Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PILOT PLANTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

10 MWe Coal Direct Chemical Looping (CDLC) Large Pilot Plant Test – Phase I Feasibility

A feasibility study was performed to install a 10 MWe coal direct chemical looping steam generation system at the City of Dover Municipal Power Plant in Dover, Ohio. The chemical looping plant utilized Ohio State University's iron-oxide-based metal oxide, and a moving bed reducer coupled with a transport reactor combustor. The Babcock & Wilcox Company developed the component designs and integrated the chemical looping process with the steam cycle. A four-module design was developed which would serve as a prototype arrangement for much larger systems. An environmental study was completed to support the installation of the large pilot plant at the site.

01 COAL, LIGNITE, AND PEAT↗

Select Generic Dry-Storage Pilot Plant Design for Safeguards and Security by Design (SSBD) per Used Fuel Campaign

As preparation to the year-end deliverable (Provide SSBD Best Practices for Generic Dry-Storage Pilot Scale Plant) for the Work Package (FT-15LA040501–Safeguards and Security by Design for Extended Dry Storage), the initial step was to select a generic dry-storage pilot plant design for SSBD. To be consistent with other DOE-NE Fuel Cycle Research and Development (FCR&D) activities, the Used Fuel Campaign was engaged for the selection of a design for this deliverable. For the work Package FT-15LA040501–“Safeguards and Security by Design for Extended Dry Storage”, SSBD will be initiated for the Generic Dry-Storage Pilot Scale Plant described by the layout of Reference 2. SSBD will consider aspects of the design that are impacted by domestic material control and accounting (MC&A), domestic security, and international safeguards.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Pilot Plant Test of Removal of Co-60 and Cs-137 from the Evaporator Concentrates of Forsmark unit 3 - 17158

A pilot plant test has been conducted to treat evaporator concentrates at Forsmark BWR NPP unit 3 in Sweden using Fortum's selective ion exchanger technology. The concentrate contains an array of radionuclides of which C-60 and Cs-137 are radiologically the most important ones. Concentrate also contained a high salt content ∼ 20 g/l and high organic carbon loading ∼ 1 g/l The pilot system consisted of pre-treatment (mechanical filters, activated carbon, UV oxidation) and Cs and Co selective ion exchangers. CsTreat ion exchanger was very effective in removing Cs from the evaporator concentrate: {sup 137}Cs activity was lowered from the initial value 280 MBq/m{sup 3} to below detection limit 550 Bq/m{sup 3}. Removing Co was more complicated: results suggest that Co is bound to organic chelating compounds, thus fairly compete oxidation of organic carbon was required in order to achieve good ion exchange results. Finally, after total organic carbon (TOC) was treated to below 50 ppm, {sup 60}Co activity was lowered from the initial value of 57 MBq/m{sup 3} to 2.7 kBq/m{sup 3}. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reference Stratigraphy Applied to Rock Mechanics Studies for the Waste Isolation Pilot Plant: A Review - January 11, 2017

Reference stratigraphy for the Waste Isolation discernible clay in the orange halite, and Pilot Plant (WIPP) was developed to provide a standard for comparing the results of different models of mechanical behavior of the WIPP underground (e.g., Krieg, 1984) (Figure 1). Munson et al. (1989) revised the reference stratigraphy (Figure 2), and they concluded that mechanical behavior at WIPP was better represented by a different distribution of lithologies, in particular by assigning most of the units in the reference stratigraphy to “argillaceous halite” rather than as “clean halite.” Here I re-evaluate the background for these reference stratigraphies and lithology by examining core and other data.

