Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot Plant Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

High Yield, Economical and Environmentally Benign Production of Rare Earth Elements from Coal Ash [Abstract]

Fly ash stored in landfills and ponds across the United States is an attractive, abundant domestic resource for the cost-effective recovery of rare earth elements (REE) and other critical minerals (CM). Physical Sciences Inc. (PSI) and its team members, Winner Water Services (WWS) and University of Kentucky/Center for Applied Energy Research (UK/CAER) successfully executed a multiphase program that developed and demonstrated pilot plant operations for cost-effective and environmentally-friendly production of rare earth element oxide (REO) concentrates, and the critical minerals scandium and aluminum (in the forms of salts or oxide products). We constructed and operated a sub-scale (0.5 kg/day) micropilot facility to demonstrate the key physical and chemical processing operations, predict yields, and troubleshoot process bottlenecks. The project team then designed, constructed and operated two decoupled pilot plant operations: (1) an operational pilot plant for physical separation processes with a capacity of 0.4 metric tons per day (tpd) where we optimized processes to produce selected ash fractions as the feedstock for chemical processing as well as valuable byproducts such as cement substitute, cenospheres, magnetic ash and secondary fuel carbon, and (2) an operational pilot plant for chemical processing with a capacity of 0.5 tpd that developed optimized processes for the production of: (a) REO concentrates, (b) critical minerals recovery (Sc, Al), and (c) beneficiated ash as valuable byproduct suitable for cement applications.

01 COAL, LIGNITE, AND PEAT↗

Puget Sound Tidal Energy In-Water Testing and Development Project (Final Technical Report)

Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.

16 TIDAL AND WAVE POWER↗

Textile Resource Conservation Final Report CRADA No. TC-0699-93

This project was undertaken to develop and demonstrate on a pilot scale the use of electro-osmotic transport to increase the efficiency of textiles wet processing operations. In particular, we sought to develop a means of rinsing textiles to remove material entrapped between the individual fibers that constitute a yarn. Material trapped within the yarn is slow to exchange with rinse water flowing primarily in the open weave are abetween the yarns. The application of an external field (strength, 5-50 kV /m) requires only a few volts for most fabric thicknesses. This field is sufficient to promote a rapid exchange of material to enhance rinsing and reduce the water required for rinsing from about 20 kg/kg-fabric to 3-6 kg/kg-fabric. We successfully developed technical and economic models of application of the process to the rinsing of many materials of industrial importance, including dyes, tints, chemicals, detergents and dye electrolytes. We demonstrated the process on a pilot plant scale using a translator designed in cooperation with Milliken and Company (Spartanburg, SC).

42 ENGINEERING↗

Carbon Capture Pilot at Vicksburg Containerboard Mill (Final Technical Report)

This is the final technical report for the DOE-OCED project DE-CD0000051. The report provides the progress at the close of the project. The objective of the project is to design and build a large pilot plant for carbon dioxide (CO 2 ) capture from a pulp and paper (P&P) mill using RTI’s non-aqueous solvent (NAS) technology at a capacity of 120,000 t-CO 2 /year, with >90% CO 2 captured. The pilot plant will be used for testing and evaluating the NAS capture process using real flue gas from the P&P mill’s power boiler for a minimum of 1 year of parametric testing and a minimum of 2,000 hours of continuous long-term testing. The testing will provide data for process optimization and scale-up for the P&P industry, provide information on interaction of flue gas contaminants on solvent performance and degradation, and inform strategies for emission control. At the end of the project, the pilot plant will be managed by International Paper (IP), the host site owner, which will continue to capture CO 2 , sequester the captured CO 2 , and be eligible for the 45Q credit.

