeed the best way to achieve longevity efficiently or whether there are more efficient ways to achieve longevity. Empirical evidence shows that lower mission classes that implement effective risk reduction and selective redundancy generally results in long life at a lower Spacecraft bus cost. By evaluating redundancy careful-ly, spacecraft cost can be lowered which can enable a more capable payload. Risk of the mission is highly dependent on the complexity of the mission and is only loosely dependent on Class of Mission. High complexity missions can have many single point failures and require the development of new technology, while lower class mission can have lower risk by baselining or incorporating: (selective) redundancy, fault-tolerant design, design for minimum risk, ability to reset, and/or design for graceful degradation. The team met with Goddard Space Flight Center Space Systems Mission Operations leaders to discuss which avionics have proven in flight to be the most reliable and which have had lifetime issues. The paper proposes a list of components to focus on for redundancy for a long-lived lunar mission. Reliability numbers are presented for both single string and dual string missions. The history of life-time performance versus planned mission life according to mission class is presented. A mission with well thought out selective redundancy and effective on the ground test program, can be expected to last well beyond its mission lifetime and provided enhanced return for the community. This approach minimizes project expenditures that do not retire significant risk and allows the project to focus risk mitigation efforts on those risks that will have a significant likelihood of threatening mission success. This is aided by keeping the amount of technology maturation and mission complexity low, while focusing effort on ensuring all component stress-ing parameters well within the bounds of their capabilities.

Lessons Learned↗

Mars Reconnaissance Orbiter Landing Site Reconnaissance Capability

The Mars Reconnaissance Orbiter (MRO) entered into orbit about Mars on March 10, 2006. After a series of aerobraking and propulsive maneuvers, the spacecraft has been in its sun-synchronous primary science orbit since September 2006 performing both scientific and Mars programmatic support roles. In addition to MRO’s scientific investigations of Mars, NASA has tasked MRO to provide reconnaissance of potential landing sites for ongoing and future Mars missions. This paper covers the mission design and analysis process to characterize MRO’s landing site coverage capability for all global locations, with special focus on potential sites for future missions: Gale Crater, Mawrth Vallis, and Noachis Human Exploration Zone.

Johnston, M. Daniel↗

Mission Life Thermal Analysis and Environment Correlation for the Lunar Reconnaissance Orbiter

Standard thermal analysis practices include stacking worst-case conditions including environmental heat loads, thermo-optical properties and orbital beta angles. This results in the design being driven by a few bounding thermal cases, although those cases may only represent a very small portion of the actual mission life. The NASA Goddard Space Flight Center Thermal Branch developed a procedure to predict the flight temperatures over the entire mission life, assuming a known beta angle progression, variation in the thermal environment, and a degradation rate in the coatings. This was applied to the Global Precipitation Measurement core spacecraft. In order to assess the validity of this process, this work applies the similar process to the Lunar Reconnaissance Orbiter. A flight-correlated thermal model was exercised to give predictions of the thermal performance over the mission life. These results were then compared against flight data from the first two years of the spacecraft s use. This is used to validate the process and to suggest possible improvements for future analyses.

Garrison, Matthew B.↗

Future thrusts in the U.S. planetary program

The aim of the U.S. deep space program concept is to complete the reconnaissance of the solar system and to transfer to the era of space utilization. Such spacecraft as the Voyager Jupiter-Saturn and the Pioneer Venus will be used to visit all the planets and smaller bodies of the solar system by the year 2000. In the present paper, some missions, still in the early planning stage and requiring Congressional approval are discussed, and the enormous capabilities of Solar Electric Propulsion (SEP) and Solar Sailing are pointed out. The advantages of such low-thrust propulsion systems in performance, mission design, and operations flexibility are noted.

Friedman, L. D.↗

Lunar Reconnaissance Orbiter (LRO) Thruster Control Mode Design and Flight Experience

