Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Phase outage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

114 records · Page 7

Thermal Energy Corporation Combined Heat and Power Project

To meet the planned heating and cooling load growth at the Texas Medical Center (TMC), Thermal Energy Corporation (TECO) implemented Phase 1 of a Master Plan to install an additional 32,000 tons of chilled water capacity, a 75,000 ton-hour (8.8 million gallon) Thermal Energy Storage (TES) tank, and a 48 MW Combined Heat and Power (CHP) system. The Department of Energy selected TMC for a $10 million grant award as part of the Financial Assistance Funding Opportunity Announcement, U.S. Department of Energy National Energy Technology, Recovery Act: Deployment of Combined Heat and Power (CHP) Systems, District Energy Systems, Waste Energy Recovery Systems, and Efficiency Industrial Equipment Funding Opportunity Number: DE-FOA-0000044 to support the installation of a new 48 MW CHP system at the TMC located just outside downtown Houston. As the largest medical center in the world, TMC is home to many of the nation's best hospitals, physicians, researchers, educational institutions, and health care providers. TMC provides care to approximately six million patients each year, and medical instruction to over 71,000 students. A medical center the size of TMC has enormous electricity and thermal energy demands to help it carry out its mission. Reliable, high-quality steam and chilled water are of utmost importance to the operations of its many facilities. For example, advanced medical equipment, laboratories, laundry facilities, space heating and cooling all rely on the generation of heat and power. As result of this project TECO provides this mission critical heating and cooling to TMC utilizing a system that is both energy-efficient and reliable since it provides the capability to run on power independent of the already strained regional electric grid. This allows the medical center to focus on its primary mission providing top quality medical care and instruction without worrying about excessive energy costs or the loss of heating and cooling due to the risk of power outages. TECO's operation is the largest Chilled Water District Energy System in the United States. The company used DOE's funding to help install a new high efficiency CHP system consisting of a Combustion Turbine and a Heat Recovery Steam Generator. This CHP installation was just part of a larger project undertaken by TECO to ensure that it can continue to meet TMC's growing needs. The complete efficiency overhaul that TECO undertook supported more than 1,000 direct and indirect jobs in manufacturing, engineering, and construction, with approximately 400 of those being jobs directly associated with construction of the combined heat and power plant. This showcase industrial scale CHP project, serving a critical component of the nation's healthcare infrastructure, directly and immediately supported the energy efficiency and job creation goals established by ARRA and DOE. It also provided an unsurpassed model of a district energy CHP application that can be replicated within other energy intensive applications in the industrial, institutional and commercial sectors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Dynamic Distribution System Restoration Strategy for Resilience Enhancement: Preprint

In electric power distribution systems, distributed energy re-sources (DERs) can act as controllable power sources and support utility operators to minimize power outages after ex-treme weather events (e.g., hurricane, earthquake, wildfire) and thus help enhance the grid's resilience. Meanwhile, the influ-ences of extreme events and the capabilities of DERs are dy-namic and difficult to predict. Hence, the desired distribution system restoration strategy should be able to evolve according to real-time fault/disturbance information and the availabil-ity of DERs. In this paper, we propose a new dynamic distribu-tion system restoration strategy to enhance system resilience against potential hazards. An efficient reconfiguration algo-rithm is developed to eliminate the use of integer variables to relieve the computational burden. Model predictive control is implemented to adjust the system topology and DER opera-tion setpoints based on the updated fault information and DER forecasts. The effectiveness of the proposed restoration model in enhancing distribution system resilience is validated through an IEEE 123-bus test system. Simulation results also validate that the proposed restoration model can mitigate the occurrence of unexpected events and the fluctuations of DERs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Use of Semi-Autonomous Tools for ISS Commanding and Monitoring

