Challenges in leveraging existing human performance data for quantifying the IDHEAS HRA method

Our article documents an exploratory study for collecting and using human performance data to inform human error probability (HEP) estimates for a new human reliability analysis (HRA) method, the IntegrateD Human Event Analysis System (IDHEAS). The method was based on cognitive models and mechanisms underlying human behaviour and employs a framework of 14 crew failure modes (CFMs) to represent human failures typical for human performance in nuclear power plant (NPP) internal, at-power events [1]. A decision tree (DT) was constructed for each CFM to assess the probability of the CFM occurring in different contexts. Data needs for IDHEAS quantification are discussed. Then, the data collection framework and process is described and how the collected data were used to inform HEP estimation is illustrated with two examples. Next, five major technical challenges are identified for leveraging human performance data for IDHEAS quantification. Furthermore, these challenges reflect the data needs specific to IDHEAS. More importantly, they also represent the general issues with current human performance data and can provide insight for a path forward to support HRA data collection, use, and exchange for HRA method development, implementation, and validation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Probabilistic Risk Assessment (PRA): A Practical and Cost Effective Approach

The Lunar Reconnaissance Orbiter (LRO) is the first mission of the Robotic Lunar Exploration Program (RLEP), a space exploration venture to the Moon, Mars and beyond. The LRO mission includes spacecraft developed by NASA Goddard Space Flight Center (GSFC) and seven instruments built by GSFC, Russia, and contractors across the nation. LRO is defined as a measurement mission, not a science mission. It emphasizes the overall objectives of obtaining data to facilitate returning mankind safely to the Moon in preparation for an eventual manned mission to Mars. As the first mission in response to the President's commitment of the journey of exploring the solar system and beyond: returning to the Moon in the next decade, then venturing further into the solar system, ultimately sending humans to Mars and beyond, LRO has high-visibility to the public but limited resources and a tight schedule. This paper demonstrates how NASA's Lunar Reconnaissance Orbiter Mission project office incorporated reliability analyses in assessing risks and performing design tradeoffs to ensure mission success. Risk assessment is performed using NASA Procedural Requirements (NPR) 8705.5 - Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects to formulate probabilistic risk assessment (PRA). As required, a limited scope PRA is being performed for the LRO project. The PRA is used to optimize the mission design within mandated budget, manpower, and schedule constraints. The technique that LRO project office uses to perform PRA relies on the application of a component failure database to quantify the potential mission success risks. To ensure mission success in an efficient manner, low cost and tight schedule, the traditional reliability analyses, such as reliability predictions, Failure Modes and Effects Analysis (FMEA), and Fault Tree Analysis (FTA), are used to perform PRA for the large system of LRO with more than 14,000 piece parts and over 120 purchased or contractor built components.

Lee, Lydia L.↗

NONPARAMETRIC EMPIRICAL BAYES ESTIMATION THROUGH DECONVOLUTION IN PROBABILISTIC RISK ANALYSIS

The advent of Markov Chain Monte Carlo (MCMC) simulations and availability of open source software made full hierarchical Bayesian analysis tractable and a popular choice in parameter estimation for Probabilistic Risk Assessment (PRA). However, despite its theoretical attractiveness, the hierarchical Bayesian analysis is not without its problems. Two of the most prominent practical difficulties in applying hierarchical Bayes analysis in practice to analyze source-to-source variability, for example, is its sensitivity to the selection of the first-stage prior and dependence of the rate of convergence on the selection of the first-stage prior. The first-stage prior in hierarchical Bayesian analysis is usually assumed having a parametric form, often conjugate to the likelihood function (aleatory model). To facilitate convergence for hierarchical Bayes models, the first-stage prior is frequently set through empirical Bayes estimate, which can use available historical data to find the parameters of the first-stage prior. The paper discusses a new nonparametric empirical Bayes estimation and compare it to several well-known parametric estimates such as method of moments and maximum likelihood. The new nonparametric technique exploits the prior predictive distribution as integral equation and proceeds to solve it with respect to prior assuming the sampling data distribution and aleatory model are available. The discussion covers topics such as selection of aleatory model for future data, selection of regularization parameter, and density estimation for historical data. For comparison, the paper is using contrived as well as real-world data from utilities. Utilities data represent failure data with Poisson distribution used for aleatory model.

