Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Forecast”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

On the Probability of Occurrence of Extreme Space Weather Events

By virtue of their rarity, extreme space weather events, such as the Carrington event of 1859, are difficult to study, their rates of occurrence are difficult to estimate, and prediction of a specific future event is virtually impossible. Additionally, events may be extreme relative to one parameter but normal relative to others. In this study, we analyze several measures of the severity of space weather events (flare intensity, coronal mass ejection speeds, Dst, and greater than 30 MeV proton fluences as inferred from nitrate records) to estimate the probability of occurrence of extreme events. By showing that the frequency of occurrence scales as an inverse power of the severity of the event, and assuming that this relationship holds at higher magnitudes, we are able to estimate the probability that an event larger than some criteria will occur within a certain interval of time in the future. For example, the probability of another Carrington event (based on Dst less than - 850 nT) occurring within the next decade is approximately 12%. We also identify and address several limitations with this approach. In particular, we assume time stationarity, and thus, the effects of long-term space climate change are not considered. While this technique cannot be used to predict specific events, it may ultimately be useful for probabilistic forecasting.

Riley, Pete↗

Flight Deck Weather Avoidance Decision Support: Implementation and Evaluation

Weather related disruptions account for seventy percent of the delays in the National Airspace System (NAS). A key component in the weather plan of the Next Generation of Air Transportation System (NextGen) is to assimilate observed weather information and probabilistic forecasts into the decision process of flight crews and air traffic controllers. In this research we explore supporting flight crew weather decision making through the development of a flight deck predicted weather display system that utilizes weather predictions generated by ground-based radar. This system integrates and presents this weather information, together with in-flight trajectory modification tools, within a cockpit display of traffic information (CDTI) prototype. that the CDTI features 2D and perspective 3D visualization models of weather. The weather forecast products that we implemented were the Corridor Integrated Weather System (CIWS) and the Convective Weather Avoidance Model (CWAM), both developed by MIT Lincoln Lab. We evaluated the use of CIWS and CWAM for flight deck weather avoidance in two part-task experiments. Experiment 1 compared pilots' en route weather avoidance performance in four weather information conditions that differed in the type and amount of predicted forecast (CIWS current weather only, CIWS current and historical weather, CIWS current and forecast weather, CIWS current and forecast weather and CWAM predictions). Experiment 2 compared the use of perspective 3D and 21/2D presentations of weather for flight deck weather avoidance. Results showed that pilots could take advantage of longer range predicted weather forecasts in performing en route weather avoidance but more research will be needed to determine what combinations of information are optimal and how best to present them.

CWAM↗

Potential of Wind Power to Provide Flexible Ramping Products and Operating Reserve: Preprint

With increasing penetration levels of variable renewable energy sources, such as wind and solar, electric power systems need flexible resources that can provide fast-response ramping capabilities to counter the variability and uncertainty of renewable generation. Although the California Independent System Operator and Midcontinent System Operator have lauched ramp products, determining how wind power can participate using their flexible ramping models is still largely unclear. This paper proposes a security-constrained unit commitment (SCUC) model considering a flexible ramping constraint representing the system's flexible ramping requirements that account for the net load probabilistic forecast uncertainty. Through this explicit modeling of the uncertainty, the true cost of the flexible ramp service can be determined after solving the SCUC problem. In addition, the potential of wind power to provide operating reserves is analyzed. Numerical case studies demonstrate that with wind power providing both flexible ramping products and operating reserve, the system operating costs and ramp shortages will be reduced significantly.

17 WIND ENERGY↗

Probabilistic Wind Power Ramp Forecasting Based on a Scenario Generation Method

Wind power ramps (WPRs) are particularly important in the management and dispatch of wind power and currently drawing the attention of balancing authorities. With the aim to reduce the impact of WPRs for power system operations, this paper develops a probabilistic ramp forecasting method based on a large number of simulated scenarios. An ensemble machine learning technique is first adopted to forecast the basic wind power forecasting scenario and calculate the historical forecasting errors. A continuous Gaussian mixture model (GMM) is used to fit the probability distribution function (PDF) of forecasting errors. The cumulative distribution function (CDF) is analytically deduced. The inverse transform method based on Monte Carlo sampling and the CDF is used to generate a massive number of forecasting error scenarios. An optimized swinging door algorithm is adopted to extract all the WPRs from the complete set of wind power forecasting scenarios. The probabilistic forecasting results of ramp duration and start-time are generated based on all scenarios. Numerical simulations on publicly available wind power data show that within a predefined tolerance level, the developed probabilistic wind power ramp forecasting method is able to predict WPRs with a high level of sharpness and accuracy.

