Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pulverization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Engineering Assessment of UO 2 and Cladding Behavior under High Burnup LOCA Conditions

To maximize the data extracted from a limited number of high-burnup fuel rod samples, several modeling efforts were performed to elucidate the fuel and the cladding responses of these fuels under transient conditions. These objectives were (1) to determine the role of the fuel stress state in fuel pulverization, (2) to ascertain the differences between conditions of cladding burst during experiments and those expected during a commercial reactor transient, and (3) to develop a method to conservatively calculate the geometry of the cladding rupture’s opening to inform fuel dispersal susceptibility.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SECARB 2020 Semi-Annual Field Review Reports - Anthropogenic Test

The Southern States Energy Board (SSEB) managed the overall Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III project and the Electric Power Research Institute (EPRI) managed all activities associated with the Anthropogenic Test site. Advanced Resources International, Inc. (ARI) assisted EPRI with the management of site activities. EPRI and ARI followed reporting procedures that included monthly and quarterly technical progress reports, as well as periodic reporting on key field activities. Subsequent sections of this report catalog the field activities and are organized in a semi-annual chronology. The SECARB Anthropogenic Test was the largest demonstration of a fully integrated, pulverized coal-fueled carbon capture and storage (CCS) project in the United States as of 2012 and supports a commercial prototype of CO 2 capture; transportation; subsurface storage; and monitoring, verification, and accounting (MVA); and assessment. The demonstration-scale, post-combustion CO 2 capture facility at Alabama Power Company’s Plant Barry diverted flue gas (25MW equivalent) from its Unit #5 coal burning facility and captured the CO 2 using Mitsubishi Heavy Industries (MHI) KM-CDRTM advanced amine technology. The captured CO2 was compressed at Plant Barry and transported by pipeline to the injection location southeast of Citronelle, Alabama. The Citronelle Project’s geologic storage and MVA sites were located on the flanks of the Citronelle Dome, approximately three miles southeast of the city of Citronelle. The injection zone, the Paluxy Formation, a saline formation that occurs at approximately 9,400 feet and overlies the oil production horizon of the Citronelle oilfield, presents a favorable injection reservoir in terms of areal extent and petrophysical characteristics. The confining zone, the basal shale of the overlying Washita-Fredericksburg Formation, is persistent throughout the Citronelle area and possesses the appropriate criteria to act as an effective CO 2 seal.

01 COAL, LIGNITE, AND PEAT↗

Coal Fired Power Plant Configuration and Operation Impact on Plant Effluent Contaminants and Conditions

The primary objective of this project is to characterize coal contaminants in coal-fired power plant wastewater as a function of coal type, unit configurations, and unit operation profile with uncertainty analysis. This project was in response to the U.S. Department of Energy (DOE) Solicitation DE-FOA-0001842. The project duration was between September 01, 2018, and December 31, 2021 (no-cost extension filed, due to the Covid-19 pandemic restrictions, and approved). Field and lab test program was conducted with the main goal to characterize coal contaminants in coal-fired power plant wastewater as a function of coal type, unit configurations, and unit operation profile with uncertainty analysis. In this project, the team of Lehigh University (prime recipient) and Western Kentucky University identified two suitable Thermoelectric Power Plants (TTPs) firing bituminous and sub-bituminous coals respectively, designed test plans, and performed sample collection. Sampling included coal from each TTPs power generation units, Wet Flue Gas Desulfurization (WFGD) slurry material and waste-water samples taken from the outlet of the water treatment tank prior to discharge and other pertinent locations. Coal samples are dried, crushed, and pulverized according to the American Society for Testing and Materials (ASTM) methods. The prepared coal samples are analyzed for normal proximate and ultimate analysis tests in addition to the toxic metals and anions according to ASTM methods. The FGD slurry materials are analyzed for toxic metals and anions according to Electric Power Research Institute (EPRI) or Environmental Protection Agency (EPA) methods, as appropriate. The wastewater samples from the water treatment tank outlet are analyzed for toxic metals and anions according to EPA methods. The effluent species analyzed include mercury, arsenic, selenium, nitrate/nitrite, bromide, and chlorine. This project provided results of effluent conditions as a function of coal type, unit configuration, and unit operation profile, and identified the levels of uncertainty in the effluent results.

