Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Panel Session 25: DOE Waste Isolation Pilot Plant (WIPP) Update 2020

This panel focused on the WIPP operational efficiencies and capital improvement progress in the year 2020. Because WIPP is a key component of the US DOE EM cleanup strategy, the progress on returning WIPP to full design capacity and throughput by 2021 is of importance. Panelists with presentations: Status of WIPP Capital Asset Projects (Stephen Smith); WIPP Update (Sean Dunagan); CBFO Update (Greg Sosson)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of IH 2 ® with Cool Reformer for the Conversion of Cellulosic Biomass to Drop In Fuels

GTI Energy has integrated the Cool Reformer technology with the IH 2® -50 pilot plant (which can process a maximum of 50kg/day of biomass feed) to demonstrate the suitability of this new reforming technology for producing hydrogen within IH 2 ® process. As part of this study, we showed that all of the hydrogen required for the IH 2® process could be produced from steam reforming the IH 2® light gas generated within the process and the system can be integrated in a cost-effective way compared to the use of standard SMRs.

08 HYDROGEN↗

High Yield, Economical and Environmentally Benign Production of Rare Earth Elements from Coal Ash (Phase II Final Summary Report)

Fly ash stored in landfills and ponds across the United States is an attractive, abundant domestic resource for the cost-effective recovery of rare earth elements (REE) and other critical minerals (CM). Physical Sciences Inc. (PSI) and its team members, Winner Water Services (WWS) and University of Kentucky/Center for Applied Energy Research (UK/CAER) successfully executed a multiphase program that developed technologies and their implementation in a pilot plant. We demonstrated plant operations for cost-effective and environmentally-friendly production of rare earth element oxide (REO) concentrates, and the critical minerals scandium and aluminum (in the forms of salts or oxide products), from coal ash. We also constructed and demonstrated a research-scale (0.5 kg/day) micropilot facility to validate the key physical and chemical processing operations, predict yields, and troubleshoot process bottlenecks. The project team then designed, constructed and operated two decoupled pilot plants: (1) an operational pilot plant for physical separation processes with capacity of 0.4 metric tons per day (tpd), where we optimized processes to produce selected ash fractions as the feedstock for chemical processing and as valuable byproducts such as cenospheres, magnetic ash, and secondary fuel carbon, and (2) an operational pilot plant for chemical ash processing with a capacity of 0.5 tpd that developed optimized processes for the production of: (a) REO concentrates, (b) critical minerals (Sc, Al), and (c) beneficiated ash as a valuable byproduct suitable for cement applications. In Phase I, the project team (with Equinox Chemicals in place of WWS) developed and demonstrated the feasibility of the physical and chemical separation processes, developed the design of a pilot plant, and began the development of a preliminary techno-economic model. In the baseline (initial) Phase II program, the project team developed and demonstrated the above pilot scale plant, producing salable REE concentrates, including Y and Sc (REYSc), plus commercially viable byproducts, using environmentally safe and high-yield physical and chemical enrichment processes. The team successfully demonstrated chemical pilot design, construction, shakedown, and operations of the plant. We produced the Phase II deliverable REYSc concentrate ((50 g of >60 wt.% purity REYSc salts on elemental basis), generated the feed for the Phase II follow-on program, identified processing challenges for future optimizations, and refined the techno-economic model. In the Phase II follow-on program, the project team: (1) developed and demonstrated processes to increase the REE amount by 3X (content basis) and convert the Phase II REE salt mixture to an oxide mixture, (2) produced/delivered >38 g of REO mixture with >85 wt.% purity (elemental basis); (3) developed processes to recover critical minerals scandium and aluminum from intermediate streams; (4) produced/delivered > 1 g of scandium salt mixture with >85 wt. % purity (elemental basis); (5) produced/delivered > 100 g of aluminum oxide type material with >70% wt. purity (elemental basis); and (6) updated the techno-economic model from the baseline Phase II program to assess CAPEX and OPEX of a commercial operation. This program has developed extensive databases on process chemistry, unit operations, plant engineering, and techno-economics that will enable further scale-up toward commercial plant design. Specific future developments will be focused on achieving dramatic savings in energy, reagent usage, and operating costs. The combined results will contribute significantly for maturing the technologies of REE recovery from coal byproducts and promote the establishment of domestic REE and CM supply chains.

