Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations and Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Hydrogen Sustainable Infrastructure Guidelines (H2SIG)

Infrastructure interacts with major global challenges inclusive of climate change, resilience, equity and social justice, environmental protection and biodiversity, public health, and economic recovery. This effort directly addresses how to apply sustainability assessments to the unique aspects of hydrogen (H2) infrastructure projects using the Envision® sustainability framework developed by the Institute for Sustainable Infrastructure (ISI). Envision is a flexible system of criteria and performance objectives to aid decision makers and help project teams identify sustainable approaches during planning, design and construction of infrastructure projects that will continue throughout the project’s operations, maintenance, and end-of-life phases. The goal of this work is to support those interested in conducting sustainability assessments for hydrogen infrastructure projects. Through this work the team has developed hydrogen-specific guidelines and best practices to assist project developers, investors and regulators in straightforward application of the Envision framework to systematically enhance clarity and increase objectivity across hydrogen projects. Subject matter experts from 20 different organizations (industry, non-profits, municipalities, emissions regulators, national labs) were engaged through 7 focus groups to discuss the H2-prioritized Envision requirements and elements to be included in the guidelines. In addition to these guidelines, the team conducted case studies as a way of demonstrating and informing the guidelines and providing examples or ideas for implementing sustainability in future projects. Through this study, the authors found that hydrogen infrastructure projects can incorporate many sustainable practices including reducing GHG emissions affecting climate change, reducing air pollutant emissions affecting the health of communities, synergistically handling waste byproducts, integrating into existing infrastructure, incorporating renewable energy, and addressing equity and environmental justice. Additionally, hydrogen infrastructure projects could benefit from 2-way communication engagement and collaborative planning with stakeholders, educational awareness of hydrogen technology, tracking and reporting on water use and water quality, and including monetized environmental and social benefits in life-cycle cost estimates. This document is the final technical report for the Hydrogen Sustainability Assessment Methods for Project Development project. While the main focus of the report is to provide guidelines for applying sustainability to hydrogen infrastructure, there are sections within the appendix providing completed project tasks and methodology.

08 HYDROGEN↗

Updates and Lessons Learned from NuMI Beamline at Fermilab

The Neutrinos at the Main Injector (NuMI) beamline at Fermilab generates an intense muon neutrino beam for the NOvA (NuMI Off-axis 𝜈𝑒 Appearance) long baseline neutrino experiment. Over the years, the NuMI beamline has been pivotal in advancing neutrino physics, providing invaluable data and insights. This presentation offers updates and a comprehensive review of the lessons learned from the operation, maintenance, and monitoring of the NuMI beamline. Key topics include the optimization of beam performance, challenges in maintaining beamline stability, and proposed Machine Learning implementations to enhance monitoring. The talk aims to share best practices and provide a roadmap for future beamline projects, including the Long-Baseline Neutrino Facility (LBNF).

Wickremasinghe, Athula↗

Review of Life Cycle Cost Analysis Tools

Life cycle costing (LCC) is a vital aspect of decision-making in building retrofitting. It allows stakeholders to thoroughly assess all expenses involved throughout the lifespan of these retrofits, covering initial costs; ongoing operation, maintenance, and repair costs; and disposal costs of the system. The Federal Energy Management Program of the US Department of Energy has established clear guidelines for conducting LCC analysis, particularly for investments aimed at energy and water conservation, as well as renewable energy projects. These guidelines are detailed in the Code of Federal Regulations, 10 CFR 436, Subpart A, which outlines the methodology and procedure for LCC analysis (Department of Energy 1990). The National Institute of Standards and Technology (NIST) has developed the NIST Handbook 135 (Joshua Kneifel 2022) to standardize the process of LCC analysis within the building industry. Whereas the handbook is tailored to the needs of federal agencies, its principles and methodologies can be valuable for other organizations and industries interested in conducting life cycle costing analyses for their building projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nested Pebble Bed Blanket (NesPeB)

