Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROCUREMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

CFM technologies for space transportation: Multipurpose hydrogen testbed system definition and tank procurement

The development of a test bed tank and system for evaluating cryogenic fluid management technologies in a simulated upper stage liquid hydrogen tank is covered. The tank is 10 ft long and is 10 ft in diameter, and is an ASME certified tank constructed of 5083 aluminum. The tank is insulated with a combination of sprayed on foam insulation, covered by 45 layers of double aluminized mylar separated by dacron net. The mylar is applied by a continuous wrap system adapted from commercial applications, and incorporates variable spacing between the mylar to provide more space between those layers having a high delta temperature, which minimizes heat leak. It also incorporates a unique venting system which uses fewer large holes in the mylar rather than the multitude of small holes used conventionally. This significantly reduces radiation heat transfer. The test bed consists of an existing vacuum chamber at MSFC, the test bed tank and its thermal control system, and a thermal shroud (which may be heated) surrounding the tank. Provisions are made in the tank and chamber for inclusion of a variety of cryogenic fluid management experiments.

Fox, E. C.↗

NASA Aerospace Flight Battery Program: Recommendations for Technical Requirements for Inclusion in Aerospace Battery Procurements

This NASA Aerospace Flight Battery Systems Working Group was chartered within the NASA Engineering and Safety Center (NESC). The Battery Working Group was tasked to complete tasks and to propose proactive work to address battery related, agency-wide issues on an annual basis. In its first year of operation, this proactive program addressed various aspects of the validation and verification of aerospace battery systems for NASA missions. Studies were performed, issues were discussed and in many cases, test programs were executed to generate recommendations and guidelines to reduce risk associated with various aspects of implementing battery technology in the aerospace industry. This document contains Part 2 - Volume II Appendix A to Part 2 - Volume I.

Jung, David S.↗

Equipment Procurement and Final Design for the MARVEL High-Grade Heat Extraction System (HGHES)

This summer I worked on the design of a high-grade heat extraction system (HGHES) of the MARVEL Project. The MARVEL project at INL is a first-of-a-kind terrestrial microreactor to help provide a test platform to demonstrate the use of a microreactor to end customers and enable technology developers to test enabling microreactor technologies with a functional nuclear reactor. One of the project's main requirements is the reactors’ ability to deliver high-grade thermal power to end users, both for industrial and commercial use. The project required communication with multiple vendors for custom-made equipment, working with a high-temperature and high-pressure helium coolant system, and research of a Thermal Storage Unit (TSU).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SPC-70734 Rev 1 MARVEL Primary Coolant System (PCS) Fill and Eutectic NaK Procurement

This specification contains the requirements for the filling the Microreactor Applications Research Validation and Evaluation (MARVEL) reactor Primary Coolant System (PCS) with eutectic sodium-potassium (NaK). The subcontractor will design and fabricate a NaK filling system (referred to herein as the PCS Fill System), the requisite volume of high purity NaK, and perform filling operations in conjunction with the Contractor Operations. The MARVEL reactor system will be operated by the Contractor, and the PCS fill system will be operated by Subcontractor personnel.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SMEX-Lite Modular Solar Array Architecture

For the most part, Goddard solar arrays have been custom designs that are unique to each mission. The solar panel design has been frozen prior to issuing an RFP for their procurement. There has typically been 6-9 months between RFP release and contract award, followed by an additional 24 months for performance of the contract. For Small Explorer (SMEX) missions, with three years between mission definition and launch, this has been a significant problem. The SMEX solar panels have been sufficiently small that the contract performance period has been reduced to 12-15 months. The bulk of this time is used up in the final design definition and fabrication of flight solar cell assemblies. Even so, it has been virtually impossible to have the spacecraft design at a level of maturity sufficient to freeze the solar panel geometry and release the RFP in time to avoid schedule problems with integrating the solar panels to the spacecraft. With that in mind, the SMEX-Lite project team developed a modular architecture for the assembly of solar arrays to greatly reduce the cost and schedule associated with the development of a mission- specific solar array. In the modular architecture, solar cells are fabricated onto small substrate panels. This modular panel (approximately 8.5" x 17" in this case) becomes the building block for constructing solar arrays for multiple missions with varying power requirements and geometrical arrangements. The mechanical framework that holds these modules together as a solar array is the only mission-unique design, changing in size and shape as required for each mission. There are several advantages to this approach. First, the typical solar array development cycle requires a mission unique design, procurement, and qualification including a custom qualification panel. With the modular architecture, a single qualification of the SMEX-Lite modules and the associated mechanical framework in a typical configuration provided a qualification by similarity to multiple missions. It then becomes possible to procure solar array modules in advance of mission definition and respond quickly and inexpensively to a selected mission's unique requirements. The solar array modular architecture allows the procurement of solar array modules before the array geometry has been frozen. This reduces the effect of procurement lead-time on the mission integration and test flow by as much as 50%. Second, by spreading the non-recurring costs over multiple missions, the cost per unit area is also reduced. In the case of the SMEX-Lite procurement, this reduction was by about one third of the cost per unit area compared to previous SMEX mission-unique procurements. Third, the modular architecture greatly facilitates the infusion of new solar cell technologies into flight programs as these technologies become available. New solar cell technologies need only be fabricated onto a standard-sized module to be incorporated into the next available mission. The modular solar array can be flown in a mixed configuration with some new and some standard cell technologies. Since each module has its own wiring terminals, the array can be arranged as desired electrically with little impact to cost and schedule. The solar array modular architecture does impose some additional constraints on systems and subsystem engineers. First, they must work with discrete solar array modules rather than size the array to fit exactly within an available envelope. The array area is constrained to an integer multiple of the module area. Second, the modular design is optimized for space radiation and thermal environments not greatly different from a typical SMEX LEO environment. For example, a mission with a highly elliptical orbit (e.g., Polar, SMEX/FAST) would require thicker coverglasses to protect the solar cells from the more intense radiation environment.