01 COAL, LIGNITE, AND PEAT↗

Heat Integration Optimization and Dynamic Modeling Investigation for Advancing the Coal-Direct Chemical Looping Process

The purpose of the project is to address the optimization and startup operation of a modular coal direct chemical looping (CDCL) combustion system integrated with a steam cycle for power generation to reduce the risks involved in further scale-up of the technology. The modular reactor design of the CDCL process provides flexibility in the fabrication of the reactor and in its operating capacity (i.e. turndown ratio) at the cost of a more complex heat exchange network (HEN) design and integration. To address the technology gaps and advance the efficiency and economic feasibility of the CDCL technology, the project will perform a detailed and comprehensive analysis of the integration of a modular CDCL reactor system and a steam cycle system under both static and transient conditions via HEN process performance simulations and system dynamic modeling, respectively. The scope of work consists of 1) Experimental and computational studies of the CDCL combustor reactor 2) Comprehensive static (i.e. steady-state) system HEN design analysis in CDCL 550 MWe commercial unit for power generation and 3) Dynamic modeling of site specific design of 10MWe CDCL large pilot plant. The project team has successfully developed and validated a kinetic model for the oxidation of oxygen carriers in the combustor using the unreacted shrinking core model (UCSM). The model is capable of capturing the oxidation kinetics of fully or partially reduced oxygen carrier particles. A computational fluid dynamics (CFD) model is developed to simulate the hydrodynamics, heat transfer, and chemical reaction occurring in the CDCL combustor. The model is developed in MFIX and ANSYS Fluent. Key aspects of CDCL combustor operation, including heat transfer, oxygen carrier oxidation, and the transport of oxygen carrier particles, are simulated using this CFD model. The HEN for a commercial scale 550 MWe CDCL power plant is simulated and optimized using ASPEN Plus. Practical design considerations are incorporated based on industrial experiences. The performance and cost for the commercial CDCL plant is updated based on these analyses. A dynamic model for the 10 MWe CDCL pilot plant is developed in ProTRAX simulation software. The model is based on the pilot plant design developed in project DE-FE0027654 “10 MWe CDCL Large Pilot Plang – Pre-FEED Study” and the steam cycle data obtained from Dover Light & Power plant. The transient behaviors during pilot plant load variation are simulated using the dynamic model.

01 COAL, LIGNITE, AND PEAT↗

Demonstration of Scaled-Production of Rare Earth Oxides and Critical Materials from U. S. Coal-Based Sources (Final Report)