58 GEOSCIENCES↗

Development of the Generation 3 Particle Pilot Plant Falling Particle Receiver

A falling particle receiver (FPR) has been designed to integrate with the G3P3-USA pilot plant currently being constructed at the National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories. This receiver integrates several innovative design features including a converging tunnel (SNOUT), an optimized cavity geometry, and a multistage “catch-and-release” trough. Details about the integration of these features and the final G3P3-USA FPR design and construction are described. Ray-tracing models of the FPR utilizing the NSTTF heliostat field are developed leveraging previous modeling efforts using SolTrace. Models demonstrate that at least 1.5 MWth of incident radiative energy can be provided to the FPR on a clear day throughout a typical year in Albuquerque, NM. Spillage fluxes around the periphery of the aperture are within acceptable bounds for the majority of the year. Intercept factors are computed for each utilized heliostat at the Vernal equinox to provide guidance to heliostat operators during operation of the system.

Mills, Brantley↗

Lunar Water Pilot Plant Conceptual Design

A study was conducted to determine mass, power, and concept of operations for a polar water pilot plant that can produce 1000 kg of oxygen in a year from 1125 kg of water extracted from the icy regolith in a permanently shadowed region(PSR). Icy regolith in the PSR is excavated and delivered to a stationary dryer that extracts the water which is frozen in an ice tanker and delivered up to the ridge for further processing into oxygen and hydrogen. This study assumed a previously landed nuclear reactor was available in the PSR to provide power for the water extraction, which requires 2.4 kW of power, including a 30 percent margin. At 325 kg, the ISRU system massin the PSR, including the excavator, should be deliverable by one of the Commercial Lunar Payload Services (CLPS) landers, and the packaging and concept of operations are shown using one specific CLPS lander. The mass and power of the ISRU system components on the ridge for water electrolysis and liquefaction and storage of the oxygen and hydrogen are estimated at 840 kg and 4.3 kW.

Lunar↗

Lunar Water Pilot Plant Conceptual Design

A study was conducted to determine mass, power, and concept of operations for a polar water pilot plant that can produce 1000 kg of oxygen in a year from 1125 kg of water extracted from the icy regolith in a permanently shadowed region(PSR). Icy regolith in the PSR is excavated and delivered to a stationary dryer that extracts the water which is frozen in an ice tanker and delivered up to the ridge for further processing into oxygen and hydrogen. This study assumed a previously landed nuclear reactor was available in the PSR to provide power for the water extraction, which requires 2.4 kW of power, including a 30 percent margin. At 325 kg, the ISRU system mass in the PSR, including the excavator, should be deliverable by one of the Commercial Lunar Payload Services (CLPS) landers, and the packaging and concept of operations are shown using one specific CLPS lander. The mass and power of the ISRU system components on the ridge for water electrolysis and liquefaction and storage of the oxygen and hydrogen are estimated at 840 kg and 4.3 kW.

Lunar↗

Performance Confirmation Strategies for the Waste Isolation Pilot Plant - A Historical Perspective from an Operating Disposal Facility - 12248

Performance confirmation is an important element of the Waste Isolation Pilot Plant (WIPP) program. Performance confirmation was first used during the early WIPP site characterization phase to focus experimental activities that address the development of probabilistic repository performance models and to address stakeholder assurance needs. The program is currently used to analyze the conditions of the repository and its surroundings to ensure that the basis for the repository's long-term radioactive waste containment predictions is valid. This basis is related to the parameters, assumptions, conceptual and numerical models that are used to predict or validate the potential radioactive waste containment performance of the system. The concept of performance confirmation for the WIPP is one that has evolved since the first repository work was initiated decades ago and plays an important role in assuring adequate repository performance both now and in the long-term. The WIPP mission has progressed from a pilot project to an operational disposal facility and will progress to eventual site closure when disposal operations are completed. Performance confirmation is an important part of each of these progressions. The concept of disposing radioactive waste in a geologic repository today involves a complete understanding of many technical, political, regulatory, societal and economic elements. Many of these elements overlap and solving all relevant issues necessary to site, operate and decommission a disposal facility should be done with knowledge of each element's requirements and impacts. Performance confirmation is one tool that can help to coordinate many of these elements into a program that actively investigates what is thought to be adequately understood about the system and what information is lacking. A performance confirmation program is used to determine ways to challenge and verify those areas that are thought to be understood and to find ways to understand those areas that are not well understood. Performance confirmation programs have been used twice at WIPP, first during site characterization and PA development and later in a Compliance Monitoring program. At first, only certain technical aspects of the system were deemed important because it was a scientifically-based, government project. Early site characterization work was design to gather information about the geology and hydrology of the area and the mechanical properties of the natural barrier. The information would be used in a PA to determine the long-term containment performance of the disposal system. A performance confirmation element was used to identify the sensitive elements of the system that were certain, well understood or justified and those that were not. It identified experimental and analytical programs that could be used to reduce uncertainty, confirm sensitive assumptions and provide useful data. This performance confirmation program provided data to justify the adequacy of the information used in PA to demonstrate compliance with EPA's containment requirements. Performance confirmation will continue to be used in the post-closure period for at least 30 years and likely up to the end of the 100-year institutional controls period. As the technical basis for the repository matures throughout the operational period, the currently planned post-closure monitoring program will need to be reassessed prior to implementation. However, the intent of the program will be the same as it was for the previous programs, to ensure the ultimate goal of the repository. This goal is to safely isolate waste from the accessible environment and ensure public and environmental safety. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Installation of the Pulse-Plate Column Pilot Plant

