Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power Purchasing Agreements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Trends in Installer Strategy and Customer Choice on a Solar PV Financing Platform

In this study, we explore how solar photovoltaic (PV) installer strategies have changed over time with respect to PV financing products and how these strategies affect PV customer choice. We use a novel data set from obtained from a software platform that connects installers to institutional investors and helps installers generate financed quotes. This data set enables us to explore the behaviors of small and mid-scale installers, whose market strategies have largely been unknown owing to lack of data. We find that the financing platform extends access to financing to small- and mid-scale installers, that installers have shifted toward power purchase agreements over time, that installers appear to modify strategies in reaction to various policy and market drivers, and that installers tend to 'lock in' to a specific strategy.

14 SOLAR ENERGY↗

Utility-Scale Solar: Empirical Trends in Project Technology, Cost, Performance, and PPA Pricing in the United States (2019 Ed.)

The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2018, the utility-scale sector accounted for nearly 60% of all new solar capacity, and is expected to maintain its market-leading position for at least another six years. More than three-quarters of all states, representing all regions of the country, are now home to one or more utility-scale solar projects. This report—the seventh in an ongoing annual series—provides in-depth data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes technology trends, installed project prices, operating costs, capacity factors, power purchase agreement (“PPA”) prices, the levelized cost of solar energy (LCOE), and the market value of solar. The report also includes data and observations about completed or recently announced solar+storage projects. Given its current preeminence in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate.

14 SOLAR ENERGY↗

Pueblo of Picuris Phase I Community Solar Project (Final Report)

The Pueblo of Picuris Community Solar Project (Project) is a 1-megawatt (MW) alternating current (AC) ground mounted, fixed tilt solar photovoltaic system that became operational on December 18th, 2017. The Project, which was partially funded by the DOE (Grant No. DEIE0000033), generates revenue for the Tribe through a Power Purchase Agreement (PPA) with the electric utility, Kit Carson Electric Cooperative. The PPA revenue provides Tribal members with residential and commercial electric utility bill offsets and also supports critical Tribal programs. This Final Report provides a technical overview of the Project, documents the Project’s development process and outcomes, identifies successes and challenges, and offers recommendations for similarly funded tribal projects.

1 megawatt solar↗

Utility-Scale Solar Data Update (2020 Edition) [Slides]

Berkeley Lab’s 2020 update of utility-scale solar data and trends provides an overview of key trends in the U.S. market, with a focus on 2019. Highlights of this year’s update include: More than 4.5 GWAC of utility-scale solar (i.e., ground-mounted solar projects larger than 5 MWAC) achieved commercial operations in 2019, bringing cumulative capacity to 29 GWAC. Projects are spread across all 10 regions that we track, though more heavily concentrated in the sunniest regions. The median installed cost of projects that came online in 2019 fell to $\$$1.4/WAC ($\$$1.2/WDC), down 20% from 2018 and down by more than 70% from 2010. 77% of projects and 88% of capacity added in 2019 used single-axis tracking. Average capacity factors range from 17% in the least-sunny regions to 30% where it is sunniest. Single-axis tracking adds roughly five percentage points to capacity factor in the regions with the strongest solar resource. Nationwide average levelized power purchase agreement (PPA) prices fell to $\$$24/MWh in 2019, down 17% from 2018 and more than 80% since 2010. Thirty-nine projects (totaling 4.2 GWAC) in our PPA price sample include battery storage (totaling 2.3 GWAC and 9.5 GWh). In the “lower 48” states, a number of these recent PV+battery PPAs have been inked in the mid-$\$$20/MWh range (levelized in 2019 dollars).Not including the 30% investment tax credit (ITC), the median levelized cost of energy (LCOE) from utility-scale PV has declined by 85% since 2010, to $\$$40/MWh in 2019. When the 30% ITC is included within the LCOE calculation, the median LCOE closely tracks the median PPA price over time. In higher-penetration markets like CAISO, the value of solar has been declining, but falling PPA prices have largely kept pace, preserving solar's net value. At the end of 2019, there were nearly 370 GW of solar in interconnection queues from all 7 ISOs and 30 additional utilities across the country. Nearly a third of this proposed solar capacity is paired with battery storage.