01 COAL, LIGNITE, AND PEAT↗

Plasma Ignition and Combustion Stabilization Technology to Improve Flexible Operation, Reliability and Economics of an Existing Coal-Fired Boiler

GE Steam Power, Inc. (GE) proposed to improve reliability, flexibility, and economics of an existing coal-fired power plant by applying a new advanced technology developed by GE, a plasma-assisted pulverized fuel firing system. The objective of this program is to demonstrate the achievement of lower load by improved flame stabilization and therefore lower operating costs in a full-scale field installation at coal-fired electric utility. GE’s Plasma Ignition and Combustion Stabilization System is designed to operate continuously to support low load operation. With the plasma on, the flame will be attached and stable, removing the firing system as a limitation to low load operation. In addition, GE’s exclusively from ABENZ company licensed AC based technology has a 90+% system efficiency compared to all other systems at which are DC and operate with ~75% efficiency. Plant operating costs are lowered by eliminating use of expensive support fuel as well as the ability to operate at lower loads. The utilities’ ability to better match the demand curve will result in significant savings. Maintenance is lower for an AC system than a DC system as it operates at lower current. This eliminates the need for a demineralized cooling water system and provides longer electrode life which translates into both material and labor savings. It is the objective of GE to not only demonstrate the additional low load achievable with a plasma system after best achievable tuning, sensor and software approach has been exhausted, but also the increased stability of the flame at all loads with plasma assistance as well as cost savings at all low loads using plasma instead of oil. Upon successful completion of this project, GE will have sufficient field experience to rapidly deploy the Plasma Technology. The project objectives were achieved through the implementation of plasma ignitor technology at PacifiCorp Hunter Station Unit 3. A plasma ignitor system was retrofitted on ten wall-fired burners, Mill 3-4 combustion system. The Plasma Ignitors installed at Hunter proved that this GE technology is a direct and complete replacement for the original oil ignitors. The Hunter Unit 3 burner management system allows the plasma system to be used in all applications that originally required oil to be burned. This includes any time the Mill 3-4 is started or stopped for any reason including boiler starts, load changes, and low load support.

01 COAL, LIGNITE, AND PEAT↗

High Energy Systems for Transforming CO 2 to Valuable Products (Final Report)

The objective of this project is to develop the Direct E-Beam Synthesis (DEBS) process that uses high-energy electron beams (E-Beam) to break chemical bonds. This allows the production of valuable chemicals, such as acetic acid, methanol, and carbon monoxide, at relatively low severity (pressure near one atmosphere and temperatures <150°C) from near-pure CO 2 captured from a pulverized coal-fired power plant and methane, imported as natural gas. Creating such valuable products will offset the cost of carbon capture and storage. Through this project, we have designed, constructed, and operated an E-Beam reactor to examine the feasibility of performing dry reforming reaction without a catalyst using only DEBS. We have verified the production of syngas with 1:1 H2:CO ratio and calculated that the energy cost for conversion is about 5.2 eV/molecule of product for dry reforming reaction which is similar to the energy cost for conversion using conventional thermochemical conversion but under significantly milder conditions (room temperature and atmospheric pressure). We have performed a technoeconomic analysis (TEA) to estimate the total capital requirement and the cost of production for a 99.4 MMSCFD syngas production plant via non-catalytic Direct E-Beam Synthesis (DEBS) technology utilizing a high-energy electron beam (E-Beam) accelerator. No assumption is made for syngas utilization downstream, and the incoming reactants are pure CO 2 from carbon capture (assumed to be at zero cost) and natural gas. The Total As-Spent Cost (TASC) was calculated to be $\$242.5$ million, resulting in a levelized cost of syngas (LCOS) of $\$175.84$/tonne (metric) at a natural gas price of $\$6.24$/MMBTU1. The cost of syngas is primarily determined by the price of natural gas. If the cost of the CO 2 feedstock is assumed to be non-zero, then the price of the CO 2 feed also heavily influences the levelized cost of syngas. The potential impact on the cost of electricity from syngas revenue is significant. Following DOE NETL’s guidance, a lifecycle analysis (LCA) was conducted to compare the cradle-to-gate life cycle emissions of GTI Energy’s novel Direct E-Beam Synthesis (DEBS) process that produces syngas via the reaction of methane and carbon dioxide to the emissions of a state-of-the-art Steam Methane Reforming (SMR) process that also produces syngas via the reaction of methane and steam. The DEBS process results in less GHG emissions than SMR (with CO product as the basis of comparison). openLCA was used for the LCA and the results show that the total global warming potential (GWP) of DEBS is 0.981 kg CO 2 e per kg CO product, while the SMR process has a global warming potential of 2.573 kg CO 2 e per kg CO product. The ratio of the GWP of the proposed product system to the comparison product system is 0.381. This percent change is 61.9% lower GWP than SMR.