National Aeronautics and Space Administration s (NASA) Goddard Space Flight Center (GSFC) in Greenbelt, MD, designed, built, tested, and launched the Lunar Reconnaissance Orbiter (LRO) from Cape Canaveral Air Force Station on June 18, 2009. The LRO spacecraft is the first operational spacecraft designed to support NASA s return to the Moon, as part of the Vision for Space Exploration. LRO was launched aboard an Atlas V 401 launch vehicle into a direct insertion trajectory to the Moon. Twenty-four hours after separation the propulsion system was used to perform a mid-course correction maneuver. Four days after the mid-course correction a series of propulsion maneuvers were executed to insert LRO into its commissioning orbit. The commission period lasted eighty days and this followed by a second set of thruster maneuvers that inserted LRO into its mission orbit. To date, the spacecraft has been gathering invaluable data in support of human s future return to the moon. The LRO Attitude Control Systems (ACS) contains two thruster based control modes: Delta-H and Delta-V. The design of the two controllers are similar in that they are both used for 3-axis control of the spacecraft with the Delta-H controller used for momentum management and the Delta-V controller used for orbit adjust and maintenance maneuvers. In addition to the nominal purpose of the thruster modes, the Delta-H controller also has the added capability of performing a large angle slew maneuver. A suite of ACS components are used by the thruster based control modes, for both initialization and control. For initialization purposes, a star tracker or the Kalman Filter solution is used for providing attitude knowledge and upon entrance into the thruster based control modes attitude knowledge is provided via rate propagation using a inertial reference unit (IRU). Rate information for the controller is also supplied by the IRU. Three-axis control of the spacecraft in the thruster modes is provided by eight 5-lbf class attitude control thrusters configured in two sets of four thrusters for redundancy purposes. Four additional 20-lbf class thrusters configured in two sets of two thrusters are used for Lunar Orbit Insertion maneuvers. The propulsion system is one the few systems on-board the LRO spacecraft that has built in redundancy. The Delta-H controller consists of a Proportional-Derivative (PD) controller with a structural filter on the thrusters and a Proportional controller on the reaction wheels. The PD control that employs the thrusters is used for attitude and rate control. The Proportional controller on the reaction wheels is used for commanding the wheels to a new momentum state. The ground commands used for the Delta-H controller are the system momentum vector, reaction wheel momentum, maximum expected command time, and which set of attitude control thrusters to use. The ability to command both the system momentum vector and reaction wheel momentum in the Delta-H controller provides both a capability and an additional source of operator error. Large angle slews via the Delta-H controller is achievable via this commands because these commands are used for the exit mode criteria. Setting these commands to non-consistent values prevents the mode from exiting nominally.

Hsu, Oscar C.↗

Delay-Throughput Performance of the Deep-Space Ka-band Link

In this paper, performance of a first-in, first-out (FIFO), selective retransmission scheme for the deep-space Ka-band link is presented and compared to the performance of a comparable X-band link. In this analysis, 16 months of water vapor radiometer (WVR) and advanced water vapor radiometer (AWVR) data from the three Deep Space Network (DSN) Communication Complexes (DSCC) were used to emulate weather effects on X-band and Ka-band links from Mars. Mars Reconnaissance Orbiter (MRO) X-band and Ka-band telecommunications parameters were used for spacecraft telecommunications capabilities. One pass per week per complex was selected from MRO's Deep Space Network (DSN) schedule from April 1, 2006 to August 31, 2007 for a total of 207 passes (69 passes per complex) for this analysis. For each pass both X-band and Ka-band links were designed using at most two data rates so that the expected pass capacity would be maximized subject to a minimum availability requirement (MAR). In conjunction with the WVR/AWVR data, elevation profiles of the selected passes and models for the performance of the antennas in the DSN were used to emulate the performance of both links. It was assumed that the retransmission of the data takes place not on the same pass as the original transmission but during subsequent passes. The data collected before a pass was assumed to be a fraction of the expected capacity of the pass as calculated through the link design process. Infinite spacecraft storage was assumed to obtain an upper bound on the spacecraft storage requirement. The independent parameters of this analysis were MAR and the ratio of data collected before a pass to the expected pass capacity. Since the selected passes did not occur at regular intervals, the delay in this analysis was measured in terms of number of passes. The throughput was measured in terms of number of bits received successfully on the ground. The results indicate that reasonable delay performance could be achieved with very high throughput for relatively low MAR values for data collection to expected pass capacity ratio of around 97% for Ka-band. The results indicate that, except for very low average delay requirements, the Ka-band link provides more than twice the throughput of the X-band link for the same amount of power consumed by the spacecraft. In addition, the results indicate that the required storage onboard the spacecraft is not prohibitive and good performance could be achieved by using a buffer size less than three times the maximum amount of data collected before a pass.