14 SOLAR ENERGY↗

Best Practices at the End of Photovoltaic System Performance Period

Responsible and cost-effective dissolution of photovoltaic (PV) system hardware at the end of the performance period has emerged as an important business and environmental consideration. Alternatives include extending the performance period and existing contracts for power purchase, lease, and utility interconnect; refurbishing the plant by correcting any deficiencies; repowering the plant with new PV modules and inverters; or decommissioning the plant and removing all the hardware from the site. Often key decisions are made very early in the project development and might require decommissioning by some certain date after the end of a power purchase agreement. To “abandon in place” is not an alternative acceptable to landowners and regulators, so any financial prospectus should include costs associated with decommissioning, even if those costs are deferred by extending operations, refurbishment, or repowering. Decommissioning costs are driven by regulations regarding the handling and disposal of waste, with reuse and recycling of PV modules and other components preferred as a way to reduce both costs and environmental impact. Each alternative is discussed with order-of-magnitude costs, and recommendations are provided considering site-specific details of that situation, such as estimated costs to refurbish or repower, projected revenue from continued operations, and tax considerations.

14 SOLAR ENERGY↗

Hydrogen Production Cost with Alkaline Electrolysis

Rigorous stakeholder-vetted techno-economic analysis was performed to assess the cost of hydrogen (H 2 ) produced using state-of-the-art Liquid Alkaline (LA) electrolysis. Projected high-volume, untaxed levelized cost of hydrogen (LCOH) range from 2020US $\$ 1.84$ to $\$ 2.88$/kg-H 2 depending on technology year, process design, and electrolyzer project scale, assuming an electricity price of $\$ 0.03$/kWh. The total installed capital cost for a LA electrolysis plant was estimated from bottom-up stack and installed cost models that account for purchased equipment, installation costs, site preparation, and general overhead costs. For this study, the LA electrolysis plant is assumed to be a stick-built, greenfield project developed by an EPC firm with electrolysis stacks purchased directly from an electrolysis stack manufacturer. The price of the electrolysis stacks is based on a bottom-up cost assessment with business markup for the electrolysis company fabricator. Methods from the Hydrogen Analysis (H 2 A) production model, a peer-reviewed national laboratory-developed discounted cash flow model, were used to calculate the LCOH production in 2020$/kg-H 2 . The baseline electricity price case ($\$ 0.03$/kWh) corresponds to average wholesale electricity prices currently possible in U.S. markets with plentiful wind. Similar low-cost electricity pricing is possible from solar Power Purchase Agreements (PPA) although these prices are typically limited by renewable energy capacity factors.

08 HYDROGEN↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2024 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis.

14 SOLAR ENERGY↗

Hydrogen Production Cost with Anion Exchange Membrane Electrolysis

Rigorous stakeholder-vetted techno-economic analysis was performed to assess the cost of hydrogen (H 2 ) produced using state-of-the-art Anion Exchange Membrane (AEM) electrolysis. Projected high-volume, untaxed and unsubsidized levelized cost of hydrogen (LCOH)1 range from 2020 $\$$1.78 to $\$$3.68/kg H 2 depending on technology year, process design, and electrolyzer project scale, assuming an electricity price of $\$$0.03/kWh and a capacity factor of 97%. The total installed capital cost for an AEM electrolysis plant was estimated from bottom-up stack and process plant cost models. The stack cost model accounts for manufacturing equipment, equipment maintenance, material, tooling, cycle time, yield, labor, utilities and general overhead. The process plant cost model accounts for purchased equipment, installation costs, site preparation, and general overhead costs. For this study, the AEM electrolysis plant is assumed to be a stick-built, greenfield project developed by an engineering, procurement, and construction (EPC) firm with electrolysis stacks purchased directly from an electrolysis stack manufacturer. The price of the electrolysis stacks is based on a bottom-up cost assessment with business markup for the electrolysis company fabricator. Methods from the Hydrogen Analysis (H2A) production model, a peer-reviewed national laboratory-developed discounted cash flow (DCF) model, were used to calculate the production LCOH in 2020 $\$$/kg H 2 . The baseline electricity price case ($\$$0.03/kWh) corresponds to average wholesale electricity prices currently possible in U.S. markets with plentiful wind. Similar low-cost electricity pricing is possible from solar Power Purchase Agreements (PPA) although these prices are typically limited by renewable energy capacity factors.

08 HYDROGEN↗

Electric Grid and Markets 101 [Slides]

This presentation covers aspects of operating the bulk power system with a focus on the regulatory levels of the US grid at a pretty introductory level. It was meant ot help inform a request from USDA for a "101" presentation that spoke to how electricity markets, contracting and regulation interact with the engineering and physics of operating the bulk power system. They are presently moving to being able to more directly fund PPAs or other non-co-op owned assets for member co-ops, is my understanding.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Nine Canyon Long-Duration Energy Storage: A Feasibility Study

The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.

