Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Process integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Filtering algorithms for processing prefiltered measurements

The filtering algorithm for processing integral measurements is extended to include analog type prefilters with infinite memory, and to include sequential processing of prefiltered data in multi-sensor, multi-sample rate systems. The extension to infinite memory prefilters requires serial decorrelation of the prefilter output prior to state estimation. These algorithms provide a technique for investigation of prefilter parameter sensitivities, and provide optimal compensation for any information loss due to prefiltering.

Warren, A. W.↗

Integrated payload and mission planning, phase 3. Volume 1: Integrated payload and mission planning process evaluation

The integrated payload and mission planning process for STS payloads was defined, and discrete tasks which evaluate performance and support initial implementation of this process were conducted. The scope of activity was limited to NASA and NASA-related payload missions only. The integrated payload and mission planning process was defined in detail, including all related interfaces and scheduling requirements. Related to the payload mission planning process, a methodology for assessing early Spacelab mission manager assignment schedules was defined.

Sapp, T. P.↗

Research in software allocation for advanced manned mission communications and tracking systems

An assessment of the planned processing hardware and software/firmware for the Communications and Tracking System of the Space Station Freedom (SSF) was performed. The intent of the assessment was to determine the optimum distribution of software/firmware in the processing hardware for maximum throughput with minimum required memory. As a product of the assessment process an assessment methodology was to be developed that could be used for similar assessments of future manned spacecraft system designs. The assessment process was hampered by changing requirements for the Space Station. As a result, the initial objective of determining the optimum software/firmware allocation was not fulfilled, but several useful conclusions and recommendations resulted from the assessment. It was concluded that the assessment process would not be completely successful for a system with changing requirements. It was also concluded that memory requirements and hardware requirements were being modified to fit as a consequence of the change process, and although throughput could not be quantitized, potential problem areas could be identified. Finally, inherent flexibility of the system design was essential for the success of a system design with changing requirements. Recommendations resulting from the assessment included development of common software for some embedded controller functions, reduction of embedded processor requirements by hardwiring some Orbital Replacement Units (ORUs) to make better use of processor capabilities, and improvement in communications between software development personnel to enhance the integration process. Lastly, a critical observation was made regarding the software integration tasks did not appear to be addressed in the design process to the degree necessary for successful satisfaction of the system requirements.

Warnagiris, Tom↗

Cost reduction by integration of the assurance technologies.

It is shown how the cost of applying assurance disciplines to the development of complex systems can be reduced by integrating the mechanics of system engineering and system management into a 'Development Risk Control System'. The essential features of the integration process are examined. A 'Development Risk Management Model' is described, and the use of the model to integrate and thereby reduce the cost of other assurance disciplines is discussed and illustrated.

Ball, L. W.↗

Studies in optical parallel processing

Threshold and A/D devices for converting a gray scale image into a binary one were investigated for all-optical and opto-electronic approaches to parallel processing. Integrated optical logic circuits (IOC) and optical parallel logic devices (OPA) were studied as an approach to processing optical binary signals. In the IOC logic scheme, a single row of an optical image is coupled into the IOC substrate at a time through an array of optical fibers. Parallel processing is carried out out, on each image element of these rows, in the IOC substrate and the resulting output exits via a second array of optical fibers. The OPAL system for parallel processing which uses a Fabry-Perot interferometer for image thresholding and analog-to-digital conversion, achieves a higher degree of parallel processing than is possible with IOC.

Lee, S. H.↗

Program for Space Shuttle Payload Cabling

EXCABL is expert-system computer program developed to route electrical cables in Space Shuttle Orbiter payload bay for each mission. Automates cable-routing process and provides data for cable-installation documents. Automation increased speed and accuracy of payload-integration process, and expert system codifies knowledge cabling experts have acquired. Written in ART.