17 WIND ENERGY↗

Probabilistic Wind Power Ramp Forecasting Based on a Scenario Generation Method: Preprint

Wind power ramps (WPRs) are particularly important in the management and dispatch of wind power, and they are currently drawing the attention of balancing authorities. With the aim to reduce the impact of WPRs for power system operations, this paper develops a probabilistic ramp forecasting method based on a large number of simulated scenarios. An ensemble machine learning technique is first adopted to forecast the basic wind power forecasting scenario and calculate the historical forecasting errors. A continuous Gaussian mixture model (GMM) is used to fit the probability distribution function (PDF) of forecasting errors. The cumulative distribution function (CDF) is analytically deduced. The inverse transform method based on Monte Carlo sampling and the CDF is used to generate a massive number of forecasting error scenarios. An optimized swinging door algorithm is adopted to extract all the WPRs from the complete set of wind power forecasting scenarios. The probabilistic forecasting results of ramp duration and start time are generated based on all scenarios. Numerical simulations on publicly available wind power data show that within a predefined tolerance level, the developed probabilistic wind power ramp forecasting method is able to predict WPRs with a high level of sharpness and accuracy.

17 WIND ENERGY↗

A Data-Driven Method for Adaptive Reserve Requirement Estimation via Probabilistic Net Load Forecasting

The University of Colorado Boulder Boulder, CO, 80309, USA With the increasing penetration of renewable energy, power systems are subject to more uncertainty. This makes power system reserve scheduling more challenging. Most of the current reserve requirement determination methods calculate reserve requirements based on historical data, which does not consider the real-time or future system uncertainty. In this paper, a data-driven method is developed to determine the non-spinning reserve requirement (NSRR) in the Electric Reliability Council of Texas (ERCOT) system. The method follows the procedure of the current ERCOT method while adaptively determining the NSRR based on probabilistic net load forecasts. Case studies with two years of ERCOT data show that the developed method significantly reduces the NSRR by introducing an adaptive temporal resolution and update rate. Sensitivity analysis with different forecasting and percentile thresholds indicates the flexibility of the developed method.

non-spinning reserve↗

What Is the Value of Alternative Methods for Estimating Ramping Needs?

Power system operators procure and deploy flexibility reserves or ramping products to address balancing needs caused by uncertainty and variability of load and generation. Existing methods estimate ramping needs using calendar information and historical forecast errors. Novel methods investigate if real-time weather information could inform ramping and other balancing requirements. This paper compares estimation methods for ramping requirements in theory and practice. The theoretical framework indicates when an alternative method could yield improved economic or reliability performance than existing methods by requiring lower or higher levels of ramping products. Preliminary simulations on a 118-bus test system for 4 days in May 2019 illustrate how system performance improves or deteriorates when ramping requirements are weather-informed (alternative) instead of calendar-based (baseline). Preliminary results suggest high variability in change of performance and underline the impact of additional factors, such as system conditions, on the realized performance change.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Short-Term Load Forecasting Considering EV Charging Loads with Prediction Interval Evaluation

Short-term load forecasting plays a critical role in power system planning and operation. Along with the electrification of various loads, electricity demands are becoming increasingly hard to predict. Notably, the recent rise in electric vehicles (EVs) has further contributed to this unpredictability. To address this issue, this paper proposes a probabilistic load forecasting strategy utilizing Gaussian process regression, structured in a day-ahead manner. While many works focus on deterministic prediction, probabilistic forecasting offers additional insights into variability and uncertainty, enabling more flexible and reliable operation for power systems. To enhance the accuracy of the load forecasting model, the inputs include features related to EV charging habits as well as commonly used weather information. The load forecasting results are evaluated using various metrics, including conventional ones that assess the accuracy of point forecasts, as well as additional metrics that test the reliability of prediction intervals. The proposed load forecasting method is finally tested on real residential power consumption data and EV charging data sampled from real-world sources. The results prove that the new features can greatly improve the performance of the load forecasting method.

electrical vehicle↗

A real-time probabilistic channel flood-forecasting model based on the Bayesian particle filter approach