The project objective was to demonstrate scaled production of high purity rare earth oxides (REO), nominally exceeding 90% grade, from coal refuse sources using innovative technologies that reduce cost and improve environmental outcomes relative to traditional rare earth processing technologies. The project utilized a critical material pilot plant constructed and tested as part of a previous U.S. Department of Energy project. Target performance criteria was a 50% reduction in production cost based on previous optimum values, 150% increase in recovery and greater than 2% concentrates of rare earth oxides, cobalt and manganese. Concentrate production goals were to produce a rare earth mix oxide product at a rate of 200 grams per day having a minimum purity of 50% as well as products of cobalt and manganese having a minimum purity of 2%. A previous pilot plant investigation identified acid cost as the major contributor to an operating cost that made the recovery of rare earth and other critical metals from bituminous coal sources economically challenging. As such, acid cost reduction was a major target using bio-oxidation reactors to produce sulfuric acid from naturally occurring coal pyrite. Based on laboratory data, a bio-oxidation circuit was designed for the pilot plant to produce 7.5 l/min of acid using two 11-m3 (3000 gallon) reactors equipped with 40 hp aerators for air dispersion. The pilot-scale tests revealed that acid concentration equivalent to as high as 1.0 M sulfuric acid could be continuously produced. However, the bio-acid contained exceptionally high iron concentrations, which complicated downstream processing of the pregnant leach solution (PLS). A TEA of the bio-oxidation circuit showed that production cost was approximately $0.13 per kg acid equivalent if produced using a four-day retention time in the reactors. This value represents a 48% reduction from that of purchased bulk sulfuric acid. Calcination (or roasting) studies were conducted on coarse refuse from West Kentucky No. 13 and Fire Clay coal seam sources. The test results revealed the potential to increase recovery by nearly 100% using temperatures between 500°C to 700°C with light REE recovery value being the most improved. Acid baking of the calcined products using sulfuric acid at 250°C increased heavy rare earth recovery from around 40% to 80% while decreasing the acid requirements by over 50%. The existing pilot plant was upgraded for the pilot scale demonstration of REE and CM recovery. The primary feedstocks were West Kentucky No.13 and heap leach pregnant leach solution (PLS) while a secondary feedstock was a lignite waste material from a construction sand operation. The pilot scale operation started with PLS generation through leaching followed by iron and aluminum removal, nominally at 3.3 and 4.5 pH, respectively. Leaching lixiviants used for the test were industrial grade sulfuric acid or bio-acid generated at the pilot scale facility. For most of the tests, the solid feed rate was 200 lb/hr whereas lixiviant was added at 2 gpm to provide an optimal residence time of 45 minutes. Following the contaminant removal step, several different process schematics were tested with the goal of maximizing REE recovery and purity. In the first test, direct processing of aluminum precipitation raffinate for REE recovery using oxalic acid at pH 1.5 was investigated. Overall REE recovery was approximately 45%. Unfortunately, elevated calcium content in the PLS significantly impacted the RE-Oxide product grade. Similarly, high calcium content decreased both the product purity and grades of CM products. As such, a new flowsheet was tested with the same initial process schematic but different precipitation stages for REEs and CMs at pH 6.0 and 9.0, respectively. It was noted that the overlapping precipitation behavior of Co, Ni and Zn with REEs limited the applicability of this process schematic. While this change increased the RE-Oxide grade from 36% in the first test to 87%, the loss of critical metals to the REE cake and bypass of the REEs to the CM cake significantly impacted the recovery of both REEs and CMs. Therefore, the modified process flowsheet combined oxalic acid precipitation stage raffinate and redissolved CM cake filtrate to maximize both the recovery and purity of the products. Consequently, a RE-Oxide product with 85% purity and CM cakes with over 19% Co, 38% Ni, 14% Zn and 9% Mn content were generated with significantly higher recoveries. While the modified process flowsheet improved recoveries and grades, elemental losses observed in separate precipitation and redissolution losses inspired the adaptation of a single precipitation stage at pH 9.0 for both REEs and CMs. This change was anticipated to maximize the REE recovery while minimizing the costs associated with separated redissolution and processing stages. As expected, REE recovery in this new circuit arrangement was over 56% with a product grade of over 87% RE-Oxide content. Similarly, Co, Ni, Mn, and Zn recoveries of 54%, 40%, 67%, and 66%, respectively, were achieved. Unfortunately, the elevated calcium content present in the solution due to its precipitation at pH 9.0 caused a decrease in the CM cake quality. Therefore, the final process flowsheet involved the addition of calcium oxalate precipitation following the oxalic acid precipitation stage, which effectively eliminated calcium contamination of the CM products. Finally, the pilot scale experiments conducted using bio-acid achieved comparable REE leaching recoveries to the conventional sulfuric acid leaching. Elevated iron concentration in the solution caused the co-precipitation of REEs with the iron and aluminum cake, resulting in the REE losses. Furthermore, elevated iron content bypassing the iron and aluminum precipitation stages contaminated the metal sulfide and manganese cake, respectively. A techno-economic analysis was performed based on a commercial facility capable of treating 500 tph of coal-based material. The production cost for West Kentucky No. 13 coarse refuse material ranged from approximately $500-$700/kg of total rare earth oxide whereas the lignite source had significantly lower production cost of $100-$300/kg. The significant difference in cost was due to the easier leaching characteristics of the lignite material and the higher feed concentrations. All process scenarios resulted in a negative net present value (NPV). For the lignite feedstock, laboratory REE leach recovery values were about 30% higher than the pilot plant data. Using the lab leach results, a positive net present value was achieved and the production cost decreased from $100-$300 $/kg to less than $150/kg of total REO.

