Final Report Ra Power Management 1255 10-15-16 FINAL_Public

Ra Power Management (RPM) has developed a cloud based software platform that manages the financial and operational functions of third party financed solar projects throughout their lifecycle. RPM’s software streamlines and automates the sales, financing, and management of a portfolio of solar assets. The software helps solar developers automate the most difficult aspects of asset management, leading to increased transparency, efficiency, and reduction in human error. More importantly, our platform will help developers save money by improving their operating margins

14 SOLAR ENERGY↗

Solar Asset Management Software

Ra Power Management (RPM) has developed a cloud based software platform that manages the financial and operational functions of third party financed solar projects throughout their lifecycle. RPM’s software streamlines and automates the sales, financing, and management of a portfolio of solar assets. The software helps solar developers automate the most difficult aspects of asset management, leading to increased transparency, efficiency, and reduction in human error. More importantly, our platform will help developers save money by improving their operating margins.

14 SOLAR ENERGY↗

Advances on CHP District Energy and Microgrids Deployment: Simplified Tool for Rapidly Deploying Feasibility Analytics for the Non-Technical User (Final Technical Report)

Community energy systems have proven to have the potential to improve cost efficiency, resilience, and decarbonize. However, investing in community energy systems such as community microgrids or district energy systems is a complex decision due to the high initial investment and the uncertainties associated with the long development time and lifecycle of the project. Tools that make feasibility assessments accessible to non-technical users like investors, policymakers, and other stakeholders will result in more feasibility analyses completed, more candidate projects identified, and more community energy systems deployed. The pilot tool developed under this award is named Energy Fellow. Energy Fellow allows technical and non-technical users to complete feasibility analyses for district energy systems and community microgrids. This is the first software tool of its kind designed for non-technical users and available at no cost. Its scope was adjusted to a 25x25-mile region within the Houston area in Texas to make its development compatible with the funding available. However, the findings and models developed make this pilot tool easily scalable to the US. The lessons learned during the design, implementation, and testing stages have helped find trade-off solutions to software and hardware challenges related to implementing 3D models in online tools. Green software strategies has been successfully applied to the design and operations of the tool, and the team has researched the aspects of the (non-technical) user experience that will make commercial developments of this tool even more impactful.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Requirements UML Tool (RUT) Expanded for Extreme Programming (CI02)

A procedure for capturing and managing system requirements that incorporates XP user stories. Because costs associated with identifying problems in requirements increase dramatically over the lifecycle of a project, a method for identifying sources of software risks in user stories is urgently needed. This initiative aims to determine a set of guide-lines for user stories that will result in high-quality requirement. To further this initiative, a tool is needed to analyze user stories that can assess the quality of individual user stories, detect sources cf software risk's, produce software metrics, and identify areas in user stories that can be improved.

McCoy, James R.↗

System Architecture Modeling for Technology Portfolio Management using ATLAS

Strategic planners and technology portfolio managers have traditionally relied on consensus-based tools, such as Analytical Hierarchy Process (AHP) and Quality Function Deployment (QFD) in planning the funding of technology development. While useful to a certain extent, these tools are limited in the ability to fully quantify the impact of a technology choice on system mass, system reliability, project schedule, and lifecycle cost. The Advanced Technology Lifecycle Analysis System (ATLAS) aims to provide strategic planners a decision support tool for analyzing technology selections within a Space Exploration Architecture (SEA). Using ATLAS, strategic planners can select physics-based system models from a library, configure the systems with technologies and performance parameters, and plan the deployment of a SEA. Key parameters for current and future technologies have been collected from subject-matter experts and other documented sources in the Technology Tool Box (TTB). ATLAS can be used to compare the technical feasibility and economic viability of a set of technology choices for one SEA, and compare it against another set of technology choices or another SEA. System architecture modeling in ATLAS is a multi-step process. First, the modeler defines the system level requirements. Second, the modeler identifies technologies of interest whose impact on an SEA. Third, the system modeling team creates models of architecture elements (e.g. launch vehicles, in-space transfer vehicles, crew vehicles) if they are not already in the model library. Finally, the architecture modeler develops a script for the ATLAS tool to run, and the results for comparison are generated.