As the International Space Station (ISS) has moved into a utilization phase, operations have shifted to become more ground-based with fewer mission control personnel monitoring and commanding multiple ISS systems. This shift to fewer people monitoring more systems has prompted use of semi-autonomous console tools in the ISS Mission Control Center (MCC) to help flight controllers command and monitor the ISS. These console tools perform routine operational procedures while keeping the human operator "in the loop" to monitor and intervene when off-nominal events arise. Two such tools, the Pre-positioned Load (PPL) Loader and Automatic Operators Recorder Manager (AutoORM), are used by the ISS Communications RF Onboard Networks Utilization Specialist (CRONUS) flight control position. CRONUS is responsible for simultaneously commanding and monitoring the ISS Command & Data Handling (C&DH) and Communications and Tracking (C&T) systems. PPL Loader is used to uplink small pieces of frequently changed software data tables, called PPLs, to ISS computers to support different ISS operations. In order to uplink a PPL, a data load command must be built that contains multiple user-input fields. Next, a multiple step commanding and verification procedure must be performed to enable an onboard computer for software uplink, uplink the PPL, verify the PPL has incorporated correctly, and disable the computer for software uplink. PPL Loader provides different levels of automation in both building and uplinking these commands. In its manual mode, PPL Loader automatically builds the PPL data load commands but allows the flight controller to verify and save the commands for future uplink. In its auto mode, PPL Loader automatically builds the PPL data load commands for flight controller verification, but automatically performs the PPL uplink procedure by sending commands and performing verification checks while notifying CRONUS of procedure step completion. If an off-nominal condition occurs during procedure execution, PPL Loader notifies CRONUS through popup messages, allowing CRONUS to examine the situation and choose an option of how PPL loader should proceed with the procedure. The use of PPL Loader to perform frequent, routine PPL uplinks offloads CRONUS to better monitor two ISS systems. It also reduces procedure performance time and decreases risk of command errors. AutoORM identifies ISS communication outage periods and builds commands to lock, playback, and unlock ISS Operations Recorder files. Operation Recorder files are circular buffer files of continually recorded ISS telemetry data. Sections of these files can be locked from further writing, be played back to capture telemetry data that occurred during an ISS loss of signal (LOS) period, and then be unlocked for future recording use. Downlinked Operation Recorder files are used by mission support teams for data analysis, especially if failures occur during LOS. The commands to lock, playback, and unlock Operations Recorder files are encompassed in three different operational procedures and contain multiple user-input fields. AutoORM provides different levels of automation for building and uplinking the commands to lock, playback, and unlock Operations Recorder files. In its automatic mode, AutoORM automatically detects ISS LOS periods, then generates and uplinks the commands to lock, playback, and unlock Operations Recorder files when MCC regains signal with ISS. AutoORM also features semi-autonomous and manual modes which integrate CRONUS more into the command verification and uplink process. AutoORMs ability to automatically detect ISS LOS periods and build the necessary commands to preserve, playback, and release recorded telemetry data greatly offloads CRONUS to perform more high-level cognitive tasks, such as mission planning and anomaly troubleshooting. Additionally, since Operations Recorder commands contain numerical time input fields which are tedious for a human to manually build, AutoORM's ability to automatically build commands reduces operational command errors. PPL Loader and AutoORM demonstrate principles of semi-autonomous operational tools that will benefit future space mission operations. Both tools employ different levels of automation to perform simple and routine procedures, thereby offloading human operators to perform higher-level cognitive tasks. Because both tools provide procedure execution status and highlight off-nominal indications, the flight controller is able to intervene during procedure execution if needed. Semi-autonomous tools and systems that can perform routine procedures, yet keep human operators informed of execution, will be essential in future long-duration missions where the onboard crew will be solely responsible for spacecraft monitoring and control.

Brzezinski, Amy S.↗

Random Forest Regressor-Based Approach for Detecting Fault Location and Duration in Power Systems

Power system failures or outages due to short-circuits or “faults” can result in long service interruptions leading to significant socio-economic consequences. It is critical for electrical utilities to quickly ascertain fault characteristics, including location, type, and duration, to reduce the service time of an outage. Existing fault detection mechanisms (relays and digital fault recorders) are slow to communicate the fault characteristics upstream to the substations and control centers for action to be taken quickly. Fortunately, due to availability of high-resolution phasor measurement units (PMUs), more event-driven solutions can be captured in real time. In this paper, we propose a data-driven approach for determining fault characteristics using samples of fault trajectories. A random forest regressor (RFR)-based model is used to detect real-time fault location and its duration simultaneously. This model is based on combining multiple uncorrelated trees with state-of-the-art boosting and aggregating techniques in order to obtain robust generalizations and greater accuracy without overfitting or underfitting. Four cases were studied to evaluate the performance of RFR: 1. Detecting fault location (case 1), 2. Predicting fault duration (case 2), 3. Handling missing data (case 3), and 4. Identifying fault location and length in a real-time streaming environment (case 4). A comparative analysis was conducted between the RFR algorithm and state-of-the-art models, including deep neural network, Hoeffding tree, neural network, support vector machine, decision tree, naive Bayesian, and K-nearest neighborhood. Experiments revealed that RFR consistently outperformed the other models in detection accuracy, prediction error, and processing time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EPCAPE-PT-LANL Measurements: Single Particle Soot Photometer