Reliable real-time probabilistic flood forecasting is critical for effective water management and flood protection all over the world. In this study, we develop a real-time probabilistic channel flood-forecasting model by combining a channel hydraulic model with the Bayesian particle filter approach. The new model is tested in the upstream river reach of Three Gorges Dam (TGD) on the Yangtze River, China. Stage observations at seven hydrological stations are used simultaneously to adjust the Manning's roughness coefficients and to update discharges and stages along the river reach to attain reliable probabilistic flood forecasting. The synthetic experiments are applied to demonstrate the new model's correction and forecasting performances. The real-world experiments show that the new model can make accurate flood forecasting as well as derive reliable intervals for different confidence levels. The new probabilistic flood forecasting model not only outperforms the existing deterministic channel flood-forecasting models in accuracy, but also provides a more robust tool with which to incorporate uncertainty into flood-control efforts.

54 ENVIRONMENTAL SCIENCES↗

Probabilistic Short-Term Wind Forecasting Based on Pinball Loss Optimization

Probabilistic wind power forecasts that quantify the uncertainty in wind output have the potential to aid in the economic grid integration of wind power at large penetration levels. In this paper, a novel probabilistic wind forecasting approach based on pinball loss optimization is proposed, in conjunction with a multi-model machine learning based ensemble deterministic forecasting framework. By assuming the point-forecasted value as the mean at each point, one unknown parameter (i.e., standard deviation) of a predictive distribution at each forecasting point is determined by minimizing the pinball loss. A surrogate model is developed to represent the unknown distribution parameter as a function of deterministic forecasts. This surrogate model can be used together with deterministic forecasts to predict the unknown distribution parameter and thereby generate probabilistic forecasts. Numerical results of case studies show that the proposed method has improved the pinball loss by up to 35% compared to a baseline quantile regression forecasting model.

17 WIND ENERGY↗

A Deterministic and Probabilistic Framework for Forecasting of Time-Series Damage States and Associated End-of-lIfe of a Pressurizer Water Reactor Surge Line under Design-Basis and Grid-Load-Following Loading Conditions

Argonne National Laboratory in support of the Department of Energy’s Light Water Reactor Sustainability (LWRS) program. The present semi-annual report covers the period between May 2018 and September 2018. In this report, we present the work performed to further improve the capability for structural integrity prediction. Part of this work focused on validating a computational fluid dynamics model for modeling thermal stratification. We also present finite element (FE) model based thermal-mechanical stress analysis of a pressurized water reactor (PWR) surge line under grid-load-following loading condition. In addition, we present work related to end-of-life prediction of a PWR surge line based on ASME code and NUREG-6909 deterministic approaches under design-basis and grid-load-following conditions. Our research in this report period also majorly involved with the development of a strategy for probabilistic fatigue life estimation. First, we applied a Weibull probabilistic modeling approach based on end-of-life fatigue data (traditional S~N data under in-air and PWR water conditions) to estimate the probabilistic life for a given strain amplitude. Second, we developed a data analytics based Markov-Chain-Monte-Carlo (MCMC) model for probabilistic modeling of time-series fatigue damage states and the associated probabilistic end-of-life of a component. Unlike the Weibull type approach, the MCMC type may not require a large number of fatigue tests for estimating the end-of-life for given loading and environmental conditions. We demonstrated the use of this framework through symmetric fatigue tests (stress- or strain-ontrolled tests either under in-air or PWR-water conditions) obtained from our earlier experiments. The MCMC model can use base time-series data either obtained from a model or fatigue experiment. Since experimental data are typically more accurate than model-calculated data, we used experiment-based time-series data to demonstrate the MCMC framework. However, when performing a complex experiment is not possible (due to time and costs involved), a model-based approach can be used to generate the time-series data. Similar model-based data are presented in our earlier report (e.g. for cyclic hardening damage states of a PWR surge line under constant amplitude and design-basis loading [1]). However, for the MCMC work in this report, we used experiment-based time-series damage states obtained from fatigue experiments under design-basis and grid-load-following loading conditions. The experimental loading inputs were based on thermal-mechanical FE model results of a typical PWR surge line. Then, we used the experimental time-series damage state data for forecasting the probabilistic time-series damage states and end-of-life of the PWR surge line. Based on this MCMC modeling strategy, and with the assumed loading, environment and thermal-mechanical boundary conditions, we have estimated that a 316SS-pure base metal PWR surge line would survive at least 159 years with zero failure probability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improving probabilistic infectious disease forecasting through coherence

