Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operational technology (OT)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

114 records · Page 7

Equipment Self-Assessment Guide Checklist

This Equipment Self-Assessment Checklist is designed for asset owners and operators (AOOs) responsible for the deployment, operation, maintenance, or cybersecurity oversight of grid systems and digital energy technologies. It provides a structured inspection checklist for evaluating the security, integrity, and operational trustworthiness of equipment across substations, generation sites, distributed energy resources (DERs), and control environments.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

OT Emulation Data Broker

The OT Emulation Data Broker system allows Simulink models to be connected to an emulated control system network. The package includes a Simulink S-Function that allows communication to the data broker via inter process communication; a data broker, which orchestrates communication between the emulated control system network and the simulation; an endpoint, which facilitates communication between the data broker and PLC's on the control network using ModBus/TCP; and an example PLC structured text files that work with OpenPLC, an open source emulated PLC. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525. SAND2021-11479 O

Hahn, Andrew↗

OT Emulation Data Broker v.2.0

SAND2021-11479 O The OT Emulation Data Broker system allows Simulink models to be connected to an emulated control system network. The package includes a Simulink S-Function that allows communication to the data broker via inter process communication; a data broker, which orchestrates communication between the emulated control system network and the simulation; an endpoint, which facilitates communication between the data broker and PLC's on the control network using ModBus/TCP; and an example PLC structured text files that work with OpenPLC, an open source emulated PLC. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Hahn, Andrew↗

The CMS Outer Tracker for the High Luminosity LHC

The High Luminosity LHC (HL-LHC) is expected to deliver an integrated luminosity of 3000 - 4000 fb -1 in its lifetime with peak instantaneous luminosities reaching about 5 - 7.5×10 34 cm -2 s -1 . During the Long Shutdown 3 period, several components of the CMS detector will undergo major changes, called Phase-2 upgrades, to be able to operate in the challenging environment of the HL-LHC, including the replacement of the entire silicon tracker. The Phase-2 Outer Tracker (OT) will have high radiation tolerance, higher granularity, and the capability to handle higher data rates. Another key feature of the OT will be to provide tracking information to the Level-1 trigger, allowing trigger rates to be kept at a sustainable level without sacrificing physics potential. For this, the OT will be made of modules that have two closely spaced sensors read out by the same electronics, which can correlate hits in the two sensors creating short track segments called ”stubs”. The stubs will be used for tracking at 40 MHz. In this contribution, the design of the CMS Phase-2 OT, the technological choices, and highlights of research and development activities are reported.

Ravera, Fabio↗

Design and construction of the CMS Outer Tracker for the Phase-2 Upgrade

The High Luminosity LHC (HL-LHC) is expected to deliver an integrated luminosity of $3000-4000\;$fb$^{-1}$ after 10 years of operation with peak instantaneous luminosity reaching about $5-7.5\times10^{34}$cm$^{-2}$s$^{-1}$. During Long Shutdown 3, several components of the CMS detector will undergo major changes, called Phase-2 upgrades, to be able to operate in the challenging environment of the HL-LHC. The current CMS silicon strip tracker has to be replaced with a new detector. The Phase-2 Outer Tracker (OT) will have high radiation tolerance, higher granularity and the capability to handle higher data rates. Another key feature of the OT will be to provide tracking information to the Level-1 trigger, allowing trigger rates to be kept at a sustainable level without sacrificing physics potential. For this, the OT will be made out of modules which have two closely spaced sensors read out by front-end ASICs, which can correlate hits in the two sensors creating short track segments, called stubs. The stubs will be used for tracking in the L1 track finder. In this contribution, the design of the CMS Phase-2 OT, the technological choices and first results with prototype devices are reported.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design and construction of the CMS Outer Tracker for the Phase-2 Upgrade

he High Luminosity LHC (HL-LHC) is expected to deliver an integrated luminosity of $3000-4000$~fb$^{-1}$ after 10 years of operation with peak instantaneous luminosity reaching about $5-7.5\times10^{34}$cm$^{-2}$s$^{-1}$. During Long Shutdown 3, several components of the CMS detector will undergo major changes, called Phase-2 upgrade, to be able to operate in the challenging environment of the HL-LHC. The current CMS silicon strip tracker has to be replaced with a new detector. The Phase-2 Outer Tracker (OT) will have higher radiation tolerance, higher granularity, and the capability to handle higher data rates compared to the current system. Another key feature of the OT will be to provide tracking information to the Level-1 (L1) trigger, allowing trigger rates to be kept at a sustainable level without sacrificing physics potential. For this, the OT will be made out of modules with two closely spaced sensors read out by front-end ASICs, which can correlate hits in the two sensors creating short track segments called stubs. The stubs will be used for tracking in the L1 track finder. The modules come in two flavors: strip-strip (2S) and pixel-strip (PS), which contain different sensor configurations and multiple ASICs. In this contribution, the design of the CMS Phase-2 OT, the technological choices, and the quality assurance (QA) procedures used to ensure the functionality of the modules will be reported. The contribution will cover the first results with pre-production devices and the different aspects taken into account during the QA: from fulfilling the precision specification of the module assembly procedure to ensuring the proper communication between the different ASICs on the module. The module noise performance is also checked and the full module functionality is verified at different temperatures.

Zoi, Irene↗