Coastal cities offer a unique environment for studying aerosol-cloud interactions and the effects of urban emissions on cloud properties. As part of the Eastern Pacific Cloud Aerosol Precipitation Experiment (EPCAPE), the Partitioning Thrust by Los Alamos National Laboratory (EPCAPE-PT-LANL) was conducted. Our campaign focused on measuring the optical and chemical properties of aerosols and their interactions within marine stratocumulus clouds in La Jolla, California. EPCAPE-PT-LANL enhances the primary goals of EPCAPE through innovative observations of vapor-phase transitions between aerosols and cloud droplets, the impact of black carbon on aerosol-cloud dynamics, and the effects of cloud processing on aerosol optical properties. Instrument: Single Particle Soot Photometer (Droplet Measurements Technology) Data Notes: Contact us if you want additional data products from this instrument. Reported data is the black carbon (rBC) number and mass concentration with diagnostic flags. The SP2 measures incandescence from particles that is induced with a 1064 Nd-YAG laser. Particles that absorb the laser energy and then emit radiation is assumed to contain black carbon. The amount of intensity of radiation is related to the mass of absorbing material in the particle. Here, we calibrate the incandescence intensity to size selected Regal Black (Cabot) nebulized from solution. Data provided for the EPCAPE campaign used the combined broadband high-gain + low-gain channels (BHBL). Each channel has a lower threshold of detection equivalent to 2-s of the respective channel noise. Thresholding has been applied to select between the high-gain and low-gain channels. The detection limit is 80-540 nm (Deq) or 0.36- 55 fg. It is assumed that rBC is the only aerosol type that is in significant concentration in the sampled atmosphere that absorbs the laser energy. Particle data are integrated over 10 second windows to calculate a rBC number and mass concentration. QC/QA: • Diagnostic flags that impacted measured concentration: - Sample, Sheath, and Purge Flow Rates: Despite observing fluctuations in all flows, the rBC detection and mass quantification are generally observed to be stable, although large changes in sample flow rate did impact detection efficiency. A flag was implemented for sample flow deviations >12 cm3/min from the set point averaged over 30 seconds - Laser Power: Detection efficiency decreases with laser power and deviations in laser power also affect mass quantification. Flag for laser power is set for deviations in laser current from the set value >5 mA. - Primary Detector Threshold: Primary thresholding is the signal value which determines whether a “particle” is recorded. Thresholding errors occur when the threshold value is too HIGH and real particles are ignored. • Several periods without data: - 16-18 Nov: Ultra Zero Air generator failure, flows deviated significantly from set points. rBC # conc recovered but questionable. - 20-21 Nov: Offline for calibrations for several hours each day. - 25-27 Nov: Data is missing. - 30 Nov: Power outage 3 Dec: SP2 hard-drive full. - 3 Dec: Power Outage Header: - BHBL_NumbConc[#/cc]: Refers to the number concentration of refractory black carbon (rBC) measured from combined broadband high-gain and low-gain channels, expressed in particles per cubic centimeter. - BHBL_BCMass_Conc[ug/m3]: Refers to the mass concentration of refractory black carbon (rBC) measured from combined broadband high-gain and low-gain channels, expressed in micrograms per cubic meter. - NoData_Flag[bool]: A boolean flag that indicates whether no data was recorded during a measurement. - NoBC_Flag[bool]: A boolean flag indicating whether no black carbon particles were recorded during the measurement. - Laser_Flag[bool]: A boolean flag indicating deviations in laser current during the measurement. - SampleFlow_Flag[bool]: A boolean flag indicating deviations from the set sample flow rate during the measurement. - PrimThresh_Flag[bool]: A boolean flag indicating deviations from the set primary threshold during the measurement, potentially ignoring real particles. - Manual_Flag[bool]: A boolean flag indicating manual intervention or adjustments during the measurement. - CVI_Flag[bool]: A boolean flag indicating whether the Counterflow Virtual Impactor (CVI) was active or inactive during the measurement.

54 ENVIRONMENTAL SCIENCES↗

Modular Controllable Transformers (MCT)