Recent advances in magnetic confinement fusion technology have attracted billions of dollars of investments in startups from venture capitals and corporations, resulting in the development of devices aiming to demonstrate net energy gain in a self-heated burning plasma, such as SPARC (under construction) and others. However, future fusion power plants must operate in regimes that will require technologies far beyond current experience. According to a National Academies of Science, Engineering, and Medicine report, to have nuclear fusion power plants contributing in a timely manner to the planned reduction of atmospheric carbon dioxide, a pilot plant should be built by 2035, and it should demonstrate fusion power production and the performance of the tritium fuel system (requiring a high enough tritium breeding) by 2040. A recognized key technology gap by [26] is the fusion first wall and blanket since no current blanket concept is considered satisfactory or has been built and proven. The first wall and blanket in magnetic fusion reactors form a vital and complex system, as it must satisfy different functions such as power extraction, tritium breeding, plasma containment, radiation shielding, and safety. The list of design requirements is even longer: high enough tritium production for fusion self-sufficiency, low material activation, decay heat and shutdown dose rates, high thermal efficiency, high-capacity factor, high magnets-divertor-vacuum vessel-first wall life, low corrosion, low cost, and intrinsically safe (requiring minimal licensing). Despite fifty-plus years of research, the first wall and blanket concepts proposed suffer from fundamental technical problems and immaturity (TRL=2-3) that jeopardize the timely delivery of a commercial fusion power plant. A fusion first-wall blanket has never been built nor tested, and a "winning", practical functioning design requires enough engineering margins (high enough tritium breeding considering the uncertainty, etc.), manufacturing simplicity, ease of continuous operation, maintenance, and low cost. A new, groundbreaking blanket concept called "Nested Pebble Bed Blanket" (NesPeB) was developed at ORNL under the successful ARPA-E GAMOW FERMI project (patent application allowed by the USPTO). The NesPeB blanket concept addresses current blanket concepts' shortcomings and technical immaturity, paving the way for accelerated delivery of fusion power plants. NesPeB is based on nested pebbles, which are binary-sized lithium-ceramic pebbles enclosed in "Beryllide" perforated and coated spherical shells, which are also binary-sized, stacked on top of each other, forming a "bed" and cooled by Nitrogen gas also "sweeping" the Helium and Tritium generated by the neutron irradiation of Lithium; the vacuum vessel plasma facing material is Molybdenum-96 and -97 with the first wall cooled by Helium while the divertor armor is made of Tungsten. The simulations of the NesPeB blanket using Fusion Reactors Models Integrator (FERMI) are encouraging as they estimate a tritium breeding ratio (TBR) greater than 1.2 using natural Lithium, acceptable pressure drop, and excellent heat transfer properties. Furthermore, the NesPeB blanket is not limited by magneto-hydro-dynamics (MHD) effects, is designed for online refueling, relies on existing tritium extraction technologies, has a simple construction, and limits the corrosion and chemical reactivity problems. NesPeB has the potential to be transformational and disruptive since it can solve all the main, challenging technical problems of fusion device blankets and accelerate a pilot plant delivery for 10 or more years.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Report series: finding of effect and mitigation documentation for the mercury solar photovoltaic array and battery energy storage system, area 23, nevada national security site, nye county, nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) proposes to install solar photovoltaic (PV) power generation arrays and an associated battery energy storage system (BESS) for the town of Mercury at the Nevada National Security Site (NNSS) in Nye County, Nevada (Figure 1). The purposes of the development of this facility are to support long-term efforts to modernize Mercury and to provide energy-resilient infrastructure and address climate adaptation needs. Because it is within the boundary of the Mercury Historic District (MHD), it is subject to the terms of the Programmatic Agreement Between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada (hereafter referred to as the Mercury PA). An identification and evaluation report prepared for this undertaking determined that a contributing element to the MHD, the Mercury airstrip (26NY15777), is within the APE (Haynes 2024). The Mercury airstrip was developed following the closure of Camp Desert Rock in 1957 and used until late 1963 or 1964 when the Camp Desert Rock Airport was renovated, and the Mercury Bypass road constructed. The town of Mercury and the immediate surrounding area have been determined eligible for listing in the National Register of Historic Places (NRHP) as the MHD (SHPO Resource No. D230) under Criteria A and C for its importance in supporting nuclear testing and scientific research from 1951 through 1992 (Reed 2019). Originally recorded in 2016, 26NY15777 was determined individually not eligible for listing in the NRHP because it lacked sufficient integrity to convey its significance (Palmer 2016). It was subsequently determined in 2018 to be a contributing element of the MHD in an architectural survey of the district (Palmer 2018) and identified in Appendix C of the Mercury PA as a Category I contributing element. However, as per Stipulation IV.B.2, because the airstrip had already been formally evaluated and determined not to be individually eligible for the NRHP in consultation with the SHPO, this categorization was an error. NNSA/NFO reported this to the SHPO in Haynes 2024 and the SHPO concurred on June 11, 2024 (Reed). Accordingly, the airstrip is a Category II Property for the purposes of complying with the Mercury PA. The Mercury airstrip is a historic property for the purposes of compliance with Section 106 of the National Historic Preservation Act (NHPA) and subject to the stipulations of the Mercury PA.