97 MATHEMATICS AND COMPUTING↗

Modeling and Quantification of Team Performance in Human Reliability Analysis for Probabilistic Risk Assessment

Probabilistic Risk Assessment (PRA) and Human Reliability Assessment (HRA) are important technical contributors to the United States (U.S.) Nuclear Regulatory Commission’s (NRC) risk-informed and performance based approach to regulating U.S. commercial nuclear activities. Furthermore, all currently operating commercial NPPs in the U.S. are required by federal regulation to be staffed with crews of operators. Yet, aspects of team performance are underspecified in most HRA methods that are widely used in the nuclear industry. There are a variety of "emergent" team cognition and teamwork errors (e.g., communication errors) that are 1) distinct from individual human errors, and 2) important to understand from a PRA perspective. The lack of robust models or quantification of team performance is an issue that affects the accuracy and validity of HRA methods and models, leading to significant uncertainty in estimating HEPs. This paper describes research that has the objective to model and quantify team dynamics and teamwork within NPP control room crews for risk informed applications, thereby improving the technical basis of HRA, which improves the risk-informed approach the NRC uses to regulate the U.S. commercial nuclear industry.

99 GENERAL AND MISCELLANEOUS↗

Analysis of the Space Propulsion System Problem Using RAVEN

This paper presents the solution of the space propulsion problem using a PRA code currently under development at Idaho National Laboratory (INL). RAVEN (Reactor Analysis and Virtual control ENviroment) is a multi-purpose Probabilistic Risk Assessment (PRA) software framework that allows dispatching different functionalities. It is designed to derive and actuate the control logic required to simulate the plant control system and operator actions (guided procedures) and to perform both Monte- Carlo sampling of random distributed events and Event Tree based analysis. In order to facilitate the input/output handling, a Graphical User Interface (GUI) and a post-processing data-mining module are available. RAVEN allows also to interface with several numerical codes such as RELAP5 and RELAP-7 and ad-hoc system simulators. For the space propulsion system problem, an ad-hoc simulator has been developed and written in python language and then interfaced to RAVEN. Such simulator fully models both deterministic (e.g., system dynamics and interactions between system components) and stochastic behaviors (i.e., failures of components/systems such as distribution lines and thrusters). Stochastic analysis is performed using random sampling based methodologies (i.e., Monte-Carlo). Such analysis is accomplished to determine both the reliability of the space propulsion system and to propagate the uncertainties associated to a specific set of parameters. As also indicated in the scope of the benchmark problem, the results generated by the stochastic analysis are used to generate risk-informed insights such as conditions under witch different strategy can be followed.

97 MATHEMATICS AND COMPUTING↗

Reliability and Probabilistic Risk Assessment - How They Play Together

Since the Space Shuttle Challenger accident in 1986, NASA has extensively used probabilistic analysis methods to assess, understand, and communicate the risk of space launch vehicles. Probabilistic Risk Assessment (PRA), used in the nuclear industry, is one of the probabilistic analysis methods NASA utilizes to assess Loss of Mission (LOM) and Loss of Crew (LOC) risk for launch vehicles. PRA is a system scenario based risk assessment that uses a combination of fault trees, event trees, event sequence diagrams, and probability distributions to analyze the risk of a system, a process, or an activity. It is a process designed to answer three basic questions: 1) what can go wrong that would lead to loss or degraded performance (i.e., scenarios involving undesired consequences of interest), 2) how likely is it (probabilities), and 3) what is the severity of the degradation (consequences). Since the Challenger accident, PRA has been used in supporting decisions regarding safety upgrades for launch vehicles. Another area that was given a lot of emphasis at NASA after the Challenger accident is reliability engineering. Reliability engineering has been a critical design function at NASA since the early Apollo days. However, after the Challenger accident, quantitative reliability analysis and reliability predictions were given more scrutiny because of their importance in understanding failure mechanism and quantifying the probability of failure, which are key elements in resolving technical issues, performing design trades, and implementing design improvements. Although PRA and reliability are both probabilistic in nature and, in some cases, use the same tools, they are two different activities. Specifically, reliability engineering is a broad design discipline that deals with loss of function and helps understand failure mechanism and improve component and system design. PRA is a system scenario based risk assessment process intended to assess the risk scenarios that could lead to a major/top undesirable system event, and to identify those scenarios that are high-risk drivers. PRA output is critical to support risk informed decisions concerning system design. This paper describes the PRA process and the reliability engineering discipline in detail. It discusses their differences and similarities and how they work together as complementary analyses to support the design and risk assessment processes. Lessons learned, applications, and case studies in both areas are also discussed in the paper to demonstrate and explain these differences and similarities.