42 ENGINEERING↗

CRITICALITY SAFETY OF PROCESSING SALT SOLUTION AT SRS

High level radioactive liquid waste generated as a result of the production of nuclear material for the United States defense program at the Savannah River Site has been stored as 36 million gallons in underground tanks. About ten percent of the waste volume is sludge, composed of insoluble metal hydroxides primarily hydroxides of Mn, Fe, Al, Hg, and most radionuclides including fission products. The remaining ninety percent of the waste volume is saltcake, composed of primarily sodium (nitrites, nitrates, and aluminates) and hydroxides. Saltcakes account for 30% of the radioactivity while the sludge accounts for 70% of the radioactivity. A pilot plant salt disposition processing system has been designed at the Savannah River Site for interim processing of salt solution and is composed of two facilities: the Actinide Removal Process Facility (ARPF) and the Modular Caustic Side Solvent Extraction Unit (MCU). Data from the pilot plant salt processing system will be used for future processing salt at a much higher rate in a new salt processing facility. Saltcake contains significant amounts of actinides, and other long-lived radioactive nuclides such as strontium and cesium that must be extracted prior to disposal as low level waste. The extracted radioactive nuclides will be mixed with the sludge from waste tanks and vitrified in another facility. Because of the presence of highly enriched uranium in the saltcake, there is a criticality concern associated with concentration and/or accumulation of fissionable material in the ARP and MCU.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Progress in Developing the STFNSF Configuration

The design features developed for the Spherical Tokamak (ST) in the PPPL pilot plant study was used as the starting point in developing designs to meet the mission of a Fusion Nuclear Science Facility (FNSF) considering a range of machine sizes based on the influence of tritium consumption and maintenance strategies. The compact nature of a steady state operated ST device for this mission pushes operating conditions and places challenges in the design of components, device maintenance and the integration of supports and services. This paper reviews the general arrangement, design details and maintenance strategy of the ST-FNSF device core for a 1.6-m and 1.0-m device; operating points which bracket the region between purchasing and breeding tritium.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Combined Reverse-Brayton Joule Thompson Hydrogen Liquefaction Cycle

The following is a compilation of Annual Progress Reports submitted to the DOE’s Fuel Cell Technologies Office by Gas Equipment Engineering Corp. for contract DE-FG36-05GO15021. The reports cover the project activities from August 2005 through June 2010. The purpose of this project is to produce a pilot-scale liquefaction plant that demonstrates GEECO’s ability to meet or exceed the efficiency targets set by the DOE. This plant will be used as a model to commercialize this technology for use in the distribution infrastructure of hydrogen fuel. It could also be applied to markets distributing hydrogen for industrial gas applications. Extensive modeling of plant performance will be used in the early part of the project to identify the liquefaction cycle architecture that optimizes the twin goals of increased efficiency and reduced cost. The major challenge of the project is to optimize/balance the performance (efficiency) of the plant against the cost of the plant so that the fully amortized cost of liquefying hydrogen meets the aggressive goals set by DOE. This project will design and build a small-scale pilot plant (several hundred kg/day) that will be both a hardware demonstration and a model for scaling to larger plant sizes (>50,000 kg/day). Though an effort will be made to use commercial or near-commercial components, key components that will need development for either a pilot- or full-scale plant will be identified. Prior to starting pilot plant fabrication, these components will be demonstrated at the appropriate scale to demonstrate sufficient performance for use in the pilot plant and the potential to achieve the performance used in modeling the full-scale plant.

08 HYDROGEN↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cyber-Physical System: Design for Sustainability and Resilience

When considering the design tools needed in the transition from numeric models to pilot plant, cyber-physical systems (CPS) come to the forefront as a method to model complex integrated energy systems. CPS approach has proven to be valuable to identify opportunities for economically viable early adoption of integrated energy technologies. This tutorial will introduce the concepts and the roles of CPS in co-design to minimize risks for pilot plant and technology deployment. This tutorial will also layout basic requirements for the CPS development, which requires a highly interdisciplinary effort with expertise in sensors, hardware testing, real-time modeling, controls, and system integration.