25 ENERGY STORAGE↗

Firmware Tampering Detection in Heavy-Duty Vehicles through J1939 CAN Analysis

Modern heavy-duty vehicles rely on complex networks of Electronic Control Units (ECUs) that communicate using the J1939 protocol. While this system makes it easier to update and configure vehicle components, it also opens the door to serious cybersecurity risks if not properly secured. This work investigates the potential for firmware tampering through the J1939 communication protocol, which enables ECU configuration and reprogramming over the Controller Area Network (CAN) bus. By monitoring CAN traffic during legitimate maintenance operations and reverse-engineering OEM diagnostic software, we identified common and proprietary J1939 message identifiers, authentication patterns, and vulnerabilities within Unified Diagnostic Services (UDS). These findings demonstrate that inadequate authentication mechanisms can allow malicious actors to alter ECU firmware or disable safety functions, posing severe operational and safety risks. Our analysis contributes to the development of vehicle intrusion detection systems capable of recognizing abnormal reprogramming activity and future firmware fingerprinting methods to verify software integrity across ECUs. This work highlights the importance of standardizing secure firmware authentication across manufacturers to strengthen cyber resilience in heavy-duty vehicle systems.

33 ADVANCED PROPULSION SYSTEMS↗

A Novel Algorithm for CAD to CSG Conversion in McCAD

Modeling and simulation lie at the heart of the design process of any nuclear application. An accurate representation of the radiation environment ensures not only the feasibility of new technologies, but it also aids in operation, maintenance, and even decommissioning. With increasingly complex designs, high-fidelity models have become a necessity for design maturity. McCAD has been under development for many years at Karlsruhe Institute of Technology (KIT) to facilitate the process of generating suitable models for nuclear analyses. In this paper, an overview of the major advances in the new version of the code is presented. A novel conversion algorithm has proven to be robust in significantly reducing the processing time to generate radiation transport models, making it easier to iterate on design details. A first-of-a-kind capability to generate hierarchical void cells is also discussed with preliminary analysis showing performance gains for particle tracking.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Q1-2024 Solar Cost Benchmarks

Each year, the U.S. Department of Energy’s (DOE) Solar Energy Technologies Office (SETO) and its national laboratory partners develop cost benchmarks for U.S. solar photovoltaic (PV) systems. These benchmarks track progress toward reducing solar costs and guide R&D priorities. Unlike typical studies that report only $/W, SETO uses intrinsic units (e.g., $/m² for mounting structures) to better capture how technology improvements such as module efficiency would impact system costs. This allows flexible modeling where inputs can vary significantly to assess cost sensitivity. Costs are reported in two ways: Minimum Sustainable Price (MSP): Long term, financially viable price under stable market conditions. Modeled Market Price (MMP): Actual market price, influenced by short term distortions such as tariffs or subsidies. Three national labs collect cost data from industry stakeholders, ensuring no duplication in outreach to stakeholders. Data reflects real transactions (primarily from Q1) and is weighted based on the number of sources per cost element. The PV System Cost Model (PVSCM) divides total installed system cost into eight categories: 1. Module (PV) 2. Inverter 3. Energy Storage System (ESS) 4. Structural BOS (SBOS) 5. Electrical BOS (EBOS) 6. Fieldwork 7. Office work 8. Other (developer/EPC costs) The first five are hardware costs, while the last three are soft costs. Each category includes fixed and variable cost components, where “size” depends on context (e.g., manufacturing capacity for modules vs. system capacity for installation costs). Variable costs are expressed using appropriate intrinsic units. The model reflects the owner’s upfront overnight capital cost, excluding tax credits. Tariffs and subsidies are treated as temporary market distortions affecting MMP but not MSP. PVSCM is implemented in Excel, where cost elements are aggregated into total system cost. Additional sheets handle unit conversions and operation & maintenance (O&M), with O&M costs levelized over the system’s lifetime.