Safie, Fayssal↗

Mining data in a dynamic PRA framework

Computational (also known as Dynamic) Probabilistic Risk Assessment (PRA) methods employs system simulation codes coupled with stochastic analysis tools in order to determine probabilities of certain outcomes such as system failure. In contrast to classical PRA methods (i.e., Event-Tree and Fault-Tree) in which timing and sequencing of events is set by the analyst, accident progression is dictated by the system control logic and its interaction with system temporal evolution. Due to the nature of the problem, Simulation-Based PRA methods require large amount of computationally expensive simulation runs. In addition, these methods usually generate a large number of simulation runs (database storage may be on the order of gigabytes or higher). In this paper we investigate and apply several methods and algorithms to analyze these large amounts of time-dependent data. Furthermore, the scope of this article is to present a broad overview of methods and algorithms that can be used to improve data quality and to analyze and extract information from large data sets containing time dependent data. In this context, “extracting information” means constructing input-output correlations, finding commonalities, and identifying outliers.

97 MATHEMATICS AND COMPUTING↗

Industry Fire Modeling Enhancement Tools and Methods. Light Water Reactor Sustainability Program report

Modeling and implementing fire safety for nuclear power plants is a costly activity. Because of the complexity of fire phenomenon and multiple operational procedures, it is difficult to computationally provide assurance that the mitigation methods are adequate for critical areas using current analysis methods. An economical method to provide more accurate modeling and optimize mitigation methods is needed to improve nuclear power viability. This report describes the background of current fire model strategy; the first stage of a tool to help reduce resources needed in fire analysis and the plan for the next step in advancing fire. The report lays out the path decided upon by Idaho National Laboratory and Industry representatives to best help reduce costs and improve realism in Fire Probabilistic Risk Analysis.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Artemis Missions Probabilistic Risk Assessment (PRA) & Reliability Assessment Overview

To show how NASA’s Moon-to-Mars (M2M) program can use hardware reliability assessments and comprehensive Probabilistic Risk Assessments (PRAs) to estimate risk of future missions and manage risk via safety and mission success requirements from the top down, so that this risk can be balanced with other program metrics like cost and schedule. These PRAs and reliability assessments can be used during the concept, design, and operational phases of development. This presentation also provides some thoughts on how the NASA process can be utilized for a lunar surface power grid development.

PRA↗

Comparison of Artemis 2 and Artemis 5 Model Outcomes Using the Impact Probabilistic Risk Assessment Tool