With an estimated $10.4 billion in medical costs and 31.4 million outpatient visits each year, influenza poses a serious burden of disease in the United States. To provide insights and advance warning into the spread of influenza, the U.S. Centers for Disease Control and Prevention (CDC) runs a challenge for forecasting weighted influenza-like illness (wILI) at the national and regional level. Many models produce independent forecasts for each geographical unit, ignoring the constraint that the national wILI is a weighted sum of regional wILI, where the weights correspond to the population size of the region. We propose a novel algorithm that transforms a set of independent forecast distributions to obey this constraint, which we refer to as probabilistically coherent. Enforcing probabilistic coherence led to an increase in forecast skill for 79% of the models we tested over multiple flu seasons, highlighting the importance of respecting the forecasting system’s geographical hierarchy.

59 BASIC BIOLOGICAL SCIENCES↗

Probabilistic Day-Ahead Forecasting Using an Analog Ensemble Approach for Wind Farm Grid Services

Wind resource assessment and wind power forecasting are used in research and industry to anticipate future power output at scales ranging from individual wind turbines to entire wind farms. Probabilistic day-ahead wind forecasting is useful for anticipating how a wind farm could potentially participate in the day-ahead market by providing upper and lower bounds for expected power generation, thus informing grid operators of its uncertainty. Understanding this uncertainty is part of a larger project focused on building a platform that combines efforts in weather forecasting, aerodynamic and economic modeling to create maximum value of a wind plant to better provide services to the grid. This effort is also known as the Atmosphere to Electrons to Grid (A2E2G) project. One method for producing a probabilistic forecast is through the analog ensemble approach (Delle Monache et al., 2011). This method leverages historical forecasts and their corresponding observations as a training data set from which future forecasts can be made. For some future forecast, the most similar historical forecasts (analogs) are identified on a regular time basis such as once per a 3-hour window. The most similar analogs, based on a metric such as root mean square error (RMSE), are recorded and their corresponding verifying observations are used as an ensemble member for this future forecast. Prior work in this area demonstrates improvements over raw Numerical Weather Prediction (NWP) forecasts and shows skill similar to techniques such as logistic regression and machine learning (Delle Monache et al., 2013; Alessandrini et al., 2015). Here, we take the High-Resolution Rapid Refresh model (HRRR) day-ahead forecast (0-36 hours) to create a probabilistic day-ahead forecast using an analog ensemble approach. The HRRR has an hourly temporal resolution, with a spatial resolution of 3 km. The 12 UTC HRRR model run is downloaded every day for one year from August 2019 - July 2020, with the first 11 months serving as a bank of analogs from which the forecasting algorithm can create a probabilistic forecast. Once downloaded, the original HRRR forecast is temporally interpolated to 5-minutes, aligning with both the temporal resolution of the observations as well as the timescale relevant for day-ahead power forecasts. The forecast is validated at the M2 tower at the Flatirons Campus of the National Renewable Energy Laboratory (NREL) at a typical wind turbine height of 80 m. Variables such as wind speed, wind direction, and turbulence intensity are incorporated into the probabilistic forecast model and weighted according to their relative importance to the forecast. Based on metrics such as mean bias error (MBE), mean absolute error (MAE), and root mean square error, the analog ensemble forecast outperforms the raw HRRR forecast during the testing period of July 2020. Figure 1 illustrates an example day-ahead forecast compared against the verifying observations. The general variability and ramps are captured throughout the day, with potential to further improve the analog ensemble model through machine learning techniques.

numerical weather prediction↗

An efficient method to identify uncertainties of WRF-Solar variables in forecasting solar irradiance using a tangent linear sensitivity analysis