Thompson, Robert W.↗

WBS 1.2.3.405 - Life Cycle Assessment of Storage Technologies

Recent commitments by the Biden administration have established targets to achieve a net-zero energy system by 2050. Meeting these targets will spur a rapid transition to clean energy technologies and a commensurate need to develop and deploy energy storage technologies at scale. Pumped Storage Hydro (PSH) is expected to be part of this solution because its ability to provide grid flexibility and stability and enable the dispatching of disparate variable renewable energy technologies. Despite PSH being a mature technology with a history of deployment dating back several decades, there is very little information on the greenhouse gas (GHG) implications of PSH as compared to other storage technologies. The objective of this project is to perform a full lifecycle assessment (LCA) of new PSH projects in the U.S. This LCA includes all project phases (resource extraction, construction, operation, maintenance, end-of-life). The functional unit for this study is 1 kWh electricity delivered by system to grid substation connection point and the estimated lifetime for our base case is 80 years. Data used in this study are based on over 30 potential PSH projects that are in preliminary planning phases and are represent a wide range of potential closed-loop PSH systems in terms of location, technology, and capacity. The project approach, data sources, and modeling assumptions have been informed by a technical review committee of stakeholders that include experts from academia, national and international government, industry, and utilities. The GHGs and energy return on investment (EROI) from PSH will be compared to other storage technologies (e.g., stationary battery storage). Results from this project will improve the PSH community's understanding of the environmental impacts and sustainability of new PSH projects and how PSH compares to other storage technologies. The approach used in this project relies on open-source programming. The analysis framework (source code and data) and will be made publicly available at the end of the project. In addition to reporting results for the base case, we will perform rigorous sensitivity analysis to identify the major drivers, understand impacts of different configurations, and future energy markets. Results from this project will be published in a suitable journal.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Telescience Resource Kit Software Lifecycle

The challenge of a global operations capability led to the Telescience Resource Kit (TReK) project, an in-house software development project of the Mission Operations Laboratory (MOL) at NASA's Marshall Space Flight Center (MSFC). The TReK system is being developed as an inexpensive comprehensive personal computer- (PC-) based ground support system that can be used by payload users from their home sites to interact with their payloads on board the International Space Station (ISS). The TReK project is currently using a combination of the spiral lifecycle model and the incremental lifecycle model. As with any software development project, there are four activities that can be very time consuming: Software design and development, project documentation, testing, and umbrella activities, such as quality assurance and configuration management. In order to produce a quality product, it is critical that each of these activities receive the appropriate amount of attention. For TReK, the challenge was to lay out a lifecycle and project plan that provides full support for these activities, is flexible, provides a way to deal with changing risks, can accommodate unknowns, and can respond to changes in the environment quickly. This paper will provide an overview of the TReK lifecycle, a description of the project's environment, and a general overview of project activities.

Griner, Carolyn S.↗

Early Warning Look Ahead Metrics: The Percent Milestone Backlog Metric

All complex development projects experience delays and corresponding backlogs of their project control milestones during their acquisition lifecycles. NASA Goddard Space Flight Center (GSFC) Flight Projects Directorate (FPD) teamed with The Aerospace Corporation (Aerospace) to develop a collection of Early Warning Look Ahead metrics that would provide GSFC leadership with some independent indication of the programmatic health of GSFC flight projects. As part of the collection of Early Warning Look Ahead metrics, the Percent Milestone Backlog metric is particularly revealing, and has utility as a stand-alone execution performance monitoring tool. This paper describes the purpose, development methodology, and utility of the Percent Milestone Backlog metric. The other four Early Warning Look Ahead metrics are also briefly discussed. Finally, an example of the use of the Percent Milestone Backlog metric in providing actionable insight is described, along with examples of its potential use in other commodities.