BACKGROUND The Artemis campaign is a Moon exploration program with a series of six planned missions, five of which will be crewed. These five crewed missions will contain a single mission segment (space flight), or multiple mission segments involving space flight (Orion), lunar landing (LTV) and/or space habitat (Gateway). Each crewed segment faces the risk of unique medical conditions, necessitating medical sets/kits tailored to those specificities. To support and enable a data-driven and evidence-based decision-making process through out a mission’s life cycle, a software tool called IMPACT was developed. Using probabilistic risk assessment (PRA) methodologies, IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a novel tool built for analyzing the possibility of encountering complex medical risks during space flight, and for identifying the medical resources and capabilities needed to treat those potential at-risk medical conditions. This presentation will seek to compare IMPACT’s computational results upon potential complex space medical conditions (e.g., sprain/strain back or sleep disturbance) using IMPACT’s risk metrics and the associated optimized medical sets/kits between two Artemis missions: single segment Artemis 2 and multi-segmented Artemis 5. OVERVIEW By identifying potential medical conditions in space using input criteria such as crew quantity and composition, certain crew physical characteristics, mission duration and mission activities, IMPACT can produce analyses on the type of medical resources and capabilities needed to produce an optimized medical set/kit to address those medical conditions. IMPACT achieves this by performing hundreds of thousands of Monte Carlo simulations of missions to build aggregate pictures of medical risk. IMPACT’s risk metrics include loss of crew life (LOCL) – a measure of crew mortality due to medical conditions in space, return to definitive care (RTDC) – the need to perform crew evacuation, and task time lost (TTL) – a measure of the inability to perform activities due to crew disability. These risk metrics are applied to every medical condition identified by IMPACT’s computation analyses for every segment of the mission. Medical sets/kits are optimized to address these medical conditions but must fit within the stated Artemis Design Reference Mission (DRM) request for mass and volume physical size constraints. ANTICIPATED ANALYSIS AND CONCLUSION Using two Artemis missions, Artemis 2 and Artemis 5, IMPACT will provide the analyses for comparison of medical set/kit contents based upon mass and/or volume requirements and identify the at-risk medical conditions within both missions. This paper serves as an initial exploration of probabilistic risk assessment (PRA) medical risk calculations between two crewed Artemis missions and is not intended to be deemed the official medical response for the Artemis campaign.

probabilistic risk assessment↗

Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners (Second Edition)

Probabilistic Risk Assessment (PRA) is a comprehensive, structured, and logical analysis method aimed at identifying and assessing risks in complex technological systems for the purpose of cost-effectively improving their safety and performance. NASA's objective is to better understand and effectively manage risk, and thus more effectively ensure mission and programmatic success, and to achieve and maintain high safety standards at NASA. NASA intends to use risk assessment in its programs and projects to support optimal management decision making for the improvement of safety and program performance. In addition to using quantitative/probabilistic risk assessment to improve safety and enhance the safety decision process, NASA has incorporated quantitative risk assessment into its system safety assessment process, which until now has relied primarily on a qualitative representation of risk. Also, NASA has recently adopted the Risk-Informed Decision Making (RIDM) process [1-1] as a valuable addition to supplement existing deterministic and experience-based engineering methods and tools. Over the years, NASA has been a leader in most of the technologies it has employed in its programs. One would think that PRA should be no exception. In fact, it would be natural for NASA to be a leader in PRA because, as a technology pioneer, NASA uses risk assessment and management implicitly or explicitly on a daily basis. NASA has probabilistic safety requirements (thresholds and goals) for crew transportation system missions to the International Space Station (ISS) [1-2]. NASA intends to have probabilistic requirements for any new human spaceflight transportation system acquisition. Methods to perform risk and reliability assessment in the early 1960s originated in U.S. aerospace and missile programs. Fault tree analysis (FTA) is an example. It would have been a reasonable extrapolation to expect that NASA would also become the world leader in the application of PRA. That was, however, not to happen. Early in the Apollo program, estimates of the probability for a successful roundtrip human mission to the moon yielded disappointingly low (and suspect) values and NASA became discouraged from further performing quantitative risk analyses until some two decades later when the methods were more refined, rigorous, and repeatable. Instead, NASA decided to rely primarily on the Hazard Analysis (HA) and Failure Modes and Effects Analysis (FMEA) methods for system safety assessment.