Schultz, Roger D.↗

Strategies for automatic planning: A collection of ideas

The main goal of the Jet Propulsion Laboratory (JPL) is to obtain science return from interplanetary probes. The uplink process is concerned with communicating commands to a spacecraft in order to achieve science objectives. There are two main parts to the development of the command file which is sent to a spacecraft. First, the activity planning process integrates the science requests for utilization of spacecraft time into a feasible sequence. Then the command generation process converts the sequence into a set of commands. The development of a feasible sequence plan is an expensive and labor intensive process requiring many months of effort. In order to save time and manpower in the uplink process, automation of parts of this process is desired. There is an ongoing effort to develop automatic planning systems. This has met with some success, but has also been informative about the nature of this effort. It is now clear that innovative techniques and state-of-the-art technology will be required in order to produce a system which can provide automatic sequence planning. As part of this effort to develop automatic planning systems, a survey of the literature, looking for known techniques which may be applicable to our work was conducted. Descriptions of and references for these methods are given, together with ideas for applying the techniques to automatic planning.

Collins, Carol↗

Recent progress in utilization planning for Space Station Freedom

The progress made in utilization planning for the redesigned Space Station Freedom (SSF) concept is described. Consideration is given to the SSF user capabilities, the strategic planning process, the strategic planning organizations, and the Consolidated Operations and Utilization Plan (COUP, which will be released in January 1993) as well as to the COUP development process and implementation. The process by which the COUP will be produced was exercised in the international Multilateral Strategic and Tactical Integration Process (MUSTIP) simulation. The paper describes the MUSTIP simulation and its activities along with MUSTIP findings and recommendations.

Bartoe, John-David F.↗

Fast Quantum Algorithms for Numerical Integrals and Stochastic Processes

We discuss quantum algorithms that calculate numerical integrals and descriptive statistics of stochastic processes. With either of two distinct approaches, one obtains an exponential speed increase in comparison to the fastest known classical deterministic algotithms and a quadratic speed increase incomparison to classical Monte Carlo methods.

quantum algorithms numerical integrals↗

Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challange

The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), responsible for project management and flight operations; Orbital Sciences Corporation (OSC), spacecraft builder and responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), responsible for science planning and operations. As a cost-capped mission, one of Dawn s implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL s ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL s GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project s commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to an overall systems engineering process and fundamental systems engineering practices: decomposition of the project request into manageable requirements; definition of a structured yet flexible development process; integration of multiple ground disciplines and experts into a focused team effort; in-process risk management; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

systems engineering↗

International Space Station Payload Analytical Integration Overview

This paper contains a general description of the NASA Space Station Payloads Office (SSPO) integration process for International Space Station (ISS) payloads. The end-to-end processes described herein cover the Increment and execute preparation, real-time operations and post-flight phases of payload integration. The paper describes the necessary agreements, plans, documents and reviews required to integrate and operate payloads into standard payload locations. It also summarizes the Program boards, panels and points of contact that a Payload Developer (PI)) will participate in or interface with during the course of the process. The purpose is to provide potential PDs with an outline of the SSPO processes to deliver payloads to orbit, conduct research on orbit and return them to Earth.

Scheib, J.↗

Launch Vehicle Design Process: Characterization, Technical Integration, and Lessons Learned

Engineering design is a challenging activity for any product. Since launch vehicles are highly complex and interconnected and have extreme energy densities, their design represents a challenge of the highest order. The purpose of this document is to delineate and clarify the design process associated with the launch vehicle for space flight transportation. The goal is to define and characterize a baseline for the space transportation design process. This baseline can be used as a basis for improving effectiveness and efficiency of the design process. The baseline characterization is achieved via compartmentalization and technical integration of subsystems, design functions, and discipline functions. First, a global design process overview is provided in order to show responsibility, interactions, and connectivity of overall aspects of the design process. Then design essentials are delineated in order to emphasize necessary features of the design process that are sometimes overlooked. Finally the design process characterization is presented. This is accomplished by considering project technical framework, technical integration, process description (technical integration model, subsystem tree, design/discipline planes, decision gates, and tasks), and the design sequence. Also included in the document are a snapshot relating to process improvements, illustrations of the process, a survey of recommendations from experienced practitioners in aerospace, lessons learned, references, and a bibliography.

