Modeling Approach for the Aluminum-clad Dry Storage Pilot using HFIR Fuel

To confirm that the dry storage of aluminum-clad research reactor spent nuclear fuel (ASNF) will remain within the safety envelope after applied drying schemes and that the resulting evolution of the gas space composition, temperature, and pressure conditions are understood, a dry storage pilot project is being established. The pilot will incorporate an instrumented lid for discrete interval or for on-demand gas composition and temperature monitoring of two DOE Standard Canisters (DSCs) loaded with three High Flux Isotope Reactor (HFIR) inner cores per DSC. Each DSC would be subjected to a separate alternative candidate drying scheme. Canisters will undergo 1 to 5 years of monitoring, including internal temperature and gas sampling to track pressure and composition changes. This report outlines the approach for modeling the ASNF-in-canister behavior in terms of evolving gas space conditions for the ASNF dry storage pilot using HFIR fuel. The ASNF has an adherent surface oxyhydroxide layer comprised of boehmite/bayerite that generates hydrogen when subjected to irradiation. Three-dimensional multi-physics computational fluid dynamics simulations will be executed to compute the thermal field within the DSC and provide inputs to a chemical model employed to compute pressure buildup as hydrogen is generated in the system. Implemented in Cantera, the chemical model solves gas phase and aluminum oxyhydroxide surface-mediated radiolysis reactions. Gas phase reactions are sourced from Wittman and Hanson (2015), whereas surface-mediated reactions are incorporated by fitting experimental data using an optimization algorithm (Abboud, 2023). Water radiolysis reactions from Wren and Ball (2001) are adopted with modifications as described in Abboud (2023c). Understanding the effect of the hydrogen buildup over time is important for long-term storage safety considerations. Modeling results will include the canister pressure, temperature, and composition evolution from the initial helium backfill with the addition of radiolytically-evolved chemical species (e.g., hydrogen and oxygen). The specific HFIR cores for the pilot program have not yet been selected, and the overall design is still in development. The CFD-chemical model used for this work will be based on prior models with necessary updates to allow for improved accuracy and efficiency. The experimental data obtained from the HFIR demonstration will be used to improve and validate the computational models to predict the ASNF-in-canister behavior.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

Emerald Connections Weatherization Plus Health Pilot Program

The Emerald Connections Weatherization Plus Health Pilot Program (Healthy Homes Pilot or the pilot), delivered 97 comprehensive energy retrofits to low-income households in two underserved communities: Lynn, Massachusetts (57) and the Beacon Hill neighborhood in Seattle, Washington (40). Designed by Emerald Cities Collaborative (ECC) and funded via a U.S. Department of Energy (DOE) Weatherization Assistance Program (WAP) Enhancement and Innovation (E&I) grant, ECC created the pilot to expand the reach and range of services typically available to participating WAP households.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

PILOT PEAT-BED TREATMENT SYSTEM FOR NPDES OUTFALL H-12

A National Pollutant Discharge Elimination System (NPDES) Permit was issued to the Savannah River Site (SRS) by the South Carolina Department of Health and Environmental Control (SCDHEC) and became effective on December 1, 2003. The new permit contained revised limits for copper and zinc derived by adjusting the South Carolina aquatic life water quality standards in accordance with dissolved metals criteria. The new copper and zinc limits are very low and may not be met consistently at Outfall H-12. The outfall has periodically exceeded the new 6 {micro}g/l (0.006 mg/L) monthly average limit and the 8 {micro}g/l (0.008 mg/L) maximum limit for copper and recently has begun exceeding the 100 {micro}g/l (0.100 mg/L) limit for zinc. The compliance date for Outfall H-12 is November 1, 2008. A study was conducted on this outfall and other outfalls to evaluate possible alternatives for meeting the new permit limits (Shipman and Bugher 2004). The study team recommended construction of a peat bed for treatment of the Outfall H-12 effluent. This recommendation was repeated by a second alternatives study team in 2007 (WSRC 2007). A bench-scale laboratory study demonstrated the feasibility of peat-bed treatment for Outfall H-12 effluent, with the peat demonstrating excellent removal of copper (Nelson and Specht 2005). An additional study was performed in 2006 and early 2007 using vertical-flow peat columns to investigate the influence of water retention time (contact time) on the removal of copper and zinc from the water (Nelson 2007c). Analytical results indicated that copper removal was very high at each of the three retention times tested, ranging from 99.6% removal at five and three hours to 98.8% removal at one hour. Effluent copper levels from these studies were much lower than the new compliance limit for the outfall. Most divalent metals, including zinc, were removed to below their normal reporting detection limit. The H-Area Material Disposition organization requested a larger-scale study to investigate key design and operation parameters/issues, such as the possibility of rapid plugging of the piping or clogging of the peat bed, the effectiveness of the treatment, hydraulic conductivity, etc. The resulting pilot-scale facility was constructed adjacent to Outfall H-12 with SCDHEC approval (Mullinax 2007). The pilot-scale study was performed by the Savannah River National Laboratory's (SRNL) Environmental Science and Biotechnology Directorate personnel. Since the construction and operation of the pilot-scale peat bed facility, however, a new strategy for achieving compliance of Outfall H-12 effluent with the new permit limits has been selected. This new strategy incorporates a variety of efforts including source reduction, recalculation of limits using an aquatic species that is indigenous to the area instead of a standard species, and dissolved organic carbon addition to reduce copper toxicity. This report documents the construction and operation of the pilot-scale treatment system, the results obtained, and recommendations on the usefulness of this technology for Outfall H-12 or other outfalls at SRS.