01 COAL, LIGNITE, AND PEAT↗

Description of FY25 Theory and Simulation Performance Target: Development of an integrated modeling framework for fusion reactor design and assessment

The urgency to deliver fusion power is growing now more than ever, with increasing pressure for both public programs and private companies to meet milestones timelines and overcome significant remaining technical challenges to ensure growth of a nascent fusion industry in time to meet rapidly growing clean energy demands. With incredible advancements in computation and years of investment in fusion model development and validation, integrated modeling is poised to fill a key role in accelerating the timeline to a fusion pilot plant (FPP). Future fusion pilot plants will operate in regimes far beyond current experience, and device design will rely on physics-based prediction and extrapolation. Many concepts will also rely on simulation to assess safety (shielding, tritium management, materials activation and lifetimes), economics and scalability before the decision to build. Importantly, integrated simulation can be used to reveal and solve the complexities of system integration that may otherwise not be apparent in physical components or models developed in isolation. New experimental test facilities that produce relevant conditions to validate and resolve key technical challenges for various subsystems (materials, blankets, fuel cycle, etc.) have been repeatedly called for by the fusion community but are not yet realized. Integrated modeling has an important role in identifying realistic load conditions (thermal, electromagnetic, plasma, neutron and photon loads, etc.) and defining the components and experiments for these test facilities in order to ensure meaningful validation that sufficiently reduces modeling uncertainties and technical risk for the full integrated reactor. The Fusion REactor Design and Assessment (FREDA) SciDAC project is building a component-based integrated modeling framework & data structure to enable self-consistent, multi-fidelity, iterative optimization workflows for the fusion reactor design process. FREDA aims to shorten the time to viable designs by providing a set of flexible workflows to support the various stages of the design process using an integrated model hierarchy, ranging from the simple analytic descriptions to the highest fidelity, theory-based plasma and engineering modeling developed by the fusion and fission communities. These tools are expected to be needed for timely support of FPP design in the milestone program and in the FIRE collaboratives. The plasma simulation backbone of FREDA is IPS-FASTRAN with newly developed coupled Core-Edge Pedestal-SOL (CESOL) workflows, which is being extended to the far-SOL region up to the plasma facing components. FREDA incorporates the FERMI engineering modeling suite and will enable self-consistent evaluation of the thermal shields, limiters, blanket, magnets, and other surrounding structures with predictions of temperatures, erosion, dpa, activation, tritium generation and transport, creep, corrosion, material degradation, etc. Parametric generation of 3D CAD enables rapid iteration of component geometry in response to plasma and loading specifications.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

High Yield, Economical and Environmentally Benign Production of Rare Earth Elements from Coal Ash [Abstract]

Fly ash stored in landfills and ponds across the United States is an attractive, abundant domestic resource for the cost-effective recovery of rare earth elements (REE) and other critical minerals (CM). Physical Sciences Inc. (PSI) and its team members, Winner Water Services (WWS) and University of Kentucky/Center for Applied Energy Research (UK/CAER) successfully executed a multiphase program that developed and demonstrated pilot plant operations for cost-effective and environmentally-friendly production of rare earth element oxide (REO) concentrates, and the critical minerals scandium and aluminum (in the forms of salts or oxide products). We constructed and operated a sub-scale (0.5 kg/day) micropilot facility to demonstrate the key physical and chemical processing operations, predict yields, and troubleshoot process bottlenecks. The project team then designed, constructed and operated two decoupled pilot plant operations: (1) an operational pilot plant for physical separation processes with a capacity of 0.4 metric tons per day (tpd) where we optimized processes to produce selected ash fractions as the feedstock for chemical processing as well as valuable byproducts such as cement substitute, cenospheres, magnetic ash and secondary fuel carbon, and (2) an operational pilot plant for chemical processing with a capacity of 0.5 tpd that developed optimized processes for the production of: (a) REO concentrates, (b) critical minerals recovery (Sc, Al), and (c) beneficiated ash as valuable byproduct suitable for cement applications.