Stamatelatos,Michael↗

In-Depth Modeling and Simulation Analysis of Artemis Missions Using the Impact Probabilistic Risk Assessment Tool

BACKGROUND The Artemis campaign is a Moon exploration program with a series of six planned missions, five of which will be crewed. These five crewed missions will contain a single mission segment (space flight), or multiple mission segments involving space flight (Orion), lunar landing (LTV) and/or space habitat (Gateway). Each crewed segment faces the risk of unique medical conditions, necessitating medical sets/kits tailored to those specificities. To support and enable a data-driven and evidence-based decision-making process through out a mission’s life cycle, a software tool called IMPACT was developed. Using probabilistic risk assessment (PRA) methodologies, IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a novel tool built for analyzing the possibility of encountering complex medical risks during space flight, and for identifying the medical resources and capabilities needed to treat those potential at-risk medical conditions. IMPACT achieves this by performing hundreds of thousands of Monte Carlo simulations of missions to build aggregate pictures of medical risk. During an extended simulation modeling phase, IMPACT generated analytical results for medical risks, and the medical resources and capabilities to address those risks, for every segment of every crewed Artemis mission. This presentation will highlight the reliability, consistency and validity of IMPACT’s computational modeling techniques and will showcase the library of analytical outcomes generated for the Artemis missions. OVERVIEW During the early stages of IMPACT’s design, architecture and technical requirements collection, “scenarios” (use cases) - achievement goals required for acceptance testing, were identified by stakeholders. IMPACT successfully completed the scenario testing requirements and undertook an extensive operational run phase utilizing a wide range of input combinations with a goal of delivering a cohesive, trustworthy, reliable, vast, and diverse body of evidence. The intent of these modeling runs was to validate consistency in output, ensure solidity of executable operations and to streamline processes by identifying areas requiring efficiency improvements. Using the many missions of Artemis, IMPACT ran variations of operational runs to assess the output for acceptable, as well as unusual characteristics. This rigorous long-term “shakedown” analysis was implemented to help build a collective body of evidence to aid in securing a high level of confidence, reliability, and validity in the output, whether from the applicational components of IMPACT, or the entirety of the operational process. ANTICIPATED ANALYSIS AND CONCLUSION This presentation will discuss the various categories of input criteria; the comparisons in the application of these input criteria to various Artemis missions; the preparation and collection of the body of evidence, and reliability of the computational modeling techniques. This paper serves as an initial analytical overview of IMPACT’s probabilistic risk assessment (PRA) medical risk outputs covering Artemis missions and is not intended to be deemed the official medical response for the Artemis campaign.

Crew Composition↗

Risk Importance Ranking of Fire Data Parameters to Enhance Fire PRA Model Realism