01 COAL, LIGNITE, AND PEAT↗

Experimental Investigation of a Piloted, Natural Gas-Air Rotating Detonation Wave Combustor

Development and experimental investigation of a piloted, rotating detonation wave combustor (RDWC) designed for natural gas and air propellants is presented in the current paper. The pilot stage was designed to operate with natural gas and oxygen to extend the main stage RDWC range of operability, control its dynamics, and scale the system thermal power. The main chamber can operate with oxygen enrichment across a range of oxygen mass fraction in oxidizer flow of 23.2% (air) to 35%. An annular sting design for natural gas injection was chosen for the main stage of the RDWC to both minimize injection distance and provide modularity in injector design for future testing. Initial experiments were performed with the main chamber operating without the pilot at high pressure (10 atm) and air preheat temperatures up to 650 K. High- and low-frequency pressure measurements are analyzed to understand performance and chamber dynamics. While high-amplitude chamber dynamics with p0=pc = 60% were observed in preliminary experiments, stable detonative behavior in the main chamber has not yet been demonstrated, and further testing must be completed to define RDWC operability range before adding pilot stage operation.

20 FOSSIL-FUELED POWER PLANTS↗

Controlled pilot oxidizer for a gas turbine combustor

A combustor (22) for a gas turbine (10) includes a main burner oxidizer flow path (34) delivering a first portion (32) of an oxidizer flow (e.g., 16) to a main burner (28) of the combustor and a pilot oxidizer flow path (38) delivering a second portion (36) of the oxidizer flow to a pilot (30) of the combustor. The combustor also includes a flow controller (42) disposed in the pilot oxidizer flow path for controlling an amount of the second portion delivered to the pilot.

Laster, Walter R↗

ISO 50001 for Commercial Buildings: Lessons Learned From U.S. DOE Pilot Project: Preprint

In the U.S., the ISO 50001 Standard, which establishes energy management systems (EnMSs) and processes, has shown uptake primarily in the industrial sector. The U.S. Department of Energy (DOE) undertook a pilot program to explore ISO 50001 implementation in commercial buildings. Eight organizations participated as pilots, with technical assistance provided by DOE, the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Georgia Institute of Technology (Georgia Tech). This paper shares important lessons learned from the pilot. Staff time was the most critical resource required to establish effective EnMSs in commercial buildings. The pilot also revealed that technical support and template/example materials were essential inputs. Crucial activities included evaluating performance, identifying goals, making connections, communicating operational controls, and tracking/reviewing progress. Benefits realized included enhanced intra-organizational connections, greater energy awareness, increased process efficiencies, and improved ability to make business cases. Incremental benefits for ISO 50001 certification were greater accountability, assurance of best practices, public relations opportunities, and potential to unlock verified savings credits or incentive money. Incremental certification costs included more staff/consultant time, money for certification, and a tendency to limit EnMS scope in order to ensure favorable audit results. Five best practices were identified - utilizing expert technical assistance, training, and other resources; focusing on implementation over documentation; keeping top management involved; considering organizational structure when selecting EnMS scope; and matching the implementation level to an EnMS's scope and scale. The last two practices are particularly relevant to the commercial buildings sector.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SkyMine Carbon Mineralization Pilot Project