01 COAL, LIGNITE, AND PEAT↗

Delivering Effective Virtual Energy-Focused Trainings: Successful Strategies and Lessons Learned from the Virtual Cohort In-Plant Training Pilot

While there are always barriers to energy efficiency efforts, few challenges have been as severe as the global COVID-19 pandemic. Many manufacturers throughout the United States and the world have been trying to determine how to safely open and operate their plants. To minimize the number of people working within facilities and maximize the physical distance between workers, only essential facility engineers are allowed into plants to ensure proper operations. The Department of Energy’s Better Plants Program created In-Plant Trainings (INPLTs) to help partners develop in-house expertise in energy efficiency. Delivering INPLTs in the traditional in-person fashion is infeasible under these circumstances. To continue providing INPLTs during this difficult time, the Better Plants Program piloted Virtual Cohort In-Plant Trainings (VINPLTs) on wastewater treatment and ammonia industrial refrigeration systems from October 27 to November 19, 2020. This paper provides an overview of the pilot, then discusses successful strategies and lessons learned from this pilot for delivering effective virtual energy-focused trainings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Architectural development of an ST fusion device

A recent U.S. National Academy study recommended the development of a next step Sustained High Power Density (SHPD) facility within the U.S. as an intermediate step in designing and building a Pilot Plant device. Several papers have been written describing the physics, design and engineering scoping analysis performed in developing this machine design. This paper places emphasis on the continued evolution of the architectural development of past activities to meet the requirements of an ST fusion pilot plant and power plant. The current effort centers on meeting basic physics and component requirements in a machine design that improves the chance of achieving fission level availability (95%) within an arrangement that promotes design simplicity, offsite construction with on-site modular assembly. As a prelude to both the SHPD and Pilot Plant, a scoping design of a 500MWe Spherical Tokamak Advanced Reactor (STAR) has been defined to investigate design options and physics scenarios that can successfully meet physics performance, engineering requirements and economic conditions of an ST power plant. Following a successful physics/engineering assessment, the STAR Power Plant design will be downsized to meet the specifications established in the design of a near term ST Pilot Plant

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Filter 'Cook-Off': Filter Selection via Side-by-Side Testing at Actual Process Conditions - 20040

In 2005, the THOR steam reforming fluidized-bed reactor technology was selected by the U.S. Department of Energy for treatment of sodium-bearing waste at the INL. During the final phase of commissioning prior to radiological operations, regeneration of the high temperature filters in the process gas filter (PGF) vessel became ineffective. After approximately 50 days of testing, the differential pressure across the filters began increasing exponentially and the plant had to be shutdown. Subsequent investigation revealed that the Inconel 625 (I625) sintered metal filter media was corroding in the 550 deg. C reducing environment. A pilot plant run tested four candidate replacement filter media. The top candidate was further tested during a long-term pilot plant run to validate the selection. Data from the testing indicate the selected filters will provide reliable service throughout the life of the project, including after in-situ radiological decontamination. This paper presents the data from this effort and reinforces the value of pilot plant testing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Performance of hydrophobic physical solvents for pre-combustion CO 2 capture at a pilot scale coal gasification facility