Large Power Transformers (LPTs) are at the heart of the electricity infrastructure and are critical pieces in today’s grid. Aging assets, long turn-around times, transportation delays and dependence on foreign manufacturing for these components have created conditions for points of failure across the system. Moreover, there is no available dynamic control on these passive sections of the grid. For all the automation embedded on the low voltage side of the low voltage side of the system there is absolutely no flexibility on the high voltage side. Changes in power flow patterns are brought about by altering dispatch patterns for generators which requires a coordinated effort and is often time consuming. Traditional FACTS based approaches such as UPFC or HVDC light involve massive modifications to the existing infrastructure. Recent instances of physical attacks on LPTs and the slow recovery process associated with fixing or replacing these damaged units has created an increased awareness for this issue. LPT designs are highly customized owing to specific field requirements. Long lead times coupled with transportation delays make procuring and installing LPTs a lengthy process. In an attempt to minimize the recovery time following an LPT failure, transformer manufacturers have developed mobile transformer units. These units typically consist of either a single-phase or three-phase transformer mounted on a truck and characterized by compact form factors. By reducing the assembly time and transport time these units offer a fast and temporary solution to LPT failures. Several efforts led by DOE, Edison Electric Company (EEI) and North American Electric Reliability Corporation (NERC) have led to the RecX program. RecX transformers consist of single phase transformers transported on specialized assemblies to enable fast restoration and minimal installation time. NERC and EEI have instituted transformer sharing programs like Spare Equipment Database (SED) as well as Spare Transformer Equipment Database (STEP) which encourage utilities to maintain and share a fleet of LPTs. Mobile transformers are typically limited to less than 100 MVA to enable transportation on a trailer. Also, the efficiency of mobile transformer units and RecX transformers is lower since they are temporary solutions. The ideal replacement solution would be one that could utilize a set of standardized transformers while incorporating flexibility to influence metrics like power flow, apparent impedance and voltage profiles. In view of these issues the team at Georgia Tech proposed a concept called Modular Controllable Transformers (MCTs). This project was commissioned as a part of DOE’s Transformer Resiliency and Advance Component (TRAC) program. The approach consists of splitting one large unit rated upwards of 100 MVA with smaller modular, standardized units. Each of these smaller units are augmented with a converter to add power flow, voltage and impedance control. Splitting the power level into multiple units has two important implications. By making smaller units, the transportation times can be reduced drastically. Moreover, even though these units have very specific impedance and other parameters, the augmented converters can make it emulate the unit being replaced. Thus, faster replacement times and added controls are achieved making this an extremely resilient approach. In the event of one modular units failure, the other two controllable units can operate in the most resilient fashion keeping the net system overloads to a minimum. Moreover, for the same probability of failure only a fraction of the system capacity is lost. The converter is augmented on to the tertiary winding of the transformer making it retrofittable in the field without massive modifications to the system. The material proposed in this report highlights design considerations to minimize recovery time as well as results displaying overall improvement in resiliency. The cost analysis of this approach shows significant savings compared to UPFC and HVDC lite based approaches. Extensive analysis was conducted on numerous aspects of this project over the course of this project. Simulation studies were conducted to prove the 5MVA converter design. Challenging BIL constraints and transient issues were addressed over the course of this project. Simulations on EMTP platform presented in consequent sections were used to finely tune the control for the same. A final design for a back-to-back 5MVA neutral-point-clamped (NPC) converter was completed in this project. Furthermore, switching components like high power IGBTs from IXYS Westcode Press-Pack series and ABB Stackpack series were identified for this application. These devices exhibit a blocking voltage of 6.5 kV and a nominal collector current of 900 A. Potential housing options as well as existing commercial option were identified for this converter design. A 56 MVA modular transformer unit was designed with Delta Star Inc. with consultation and inputs from all project members. The transformer cooling systems were chosen to be Oil Natural Air Forced (ONAF) to optimize ease of transport. A full Product Requirement Document (PRD) for the converter and the transformer was generated. The team also investigated key aspects of resiliency and how to quantify the same. A metric was developed to analyze resiliency and numerous simulation cases were presented. Increased (N-1) resiliency and outage resistance was showcased through simulation on the Texas Large scale power system. Dynamic control capabilities were also showcased on numerous system level simulations. An IEEE 30 bus system was used to show the ability of the MCT approach to reduce line congestion. Power flow control; a part of the MCTs abilities, showcased a 29% reduction in transformer loading on the same system. Full control over tie line flows was demonstrated on a modified IEEE 13 bus system. Dynamic LTC capabilities were shown through simulation and were compared to traditional LTCs. Furthermore, the ability of the MCTs to alter apparent transformer impedance was simulated to promote standardization of modular transformer units while retaining the ability to emulate a varied range of impedance characteristics. Thus granular control over power flow, voltages, impedances and was presented. Regulatory analysis conducted by Oak Ridge National Laboratory (ORNL) further bolstered the efficacy of the MCT approach and verified the added resiliency achieved due to this approach. As a conclusion, it was proved that the resilience improvement obtained from using the MCT approach is justified by just one failure in a 30-year period. This means that the benefits obtained from using the MCT approach far outweigh the cost of setting this approach up. As a part of the future efforts, the team is proposing building a (12.47-24) kV/400 kVA scaled down unit to control 5MVA of power flows. Emphasis would be laid on using commercial components to speed up the build of these units. Further the actual transport of the modular transformer unit would be a part of this operation and would provide insight into transportation issues. The approach shows much promise and adds key dynamic control on passive sub transmission and transmission sectors.

24 POWER TRANSMISSION AND DISTRIBUTION↗