This Topical Report addresses accomplishments achieved during Phase 2b of the SkyMine® Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO2 from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO2 to products having commercial value (i.e., beneficial use), show the economic viability of the CO2 capture and conversion process, and thereby advance the technology to the point of readiness for commercial scale demonstration and deployment. The overall process is carbon negative, resulting in mineralization of CO2 that would otherwise be released into the atmosphere. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at the commercial scale. The project is being conducted in two phases. The primary objectives of Phase 1 were to evaluate proven SkyMine® process chemistry for commercial pilot-scale operation and complete the preliminary design for the pilot plant to be built and operated in Phase 2, complete a NEPA evaluation, and develop a comprehensive carbon life cycle analysis. The objective of Phase 2b was to build the pilot plant to be operated and tested in Phase 2c.

Christenson, Norm↗

Building America Case Study: Whole-House Solutions for Existing Homes: Greenbelt Homes, Inc. Pilot Retrofit Program; Whole-House Solutions for Existing Homes, Energy Efficiency & Renewable Energy (EERE)

In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. With the community upgrade fully funded by the cooperative through their membership without outside subsidies, this project presents a unique opportunity to evaluate and prioritize the wide-range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy savings benefits of improvements. Phase 1: baseline evaluation for a representative set of 28 homes sited in seven buildings; Phase 2: installation of the building envelope improvements and continued monitoring of the energy consumption for the heating season and energy simulations supporting recommendations for HVAC and water heating upgrades to be implemented in Phase 3.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Existing Whole-House Solutions Case Study: Greenbelt Homes, Inc. Pilot Retrofit Project

In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc., (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. With the community upgrade fully funded by the cooperative through their membership without outside subsidies, this project presents a unique opportunity to evaluate and prioritize the wide range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects that include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy-savings benefits of improvements. Phase 1—baseline evaluation for a representative set of 28 homes sited in seven buildings; Phase 2—installation of the building envelope improvements and continued monitoring of the energy consumption for the heating season; Phase 3—energy simulations supporting recommendations for HVAC and water heating upgrades.

Attic↗

"250 kWt Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

The Babcock & Wilcox Company and The Ohio State University are developing iron-based metal oxide chemical looping technology for power generation and conversion of fossil fuels to chemicals and liquid fuels. A 250 kWt pilot facility has been constructed at the Babcock & Wilcox Research Center in Barberton, Ohio. Testing was conducted on the facility to support scale-up of the technology for implementation in a 10 MWe coal direct chemical looping large pilot plant at Dover Light & Power in Dover, Ohio. The paper discusses the results of the pilot test and the impact of the results on the design of the large pilot facility.

20 FOSSIL-FUELED POWER PLANTS↗

250 kWth Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

From Theory to Practice: Lessons Learned from an Advanced M&V Commercial Pilot

Advanced measurement & verification (M&V), or M&V 2.0, is an energy data analysis method using advanced metering infrastructure (AMI) data in combination with analytics to quantify energy efficiency project savings. Advanced M&V is viewed as an enabler for underutilized behavioral, retrocommissioning, and holistic multi-measure efficiency efforts, as quantifying savings for these programs with existing methods has typically been very challenging. Despite its promise, there are still several unanswered questions about the use of advanced M&V such as: How accurately can these tools quantify energy savings? How can advanced M&V satisfy regulatory requirements for rigorous savings estimates? Where and how does advanced M&V intersect with traditional impact evaluation and the principles of ‘embedded’ evaluation, measurement & verification (EM&V)? Pilots are being pursued in various regions and program contexts to address these research questions. However, results from these pilots are rarely made public, meaning that lessons may not be widely shared and the scope of analyses varies widely. The paper presents encouraging results from a recent advanced M&V pilot and discusses key process-related aspects such as managing AMI data and refining analysis methodologies. An approach to reviewing and classifying projects based on savings characteristics and magnitude is demonstrated, as a potential risk management tool. The authors also demonstrate how advanced M&V can identify underperforming projects and non-routine events in a timely manner. The paper also outlines lessons learned from this and other recent pilot activity and barriers to be overcome in moving toward the goal of widespread adoption of holistic meter-based programs.