Here, in this paper, we present the first pilot plant data for hydrophobic physical solvents for CO 2 and H 2 S removal from coal-derived H 2 -rich syngas. Four physical solvents were tested under pre-combustion CO 2 capture conditions at bench scale and pilot plant scale: one baseline hydrophilic solvent and three hydrophobic solvents. The solvents were: (1) polyethylene-glycol-dimethyl ether (PEGDME), a hydrophilic solvent analog for the commercial process Selexol, (2) tributyl- phosphate (TBP), a commercially available hydrophobic solvent, (3) polyethylene glycol-poly(dimethylsiloxane) (PEG-PDMS-3), and (4) diethyl sebacate (CASSH-1), a novel, computationally screened hydrophobic solvent developed by the National Energy Technology Laboratory (NETL). All solvents were studied under pure gas (CO 2 /N 2 /H 2 /CH 4 ) equilibrium conditions at NETL followed by pilot plant testing with syngas at the University of North Dakota Energy & Environmental Research Center (UND EERC). Long term performance of CASSH-1 and PEDGME was then assessed with results compared to process simulation predictions. Within experimental uncertainties, all solvents showed comparable CO 2 absorption performance at above room temperature operation while the hydrophobic solvents had limited water uptake and low vapor pressure, which alleviates concerns related to corrosion, water absorption, and solvent loss to evaporation. These results indicate low viscosity, low vapor pressure hydrophobic solvents are a promising option for lower cost CO 2 capture from high pressure syngas applications.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Carbon Capture Pilot at Vicksburg Containerboard Mill (Final Technical Report)

This is the final technical report for the DOE-OCED project DE-CD0000051. The report provides the progress at the close of the project. The objective of the project is to design and build a large pilot plant for carbon dioxide (CO 2 ) capture from a pulp and paper (P&P) mill using RTI’s non-aqueous solvent (NAS) technology at a capacity of 120,000 t-CO 2 /year, with >90% CO 2 captured. The pilot plant will be used for testing and evaluating the NAS capture process using real flue gas from the P&P mill’s power boiler for a minimum of 1 year of parametric testing and a minimum of 2,000 hours of continuous long-term testing. The testing will provide data for process optimization and scale-up for the P&P industry, provide information on interaction of flue gas contaminants on solvent performance and degradation, and inform strategies for emission control. At the end of the project, the pilot plant will be managed by International Paper (IP), the host site owner, which will continue to capture CO 2 , sequester the captured CO 2 , and be eligible for the 45Q credit.

42 ENGINEERING↗

NSTX-U National Research Program: White Paper in Response to Call from FESAC Sub-Committee

Both scientific and technical innovation is needed for the realization of an attractive engineering solution for a timely and cost-effective Pilot Plant, the design and construction of which is the overarching recommendation of the FESAC Long Range Plan, and the 2021 NASEM Pilot Plant reports, which underpin the Bold Decadal Vision. The two most significant plasma physics gaps to close for a Compact Pilot Plant (CPP) are core confinement improvement and heat flux mitigation, neither of which have been closed in an integrated fashion for any planned fusion power production device. High core confinement and stability are essential for producing majority self-driven plasmas in CPPs with reduced size and auxiliary heating power requirements, with an improvement in confinement being the major driver for cost reduction of a CPP. The National Spherical Tokamak Experiment - Upgrade (NSTX-U) is a unique low aspect ratio research facility that will address the fundamental challenge of developing the science and technology basis for a CPP design that integrates high core and edge confinement with the ability to mitigate very high incident heat fluxes. NSTX-U capabilities will enable the high performance, already achieved on NSTX, to extend into physics regimes much closer to those anticipated in Spherical Tokamak (ST)-based CPPs. These confinement and stability properties will be assessed by a full complement of diagnostics and analysis tools, which will also aid in the development of the underlying theory and predictive models needed for further optimization. Both conventional and transformative heat flux mitigation methods, such as liquid lithium plasma-facing components, will be developed and tested in-situ in NSTX-U at incident heat fluxes of ~100 MW/m 2 , and will inform plans and reduce risk for a subsequent major upgrade to the device to fully heated, high-Z wall and full liquid lithium divertor capability, a technology that potentially could then be implemented on any magnetic confinement device at any aspect ratio. NSTX-U research is fully complementary to programs performed on other STs, nationally and internationally. Furthermore, NSTX-U research has a direct connection to the private sector by informing design choices for future power production facilities being developed by these companies. The NSTX-U program will operate as a national User Facility, with collaborating researchers, engineers, and graduate students from 19 outside institutions, and open to participation and experiments led by researchers from both public and private entities. The research program will advance workforce development through training of young scientists, engineers, and technicians, and it will also serve for further diagnostic innovation, especially for high heat flux and high-Z wall environments, and implementation of advanced artificial intelligence (AI) for plasma and heat flux control.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