Fire is historically and analytically a significant contributor to nuclear power plant risk. The level of fire risk and the methods, tools and data for modeling this risk is highly debated by experts. One area of debate is the input data used in fire modeling and how to deal with this data’s high uncertainty. This report outlines initial work performed for determining the key parameters causing this uncertainty and how it propagates into nuclear power plant models. This research paves the way for the development of methods to reduce fire data uncertainty used in modeling. The Nuclear Regulatory Commission has mandated that nuclear power plants perform fire risk modeling. However, there are several issues with the current risk modeling implementation that affect the results. Approved modeling methods can be overly conservative and often do not match plant experience. Also, the data used in the modeling can have high uncertainties and is influenced by expert judgement. To evaluate input data uncertainty, researchers performed an initial review of several fire experiments done at Sandia National Laboratories. Uncertainties for fire data can come from many sources, such as experiment design constraints, environmental conditions, or other plant-specific aspects. There are many different significant and insignificant parameters driving the uncertainty. Additionally, the uncertainty of the different input data used in the fire modeling could have a significant or insignificant effect on the entire plant risk. A four-step methodology was developed to perform Integrated Probabilistic Risk Assessment Importance Ranking. A demonstration case using these steps was set up and three of the four steps were completed in fiscal year (FY) 2019 and the fourth step done FY 2020. These steps are: 1. The qualitative analysis of potential sources was conducted with the following items identified for the demonstration. • Maximum heat release rate • Time to maximum heat release rate • Duration of max heat release rate • Time to decay • Thermal conductivity of concrete • Specific heat of concrete • Density of concrete • Cable jacket thickness 2. A quantitative characterization of dominant sources of uncertainty was performed. A list of distributions and determined values of the dominant sources is shown in Appendix A. 3. A quantitative screening of the potential sources of uncertainty using Morris Elementary Effects Analysis was completed. An experimental model using the physics-based fire modeling tool Fire Dynamics Simulator was developed and coupled with the Risk Analysis Virtual Environment. The Morris analysis identified at least two parameters that can be eliminated as significant contributors (specific heat of concrete and cable jacket thickness). 4. Global importance measure (Global IM) analysis to generate a comprehensive ranking based on their influence on the plant risk. In this research, a moment-independent Global IM is used since it can address (a) uncertainty in the input parameters of the fire model, (b) uncertainty in the risk outputs, and (c) non-linearity and interactions among input parameters in the fire model, more accurately than the correlation-based and variance-based global methods. The observations from the research showed that, depending on the initial and boundary conditions of the fire scenarios, fire-induced damage could have a very small probability and could be dominated by the tail of the uncertainty distribution; hence, the accuracy of the correlation-based and variance-based methods is questionable. The moment-independent Global IM analysis in this research provides a better understanding of how experimental uncertainty data affects industry’s plant models and where improvements in that data will have the largest benefit for improving fire modeling accuracy in causing core damage. Among the five unscreened parameters obtained from the Morris EE analysis, the Global IM analysis results for the case study indicated that max heat release rate and fire location are the most important parameters. The report also outlines benefits of using a unified computational platform that integrates the underlying simulations (e.g., a fire progression model), quantitative screening (using the Morris EE method), and the Global IM analysis. A unified platform can (i) facilitate the ranking of input parameters considering multiple key fire scenarios simultaneously, rather than considering one scenario at a time, (ii) contribute to more explicit and accurate treatment of dependencies at multiple levels of Fire PRA, (iii) facilitate the sampling-based uncertainty quantification for Fire PRA, and (iv) help generating both “industry-wide” and "plant-specific" ranking of uncertainty sources in Fire PRA. Future research should be done to include additional parameters such as detection/suppression or cable fire spread. Adding a PRA software such as SAPHIRE to the RAVEN platform would help with plant model integration and improve treatment of fire-induced dependency. The I-PRA risk importance ranking methodology offered in this report can provide valuable information for efficiently (a) enhancing the realism of Fire PRA for existing plants and (b) supporting the development of Dynamic Fire PRA for advanced reactors and new plants.

97 MATHEMATICS AND COMPUTING↗

A Simulation-Based Dynamic Approach for External Flooding Analysis in Nuclear Power Plants

All nuclear power plants must consider and evaluate external flooding risks such as local intense precipitation, dam failure, and coastal flooding due to storm surge or tsunami. While these events could challenge off-site power and other plant structure integrity, threaten plant safety systems and components, and limit plant access, they are more than often qualitatively regarded as risk insignificant and screened out from detailed evaluation and quantification. The recent lessons learned from the Fukushima seismic/tsunami initiated nuclear accident (2011), the Fort Calhoun (2011), Vermont Yankee (2013), Arkansas Nuclear One (2013), and St. Luice (2014) flooding events showed otherwise. However, developing an external flood model with traditional event tree/fault tree approach as in a static probabilistic risk assessment (PRA) model could be difficult to accurately represent plant system and component behavior and reliability of manual actions during an ever-progressing flood event. The plant response to external flood may be highly spatial- and time- dependent and subject to the hydrological and hydraulic characteristics of the flood event. Such unique challenges prompt the investigation of using the simulation-based dynamic analysis approaches for external flood risk assessment. Simulation methods can better illustrate the performance of structures, systems, and components during an external flooding event. A general framework to perform a simulation-based dynamic flooding analysis is presented in this paper with the sub-tasks of flood hazard analysis, flood fragility analysis, plant response modeling, safety margin analysis or PRA quantification. A new type of State PRA modeling technique is introduced to incorporate time-related interactions such as those from 3D simulations into a traditional PRA model.