There are three primary types of solvent extraction equipment utilized in the nuclear industry for reprocessing of used nuclear fuel; pulse columns, mixer-settlers, and centrifugal contactors. Considerable research and development has been performed at the INL and throughout the DOE complex on the application of centrifugal contactors for used fuel reprocessing and these contactors offer many significant advantages. However, pulse columns have been used extensively in the past in throughout the world for aqueous separations processes and remain the preferred equipment by many commercial entities. Therefore, a pulse-plate column pilot plant has been assembled as part of the Advanced Fuel Cycle Initiative to support experimentation and demonstration of pulse column operation. This will allow the training of personnel in the operation of pulse columns. Also, this capability will provide the equipment to allow for research to be conducted in the operation of pulse columns with advanced solvents and processes developed as part of the fuel cycle research and development being performed in the AFCI program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DRSPALL: Impact of the Modification of the Numerical Spallings Model on Waste Isolation Pilot Plant Performance Assessment.

The numerical code DRSPALL (from direct release spallings) is written to calculate the volume of Waste Isolation Pilot Plant (WIPP) solid waste subject to material failure and transport to the surface as a result of a hypothetical future inadvertent drilling intrusion. An error in the implementation of the DRSPALL finite difference equations was discovered as documented in Software Problem Report (SPR) 13-001. The modifications to DRSPALL to correct the finite difference equations are detailed, and verification and validation testing has been completed for the modified DRSPALL code. The complementary cumulative distribution function (CCDF) of spallings releases obtained using the modified DRSPALL is higher compared to that found in previous WIPP performance assessment (PA) calculations. Compared to previous PAs, there was an increase in the number of vectors that result in a nonzero spallings volume, which generally translates to an increase in spallings releases. The overall mean CCDFs for total releases using the modified DRSPALL are virtually unchanged, thus the modification to DRSPALL did not impact WIPP PA calculation results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Maintainable Fusion Pilot Plant