acquisition lifecycles↗

Isolating Weakly and Strongly-Absorbing Classes of Carbonaceous Aerosol: Optical Properties, Abundance and Lifecycle

The goal of this project was to evaluate climate-relevant properties of carbonaceous particles and the transformations of those particles in the atmosphere, with the purpose of developing lumped classes of carbonaceous particles suitable for use in large-scale models. These climate-relevant properties included light absorption and hygroscopicity. Hygroscopicity is a measure of water affinity, which governs particle growth at humid conditions and absorption and scattering under those conditions. It also controls particles’ activation into cloud droplets, which in turn affects cloud albedo and particle removal. This project used laboratory measurements of fresh and aged carbonaceous aerosol, and predictions of properties using a particle-resolved model, to identify sensitivities. The focus in this project was on aerosol from biomass pyrolysis, abbreviated BrC (“brown carbon”). We measured absorption by aerosol from biomass pyrolysis from two sources with very different composition: wood and corn stalk. For both sources, the greatest light absorption occurred at the highest generation temperature, and this maximum absorption was very similar to that of wood-generated aerosol. We suggest that pyrolysis products can be considered surrogates for a wide range of biomass aerosol. We captured aerosol emitted from biomass pyrolysis on filters and exposed it to ultraviolet radiation, to the atmospheric trace gases ozone, ammonia (NH 3 ) and nitrogen oxide; and to aqueous saturated salt solutions of ammonium sulfate, ammonium nitrate, sodium chloride and sodium sulfate. Absorption increased, but by only small amounts for all of these treatments, with one exception: after aging with ammonia, absorption increased by almost a factor of four. Absorption increased more at visible wavelengths. We confirmed that a significant change occurred in the aerosol phase, by measuring absorption by suspended particles after aging with NH 3 and finding doubled aerosol absorption. Aging by NH 3 produces a mild increase in the hygroscopicity of BrC, and a greater increase in cloud condensation nucleus activity. Therefore, reactions with NH 3 form compounds that absorb more light than the original aerosol and act as surfactants, increasing the likelihood that these particles will participate in cloud formation. The particle-resolved model PartMC was enhanced to include additional physical processes. It was calibrated against chamber results, and we needed to account for the non-spherical structure of particle agglomerates, even for ammonium sulfate. We implemented the “volatility basis set” (VBS) framework in the model. The updated PartMC-MOSAIC model was able to simulate gas and aerosol concentrations from the CARES campaign at levels similar to observations. The PartMC model was used to evaluate plume dynamics affecting CCN activity of biomass burning aerosols early in a plume. Coagulation limits emission of CCN to about 1016 per kg of fuel. Co-emitted, semi-volatile organic compounds or emission at small particle sizes can homogenize composition before plume exit, and SVOC co-emission can be the main factor determining plume-exit CCN for hydrophobic or small particles. When externally-mixed, accumulation-mode particles are emitted in the absence of SVOCs, CCN can be overestimated by up to a factor of two. This means that measurements made on aerosol from all phases of combustion gathered into a single chamber may incorrectly estimate CCN properties. Based on the findings here, we make some recommendations for use in large-scale models: (1) inventories should represent “internally” versus “externally” mixed under certain combustion conditions; (2) consideration of non-spherical particles when coagulation is important for climate-relevant properties near sources; (3) designating organic biomass particles as weakly absorbing; (4) “inherent absorption” and hygroscopicity are not altered with aging by ozone or ultraviolet light, and inherent absorption is not altered with salt addition, but both cloud activity and absorption are altered by aging with ammonia and could require a separate class in large-scale models.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Risk matrix for legacy wells within the Area of Review (AoR) of Carbon Capture & Storage (CCS) projects