Crowe, Eliot↗

The CanBikeCO Mini Pilot: Procedure and Preliminary Results

In fall 2020, the Colorado Energy Office, as part of the State of Colorado's "Can Do Colorado" initiative, initiated a project aimed at encouraging energy-efficient transportation during the COVID-19 pandemic. The initial mini-pilot provided e-bikes to 13 low-income households under an individual ownership model. This report assesses the impact of providing this additional mobility option on the travel behavior of participants. It also outlines the lessons learned from deploying a continuous monitoring platform to track the travel behavior. These lessons will influence the evaluation component for the full pilot, which will cover multiple geographic regions, start in summer 2021, and run for 2 years. The continuous data collection was enabled by a customized version of the open-source e-mission platform, called CanBikeCO, configured with a behavioral gamification feature. The Colorado Energy Office used this system to collect a unique data set consisting of 3 months of partially automated travel diaries, combining sensed and surveyed data and linked with demographic information, from 12 participants. The data collection process worked well overall: users generally liked the app, appreciated the game, and did not complain about battery life. The long tracking period introduced behavioral challenges in user engagement, which we plan to address using repeated patterns and automated status checks for the full pilot. The analysis results, based on the subset of trips with user-reported labels (68%), indicate that the e-bike was the dominant commute mode share (31%), in sharp contrast to the census bicycle commute mode share (<1%). E-bike trips primarily replaced single-occupancy vehicle (SOV) trips (28%), followed closely by walking (24%) and regular bike (20%). The non-motorized mode replacement corresponds to lower travel time and increased productivity enabled by the program. The emissions impact analysis of the program, computed using trip-level energy intensity factors, indicates savings of 1,367 lbs. of CO2. Although the results are strongly positive, the narrow demographic profile of study participants, their limited mobility alternatives, and nonuniform labeling indicate caution in broader interpretation. These preliminary results do suggest that such programs, supported by real-time education and support from program managers, can simultaneously meet equity and sustainability goals. The planned full pilot, addressing the data collection challenges and broadening the geographic scope, will provide additional insights into the generality of this approach.

ADVANCED PROPULSION SYSTEMS↗

Experimental Investigation of Polymer Induced Fouling of Heater Tubes in the First-Ever Polymer Flood Pilot on Alaska North Slope

Mineral fouling in heat exchangers has been extensively investigated by researchers in recent times. The oil and gas industry has a long history of fouling issues in production systems as a result of produced fluids treatment. Due to decline in production rates in oilfields new technologies are being developed and field tested in pilots. Polymer flooding is one such technology that involves addition of polymers to injection fluids to enhance oil production. A polymer flood pilot has been set up in the Schrader Bluff viscous oil reservoir at Milne Point field on the Alaska North Slope (ANS). The results from the pilot are encouraging, however a major concern of the operator is the influence of polymer on the production system after breakthrough, especially the fouling in heat exchangers. This study investigates the propensity of polymer fouling on the heater tubes as a function of different variables, with the ultimate goal of determining safe and efficient operating conditions. This work applies a multi-experimental approach to study the severity of polymer-induced fouling in both dynamic and static states of produced fluids as well as studying the stability of polymer solutions at different temperatures. A unique experimental setup was designed and developed in-house to simulate the fouling process on the heating tube. The influence of heating tube skin temperature, tube material, and polymer concentration on fouling tendency was investigated. Each test was run five times with the same tube, and in each run, the freshly prepared synthetic brine and polymer solution was heated from 77°F to 122°F to mimic field-operating conditions. The heating time and fouling amount were recorded for each run. Dynamic Scale Loop (DSL) tests were conducted to study fouling due to polymer at different temperatures (165°F to 350°F) in a dynamic state of fluid flow where the fluids mimic the residence time of fluids in the heat exchanger on the field pilot. Cloud point measurement has also been conducted to find the critical temperature at which the polymer in solution becomes unstable and precipitates out. The morphology and composition of the deposit samples were analyzed by environmental scanning electron microscopy (ESEM) and X-ray diffraction (XRD), respectively. It was found that the presence of polymer in produced fluids would aggravate the fouling issues on both carbon steel and stainless-steel surfaces at all tested skin temperatures. Only higher skin temperatures of 250°F and 350°F could cause polymer-induced fouling issues on the copper tube surface, and the fouling tendency increased with polymer concentration. At the lower skin temperatures of 165°F, no polymer-induced fouling was identified on the copper tube. A critical temperature that is related to the cloud point of the polymer solution was believed to exist, below which polymer-induced fouling would not occur, and only mineral scale was deposited but above which the polymer would aggravate the fouling issue. The cloud point of the tested polymer solution was determined to be between 220°F and 230°F. In the DSL tests it was found that at higher skin temperatures of 250°F and 350°F tube blocking was observed in the DSL tests whereas the tests at 165°F and 200°F did not show any tube blocking in the same time period. These experiments also manifested the influence of cloud point of the solution as deposit rate increased significantly in both carbon steel and stainless-steel tubes when the skin temperature was higher than the solution cloud point. The results of this study have provided guidance to the operator for the field-operations.