The US fusion community has coalesced around the goal of building an FPP as described by the National Academies of Science, Engineering, and Medicine (NASEM). In addition to demonstrating the viability of the technologies necessary to operate such a plant, including demonstration of net energy and electricity production, NASEM found that a “fusion pilot plant will need to demonstrate the ability to efficiently perform remote maintenance and replacement in support of the design of a power plant, taking into account details of the consequences of the fusion environment, such as material activation and tritium retention in components.” Current designs of fusion demonstration reactors do usually foresee a regular exchange of their first wall modules, including the tritium breeding blankets. In the European Power Plant Conceptual Studies, it is assumed that a fusion reactor will need to change its divertor every 2 years and its first wall blanket module every 5 to 6 years to reach acceptable availability. Underlying this capability are remote-handling technologies to keep the outage for the exchange of these components short. There are many uncertainties in the remote-handling schemes, and most schemes are at a preconceptual level at best. In addition, the exchange of these components would either produce an enormous rad-waste stream or would require an enormous refurbishment activity with huge cost-prohibitive hot-cells. Past Fusion Nuclear Science Facility (FNSF) preconceptual studies have led to hot cell dimensions of an unbelievable size, likely costing tens of billions of dollars. Already at The Way (previously International Thermonuclear Experimental Reactor, ITER), hot-cells have become cost-prohibitive, demanding redesigns of the ITER first wall to reduce the toxic rad-waste/inventory. In this in-situ PFC repair project, a concept for a long-life, maintainable first wall module concept is developed and tested. This first wall concept relies on innovative remote handling to repair the first wall modules in-situ, avoiding costly refurbishments outside of the tokamak vessel. This approach was highlighted in the Fusion Energy Sciences Advisory Committee (FESAC) report on Transformative Enabling Capabilities for Efficient Advance Toward Fusion Energy. In general, the damage of the first wall armor is due to particle and radiation exposures. Load conditions vary from one fusion reactor design to another. In tokamaks, first wall Plasma Facing Components (PFCs) are exposed to far-Scrape-Off-Layer plasma fluxes, electromagnetic radiation, energetic CX neutrals, and potentially runaway electron beams. Protecting the first wall to the worst-case load conditions would require the design of a very thick first wall armor. Transient heat and particle fluxes due to disruptions or edge localized modes can lead to excessive heat loads resulting potentially in melting PFCs down to the cooling channel. Catastrophic events like these need to be avoided by appropriate disruption mitigation systems. However, failure of these systems will still put a first wall at an unacceptable risk. Hence, a first wall design needs to accommodate the occasional transient heat loads by introducing sacrificial limiters, which will absorb these transients.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A Pilot Plant: The Fastest Path to Commercial Fusion Energy

Considerable effort has been dedicated to determining the possible properties of a magneticconfinement fusion power plant, particularly in the U.S.1, Europe2 and Japan3. There has also been some effort to detail the development path to fusion energy, particularly in the U.S.4 Only limited attention has been given, in Japan5 and in China6, to the options for a specific device to form the bridge from the International Thermonuclear Experimental Reactor, ITER, to commercial fusion energy. Nor has much attention been paid, since 2003, to the synergies between magnetic and inertial fusion energy development. Here we consider, at a very high level, the possibility of a Qeng ≥ 1 Pilot Plant, with linear dimensions ~ 2/3 the linear dimensions of a commercial fusion power plant, as the needed bridge. As we examine the R&D needs for such a system we find significant synergies between the needs for the development of magnetic and inertial fusion energy.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Developing solid-surface plasma facing components for pilot plants and reactors with replenishable wall claddings and continuous surface conditioning. Part A: concepts and questions

Abstract It is estimated that pilot plants and reactors may experience rates of net erosion and deposition of solid plasma facing component (PFC) material of 10 3 –10 5 kg yr −1 . Even if the net erosion (wear) problem can be solved, the redeposition of so much material has the potential for major interference with operation, including disruptions due to so-called ‘unidentified flying objects (UFOs)’ and unsafe dust levels. The potential implications appear to be no less serious than for plasma contact with the divertor target: a dust explosion or a major UFO-disruption could be as damaging for an actively-cooled deuterium-tritium (DT) tokamak as target failure. It will therefore be necessary to manage material deposits to prevent their fouling operation. This situation appears to require a fundamental paradigm shift with regard to meeting the challenge of taming the plasma–material interface: it appears that any acceptable solid PFC material will in effect be flow-through , like liquid–metal PFCs, although at far lower mass flow rates. Solid PFC material will have to be treated as a consumable , like brake pads in cars. ITER will use high-Z (tungsten) armor on the divertor targets and low-Z (beryllium) on the main walls. The ARIES-AT reactor design calls for a similar arrangement, but with SiC cladding on the main walls. Non-metallic low-Z refractory materials such as ceramics (graphite, SiC, etc) used as in situ replenishable, relatively thin—of order mm—claddings on a substrate which is resistant to neutron damage could provide a potential solution for the main walls, while reducing the risk of degrading the confined plasma. Separately, wall conditioning has proven essential for achieving high performance. For DT devices, however, standard methods appear to be unworkable, but recently powder droppers injecting low-Z material ∼continuously into discharges have been quite effective and may be usable in DT devices as well. The resulting massive generation of low-Z debris, however, has the same potential to seriously disrupt operation as noted above. Powder droppers provide a unique opportunity to carry out controlled studies on the management of low-Z slag in all current tokamaks, independent of whether their protection tiles use low-Z or high-Z material.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