25 ENERGY STORAGE↗

Opportunities for Open Automated Demand Response in Wastewater Treatment Facilities in California - Phase II Report. San Luis Rey Wastewater Treatment Plant Case Study

This case study enhances the understanding of open automated demand response opportunities in municipal wastewater treatment facilities. The report summarizes the findings of a 100 day submetering project at the San Luis Rey Wastewater Treatment Plant, a municipal wastewater treatment facility in Oceanside, California. The report reveals that key energy-intensive equipment such as pumps and centrifuges can be targeted for large load reductions. Demand response tests on the effluent pumps resulted a 300 kW load reduction and tests on centrifuges resulted in a 40 kW load reduction. Although tests on the facility?s blowers resulted in peak period load reductions of 78 kW sharp, short-lived increases in the turbidity of the wastewater effluent were experienced within 24 hours of the test. The results of these tests, which were conducted on blowers without variable speed drive capability, would not be acceptable and warrant further study. This study finds that wastewater treatment facilities have significant open automated demand response potential. However, limiting factors to implementing demand response are the reaction of effluent turbidity to reduced aeration load, along with the cogeneration capabilities of municipal facilities, including existing power purchase agreements and utility receptiveness to purchasing electricity from cogeneration facilities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Dispatch Optimization, System Design and Cost Benefit Analysis of a Nuclear Reactor with Molten Salt Thermal Storage

Variable renewable energy availability has increased the volatility in energy prices in most markets. Nuclear power plants, with a large ratio of capital to variable costs, have historically operated as base load energy suppliers but the need for more flexible operation is increasing. We simulate the techno-economic performance of a 950 MWt nuclear power plant, based on the Westinghouse lead-cooled fast reactor, coupled with molten salt thermal storage as a method for flexible energy dispatch. We use the System Advisor Model to model the nuclear reactor thermal power input and power cycle operating modes. We combine this robust engineering model with a mixed-integer linear program model for optimized dispatch scheduling. We then simulate the coupled nuclear and thermal storage system under different market scenarios with varying price volatility. We find that the coupled plant outperforms the base plant under markets where energy price peaks fluctuate by a factor of two or more about the mean price. We show that a calculated power purchase agreement price for the plant improves by up to 10% when operating under California energy market conditions. Sensitivity analysis on the thermal storage cost shows that the optimal design remains unchanged even when doubling costs.

25 ENERGY STORAGE↗

Getting from Goals to Projects in the Ground (Presentation)

Presentation given at the 2012 Department of Homeland Security Renewable Energy Roundtable on Energy Savings Performance Contracts (ESPCs) and Power Purchase Agreements (PPAs) for Renewable Energy (RE).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Wind Technology Modeling Within the System Advisor Model (SAM) (Poster)

This poster provides detail for implementation and the underlying methodology for modeling wind power generation performance in the National Renewable Energy Laboratory's (NREL's) System Advisor Model (SAM). SAM's wind power model allows users to assess projects involving one or more large or small wind turbines with any of the detailed options for residential, commercial, or utility financing. The model requires information about the wind resource, wind turbine specifications, wind farm layout (if applicable), and costs, and provides analysis to compare the absolute or relative impact of these inputs. SAM is a system performance and economic model designed to facilitate analysis and decision-making for project developers, financers, policymakers, and energy researchers. The user pairs a generation technology with a financing option (residential, commercial, or utility) to calculate the cost of energy over the multi-year project period. Specifically, SAM calculates the value of projects which buy and sell power at retail rates for residential and commercial systems, and also for larger-scale projects which operate through a power purchase agreement (PPA) with a utility. The financial model captures complex financing and rate structures, taxes, and incentives.

17 WIND ENERGY↗

Portfolio Analysis of Renewable Energy Opportunities: Preprint

Time Warner Cable (TWC), now Charter Communications (CC), partnered with the National Renewable Energy Laboratory (NREL) to assess the technical and economic potential for solar photovoltaic (PV), wind, and ground-source heat-pump systems at 696 TWC facilities. NREL identified 306 sites where adding a renewable energy system would provide cost savings over the project life-cycle. In general, the top sites have some combination of high electricity rates ($0.16-$0.29/kWh), significant state incentives, and favorable net-metering policies. If all projects were implemented via third-party power purchase agreements, TWC/CC would save $37 million over 25 years and meet 10.5% of their energy consumption with renewable energy. This paper describes the portfolio screening methodology used to identify and prioritize renewable energy opportunities across the TWC sites, as well as a summary of the potential cost savings that may be realized by implementing these projects. This may provide a template for other companies interested in identifying and prioritizing renewable energy opportunities across a large number of geographically dispersed sites. Following this initial portfolio analysis, NREL will be conducting in-depth analysis of project development opportunities at ten sites and evaluating off-grid solutions that may enable carbon emission reduction and grid independence at select facilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Crossing the Barriers: An Analysis of Market Barriers to Geothermal Development and Potential Improvement Scenarios

Developers have identified many non-technical barriers to geothermal power development, including market barriers. Understanding the challenges to market deployment of geothermal power is important since obtaining power purchase agreements is often cited as one of the largest barriers to geothermal development. This paper discusses the impacts to deployment caused by market challenges, including market demand, price of electricity, policies and incentives.