Dhaliwal, Anshul↗

Caustic Recycling Pilot Unit to Separate Sodium from LLW at Hanford Site - 12279

As part of the Department of Energy (DOE) sponsored Advanced Remediation Technologies initiative, a scheme was developed to combine Continuous Sludge Leaching (CSL), Near-Tank Cesium Removal (NTCR), and Caustic Recycling Unit (CRU) using Ceramatec technology, into a single system known as the Pilot Near-Tank Treatment System (PNTTS). The Cesium (Cs) decontaminated effluent from the NTCR process will be sent to the caustic recycle process for recovery of the caustic which will be reused in another cycle of caustic leaching in the CSL process. Such an integrated mobile technology demonstration will give DOE the option to insert this process for sodium management at various sites in Hanford, and will minimize the addition of further sodium into the waste tanks. This allows for recycling of the caustic used to remove aluminum during sludge washing as a pretreatment step in the vitrification of radioactive waste which will decrease the Low Level Waste (LLW) volume by as much as 39%. The CRU pilot process was designed to recycle sodium in the form of pure sodium hydroxide. The basis for the design of the 1/4 scale pilot caustic recycling unit was to demonstrate the efficient operation of a larger scale system to recycle caustic from the NTCR effluent stream from the Parsons process. The CRU was designed to process 0.28 liter/minute of NTCR effluent, and generate 10 M concentration of 'usable' sodium hydroxide. The proposed process operates at 40 deg. C to provide additional aluminum solubility and then recover the sodium hydroxide to the point where the aluminum is saturated at 40 deg. C. A system was developed to safely separate and vent the gases generated during operation of the CRU with the production of 10 M sodium hydroxide. Caustic was produced at a rate between 1.9 to 9.3 kg/hr. The CRU was located inside an ISO container to allow for moving of the unit close to tank locations to process the LLW stream. Actual tests were conducted with the NTCR effluent simulant from the Parsons process in the CRU. The modular CRU is easily scalable as a standalone system for caustic recycling, or for NTTS integration or for use as an In-Tank Treatment System to process sodium bearing waste to meet LLW processing needs at the Hanford site. The standalone pilot operation of the CRU to recycle sodium from NTCR effluent places the technology demonstration at TRL level 6. Multiple operations were performed with the CRU to process up to 500 gallons of the NTCR effluent and demonstrate an efficient separation of up to 70 % of the sodium without solids precipitation while producing 10 M caustic. Batch mode operation was conducted to study the effects of chemistry variation, establish the processing rate, and optimize the process operating conditions to recycle caustic from the NTCR effluent. The performance of the CRU was monitored by tracking the density parameter to control the concentration of caustic produced. Different levels of sodium were separated in tests from the effluent at a fixed operating current density and temperature. The voltage of the modules remained stable during the unit operation which demonstrated steady operation to separate sodium from the NTCR effluent. The sodium transfer current efficiency was measured in testing based on the concentration of caustic produced. Measurements showed a current efficiency of 99.8% for sodium transfer from the NTCR effluent to make sodium hydroxide. The sodium and hydroxide contents of the anolyte (NTCR feed) and catholyte (caustic product) were measured before and after each batch test. In two separate batch tests, samples were taken at different levels of sodium separation and analyzed to determine the stability of the NTCR effluent after sodium separation. The stability characteristics and changes in physical and chemical properties of the NTCR effluent chemistry after separation of sodium hydroxide as a function of storage time were evaluated. Parameters such as level of precipitated alumina, total alkalinity, analysis of Al, Na, K, Cs, Fe, OH, nitrate, nitrite, total dissolved and undissolved solids, viscosity, density, and other parameters of the NTCR effluent were measured. Changes in rheology and properties of NTCR stream to support downstream handling of the effluent after sodium separation was the basis for the analysis. The results show that the NTCR effluent is stable without the precipitation of aluminum hydroxide after 70% of the sodium was separated from the effluent. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment of Activated Carbon, PVC, and Other Wastes using the THOR process - Pilot Plant Test Summary - 17399