10 MWE CDCL Large Pilot Plant – pre-FEED Study

Coal Direct Chemical Looping (CDCL) is an advanced oxy-combustion technology that has the potential to substantially reduce the energy penalty and the cost of electricity (COE) for coal-fired power generation with CO₂ capture. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been collaborating on the development of an iron oxide oxygen-carrier based chemical looping technology for clean power generation with inherent carbon capture. In this process, coal is dried and pulverized prior to being transported into a moving-bed reducer. In the reducer, coal reacts with the oxygen-carrier particles, forming combustion byproducts, predominantly CO₂ and H₂O, while reducing the iron oxide oxidation state from Fe₂O₃ to a mixture of FeO and Fe. The reduced state particles are then transported to a combustor reactor and re-oxidized with air. Following the oxidation, the oxygen-carrier particles are regenerated, and a large amount of heat is released for steam production. The produced steam is sent to a turbine for electricity generation. Meanwhile, the CO₂–rich stream leaving the reducer is cooled, cleaned, and compressed for subsequent pipeline transportation and sequestration. By combining air separation and fuel conversion into a single system, the CDCL technology enables the intensification of oxy-combustion processes by eliminating the energy and cost intensive cryogenic air separation unit and thereby results in higher overall plant efficiencies and lower COE’s. The use of a moving-bed reducer results in high conversions of volatile hydrocarbons and high CO₂ purity, which reduces the cost of downstream CO₂ purification for sequestration or utilization. The Babcock & Wilcox Company in collaboration with The Ohio State University, Johnson & Matthey, The Electric Power Research Institute, and Dover Light & Power completed a Preliminary Front-End Engineering and Design (Pre-FEED) study of a 10 MWe coal-direct chemical looping (CDCL) pilot plant. The planned system is a modular 10 MWe CDCL large pilot facility consisting in 4 modules of 2.5 MWe each, working in parallel and to be hosted within the current structure at the City of Dover’s Municipal Power Plant. The CDCL system can achieve auto-thermal operation and includes a sub-critical steam cycle for power generation. The pilot system was designed to demonstrate full commercial operation at a reduced scale. The coal distribution per plan area is a representative slice of larger commercial arrangements. The system includes a CO₂ recycle system, but it does not include a compression system. The large pilot includes all the environmental control equipment and oxygen carrier and ash handling systems. As part of the project, the Team performed laboratory testing and carried out multiple pilot test campaigns to obtain design and performance information at the 250 kWth CDCL pilot facility at the Babcock & Wilcox Company’s Research Center. The Team demonstrated sustained operations at designed coal inputs, high coal conversion, high CO₂ purity, heat generation on the combustor, low carbon carryover between reactors and low particle attrition. Emissions generated in the reducer reactor were identified as SO₂ and NO x . The commercial manufacturing cost of oxygen carrier particle was evaluated by JM. A particle manufacturing report was generated and submitted to the DOE. Based on the results from the pilot tests and the pre-FEED design efforts, a techno-economic analysis was performed. The study shows that the CDCL process is a promising carbon-friendly technology capable of producing electricity with high efficiency. The estimated COE of the supercritical CDCL plant is $83.3 / MWh, which meets DOE’s target of less than 30% increase in COE when compared to a supercritical PC plant without CO₂ capture. This is the lowest among the existing carbon capture technologies (post-combustion and oxy-combustion) for fossil fuel power plant. CDCL is evaluated to be the most promising technology for carbon capture from the economic aspect.