Blair, J. C.↗

Using Dynamic Interface Modeling and Simulation to Develop a Launch and Recovery Flight Simulation for a UH-60A Blackhawk

Joint Shipboard Helicopter Integration Process (JSHIP) is a Joint Test and Evaluation (JT&E) program sponsored by the Office of the Secretary of Defense (OSD). Under the JSHDP program is a simulation effort referred to as the Dynamic Interface Modeling and Simulation System (DIMSS). The purpose of DIMSS is to develop and test the processes and mechanisms that facilitate ship-helicopter interface testing via man-in-the-loop ground-based flight simulators. Specifically, the DIMSS charter is to develop an accredited process for using a flight simulator to determine the wind-over-the-deck (WOD) launch and recovery flight envelope for the UH-60A ship/helicopter combination. DIMSS is a collaborative effort between the NASA Ames Research Center and OSD. OSD determines the T&E and warfighter training requirements, provides the programmatics and dynamic interface T&E experience, and conducts ship/aircraft interface tests for validating the simulation. NASA provides the research and development element, simulation facility, and simulation technical experience. This paper will highlight the benefits of the NASA/JSHIP collaboration and detail achievements of the project in terms of modeling and simulation. The Vertical Motion Simulator (VMS) at NASA Ames Research Center offers the capability to simulate a wide range of simulation cueing configurations, which include visual, aural, and body-force cueing devices. The system flexibility enables switching configurations io allow back-to-back evaluation and comparison of different levels of cueing fidelity in determining minimum training requirements. The investigation required development and integration of several major simulation system at the VMS. A new UH-60A BlackHawk interchangeable cab that provides an out-the-window (OTW) field-of-view (FOV) of 220 degrees in azimuth and 70 degrees in elevation was built. Modeling efforts involved integrating Computational Fluid Dynamics (CFD) generated data of an LHA ship airwake and integrating a real-time ship motion model developed based on a batch model from Naval Surface Warfare Center. Engineering development and integration of a three degrees-of-freedom (DOF) dynamic seat to simulate high frequency rotor-dynamics dependent motion cues for use in conjunction with the large motion system was accomplished. The development of an LHA visual model in several different levels of resolution and an aural cueing system in which three separate fidelity levels could be selected were developed. VMS also integrated a PC-based E&S simFUSION system to investigate cost effective IG alternatives. The DIMSS project consists of three phases that follow an approved Validation, Verification and accreditation (VV&A) process. The first phase will support the accreditation of the individual subsystems and models. The second will follow the verification and validation of the integrated subsystems and models, and will address fidelity requirements of the integrated models and subsystems. The third and final phase will allow the verification and validation of the full system integration. This VV&A process will address the utility of the simulated WOD launch and recovery envelope. Simulations supporting the first two stages have been completed and the data is currently being reviewed and analyzed.

Sweeney, Christopher↗

Mechanisms of selective attention and space motion sickness

The neural mismatch theory of space motion sickness asserts that the central and peripheral autonomic sequelae of discordant sensory input arise from central integrative processes falling to reconcile patterns of incoming sensory information with existing memory. Stated differently, perceived novelty reaches a stress level as integrative mechanisms fail to return a sense of control to the individual in the new environment. Based on evidence summarized here, the severity of the neural mismatch may be dependent upon the relative amount of attention selectively afforded to each sensory input competing for control of behavior. Components of the limbic system may play important roles in match-mismatch operations, be therapeutically modulated by antimotion sickness drugs, and be optimally positioned to control autonomic output.