20 FOSSIL-FUELED POWER PLANTS↗

Advanced Water-Related Technology Performance Development

This U.S. Department of Energy/National Energy Technology Laboratory techno-economic analysis evaluates those parameters having the greatest performance and cost impact on wet flue gas desulfurization (FGD) effluent wastewater treatment systems, and air cooled condensers for dry cooling systems. Two supercritical pulverized coal power plants are considered: 1) an existing plant (modified for surface water discharge and air emissions consistent with limits for existing plants) retrofitted with wet FGD effluent wastewater treatment and 2) a greenfield plant constructed with an air-cooled condenser (ACC). Sensitivity analyses are completed on various process parameters associated with the wet FGD effluent wastewater treatment system and ACC to determine the impact on the net plant efficiency and levelized cost of electricity (LCOE). Research and development targets are recommended for the parameters shown to have the greatest potential impact on cost or performance.

20 FOSSIL-FUELED POWER PLANTS↗

Cost and Performance Baseline for Fossil Energy Plants Volume 1: Bituminous Coal and Natural Gas to Electricity

This revised report presents an independent assessment of the cost and performance of select fossil energy power systems—integrated gasification combined cycle (IGCC), pulverized coal (PC), and natural gas combined cycle (NGCC) plants—using a systematic, transparent technical and economic approach. The cost and performance of fossil fuel-based generation technologies represented in this report (and the series at large) are important inputs to assessments and determinations of technology combinations to be utilized to meet the projected demands of future power markets. In addition to informing technology comparisons, the reference plant configurations found in this report provide perspective for regulators and policy makers. From a research and development perspective, this report is used to assess goals and metrics and to provide a consistent basis for comparing developing technologies.

01 COAL, LIGNITE, AND PEAT↗

Eliminating the Derate of Carbon Capture Retrofits (Rev. 2)

This study presents updated cost and performance information on retrofitting pulverized coal (PC) power plants with post-combustion carbon capture based on an advanced solvent process, based on NETL's Fossil Energy Baseline, Revision 4A. Cases considered include those using a fully integrated capture system, a case that provides capture system steam via a natural gas boiler, and a case that provides combined heat and power via a natural gas simple cycle system. Comparison cases include both new build and retrofit analysis at 90% and 95% carbon capture.

20 FOSSIL-FUELED POWER PLANTS↗

Cost and Performance Baseline for Fossil Energy Plants Volume 3: Low Rank Coal and Natural Gas to Electricity

This report presents an independent assessment of the cost and performance of select fossil energy power systems—pulverized coal (PC), circulating fluidized bed (CFB), and natural gas combined cycle (NGCC) plants—using a systematic, transparent technical and economic approach. This is Volume 3 of a five-volume series, which comprise the following reports: Volume 1: Bituminous Coal and Natural Gas to Electricity; Volume 2: Coal to Synthetic Natural Gas and Ammonia (Various Coal Ranks); Volume 3: Low Rank Coal and Natural Gas to Electricity; Volume 4: Bituminous Coal to Liquid Fuels; and Volume 5: Natural Gas Electricity Generating Units for Flexible Operation. The cost and performance of fossil fuel-based generation technologies represented in this report (and the series at large) are important inputs to assessments and determinations of technology combinations to be utilized to meet the projected demands of future power markets. In addition to informing technology comparisons, the reference plant configurations found in this report provide perspective for regulators and policy makers. From a research and development perspective, this report is used to assess goals and metrics and to provide a consistent basis for comparing developing technologies.