Uncertainty in predicting solar energy resources introduces major challenges in power system management and necessitates the development of reliable probabilistic solar forecasts. As the first part of the development of probabilistic forecasts based on the Weather Research and Forecasting model with solar extensions (WRF-Solar), this study presents a tangent linear approach to identify input variables responsible for the largest uncertainties in predicting surface solar irradiance and clouds. A tangent linear analysis is capable of efficiently investigating sensitivities of output variables with respect to various input variables of WRF-Solar because this approach avoids the computational burden of perturbing the initial conditions of individual input variables. We develop tangent linear models (TLMs) for six WRF-Solar physics packages that control the formation and dissipation of clouds and solar radiation, and we evaluate the validity of TLMs using a linearity test. The tangent linear sensitivity analysis is conducted under various scenarios based on satellite observations and model simulations to consider realistic input conditions. A simple method is used to quantify the impact of the uncertainty of input variables on the output variables from the TLMs. The results demonstrate that uncertainties in the output variables that are the focus of this study—including global horizontal irradiance, direct normal irradiance, cloud mixing ratio, cloud tendency, cloud fraction, and sensible and latent heat fluxes—are highly sensitive to uncertainties in 14 input variables. This study indicates that the tangent linear method can identify key variables of physics modules in WRF-Solar that can be stochastically perturbed to generate ensemble-based probabilistic forecasts.

14 SOLAR ENERGY↗

Probabilistic Short-Term Wind Forecasting Based on Pinball Loss Optimization: Preprint

Probabilistic wind power forecasts that quantify the uncertainty in wind output have the potential to aid in the economic grid integration of wind power at large penetration levels. In this paper, a novel probabilistic wind forecasting approach based on pinball loss optimization is proposed, in conjunction with a multi-model machine learning based ensemble deterministic forecasting framework. By assuming the pointforecasted value as the mean at each point, one unknown parameter (i.e., standard deviation) of a predictive distribution at each forecasting point is determined by minimizing the pinball loss. A surrogate model is developed to represent the unknown distribution parameter as a function of deterministic forecasts. This surrogate model can be used together with deterministic forecasts to predict the unknown distribution parameter and thereby generate probabilistic forecasts. Numerical results of case studies show that the proposed method has improved the pinball loss by up to 35% compared to a baseline quantile regression forecasting model.

17 WIND ENERGY↗

Generating short-term probabilistic wind power scenarios via nonparametric forecast error density estimators: Generating short-term probabilistic wind power scenarios via nonparametric forecast error density estimators

Forecasts of available wind power are critical in key electric power systems operations planning problems, including economic dispatch and unit commitment. Such forecasts are necessarily uncertain, limiting the reliability and cost effectiveness of operations planning models based on a single deterministic or “point” forecast. A common approach to address this limitation involves the use of a number of probabilistic scenarios, each specifying a possible trajectory of wind power production, with associated probability. We present and analyze a novel method for generating probabilistic wind power scenarios, leveraging available historical information in the form of forecasted and corresponding observed wind power time series. We estimate non-parametric forecast error densities, specifically using epi-spline basis functions, allowing us to capture the skewed and non-parametric nature of error densities observed in real-world data. We then describe a method to generate probabilistic scenarios from these basis functions that allows users to control for the degree to which extreme errors are captured.We compare the performance of our approach to the current state-of-the-art considering publicly available data associated with the Bonneville Power Administration, analyzing aggregate production of a number of wind farms over a large geographic region. Finally, we discuss the advantages of our approach in the context of specific power systems operations planning problems: stochastic unit commitment and economic dispatch. Here, our methodology is embodied in the joint Sandia – University of California Davis Prescient software package for assessing and analyzing stochastic operations strategies.

17 WIND ENERGY↗

Probabilistic Cloud Optimized Day-Ahead Forecasting System Based on WRF-Solar (Final Report)

The most persistent challenge in both intraday and day-ahead solar forecasting is to get numerical weather prediction models to produce the right type of clouds with the right frequency at the right time and place. Another challenge is to understand and communicate the forecast uncertainty. The objective of this project was to develop an optimized ensemble-based solar irradiance forecasting system that will (1) demonstrably improve the current state-of-the-art solar forecasts from the deterministic Weather Research and Forecasting-Solar (WRF-Solar) model and (2) provide probabilistic forecasts for grid operations. This probabilistic solar forecasting system, referred to as the WRF-Solar Ensemble Prediction System (WRF-Solar EPS), aims to significantly enhance both the intraday and the day-ahead solar forecasting capability for grid operations. This technical report summarizes the work performed in the past 3 years through a collaboration between the National Renewable Energy Laboratory and the National Center for Atmospheric Research as part of the U.S. Department of Energy's Solar Forecasting 2 program that aims to improve the accuracy of solar energy forecasts and enable increased deployment of solar energy on the electric grid.

14 SOLAR ENERGY↗