The success of CCS depends on the capacity, injectivity, and confinement by the storage medium. Thousands of wells drilled over the past century with the intention to find the trapped oil and gas may penetrate the containment seals. These wells may provide leakage pathways for the CO 2 to escape and contaminate the underground sources of drinking water (USDW) or reach the surface in the worst-case scenario. Identifying the risky wells penetrating the containment seals and predicting their current as well as future well integrity is the most challenging task when limited data is available. Here, this paper proposes a unique methodology for risk assessment of the wells penetrating the containment seals based on the proximity of these wells from the proposed injection location, mechanical integrity, and accessibility of these wells over the lifecycle of the CCS project. This helps in identifying the wells which need immediate attention from the wells that need little to no attention. It also highlights the corrective actions necessary for the success of the CCS project as well as help estimate the approximate cost required to perform the corrective actions. This methodology focuses on all wells (producers, injectors, orphan, abandoned, water, stratigraphic, etc) while the majority of the studies found in literature focused on wells with sustained casing pressure (SCP) reports and cement bond logs (CBL). The proposed risk matrix, if applied to future CCS projects across the globe, will uniformly categorize the wells within the Area of Review (AoR).

58 GEOSCIENCES↗

Lean Model-Based Systems Engineering on the NASA High-Density Vertiplex Subproject

The High Density Vertiplex (HDV) subproject of NASA’s Advanced Air Mobility (AAM) project adopted Model-Based Systems Engineering (MBSE)in July of 2020, prior to subproject formulation. A small and lean team of HDV Systems Engineers(SE) are utilizing MagicDraw to execute NASA SE processes via MBSE. The SEs learned how to use MagicDraw from scratch and HDV is the first project for which the SEs have utilized MagicDraw. This paper will demonstrate project technical execution via MBSE, utilizing the digital elements built into the SysML (Systems Modeling Language). SysML provides a model-centric means of carrying out the NASA SE common technical processes by providing tools for complete system modeling, including requirements and interface management and design capture. The authors also leverage and extend SysML to perform other SE tasks, such as Verification and Validation (V&V)tracking. MBSE has two main purposes for HDV: 1) documenting the subproject’s logical architecture for distribution outside of the subproject, 2) capturing the subproject’s physical architecture in a single-source-of-truth for use by the subproject’s members. This paper details the challenges, lessons learned, and solutions that were encountered in implementing MBSE in the first iteration on a multi-iteration, full-lifecycle design, build, fly project.

Demetrios Katsaduros↗

Lean Model-Based Systems Engineering on the NASA High-Density Vertiplex Subproject

The High Density Vertiplex (HDV) subproject of NASA’s Advanced Air Mobility (AAM) project adopted Model-Based Systems Engineering (MBSE) in July of 2020, prior to subproject formulation. A small and lean team of HDV Systems Engineers (SE) are utilizing MagicDraw to execute NASA SE processes via MBSE. The SEs learned how to use MagicDraw from scratch and HDV is the first project for which the SEs have utilized MagicDraw. This presentation will demonstrate project technical execution via MBSE, utilizing the digital elements built into the SysML (Systems Modeling Language). SysML provides a model-centric means of carrying out the NASA SE common technical processes by providing tools for complete system modeling, including requirements and interface management and design capture. The authors also leverage and extend SysML to perform other SE tasks, such as Verification and Validation (V&V) tracking. MBSE has two main purposes for HDV: 1) documenting the subproject’s logical architecture for distribution outside of the subproject, 2) capturing the subproject’s physical architecture in a single-source-of-truth for use by the subproject’s members. This presentation details the challenges, lessons learned, and solutions that were encountered in implementing MBSE in the first iteration on a multi-iteration, full-lifecycle design, build, fly project.

systems engineering↗

Towards a Methodology and Tooling for Model-Based Probabilistic Risk Assessment (PRA)