20 FOSSIL-FUELED POWER PLANTS↗

Techno-Economic Optimization of Advanced Energy Plants with Integrated Thermal, Mechanical, and Electro-Chemical Storage (Final Report)

The increasing use of renewable energy sources is leading to increased cycling of fossil-fueled power plants (FFPP) that are designed to operate at base-loaded conditions. Integrating energy storage facilities with the FFPPs can be helpful in reducing load-following operation of FFPPs. Decentralized deployment of energy storage facilities at the FFPP level has considerable advantages due to possibilities of smaller storage capacities, immediate benefits realized by the host power plant due to the increase in the efficiency, cleaner emission and higher plant life to name a few. Most importantly, deployment at the FFPP level can exploit the existing equipment items and facilities at the host power plant, thus reducing the CAPEX and reducing the storage capacity. However, realization of these benefits will critically depend on novel configuration/integration strategies with the least impact on the power plant operation and its configuration. Furthermore, dynamics of the entire integrated system including both the FFPP and the storage technologies must be taken into account to obtain the cost-optimal solution. With these motivations, the objective of this project was to complete a focused evaluation of decentralized deployments of energy storage facilities at the FFPP level. Promising thermal, chemical, mechanical, and electro-chemical storage technologies were evaluated with due consideration of their transient response to obtain various optimal system concepts that can minimize the levelized cost of storage. For thermal storage, cryogenic energy storage along with high temperature heat storage in molten salt as well as phase change material were evaluated. For mechanical storage, cryogenic air storage and pumped hydro storages were evaluated. For chemical storage, hydrogen storage was evaluated. For electrochemical storage, the team evaluated sodium sulfur, vanadium redox flow battery as well as Li-ion batteries. Integration of these storage technologies with the natural gas combined cycle (NGCC) and supercritical pulverized coal (SCPC) plants was considered. Six technologies, namely molten salt, cryogenics, compressed air, pumped hydro, H2 storage and Li-ion battery storage, were downselected based on their levelized cost of storage. It was observed that the ranking of the optimal storage technology can differ based on the host power plant technology even when same demand/supply/price profile for electricity are considered. It was also observed that as the variability in power demand varies, the ranking of the optimal storage technologies vary. However, for the same demand and LMP profile, top six optimal storage technologies for NGCC vs SCPC plants did not differ much even though LCOS for the same technology and optimal size of a given storage technology did differ. Detailed techno-economic assessment of these six technologies was undertaken.

01 COAL, LIGNITE, AND PEAT↗

Development and Bench-Scale Testing of a Novel Biphasic Solvent-Enabled Absorption Process for Post-Combustion Carbon Capture (Final Technical Report)

A new class of biphasic solvents was developed, and the concept of the enabled carbon dioxide (CO 2 ) absorption process was tested for post-combustion carbon capture in our previous lab-scale research. The primary goals of this project were to advance the development of the novel biphasic CO 2 absorption process (BiCAP) and validate its technical advantages by testing the integrated technology at a 40 kWe bench-scale with actual coal-derived flue gas in a power plant environment. The project was led by the University of Illinois at Urban-Champaign (UIUC), and Trimeric Corporation served as a sub-awardee providing support in basic design and techno-economic studies. To achieve the project goals and objectives, solvent management studies, process modeling and optimization, bench-scale equipment design, construction and testing, and technical, economic and environmental assessments have been conducted. The two top-performing biphasic solvents developed in our previous research were used in this project. Biphasic solvent emissions and control were investigated in the laboratory. The emissions of the biphasic solvents from the absorber were comparable to or lower than the reference 30 wt% monoethanolamine (MEA) solution, while they could be more effectively removed in the water wash column. Lab-scale testing of solvent degradation reclamation has revealed that vacuum distillation was feasible for biphasic solvent reclamation. Aspen Plus models were used to optimize the BiCAP, and a CO 2 stripping configuration introducing a secondary cold solvent feed to the stripper was identified to be the most energy efficient. A 40 kWe bench-scale, integrated BiCAP system was successfully designed, fabricated, and installed at the UIUC’s Abbott Power Plant. Parametric testing with synthetic flue gas has demonstrated that the two biphasic solvents required a more than 40% lower heat duty for CO 2 desorption as compared to the reference MEA tested on the same bench-scale skid. Slipstream testing with actual coal flue gas for a total of 31 days in two test campaigns has further demonstrated stable operation of the bench-scale skid. During the first campaign targeting 90% CO 2 removal, the heat duty averaged at 2,183 MJ/tonne of CO 2 captured and during the second campaign targeting 95% removal, the heat duty averaged at 2,450 MJ/tonne of CO 2 captured. A techno-economic analysis has revealed that for integration of the BiCAP into a 650-MWe pulverized coal-fired power plant, the parasitic power loss was reduced by ~20%, and the cost of CO 2 capture was reduced by ~21% ($36.3/tonne on a December 2018 dollar basis) compared to the U.S. Department of Energy (DOE)’s baseline Case B12B. As progression from this bench-scale development effort, a new project “Engineering-Scale Testing of the Biphasic Solvent Based CO 2 Absorption Capture Technology at a Covanta Waste-to-Energy Facility” was awarded by the DOE, launched in February 2023, to allow the team to further test the technology and demonstrate its technical and economic advantages at a pilot scale.