Harun, Nor Farida↗

DESIGN OF THE DEMOSNTRATION BULK VITRIFICATION SYSTEM FOR THE SUPPLEMENTAL TREATMENT OF LOW ACTIVITY TANK WASTE AT HANFORD

In June 2004, the Demonstration Bulk Vitrification System (DBVS) was initiated with the intent to design, construct, and operate a full-scale bulk vitrification pilot-plant to treat low-activity tank waste from Hanford Tank 241-S-109. The DBVS facility uses In-Container Vitrification{trademark} (ICV{trademark}) at the core of the treatment process. The basic process steps combine liquid low-activity waste (LAW) and glassformers; dry the mixture; and then vitrify the mixture in a batch feed-while-melt process in a refractory lined steel container. Off-gases are processed through a state-of-the-art air pollution control system including sintered-metal filtration, thermal oxidation, acid gas scrubbing, and high-efficiency particulate air (HEPA) and high-efficiency gas adsorber (HEGA) filtration. Testing has focused on development and validation of the waste dryer, ICV, and sintered-metal filters (SMFs) equipment, operations enhancements, and glass formulation. With a parallel testing and design process, testing has allowed improvements to the DBVS equipment configuration and operating methodology, since its original inception. Design improvements include optimization of refractory panels in the ICV, simplifying glassformer addition equipment, increasing the number of waste feed chutes to the ICV, and adding capability for remote clean-out of piping, In addition, the U.S. Department of Energy (DOE) has provided an independent review of the entire DBVS process. While the review did not find any fatal flaws, some technical issues were identified that required a re-evaluation of the DBVS design and subsequent changes to the design. A 100 percent design package for the pilot plant will be completed and submitted to DOE for review in early 2008 that incorporates process improvements substantiated through testing and reviews. This paper provides a description of the bulk vitrification process and a discussion of major equipment design changes that have occurred based on full-scale testing over the past two years and DOE reviews.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geochemical Modeling Using OLI Systems Mixed Solvent Electrolyte Model in Support of the Waste Isolation Pilot Plant

Aqueous electrolyte thermodynamic models were developed for synthetic Salado (GWB) and Castile (ERDA-6) brines to inform the experimental design and to facilitate laboratory data interpretation in geochemical studies supporting disposal in the Waste Isolation Pilot Plant (WIPP). The thermodynamic models, which include the relevant vapor-liquid-solid equilibria for the oxidation-reduction conditions of interest, enable computation of system parameters such as activity-based pH, E h [vs. standard hydrogen electrode (SHE)], ionic strength, total dissolved solids, and solution density; the chemical speciation of all phases; saturation tendencies for thermodynamically feasible solids; and changes in brine chemistry because of the addition of H 2 (g), argon, MgO, Fe(0), and other waste form components. The impacts of oxidation-reduction potential (ORP) and pH on aqueous speciation and dominant solid phases were also assessed with the aid of real-solution Pourbaix diagrams for key elements of interest. In addition to the OLI modeling results, limited measurement data for pH and ORP standards are provided, analyzed, and discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wastewater Recycling Using a Hygroscopic Cooling System

This project by the Energy & Environmental Research Center (EERC), Baltimore Aircoil Company (BAC), and Great River Energy (GRE) evaluated the concept of recycling wastewater at a coal-fired power plant using a hygroscopic cooling system, which is an evaporative cooling technology analogous to conventional cooling towers, except that sparingly soluble dissolved solids are precipitated and removed as waste solids instead of purging them with a liquid blowdown stream. This technology can maximize the use of plant makeup water by obtaining useful evaporative cooling from wastewater while minimizing the volume of wastes needing disposal. Experimental activities were conducted in two phases, a laboratory-based evaluation of the properties of wastewater from the host site, GRE’s Coal Creek Station near Underwood, North Dakota, and a field test of a small pilot hygroscopic cooling system at the host site power plant. Findings from the laboratory study informed the design of the pilot system and the system’s field test performance served as the basis for a techno-economic analysis (TEA) of the hygroscopic recycling concept. At the preferred operating conditions identified during the TEA, the wet-bulb approach temperature of the tower was 7.3°C (13°F) and the volume of blowdown produced by the plant was reduced to 5.4% of its incoming volume. Waste solids produced during field testing were classified as nonhazardous waste based on the measured hazardous element content and evaluation of their leaching potential. However, to qualify as a solid for landfill disposal i.e., as determined by the U.S. Environmental Protection Agency’s paint filter test, it appears that a dewatering step beyond hydrocyclone separation is needed. The baseline levelized cost of wastewater disposal (LCWD) for hygroscopic wastewater recycling was estimated to be $\$ $3.69–$\$ $3.72 per m3 of plant blowdown. Capital cost was estimated to contribute over 54% to the LCWD, and parameters that impact capital cost such as the heat exchange coil material of construction and the tower’s wet-bulb approach temperature were identified as having the greatest impact on overall LCWD. A LCWD estimate prepared for the same application but using thermomechanical brine evaporation was almost 40% higher than that calculated for hygroscopic cooling, despite recovering distilled-quality water for reuse, while the LCWD for disposal-only, deep well injection was estimated to be 30% lower compared to hygroscopic wastewater recycling.