Shambayati, Shervin↗

Delay-Throughput Performance the Deep-Space Ka-Band Link

In this paper, performance of a first-in, first-out (FIFO), selective retransmission scheme for the deep-space Ka-band link is presented and compared to the performance of a comparable X-band link. In this analysis, 16 months of water vapor radiometer (WVR) and advanced water vapor radiometer (AWVR) data from the three Deep Space Network (DSN) Communication Complexes (DSCC) were used to emulate weather effects on X-band and Ka-band links from Mars. Mars Reconnaissance Orbiter (MRO) X-band and Ka-band telecommunications parameters were used for spacecraft telecommunications capabilities. One pass per week per complex was selected from MRO's Deep Space Network (DSN) schedule from April 1, 2006 to August 31, 2007 for a total of 207 passes (69 passes per complex) for this analysis. For each pass both X-band and Ka-band links were designed using at most two data rates so that the expected pass capacity would be maximized subject to a minimum availability requirement (MAR). In conjunction with the WVR/AWVR data, elevation profiles of the selected passes and models for the performance of the antennas in the DSN were used to emulate the performance of both links. It was assumed that the retransmission of the data takes place not on the same pass as the original transmission but during subsequent passes. The data collected before a pass was assumed to be a fraction of the expected capacity of the pass as calculated through the link design process. Infinite spacecraft storage was assumed to obtain an upper bound on the spacecraft storage requirement. The independent parameters of this analysis were MAR and the ratio of data collected before a pass to the expected pass capacity. Since the selected passes did not occur at regular intervals, the delay in this analysis was measured in terms of number of passes. The throughput was measured in terms of number of bits received successfully on the ground. The results indicate that reasonable delay performance could be achieved with very high throughput for relatively low MAR values for data collection to expected pass capacity ratio of around 97% for Ka-band. The results indicate that, except for very low average delay requirements, the Ka-band link provides more than twice the throughput of the X-band link for the same amount of power consumed by the spacecraft. In addition, the results indicate that the required storage onboard the spacecraft is not prohibitive and good performance could be achieved by using a buffer size less than three times the maximum amount of data collected before a pass.

Shambayati, Shervin↗

Meteoroids are Dangerous to Spacecraft

Meteoroids put dents in Shuttle windows much like bouncing gravel puts dents in your car's windshield. However, meteoroids move at such high speeds that they can partly vaporize the surfaces they strike! A dust particle (smaller than a meteoroid) hit the STEREO spacecraft and produced this fountain of smaller particles. When a meteoroid breaks up, its "shrapnel" can also be dangerous. Even when meteoroids don't damage a spacecraft, they can cause problems. Here, a small meteoroid bumped a camera on the Lunar Reconnaissance Orbiter (LRO), causing wiggles in this scan of the lunar surface. Meteoroids and pieces of space junk create rough edges on the outside of the Space Station that can damage space suits. The astronauts' gloves had to be thickened to help prevent them from ripping.

Moorhead, Althea V.↗

High Gain Antenna Calibration on Three Spacecraft

This paper describes the alignment calibration of spacecraft High Gain Antennas (HGAs) for three missions. For two of the missions (the Lunar Reconnaissance Orbiter and the Solar Dynamics Observatory) the calibration was performed on orbit. For the third mission (the Global Precipitation Measurement core satellite) ground simulation of the calibration was performed in a calibration feasibility study. These three satellites provide a range of calibration situations-Lunar orbit transmitting to a ground antenna for LRO, geosynchronous orbit transmitting to a ground antenna fer SDO, and low Earth orbit transmitting to TDRS satellites for GPM The calibration results depend strongly on the quality and quantity of calibration data. With insufficient data the calibration Junction may give erroneous solutions. Manual intervention in the calibration allowed reliable parameters to be generated for all three missions.

Hashmall, Joseph A.↗

The Gravity Field of Mars From MGS, Mars Odyssey, and MRO Radio Science

The Mars Global Surveyor (MGS), Mars Odyssey (ODY), and Mars Reconnaissance Orbiter (MRO) missions have enabled NASA to conduct reconnaissance and exploration of Mars from orbit for sixteen consecutive years. These radio systems on these spacecraft enabled radio science in orbit around Mars to improve the knowledge of the static structure of the Martian gravitational field. The continuity of the radio tracking data, which cover more than a solar cycle, also provides useful information to characterize the temporal variability of the gravity field, relevant to the planet's internal dynamics and the structure and dynamics of the atmosphere [1]. MGS operated for more than 7 years, between 1999 and 2006, in a frozen sun-synchronous, near-circular, polar orbit with the periapsis at approximately 370 km altitude. ODY and MRO have been orbiting Mars in two separate sun-synchronous orbits at different local times and altitudes. ODY began its mapping phase in 2002 with the periapis at approximately 390 km altitude and 4-5pm Local Solar Time (LST), whereas the MRO science mission started in November 2006 with the periapis at approximately 255 km altitude and 3pm LST. The 16 years of radio tracking data provide useful information on the atmospheric density in the Martian upper atmosphere. We used ODY and MRO radio data to recover the long-term periodicity of the major atmospheric constituents -- CO2, O, and He -- at the orbit altitudes of these two spacecraft [2]. The improved atmospheric model provides a better prediction of the annual and semi-annual variability of the dominant species. Therefore, the inclusion of the recovered model leads to improved orbit determination and an improved gravity field model of Mars with MGS, ODY, and MRO radio tracking data.