99 GENERAL AND MISCELLANEOUS↗

Integrated Fire Probabilistic Risk Assessment (PRA) Modeling in Support of Operational Efficiency (Final Report)

To improve the realism of Fire PRA associated with fire progression and damage modeling or manual suppression, previous research by the Socio-Technical Risk Analysis (SoTeRiA) Research Laboratory at the University of Illinois at Urbana-Champaign focused on the development of an Integrated PRA (I-PRA) methodological framework for fire risk analysis in NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimization Method to Branch and Bound Large SBO State Spaces Under Dynamic Probabilistic Risk Assessment via use of LENDIT Scales and S2R2 Sets

Traditional Probabilistic Risk Assessment (PRA) methods have been developed and are quite effective in evaluating risk associated with complex systems, but lack the capability to evaluate complex dynamic systems. These time and energy scales associated with the transient may vary as a function of transition time to a different physical state. Dynamic PRA (DPRA) methods provide a more rigorous analysis of complex dynamic systems, while complete, results in issues associated with combinatorial explosion. In order to address the combinatorial complexity arising from the number of possible state configurations and discretization of transition times, a characteristic scaling metric (LENDIT – length, energy, number, distribution, information and time) is proposed as a means to describe systems uniformly and thus provide means to describe relational constraints expected in the dynamics of a complex (coupled) systems. Thus when LENDIT is used to characterize four sets – ‘state, system, resource and response’ (S2R2) – describing reactor operations (normal and off-normal), LENDIT and S2R2 in combination have the potential to ‘branch and bound’ the state space investigated by DPRA. In this paper we introduce the concept of LENDIT scales and S2R2 sets applied to a branch-and-bound algorithm and apply the methods to a station black out transient (SBO).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Branch-and-Bound algorithm applied to uncertainty quantification of a Boiling Water Reactor Station Blackout

Evaluation of the impacts of uncertainty and sensitivity in modeling presents a significant set of challenges in particular to high fidelity modeling. Computational costs and validation of models creates a need for cost effective decision making with regards to experiment design. Experiments designed to validate computation models can be used to reduce uncertainty in the physical model. In some cases, large uncertainty in a particular aspect of the model may or may not have a large impact on the final results. For example, modeling of a relief valve may result in large uncertainty, however, the actual effects on final peak clad temperature in a reactor transient may be small and the large uncertainty with respect to valve modeling may be considered acceptable. Additionally, the ability to determine the adequacy of a model and the validation supporting it should be considered within a risk informed framework. Low fidelity modeling with large uncertainty may be considered adequate if the uncertainty is considered acceptable with respect to risk. In other words, models that are used to evaluate the probability of failure should be evaluated more rigorously with the intent of increasing safety margin. Probabilistic risk assessment (PRA) techniques have traditionally been used to identify accident conditions and transients. Traditional classical event tree methods utilize analysts’ knowledge and experience to identify the important timing of events in coordination with thermal-hydraulic modeling. These methods lack the capability to evaluate complex dynamic systems. In these systems, time and energy scales associated with transient events may vary as a function of transition times and energies to arrive at a different physical state. Dynamic PRA (DPRA) methods provide a more rigorous analysis of complex dynamic systems. Unfortunately DPRA methods introduce issues associated with combinatorial explosion of states. This study presents a methodology to address combinatorial explosion using a Branch-and-Bound algorithm applied to Dynamic Event Trees (DET), which utilize LENDIT (L – Length, E – Energy, N – Number, D – Distribution, I – Information, and T – Time) as well as a set theory to describe system, state, resource, and response (S2R2) sets to create bounding functions for the DET. The optimization of the DET in identifying high probability failure branches is extended to create a Phenomenological Identification and Ranking Table (PIRT) methodology to evaluate modeling parameters important to safety of those failure branches that have a high probability of failure. The PIRT can then be used as a tool to identify and evaluate the need for experimental validation of models that have the potential to reduce risk. Finally, in order to demonstrate this methodology, a Boiling Water Reactor (BWR) Station Blackout (SBO) case study is presented.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