01 COAL, LIGNITE, AND PEAT↗

Computer Based Procedures for Field Workers - FY16 Research Activities

The Computer-Based Procedure (CBP) research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. One of the primary missions of the LWRS program is to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. One area that could yield tremendous savings in increased efficiency and safety is in improving procedure use. A CBP provides the opportunity to incorporate context-driven job aids, such as drawings, photos, and just-in-time training. The presentation of information in CBPs can be much more flexible and tailored to the task, actual plant condition, and operation mode. The dynamic presentation of the procedure will guide the user down the path of relevant steps, thus minimizing time spent by the field worker to evaluate plant conditions and decisions related to the applicability of each step. This dynamic presentation of the procedure also minimizes the risk of conducting steps out of order and/or incorrectly assessed applicability of steps. This report provides a summary of the main research activities conducted in the Computer-Based Procedures for Field Workers effort since 2012. The main focus of the report is on the research activities conducted in fiscal year 2016. The activities discussed are the Nuclear Electronic Work Packages – Enterprise Requirements initiative, the development of a design guidance for CBPs (which compiles all insights gained through the years of CBP research), the facilitation of vendor studies at the Idaho National Laboratory (INL) Advanced Test Reactor (ATR), a pilot study for how to enhance the plant design modification work process, the collection of feedback from a field evaluation study at Plant Vogtle, and path forward to commercialize INL’s CBP system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Demonstration of High-Temperature Calcium-Based Thermochemical Energy Storage System for use with Concentrating Solar Power Facilities

Thermochemical energy storage (TCES) systems offer several advantages over sensible heat storage via molten salts for concentrating solar power (CSP) including: energy density, cost, indefinite storage time, and no risk of freezing. SR’s TCES system utilizes a CaO-based carbonation reaction at high temperature in a fixed bed heat exchanger reactor. The SunShot APOLLO project focuses on the validation of the calcium oxide sorbent for capacity, durability, system economics, and demonstration of the system at a small pilot scale, including system control and operation in simulated on-sun conditions, discharging at 720°C. Under phase I SR completed evaluation of the sorbent loaded in a single-channel heat exchanger reactor. The major accomplishments of phase II are: Design, fabrication and commissioning of a 4 kWhth pilot plant (50x capacity increase from previous bench scale) with a closed-loop CO 2 system, and a commercially relevant heat exchange reactor. The heat exchange reactor has been designed with state-of-the-art modeling tools to ensure 1) sufficient lifetime of the Incoloy body and 2) performance of the packed bed reactor will be adequate to meet the milestones. The rest of the pilot system has been designed with off-the shelf components to maximize reliability and cost effectiveness. The system is highly instrumented and capable of time resolved, independent measurements of the heat and mass balances respectively. Major developments in the technoeconomic analysis (TEA) include 1) reduction of the cost of membrane gas storage for the near-term and future systems and 2) integration with liquid metal receivers and particle receivers for higher decarbonation temperatures and pressures which reduced the cost of gas compression and increased system efficiency. The result are three scenarios with costs bases of 21.9 dollars, 14.3 dollars, and 10.9 dollars/kWhth corresponding to a real LCOE of 59, 57, 56 dollars/MWhe, respectively. The basic operations of the energy storage system were demonstrated for carbonation (discharging) and decarbonation (charging) over short time periods. Excellent control of the CO 2 mass balance across the reactor was achieved with mass flow controllers and the basic operation of the level control of the CO 2 gas bladder was achieved. The system was apparently free from leaks and operated continuously for 18 days with no mechanical failures, thus meeting milestone 2.5.5. The major shortcomings of the system had to do with the controls which prevented us from deep cycling and or reaching high cycles. We were unable to decarbonate (charge) the system for more than a few minutes at a time, which was much shorter than the design target of 10 hrs. This issue could not be resolved due to facility availability and contract closure. One major finding is that CaO-based TCES is most cost efficient when charged with HTF (heat transfer fluid) temperatures >850°C to reach the round-trip exergy efficiency and system cost targets which are higher temperatures than those considered for Gen 3 CSP. Many of the balance of plant components do not exist today, however we are encouraged by our findings that in general with more work we are able to reduce the capital cost, for example with the membrane gas storage, which is an innovative component in itself. The CaO-based TCES system has potential to meet the latest SunShot 2030 goals of LCOE at 50 dollars/MWhe with capital costs of <11/kWhth.