14 SOLAR ENERGY↗

Hybrid Zircex Hydrochlorinator

This project was driven by the desire to create easier and faster ways to load Advanced Test Reactor (ATR) Fuel Elements into the Hybrid Zircex hydrochlorinator. The primary requirements for this project were to minimize the potential release of radioactive contamination, minimize maintenance operations to replace or remove the lid seal, and allow for remote usage. Three preliminary designs were made. These designs allow ATR fuel elements to be loaded into the hydrochlorinator more efficiently while fulfilling the requirements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Life Cycle Assessment for Closed-Loop Pumped Hydropower Energy Storage in the United States

The federal government has initiated an aggressive set of policies to achieve a net-zero carbon emission goal for the electricity sector by 2050. As a result, rapid growth in deployment of renewable energy technologies is expected. Most commercially mature technologies are temporally variable and do not provide grid inertia, while renewable technologies with high projected deployment have intermittent generation methods. Energy storage technologies are needed to both dispatch power on-demand and help provide the needed grid inertia. Pumped storage hydro (PSH) is a well-established technology that has gained renewed interest in recent years offering energy-balancing, grid stability, control of electrical network frequency, and large-scale storage capacity. For widespread adoption of PSH, more information is needed regarding its current life cycle environmental impacts. The objective of this study is to perform a full life cycle assessment (LCA) of new closed-loop PSH in the U.S. The functional unit for this study is 1 kWh of electrical power delivered to the grid and the base case project lifetime is 80 years. The life cycle inventory for this project accounts for all material and energy flows associated with the green-field construction, operation, maintenance, and decommissioning of a closed-loop PSH plant in the U.S. Collected data represents a range of potential PSH specifications and geographic locations coming from all prospective closed-loop PSH installations in the U.S. with data available. In addition, existing PSH installations are used to provide assumptions for inventory inputs. Results presented will include the global warming potential (GWP IPCC 100a) and Energy Return on Investment (EROI) from our base case (average PSH installation) as well as from scenario analyses and model sensitivity. These results will be compared to the impacts from existing PSH sites and alternate storage technologies. Methods align with the assumptions and guidelines put in place by previous PSH LCAs to ensure an accurate comparison with the results from this report.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

WBS 1.2.3.405 - Life Cycle Assessment of Storage Technologies

Recent commitments by the Biden administration have established targets to achieve a net-zero energy system by 2050. Meeting these targets will spur a rapid transition to clean energy technologies and a commensurate need to develop and deploy energy storage technologies at scale. Pumped Storage Hydro (PSH) is expected to be part of this solution because its ability to provide grid flexibility and stability and enable the dispatching of disparate variable renewable energy technologies. Despite PSH being a mature technology with a history of deployment dating back several decades, there is very little information on the greenhouse gas (GHG) implications of PSH as compared to other storage technologies. The objective of this project is to perform a full lifecycle assessment (LCA) of new PSH projects in the U.S. This LCA includes all project phases (resource extraction, construction, operation, maintenance, end-of-life). The functional unit for this study is 1 kWh electricity delivered by system to grid substation connection point and the estimated lifetime for our base case is 80 years. Data used in this study are based on over 30 potential PSH projects that are in preliminary planning phases and are represent a wide range of potential closed-loop PSH systems in terms of location, technology, and capacity. The project approach, data sources, and modeling assumptions have been informed by a technical review committee of stakeholders that include experts from academia, national and international government, industry, and utilities. The GHGs and energy return on investment (EROI) from PSH will be compared to other storage technologies (e.g., stationary battery storage). Results from this project will improve the PSH community's understanding of the environmental impacts and sustainability of new PSH projects and how PSH compares to other storage technologies. The approach used in this project relies on open-source programming. The analysis framework (source code and data) and will be made publicly available at the end of the project. In addition to reporting results for the base case, we will perform rigorous sensitivity analysis to identify the major drivers, understand impacts of different configurations, and future energy markets. Results from this project will be published in a suitable journal.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Transferring Photovoltaic Lessons Learned to Concentrating Solar Power

This presentations outlines the following: 1) Points worth noting in the history of the PV industry, 2) PV benefits from standardization, 3) PV sharing reliability challenges since the 1975, 4) PV projects from an independent engineering (IE) perspective, 5) Site selection (what NOT to do), 6) PV Operations & Maintenance over time, 7) Soiling research (remove the silos), 8) Noting a few relevant PV IEC standards, and 9) PVfleets data sharing.

bio-soiling↗

Updates and Lessons Learned from NuMI Beamline at Fermilab

The Neutrinos at the Main Injector (NuMI) beamline at Fermilab generates an intense muon neutrino beam for the NOvA (NuMI Off-axis $\nu_e$ Appearance) long-baseline neutrino experiment. Over the years, the NuMI beamline has been pivotal in advancing neutrino physics, providing invaluable data and insights. This proceeding paper discusses updates and the lessons learned from recent experiences during the beam operations, maintenance, and monitoring of the NuMI beamline. Key topics include the optimization of beam performance and challenges in maintaining beamline stability. The paper aims to share best practices and provide a road-map for future beamline projects, including the Long-Baseline Neutrino Facility (LBNF).