This presentation will provide an overview of the first pilot plant study to be conducted for the Japanese Nuclear Market by Kobelco Studsvik Company (A new Joint Venture Company between Studsvik AB and Kobe Steel Ltd.). The test program was scheduled for October 2016, and it was designed to evaluate the treatment of activated carbon, PVC, and other waste types using Studsvik's THOR Process. This new study is being conducted to identify key design parameters required for application of the THOR process in the Japanese Waste Market and to confirm the effectiveness of the THOR technology in meeting the requirements for final waste acceptance. The findings of this pilot plant test will assist in the development of a revised THOR process in Japan that will treat not only spent ion exchange resins but other organic materials generated by Nuclear Power Plants (NPP) during normal operations and D and D activities. The information shared by this new pilot plant study will provide the audience with an understanding of the adaptability of the THOR process for treatment of various radioactive waste types and the results necessary to successful treat different types of carbon, plastic materials, and other waste types. In addition, it will share the lessons learned regarding how a pilot plant study should be planned and optimized to meet the specific requirements of the Japanese Nuclear waste market. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

University Data Management Pilot Utilizing the Nuclear Research Data System

Background In 2022, the Office of Science and Technology Policy (OSTP) issued a memo that significantly reshaped the landscape of access to federally funded research. The memo mandated that all taxpayer-funded research be made available to the public without delay upon publication, without an embargo period, superseding the 2013 OSTP public access policy. This public access policy promotes transparency and the democratization of knowledge, ensuring that the fruits of scientific endeavors funded by federal agencies could be immediately accessed and built upon by scientists, educators, students, and the public at large. To implement the requirements of the OSTP guidance and DOE Public Access Plan, the Office of Nuclear Energy (NE) has implemented public access plan guidance and has identified several areas where better data management practices would further expand public access to important nuclear energy related scientific data, reports, and other technical products. Significant NE supported efforts are already underway for data management and public access to important nuclear energy related data.1 2 To address gaps in data management practices, and improve retention and accessibility of data, NE is actively exploring enhanced data management options utilizing its high-performance computing resources administered by its Nuclear Scientific User Facility Program. A newly piloted system, the Nuclear Research Data System (NRDS) acts as a portal for data collection and dissemination. Nuclear Energy University Program Research and Development Portfolio According to Web of Science, NEUP has produced 2,345 journal publication that have been cited more than 61,000 times3 and countless conference proceedings. These publications are publicly available through OSTI.gov and in the open literature. Additional scientific and technical products including project milestones that are not publications and NEUP project final reports are vetted through OSTI.gov and released once reviewed and approved by DOE. Since 2009, NEUP has awarded close to 1,000 different R&D projects in technical areas across the NE research programs. As of June 2023, 512 NEUP reports are publicly available on OSTI. The underlying data for projects is still held at universities, and data transfer, co-location, and dissemination has not occurred in a systematic way. NEUP data is currently accessible through myriad university-based data repositories, or through direct requests to PIs. The program identified this patchwork of repositories, or often lack of publicly available data, as a significant barrier to an organized, accessible, and comprehensive solution to sharing data with the larger nuclear energy community. Approach The goal of this pilot project is to establish a pathway to a consolidated long-term repository for NEUP project data. To accomplish this goal, the pilot strives to accomplish the following objectives: Establish data collection standards, including a standard set of required supplementary information to contextualize and support raw data files. Work with the HPC group collect and upload information and to modify the NRDS system, as needed, to support a standardized approach. Resolve potential barriers to successful roll out of an expanded data collection strategy, including modifying data management plan guidelines and establishing a document and data release process that accounts for potential intellectual property and/or export control concerns. Results Overall, the pilot was successful in collecting 8,982 raw and processes data files, 220 reports, 56 calibration files, and 5,931 other supplementary documents. Supplementary documents included experimental plans, methods, journal publications and conference proceedings, milestone reports, and final reports. Figure 2 shows the number of data sets and supplementary project information provided by each project. Projects has significantly different input, depending on experimental data produced and completeness of the datasets provided.

Data collection↗