14 SOLAR ENERGY↗

Demonstration of High-Temperature Calcium-Based Thermochemical Energy Storage System for use with Concentrating Solar Power Facilities

Thermochemical energy storage (TCES) systems offer several advantages over sensible heat storage via molten salts for concentrating solar power (CSP) including: energy density, cost, indefinite storage time, and no risk of freezing. SR’s TCES system utilizes a CaO-based carbonation reaction at high temperature in a fixed bed heat exchanger reactor. The SunShot APOLLO project focuses on the validation of the calcium oxide sorbent for capacity, durability, system economics, and demonstration of the system at a small pilot scale, including system control and operation in simulated on-sun conditions, discharging at 720°C. Under phase I SR completed evaluation of the sorbent loaded in a single-channel heat exchanger reactor. The major accomplishments of phase II are: Design, fabrication and commissioning of a 4 kWhth pilot plant (50x capacity increase from previous bench scale) with a closed-loop CO 2 system, and a commercially relevant heat exchange reactor. The heat exchange reactor has been designed with state-of-the-art modeling tools to ensure 1) sufficient lifetime of the Incoloy body and 2) performance of the packed bed reactor will be adequate to meet the milestones. The rest of the pilot system has been designed with off-the shelf components to maximize reliability and cost effectiveness. The system is highly instrumented and capable of time resolved, independent measurements of the heat and mass balances respectively. Major developments in the technoeconomic analysis (TEA) include 1) reduction of the cost of membrane gas storage for the near-term and future systems and 2) integration with liquid metal receivers and particle receivers for higher decarbonation temperatures and pressures which reduced the cost of gas compression and increased system efficiency. The result are three scenarios with costs bases of 21.9 dollars, 14.3 dollars, and 10.9 dollars/kWh th corresponding to a real LCOE of 59, 57, 56 dollars/MW he , respectively. The basic operations of the energy storage system were demonstrated for carbonation (discharging) and decarbonation (charging) over short time periods. Excellent control of the CO 2 mass balance across the reactor was achieved with mass flow controllers and the basic operation of the level control of the CO 2 gas bladder was achieved. The system was apparently free from leaks and operated continuously for 18 days with no mechanical failures, thus meeting milestone 2.5.5. The major shortcomings of the system had to do with the controls which prevented us from deep cycling and or reaching high cycles. We were unable to decarbonate (charge) the system for more than a few minutes at a time, which was much shorter than the design target of 10 hrs. This issue could not be resolved due to facility availability and contract closure. One major finding is that CaO-based TCES is most cost efficient when charged with HTF (heat transfer fluid) temperatures >850°C to reach the round-trip exergy efficiency and system cost targets which are higher temperatures than those considered for Gen 3 CSP. Many of the balance of plant components do not exist today, however we are encouraged by our findings that in general with more work we are able to reduce the capital cost, for example with the membrane gas storage, which is an innovative component in itself. The CaO-based TCES system has potential to meet the latest SunShot 2030 goals of LCOE at 50 $/MW he with capital costs of <11/kWh th .