43 PARTICLE ACCELERATORS↗

The Myth of Fungible FTE: A Quantitative Assessment of Matrixed Resource Allocation

Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.

Bai, Mei [SLAC National Accelerator Laboratory (SL↗

SSR APPLIED – Automated Power Plants: Intelligent, Efficient and Digitised (V.2)

This report describes work undertaken during the SSR APPLIED project. The focus of the project has been on the development of digital twins to de-risk licensing of improved operating and maintenance practices. The operation of a bespoke flowing separate effects molten salt loop at ANL, with realistic temperature gradients, will provide invaluable data for computer codes validation. Three digital twins of aspects of the SSR-W have been successfully developed using ANL expertise and software. These digital twins have demonstrated optimization of the fuel cycle, the ability to model transients using an integrated coupled neutronic – thermal-hydraulic model with a model of the fuel expansion feedback so important to the inherent safety of the SSR-W. Advanced machine learning techniques have been developed and demonstrated for optimization of heat exchanger operation and maintenance.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AOI 3 Life Modelling of Critical Steam Cycle Components in Coal-Fueled Power Plants

Microstructural damage accumulation models have been used to produce calibrated life estimation models for a DR22/P22 steel wye-block welds, and a Jethete stainless steel turbine blade (bucket). The calibrated life estimation models will aid the power plant operator in determining optimal maintenance and operation schedules based upon historical operational data as well as current, or future operation schemes. The impact of this project will enable existing coal-fueled power plants to operate safely for longer periods of time and at higher efficiencies, thereby reducing the economic and environmental impact of the existing coal power plant fleet. Testing, characterization, and modelling indicates that the operating life of P22 pipelines and their welds are dominated by fatigue damage mechanisms. Specifically, fatigue is of no concern in these materials when operating under realistic conditions manifesting in the main steam piping of coal-fueled power plants. However, if a low-temperature overload ever occurs during operation, fatigue will manifest as a damage mechanism of interest. Primary impact provided by the completion of this work is in the manifestation of a detailed ABAQUS solid model providing accurate boundary conditions to enable the prediction of operational stresses and strains. The completed plant solid model, in conjunction with the calibrated fatigue and creep life models provide definitive confirmation that creep is the dominant damage mechanism during operational conditions. Jethete life modelling has been completed by the manifestation of a material-specific, and temperature-specific, Kitagowa diagram. The Kitagowa diagram provides maintenance and operation decision making with scientifically-based go/no-go support based upon the crack-like features that have been identified by use of inspection.

01 COAL, LIGNITE, AND PEAT↗

Hazard and Operability Analysis for Operating, Refueling, and Maintenance of Fuel Cell Electric Buses

​​Since hydrogen vehicles can be implemented in heavy-duty transportation applications such as buses, it is important to understand safety hazards and risks of hydrogen fuel cell electric bus (FCEB) and refueling technology. We conducted a hazard and operability analysis for FCEB operation/driving, refueling, and maintenance/inspection. We identified failure modes and consequences and defined a qualitative risk metric as the product of the likelihood of a failure and the severity of the worst-ca

08 HYDROGEN↗

Predictive-Maintenance Practices: For Operational Safety of Battery Energy Storage Systems

Changes in the Demand Profile and a growing role for renewable and distributed generation are leading to rapid evolution in the electric grid. These changes are beginning to considerably strain the transmission and distribution infrastructure. Utilities are increasingly recognizing that the integration of energy storage in the grid infrastructure will help manage intermittency and improve grid reliability. This recognition, coupled with the proliferation of state-level renewable portfolio standards and rapidly declining lithium-ion (Li-ion) battery costs, has led to a surge in the deployment of battery energy storage systems (BESSs). Additionally, although BESSs represented less than 1% of grid-scale energy storage in the United States in 2019, they are the preferred technology to meet growing demand because they are modular, scalable, and easy to deploy across diverse use cases and geographic locations.

25 ENERGY STORAGE↗