15 GEOTHERMAL ENERGY↗

Scaling Equitable Finance

Driven by dramatic declines in up-front cost, the U.S. solar photovoltaics (PV) industry has taken off over the past decade, growing from 1 gigawatt of installed capacity in 2009 to 89 gigawatts in 2020—or enough capacity to power roughly 19 million homes. The industry is expected to double in size over just the next 5 years.1 Much of the growth has been driven by large, utility-scale projects that can produce 5 mega- watts or more of power—enough to power at least 1,000 homes. The cost of electricity produced by these projects has decreased by more than 70 percent since 2010. As of Q3 2020, development costs of large, util- ity-scale solar PV power plants were under $1 per watt, down by more than 70 percent from 2010.2 A robust array of investors has come forward to efficiently deliver capital to these kinds of utility-scale projects including large banks, insurance companies, pension funds, and others. But low- and moderate-income communities, including communities of color, are at risk of being left behind in the transition to clean energy. Mission- driven solar project developers and financial institu- tions have been working alongside energy justice advocates to open up solar access for these communi- ties, using strategies ranging from community solar, to solar installations on affordable multifamily housing, to distributed solar and storage programs, and more. Their goals go beyond simply generating more green energy to advancing social equity by: • empowering communities to control their energy future • stabilizing energy prices, saving money, and build- ing wealth for low-income families • creating quality jobs • improving health by reducing pollution • providing energy resilience for vulnerable communities Mission-driven actors are successfully deploying a wide variety of strategies to meet these goals, from helping low-income homeowners get solar—and some- times battery storage, to developing solar projects serv- ing affordable rental housing and community facilities, to building larger “shared solar” projects to which households from across the community can subscribe. However, the financing ecosystem does not work nearly as well for these “mission driven” solar proj- ects as it does for utility-scale projects. For home rooftop solar, even if low-income consumers have a home and suitable roof, they may fail to qualify for federal tax incentives, lack adequate credit to qualify for a loan—or the mission-driven lenders seeking to serve them may not be adequately capitalized to make long-term loans. For mission-driven commercial or community-scale projects, assembling nearly every component of the project capital stack—whether bridging early-stage costs, attracting tax credit equity investors, securing long-term debt, or coming up with sponsor equity and filling gaps—can present challenges. A variety of obstacles contribute to the scarcity of financing for low-income solar, including small project sizes, lack of developer balance sheet capacity, both real and perceived issues with credit risk, elevated technical assistance needs, and greater subsidy requirements to pursue goals such as deep energy affordability, climate resilience, or job creation. Still other obstacles are regulatory: for example, not all states allow community solar projects or Power Purchase Agreements, common strategies used for providing low-income solar—and the potential for regulations to shift over time creates risks that mission-driven projects can ill afford. This report synthesizes information garnered from 47 key informant interviews, four focus group discus- sions involving 60 stakeholders, and a review of the substantial existing literature on low-income solar finance to assess the current landscape of mission- driven solar development in the United States, examine the roles that community-based financial institutions could play, and recommend public invest- ments and policy changes that could help to scale the provision of equitable solar finance. Key recommen- dations for policymakers and funders in the renew- able energy and community development fields that emerge from this process include the following: • Help to capitalize and support community-based lenders to provide flexible, low-cost, and long- term financing to mission-driven solar projects— including providing guarantees or other forms of credit enhancement. • Provide federal support for equitable solar, including a grant-in-lieu-of-credits option for the Investment Tax Credit to improve access to this critical government subsidy. • Develop pools of government and philanthropic support that can complement financing from community-based lenders to complete the capi- tal stack for mission-driven projects, as well as to support education and technical assistance to both consumers and potential project sponsors. • Create a national Renewable Energy Credits pro- gram that includes social equity targets to provide a baseline of support for clean energy generation. • Change utility regulations to remove barriers to low-income solar projects; lower permitting costs; provide greater certainty for developers, consumers and owners; and measure progress toward equity in renewable energy policy implementation.

14 SOLAR ENERGY↗

Case Study: Healthcare Realty's Medical Office Solar PV

This case study describes how Healthcare Realty partnered with a renewable energy advisor to establish its solar program and make progress towards its energy and GHG emissions reduction goals; all of the projects in the pipeline will be financed through third-party ownership, via power purchase agreements or through a feed-in-tariff program.

solar, solar PV, photovoltaic, onsite solar, healt↗