Lyons, John↗

Acquisition-Management Program

NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.

Avery, Don E.↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Status and Trends in the U.S. Voluntary Power Market: 2023 Data

Voluntary green power, for this report, refers to renewable energy procurement by retail electricity customers above what is otherwise provided by load-serving entities. This report is part of an annual series of reports synthesizing trends in the U.S. voluntary green power market. In 2023, about 9.7 million retail electricity customers procured about 319 million megawatt-hours (MWh) of voluntary green power (Figure ES-1), representing a 17% increase over sales in 2022. Estimated voluntary green power market sales represented about 44% of non-hydropower renewable energy sales and about 8% of all U.S. retail electricity sales in 2023. Most of the remainder of U.S. renewable energy sales reflects renewable energy procured by load-serving entities to comply with state renewable energy mandates, also known as compliance-based procurement. The U.S. voluntary green power market is undergoing a clear shift toward long-term contracts, driven primarily by increasingly ambitious corporate renewable energy procurement targets.

2023↗

NASA Alternate Access to Station Service Concept

The evolving nature of the NASA space enterprise compels the agency to develop new and innovative space systems concepts. NASA, working with increasingly strained budgets and a declining manpower base, is attempting to transform from operational activities to procurement of commercial services. NASA's current generation reusable launch vehicle, the Shuttle, is in transition from a government owned and operated entity to a commercial venture to reduce the civil servant necessities for that program. NASA foresees its second generation launch vehicles being designed and operated by industry for commercial and government services. The "service" concept is a pioneering effort by NASA. The purpose the "service" is not only to reduce the civil servant overhead but will free up government resources for further research - and enable industry to develop a space business case so that industry can sustain itself beyond government programs. In addition, NASA desires a decreased responsibility thereby decreasing liability. The Second Generation Reusable Launch Vehicle (RLV) program is implementing NASA's Space Launch Initiative (SLI) to enable industry to develop the launch vehicles of the future. The Alternate Access to Station (AAS) project office within this program is chartered with enabling industry to demonstrate an alternate access capability for the International Space Station (ISS). The project will not accomplish this by traditional government procurement methods, not by integrating the space system within the project office, or by providing the only source of business for the new capability. The project funds will ultimately be used to purchase a service to take re-supply cargo to the ISS, much the same as any business might purchase a service from FedEx to deliver a package to its customer. In the near term, the project will fund risk mitigation efforts for enabling technologies. AAS is in some ways a precursor to the 2nd Generation RLV. By accomplishing ISS resupply with existing technologies, not only will a new category of autonomous vehicles deliver cargo, but a commercial business base will be incubated that will improve the likelihood of commercial convergence with the next generation of RLVs. Traditional paradigms in government management and acquisition philosophy are being challenged in order to bring about the objective of the AAS project. The phased procurement approach is proving to be the most questionable aspect to date. This work addresses the fresh approach AAS is adopting in management and procurement through a study of the AAS history, current solutions, key technologies, procurement complications, and an incremental forward plan leading to the purchase of a service to deliver goods to ISS. Included in this work is a discussion of the Commercial Space Act of 1998 and how it affects government purchase of space launch and space vehicle services. Industry should find these topics pertinent to their current state of business.

Bailey, Michelle D.↗

Status and Trends in the U.S. Voluntary Green Power Market (2021 Data)

Voluntary green power, for the purposes of this report, refers to renewable energy procurement by retail electricity customers above state renewable energy mandates. In this report, we present data and key trends for voluntary green power markets, except for a small portion of voluntary purchasing where no data are available. In 2021, about 8 million retail electricity customers procured about 244 million megawatt-hours (MWh) of voluntary green power (Figure ES-1), representing about 27% of all U.S. renewable energy sales, about 39% of non-hydro renewable energy sales, and about 6% of all U.S. retail electricity sales. Most of the remainder of U.S. renewable energy sales reflects renewable energy procured by load-serving entities to comply with state renewable energy mandates, also known as compliance-based procurement.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Comparative life cycle assessment of remote potable water supply for the Department of Defense

The Department of Defense (DOD) and other agencies, including relief organizations, require potable water for remote missions around the globe. As part of recent initiative by the U.S. Federal government through Executive Order 14057, the DOD has been instructed to investigate the sustainability of operations and practices within the context of climate change. One such practice that needs to be addressed is the procurement of potable water, an essential requirement of any remote mission or location. Currently, there are three primary means of procuring potable water at remote locations: bottled water, on-site purification, or tie-in to existing, local infrastructure. The first two operations are often considered the most secure options, but have sustainability concerns. The purpose of this study is to compare the environmental impacts of bottled water procurement versus on-site treatment via a mobile Reverse Osmosis Water Purification Unit (ROWPU), which uses multiple levels of filtration to make potable water from a local source. A cradle-to-gate assessment was developed for both systems to compare different options for potable water supply. An in person inventory was paired with data taken from the Ecoinvent 3.8 database to directly compare the two systems. The two systems are compared on a 5-year timeline to analyze the environmental impact of repeated bottled water transport versus diesel generator-fueled on-site treatment. Across all impact categories, the results indicate that high energy costs of the reverse osmosis process have significantly less impact on the environment than the repetitive transport and procurement of bottled water. The results of the study have important implications for advancing sustainable operations for remote communities or temporary settlements.

54 ENVIRONMENTAL SCIENCES↗