01 COAL, LIGNITE, AND PEAT↗

Energy use of piperazine with the advanced stripper from pilot plant testing

Here, piperazine with the Advanced Stripper (PZAS™) was tested at the National Carbon Capture Center (NCCC) at coal and NGCC conditions. Energy performance was measured with accounting for heat loss. The net heat duty was found to be identical at 2.45 GJ/tonne for both 4 and 12% CO 2 at 90% CO 2 removal. The average measured heat loss was 0.38 GJ/tonne and represented 30% of the gross heat rate. For PZAS, the warm rich piping before the control valve is the largest in surface area. Heat loss at this location increased heat duty by 80% of the heat loss value. Therefore, the total heat duty was decreased by 80% of the heat loss. The Independence™ model was validated using 112 steady-state pilot plant runs and predicted average net heat duty with an error of 9% and lean loading with an error of 10%. The model was used to simulate process impacts of heat loss for the PZAS and simple stripper configurations. For both strippers, heat loss was found to impact heat duty at locations other than just the steam heater. While heat loss in the steam heater was the most important for PZAS, heat loss in the column was the most important for the simple stripper due to a large top-side pinch and CO 2 reabsorption at the same location. CO 2 reabsorption in PZAS occurred only at high heat loss values (~0.14 GJ/hr), compared to low heat loss values (~ 0.03 GJ/hr) in the PZ-simple stripper. Excessive packing in the PZ-simple stripper caused a large top-side pinch at 0.23 mol/mol lean loading, making the column very sensitive to heat loss. Heat loss in the PZ-simple stripper increased heat duty by 120–150% at typical heat loss values and lean loading of 0.23 mol/mol. Heat loss in the MEA-simple stripper only increased heat duty by 1–13% in a typical lean loading range of 0.1–0.2 mol/mol. A large bottom side pinch at low lean loading for 7 m MEA made the effect of heat loss less pronounced.

42 ENGINEERING↗

Simulations of Criticality Control Overpack Container Compaction at the Waste Isolation Pilot Plant

Criticality Control Overpack (CCO) containers are being considered for the disposal of defense-related nuclear waste at the Waste Isolation Pilot Plant (WIPP). At WIPP, these containers would be placed in underground disposal rooms, which will naturally close and compact the containers closer to one another over several centuries. This report details simulations to predict the final container configuration as an input to nuclear criticality assessments. Each container was discretely modeled, including the plywood and stainless steel pipe inside the 55-gallon drum, in order to capture its complex mechanical behavior. Although these high-fidelity simulations were computationally intensive, several different material models were considered in an attempt to reasonably bound the horizontal and vertical compaction percentages. When exceptionally strong materials were used for the containers, the horizontal and vertical closure respectively stabilized at 43:9 % and 93:7 %. At the other extreme, when the containers completely degraded and the clay seams between the salt layers were glued, the horizontal and vertical closure reached respective final values of 48:6 % and 100 %.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Atmospheric Dispersion Modeling of the February 2014 Waste Isolation Pilot Plant Release

This report presents the results of a simulation of the atmospheric dispersion and deposition of radioactivity released from the Waste Isolation Pilot Plant (WIPP) site in New Mexico in February 2014. These simulations were made by the National Atmospheric Release Advisory Center (NARAC) at Lawrence Livermore National Laboratory (LLNL), and supersede NARAC simulation results published in a previous WIPP report (WIPP, 2014). The results presented in this report use additional, more detailed data from WIPP on the specific radionuclides released, radioactivity release amounts and release times. Compared to the previous NARAC simulations, the new simulation results in this report are based on more detailed modeling of the winds, turbulence, and particle dry deposition. In addition, the initial plume rise from the exhaust vent was considered in the new simulations, but not in the previous NARAC simulations. The new model results show some small differences compared to previous results, but do not change the conclusions in the WIPP (2014) report. Presented are the data and assumptions used in these model simulations, as well as the model-predicted dose and deposition on and near the WIPP site. A comparison of predicted and measured radionuclide-specific air concentrations is also presented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