A Probabilistic Risk Assessment (PRA) aims to identify and assess potential risks to system technical performance requirements for the purpose of furnishing risk insights into project decisions. PRAs have traditionally been conducted manually using software with an isolated data model. As system complexity rises it becomes difficult to ensure consistency between a PRA, the evolving system design, and other engineering analyses; the techniques for conducting PRAs must evolve to meet this challenge. This work presents progress towards a methodology and tooling for conducting a PRA by leveraging data in the system model, embedded for other purposes and analyses, to conduct a PRA. An approach for identifying the appropriate probabilistic equation for each risk scenario from a standard library is presented, which is a significant step towards the quantification of the likelihood of a risk scenario occurrence. The final calculation of the likelihood of occurrence is left as an item of future work. We also present the development of preliminary tooling to carry out the methodology on a well-formed system model. The information needed to conduct the PRA is embedded in a consistent manner in a system model, so the model-based PRA can be regularly executed as the system model changes. The ability to modify the PRA in concert with lifecycle evolution affords a project the opportunity to track the extent to which system modification impacts compliance with requirements. These aspects of this model-based PRA methodology make it capable of managing risk in increasingly complex technical systems.

Schreiner, Samuel S.↗

Quantitative approaches for including equity in risk and resilience infrastructure planning analyses

Risk and resilience assessments for critical infrastructure focus on myriad objectives, from natural hazard evaluations to optimizing investments. Although research has started to characterize externalities associated with current or possible future states, incorporation of equity priorities at project inception is increasingly being recognized as critical for planning related activities. However, there is no standard methodology that guides development of equity-informed quantitative approaches for infrastructure planning activities. Here, to address this gap, we introduce a logic model that can be tailored to capture nuances about specific geographies and community priorities, effectively incorporating them into different mathematical approaches for quantitative risk assessments. Specifically, the logic model uses a graded, iterative approach to clarify specific equity objectives as well as inform the development of equations being used to support analysis. We demonstrate the utility of this framework using case studies spanning aviation fuel, produced water, and microgrid electricity infrastructures. For each case study, the use of the logic model helps clarify the ways that local priorities and infrastructure needs are used to drive the types of data and quantitative methodologies used in the respective analyses. The explicit consideration of methodological limitations (e.g., data mismatches) and stakeholder engagements serves to increase the transparency of the associated findings as well as effectively integrate community nuances (e.g., ownership of assets) into infrastructure assessments. Such integration will become increasingly important to ensure that planning activities (which occur throughout the lifecycle of the infrastructure projects) lead to long-lasting solutions to meet both energy and sustainable development goals for communities.

community-based↗

Driving Economics and Reducing Risks: The Business Case for Security-by-Design in Nuclear Power

This report provides an analysis of the financial, operational, and strategic advantages of incorporating Security-by-Design (SeBD) early in the lifecycle of nuclear power plant projects. By framing security as a foundational design element rather than a late-stage add-on, owners, vendors, and operators can reduce budget overruns, strengthen regulatory compliance, and increase revenue opportunities. The report details key lifecycle phases, highlighting the strategic imperative for organizations (including project developers, investors, vendors, and regulators) to adopt SeBD. Drawing on industry estimates, real-world case studies, and comparative cost analyses, the findings underscore that even a modest upfront investment in SeBD can yield substantial long-term returns by preventing costly retrofit activities, minimizing regulatory delays, and positioning nuclear vendors for the ability to adapt in the evolving security market. By avoiding excessive retrofit expenses and positioning security as a built-in feature rather than an afterthought, nuclear projects can protect their financial performance, enhance public trust, and secure a competitive edge in an increasingly complex global energy market. The authors advocate for SeBD’s strategic implementation, supported by established quality management methodologies, thereby promoting continuous improvement and defect avoidance. Ultimately, early SeBD integration represents a strategic investment, yielding significant returns by preventing costly retrofits and positioning nuclear projects for enhanced competitiveness and public trust.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives on current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefi t the industry at-large.

14 SOLAR ENERGY↗

Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives on current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefit the industry at-large.

14 SOLAR ENERGY↗