14 SOLAR ENERGY↗

Macroalgae for CO 2 Capture and Renewable Energy - A Pilot Project

The objective of this project was to demonstrate, at a pilot scale, the beneficial use of carbon dioxide (CO 2 ) through a technology designed to capture CO 2 from fossil-fuel fired power plant stack gas, generating macroalgae and converting the macroalgae at high efficiency to renewable methane that can be utilized in the power plant or introduced into a natural gas pipeline. The proposed pilot plant would demonstrate the cost-effectiveness and CO 2 / NO x flue-gas removal efficiency of an innovative algal scrubber technology where seaweeds are grown out of water on specially-designed supporting structures contained within greenhouses where the plants are constantly bathed by recycled nutrient sprays enriched by flue gas constituents. The work described in this document addresses Phase 1 of the project only. The scope of work for Phase 1 includes the completion of a preliminary design package; the collection of additional experimental data to support the preliminary and detailed design for a pilot scale utilization of CO 2 to cultivate macroalage and to process that algae to produce methane; and a technological and economic analysis to evaluate the potential of the system. Selection criteria for macroalgae that could survive the elevated temperatures and potential periodic desiccation of near desert project sites were identified. Samples of the selected macroalgae species were obtained and then subjected to anaerobic digestion to determine conversions and potential methane yields. A Process Design Package (PDP) was assembled that included process design, process flow diagram, material balance, instrumentation, and equipment list, sizes, and cost for the Phase 2 pilot plant. Preliminary economic assessments were performed under the various assumptions made, which are purposely conservative. Based on the results, additional development work should be conducted to delineate the areas for improving efficiency, reducing contingencies, and reducing overall costs.

09 BIOMASS FUELS↗

HTS Cable Conductor for Compact Fusion Tokamak Solenoids

Significant progress has been made recently in the US fusion community to develop a strategic plan to enable engineering design and construction of a fusion pilot plant (FPP). Princeton Plasma Physics Laboratory (PPPL) is working on developing high current density HTS conductors for next fusion experiments. Partnering with the US industry, we are evaluating feasibility and affordability of Conductor on Round Core (CORC ® ) developed by Advanced Conductor Technologies (ACT) for the next compact fusion tokamak facility. High current density achieved by a CORC ® cable based on a four-layer model coil recently tested at National High Magnetic Field Laboratory (NHMFL) motivated its consideration for low cost, reduced size fusion magnet application. This is of interest to PPPL because of its scalability to tokamak central solenoid (CS) coils in terms of required flux swings for plasma startup operations. Furthermore, partnering with ACT, we designed and built a two-layer model coil solenoid directly wound with CORC to demonstrate its applicability for compact solenoids such as that used in the national spherical torus experiment (NSTX), NSTX-upgrade (NSTX-U) and the US sustained high-power density test facility (SHPD). The ~160 mm diameter solenoid wound by a two-layer CORC is being tested in early 2022 under electromagnetic cyclic loading at NHMFL in a unique 160 mm bore, 14 T background field magnet facility.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Free-Surface Liquid Lithium Flow Modeling and Stability Analysis for Fusion Applications

Liquid metal plasma facing components are considered an attractive design choice for fusion devices including pilot plants. Virtual prototyping of such devices includes modeling of free-surface flow of the electrically conductive liquid, which requires computational fluid dynamics (CFD) and magnetohydrodynamics (MHD) simulations. Numerical tools capable of simulating flows and heat transfer in the free-surface MHD flow were developed at PPPL based on the customized ANSYS CFX. Here, MHD is introduced using a magnetic vector potential approach. Free-surface flow capabilities are available in the code and were tested. Special stabilization procedures were derived and applied to improve convergence of the momentum equations with the source terms due to the Lorentz force and surface tension. Important characteristics of the fusion-relevant liquid metal flow is free surface smoothness and stability. Heat flux from the plasma impacts the liquid surface at a very acute angle, so any change of the free surface from axisymmetry can dramatically increase the local heat flux density and thus create excessive evaporation of liquid lithium into the plasma, which is detrimental to operations. Stability analysis of the liquid metal film flow was performed to determine applicable flow regimes. Thin film flow along horizontal wall is considered. Effects of gravity, magnetic field, and surface tension are included in the analysis.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