20 FOSSIL-FUELED POWER PLANTS↗

Advanced Structured Adsorbent Architectures for Transformative Carbon Dioxide Capture Performance (Final Report)

Svante is a world leader at using solid sorbents for low-cost Carbon Dioxide (CO 2 ) capture, a technology which is recognized as critical in meeting the dual mandates of energy security/reliability and the mitigation of man-made CO 2 emissions. Svante has been developing proprietary adsorbent material compositions, forming them into structured laminates, developing and optimizing process cycles, and system design for efficient capture of CO 2 from post-combustion flue gases of thermal power plants and industrial facilities. The deployment of first-generation CO 2 capture technology has been significantly hampered by high costs and energy penalties, among other barriers. Second generation CO 2 capture technologies (including the Mark I variant of Svante’s Veloxotherm™ adsorption-based technology), utilizing single adsorbent architecture, show promise for reducing the barriers to deploying CO 2 capture plants in commercially meaningful numbers. The objective of this project was to evaluate the Recipient’s transformational (Mark-II) VeloxoTherm™ Technology via the development and bench-scale testing of an advanced structured adsorbent, including novel Bi-layer, laminated adsorbent structures and segmented beds. Svante selected, synthesized, and characterized tailored solid adsorbents for computational modeling, advanced structured adsorbent development, process simulations, and dynamic bench scale (~1-10 kg/day CO 2 captured) testing using an existing single-bed VeloxoTherm™ Station (VTS) coupled with a natural gas-fired boiler. Segmented beds used the in-house, multi-bed Process Demonstration Unit (PDU) to demonstrate key performance indicators (KPIs), such as recovery, product purity, regeneration energy, and the integrated system's productivity in lifetime analysis. Segmented beds were used at a 1 tonne per day (TPD) unit at an industrial site to provide bench-scale validation of performance in an industrial setting. Svante was developing and optimizing the post-combustion CO 2 adsorption technology architectures, including the Bi-layer and segmented laminated adsorbent structure design, integrated rapid cycle temperature swing adsorption (RC-TSA) cycle, flow path architecture, and adsorbent bed construction and packaging (including gas porting) to progress towards achievement of DOE’s Transformational CO 2 Capture goals of 95% CO 2 purity and a cost of electricity at least 30% lower than a supercritical Pulverized Coal (PC) power plant with CO 2 capture, or approximately $30 per tonne of CO 2 captured ready for demonstration by 2030. The main requirements to reach the DOE target cost of carbon capture below $30/MT using Rapid-Cycling Temperature Swing Adsorption (RC-TSA) are as follows: (1) Increased capacity at different CO 2 concentrations, (2) Increased sorbents cycle life, (3) Increased O 2 resistance, and (4) Decreased steam requirement to extract 1 kg of CO 2 .

20 FOSSIL-FUELED POWER PLANTS↗

Differences In High Burnup Fuel Management Strategies to Minimize FFRD and Increase Economic Viability