NASA Discipline Neuroscience↗

Spacelab Mission Implementation Cost Assessment (SMICA)

A total savings of approximately 20 percent is attainable if: (1) mission management and ground processing schedules are compressed; (2) the equipping, staffing, and operating of the Payload Operations Control Center is revised, and (3) methods of working with experiment developers are changed. The development of a new mission implementation technique, which includes mission definition, experiment development, and mission integration/operations, is examined. The Payload Operations Control Center is to relocate and utilize new computer equipment to produce cost savings. Methods of reducing costs by minimizing the Spacelab and payload processing time during pre- and post-mission operation at KSC are analyzed. The changes required to reduce costs in the analytical integration process are studied. The influence of time, requirements accountability, and risk on costs is discussed. Recommendation for cost reductions developed by the Spacelab Mission Implementation Cost Assessment study are listed.

Guynes, B. V.↗

Ares Project Overview - Quality in Design

This presentation introduces the audience to the overall goals of the Ares Project, which include providing human access to low-Earth orbit, the Moon, and beyond. The presentation also provides an overview of with the vehicles that will execute those goals and progress made on the vehicles to date. The briefing will provide an introduction to Lean, Six Sigma, and Kaizen practices Ares will use to improve the overall effectiveness and quality of its efforts. Finally, the briefing includes a summary of Safety and Mission Assurance practices being implemented within[Ares to ensure safety and quality early in the design process. Integrating Safety and Mission Assurance in Design: This presentation describes how the Ares Projects are learning from the successes and failures of previous launch systems in order to maximize safety and reliability while maintaining fiscal responsibility. The Ares Projects are integrating Safer T and Mission Assurance into design activities and embracing independent assessments by Quality experts in thorough reviews of designs and processes. Incorporating Lean thinking into the design process, Ares is also streamlining existing processes and future manufacturing flows which will yield savings during production. Understanding the value of early involvement of Quality experts, the Ares Projects are leading launch vehicle development into the 21st century.

Cianciola, Chris↗

HDU Pressurized Excursion Module (PEM) Prototype Systems Integration

The Habitat Demonstration Unit (HDU) project team constructed an analog prototype lunar surface laboratory called the Pressurized Excursion Module (PEM). The prototype unit subsystems were integrated in a short amount of time, utilizing a skunk-works approach that brought together over 20 habitation-related technologies from a variety of NASA centers. This paper describes the system integration strategies and lessons learned, that allowed the PEM to be brought from paper design to working field prototype using a multi-center team. The system integration process included establishment of design standards, negotiation of interfaces between subsystems, and scheduling fit checks and installation activities. A major tool used in integration was a coordinated effort to accurately model all the subsystems using CAD, so that conflicts were identified before physical components came together. Some of the major conclusions showed that up-front modularity that emerged as an artifact of construction, such as the eight 45 degree "pie slices" making up the module whose steel rib edges defined structural mounting and loading points, dictated much of the configurational interfaces between the major subsystems and workstations. Therefore, 'one of the lessons learned included the need to use modularity as a tool for organization in advance, and to work harder to prevent non-critical aspects of the platform from dictating the modularity that may eventually inform the fight system.

Gill, Tracy R.↗

Sequence information signal processor for local and global string comparisons

A sequence information signal processing integrated circuit chip designed to perform high speed calculation of a dynamic programming algorithm based upon the algorithm defined by Waterman and Smith. The signal processing chip of the present invention is designed to be a building block of a linear systolic array, the performance of which can be increased by connecting additional sequence information signal processing chips to the array. The chip provides a high speed, low cost linear array processor that can locate highly similar global sequences or segments thereof such as contiguous subsequences from two different DNA or protein sequences. The chip is implemented in a preferred embodiment using CMOS VLSI technology to provide the equivalent of about 400,000 transistors or 100,000 gates. Each chip provides 16 processing elements, and is designed to provide 16 bit, two's compliment operation for maximum score precision of between -32,768 and +32,767. It is designed to provide a comparison between sequences as long as 4,194,304 elements without external software and between sequences of unlimited numbers of elements with the aid of external software. Each sequence can be assigned different deletion and insertion weight functions. Each processor is provided with a similarity measure device which is independently variable. Thus, each processor can contribute to maximum value score calculation using a different similarity measure.

Peterson, John C.↗