Mars↗

Polar Volatiles Exploration in Peary Crater Enabled by NASA's Kilopower Project

For more than 50 years, scientists have discussed the possibility of the existence of water ice and other frozen volatiles at the lunar poles [1]. However, it was not until the 1990s when the polar orbiting spacecraft Clementine and Lunar Prospector collected data supporting these hypotheses [2]. Subsequent missions, including the Lunar Reconnaissance Orbiter (LRO) mission [3], and the Lunar Crater Observation and Sensing Satellite (LCROSS) mission [4], provided further evidence that supports the existence of water ice deposits at the lunar poles. During NASA's Constellation Program, several areas at both lunar poles polar were included in 50 Regions of Interest (ROI) for intensive study by the Lunar Reconnaissance Orbiter Camera (LROC) [5]. These polar ROI focused on peaks and craters rims that received high amounts of solar illumination, assuming initial missions back to the lunar surface would utilize solar arrays to generate electricity. Recently, the successful demonstration of NASA's Kilopower Project at the National Nuclear Security Administration (NNSA) Nevada National Security Site makes it possible to consider lunar polar missions at locations other than highly illuminated regions. The Kilopower Project was initiated in 2015 to demonstrate subsystem-level technology readiness of a small space fission power system [6]. This abstract describes the science objectives and operations for a mission concept developed at NASA Glenn Research Center's COMPASS Concurrent Engineering Team for a 1-year exploration of Peary Crater focused on prospecting for lunar polar volatiles.

Gruener, J. E.↗

Early Navigation Performance of the OSIRIS-REx Approach to Bennu

The New Frontiers-class OSIRIS-REx (Origins, Spectral Interpretation, Resource Identification, Security-Regolith Explorer) mission is the first American endeavor to return a sample from an asteroid. In preparation for retrieving the sample, OSIRIS-REx is conducting a campaign of challenging proximity-operations maneuvers and scientific observations, bringing the spacecraft closer and closer to the surface of near-Earth asteroid (101955) Bennu. Ultimately, the spacecraft will enter a 900-meter-radius orbit about Bennu and conduct a series of reconnaissance flybys of candidate sample sites before being guided into contact with the surface for the Touch and Go sample collection event. Between August and December 2018, the OSIRIS-REx team acquired the first optical observations of Bennu and used them for navigation. We conducted a series of maneuvers with the main engine, Trajectory Correction Maneuver, and Attitude Control System thruster sets to slow the OSIRIS-REx approach to Bennu and achieve rendezvous on December 3, 2018. This paper describes the trajectory design, navigation conops, and key navigation results from the Approach phase of the OSIRIS-REx mission.

Antreasian, Peter G.↗

The Mars Reconnaissance Orbiter Mission Plan

This paper describes the Mars Reconnaissance Orbiter Mission Plan with emphasis on major mission activities and key challenges in mission design, spacecraft design, and science data acquisition.

Jah, Moriba↗

The Mars Reconnaissance Orbiter mission plan

This paper describes the Mars Reconnaissance Orbiter Mission Plan with emphasis on major mission activities and key challenges in mission design, spacecraft design, and science data acquisition.

Jah, Moriba↗

The Mars Reconnaissance Orbiter Mission: From Launch to the Primary Science Orbit

The Mars Reconnaissance Orbiter (MRO) was launched from Cape Canaveral Air Force Station, Florida, USA, aboard an Atlas V-401 launch vehicle on August 12, 2005. The MRO spacecraft carries a very sophisticated scientific payload. Its primary science mission is to to provide global, regional survey, and targeted observations from a low altitude orbit for one Martian year (687 Earth days). After a seven month interplanetary transit, the spacecraft fired its six main engines and established a highly elliptical capture orbit at Mars. During the post-MOI early check-out period, four instruments acquired engineering-quality data. This was followed by five months of aerobraking operations. After aerobraking was terminated, a series of propulsive maneuvers were used to establish the desired low altitude science orbit. As the spacecraft is readied for its primary science mission, spacecraft and instrument checkout and deployment activities have continued.

orbiters↗

The Evolution of Software and Its Impact on Complex System Design in Robotic Spacecraft Embedded Systems

The growth in computer hardware performance, coupled with reduced energy requirements, has led to a rapid expansion of the resources available to software systems, driving them towards greater logical abstraction, flexibility, and complexity. This shift in focus from compacting functionality into a limited field towards developing layered, multi-state architectures in a grand field has both driven and been driven by the history of embedded processor design in the robotic spacecraft industry.The combinatorial growth of interprocess conditions is accompanied by benefits (concurrent development, situational autonomy, and evolution of goals) and drawbacks (late integration, non-deterministic interactions, and multifaceted anomalies) in achieving mission success, as illustrated by the case of the Mars Reconnaissance Orbiter. Approaches to optimizing the benefits while mitigating the drawbacks have taken the form of the formalization of requirements, modular design practices, extensive system simulation, and spacecraft data trend analysis. The growth of hardware capability and software complexity can be expected to continue, with future directions including stackable commodity subsystems, computer-generated algorithms, runtime reconfigurable processors, and greater autonomy.

software↗