The nuclear industry is pursuing approval of an increase in the length of the pressurized water reactor (PWR) cycle from 18 months to 24 months to reduce reactor downtime and enhance the economic competitiveness of nuclear energy. Such an increase in reactor cycle length will require that the maximum rod average burnup exceeds the current regulatory limit of 62 GWd/MTU, and it could peak at approximately 75 GWd/MTU, posing potential reactor safety and performance concerns. One such concern is that fuel fragmentation, relocation, and dispersal (FFRD) could occur during a severe loss-of coolant accident (LOCA) in which a fuel rod balloons and bursts, and pulverized fuel fragments are dispersed throughout the reactor’s primary coolant system. Previous analyses have identified which reactor operating conditions leave the core more susceptible to FFRD and have shown that FFRD susceptibility is strongly linked to fuel rod burnup and linear heat rate (LHR) history. The work described in this report uses an optimization strategy known as parallel simulated annealing (PSA) and a coarse mesh Purdue Advanced Reactor Core Simulator (PARCS) reactor physics model to develop two core fuel loading patterns, each with a different optimization objective. One core optimization maximized the core’s cycle length while still respecting regulatory limits on the radial peaking factor and soluble boron concentration with a peak rod average burnup of 75 GWd/MTU. The second optimization was aimed at minimizing FFRD susceptibility while still targeting a 24-month cycle length and respecting regulatory limits. PARCS model predictions were verified using the high-fidelity Virtual Environment for Reactor Applications (VERA). The two core designs were compared to highlight core design strategies to minimize FFRD susceptibility and to maximize economic viability.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Compare predictions of transient fission gas release by empirical and mechanistic models to experiments in high burnup UO 2 fuel

Understanding and predicting fuel performance at high burnup require improving our understanding of transient fission gas release. High-burnup operations enable new mechanisms of fission gas release, which affect fuel performance. The Nuclear Regulatory Commission has recently published its interpretation of existing fuel fragmentation, relocation, and dispersal data in a research information letter. There, transient fission gas release was identified as one of the main factors that contributes to fuel fragmentation, relocation, and dispersal, and therefore limits fuel extension to high burnup. However, transient fission gas release is a complex phenomenon that cannot be fully described by simple empirical descriptions. This report summarizes the development of a mechanistic model for high-burnup transient fission gas release in the fuel performance code BISON. This research was supported by the Nuclear Energy Advanced Modeling and Simulation program during fiscal year 2023 to improve our understanding of high-burnup transient fission gas release and ability to predict it as a function of operation history. To support the development of a mechanistic transient fission gas release model, the existing Simple Integrated Fission Gas Release and Swelling (Sifgrs) model in BISON has been completely refactored to make it more modular and extensible. This effort supports the model's application to high-burnup conditions, its extension to other fuel forms, and the continuous improvement of its current features. Once refactoring was completed, models for high-burnup structure formation, fission gas transfer from non-restructured fuel to high-burnup structure, high-burnup structure intragranular and intergranular fission gas behavior, high-burnup structure bubble evolution, fuel pulverization, and the resulting transient fission gas release were tested and implemented in the Simple Integrated Fission Gas Release and Swelling (Sifgrs) model or tightly coupled to it. The new mechanistic model was then compared to an empirical model developed in parallel by a Nuclear Energy University Program project using a Studsvik high-burnup loss-of-coolant-accident assessment case. Finally, the report details the preliminary BISON results for a benchmark activity organized by the Nuclear Energy Agency to evaluate fuel performance codes' predictive capabilities for burst fission gas release. This work represents an important step toward a mechanistic understanding of fission gas release in high-burnup conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Trace Element Sampling and Partitioning Modeling to Estimate Wastewater Composition and Treatment Performance at Coal Generators

The coal combusted at coal-fired power plants (CFPPs) contains several trace elements that impact human heath if released to the environment. Effective combinations of air pollution control devices (APCDs) and water pollution control devices (WPCDs) are critical to reducing these impacts. This work sampled pulverized CFPPs owned and operated by Louisville Gas & Electricity – Kentucky Utilities (LGE-KU) during baseload and cycling conditions. Next, an open-source and easy-to-implement trace element partitioning model was developed using publicly available datasets, literature studies of trace element partitioning, and sampling data to estimate trace element partitioning in APCDs to the gas, liquid, and solid phases exiting CFPPs. These estimates of the liquid phase trace element concentration in FGD wastewater were then used to estimate trace element behavior in WPCDs and evaluate treated wastewater effluent concentrations for compliance with the Effluent Limitation Guidelines (ELG) for the Steam Electric Generating Sector. Finally, cost estimates were developed for established and emerging wastewater treatment trains to identify the most cost-effective approaches for ELG compliance.

01 COAL, LIGNITE, AND PEAT↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

A. Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