Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operating Reserves”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Evaluating the Impact of Managed EV Charging for Reliable Operation of Bulk Power Systems with High Non-Dispatchable Generation

The growth of electric vehicles (EVs) and variable-generation (VG) sources introduces new challenges for power-system operations. This study introduces a modeling framework and evaluates five EV charging strategies under projected 2040 grid conditions in the Evergy service territory with high non-dispatchable generation. Using realistic EV behavior and generation models, their impacts on system peak demand, ramp rate, and reserve capacity are evaluated. Results show that only the peak-avoidance strategy effectively reduces system peak demand, while decentralized strategies-particularly cost based dynamic charging-can exacerbate peaks due to synchronized user behavior. However, ramp-rate minimization strategy significantly reduce the stress on dispatchable generation achieving the lowest maximum absolute ramp rate (MARR) (56.81 MW) and lowest reserve requirement (2.39 GW). In contrast, unmanaged and TOU random strategies increase the stress on dispatchable generation sources with increased MARR and reserve requirements. These findings highlight the importance of coordinated, system-aware managed charging strategies to ensure reliable and affordable grid operation in the presence of EVs and VG sources.

14 - SOLAR ENERGY↗

Unlocking Dysprosium Constraints for China’s 1.5 °C Climate Target

Some key low-carbon technologies, ranging from wind turbines to electric vehicles, are underpinned by the strong rare-earth-based permanent magnets of the Nd, Pr (Dy)–Fe–Nb type (NdFeB). These NdFeB magnets, which are sensitive to demagnetization with temperature elevation (the Curie point), require the addition of variable amounts of dysprosium (Dy), where an elevation of the Curie point is needed to meet operational conditions. Given that China is the world’s largest REE supplier with abundant REE reserves, the impact of an ambitious 1.5 °C climate target on China’s Dy supply chain has sparked widespread concern. Here, we explore future trends and innovation strategies associated with the linkage between Dy and NdFeBs under various climate scenarios in China. We find China alone is expected to exhaust the global present Dy reserve within the next 2–3 decades to facilitate the 1.5 °C climate target. By implementing global available innovation strategies, such as material substitution, reduction, and recycling, it is possible to avoid 48%–68% of China’s cumulative demand for Dy. Nevertheless, ongoing efforts in REE exploration and production are still required to meet China’s growing Dy demand, which will face competition from the United States, European Union, and other countries with ambitious climate targets. Here our analysis urges China and those nations to form wider cooperation in REE supply chains as well as in NdFeB innovation for the realization of a global climate-safe future.

54 ENVIRONMENTAL SCIENCES↗

Hydropower Role in a Power Grid with a High Proportion of Variable Renewables

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordination of multiple tools, including water resources modeling, ecological modeling, and technical and economic power grid modeling, informs dam water releases. Better representation of ecological constraints and other water use details in the suit of power grid models are required to identify the hydropower flexibility to provide multiple power grid services. Impacts of water planning and hydropower operation changes to a power grid are better understood by production cost model simulations with technical and economic data, including unserved energy, reserve failures, transmission congestion to serve load, and local marginal price increases. Similarly, PCM simulation of current and future projected power grid information, including LMP, and carbon emission rates, informs short-term water release plans and long-term investments for power plant upgrades for technical and ecological needs. Hydropower operations of several case studies are simulated to understand operation patterns, revenue, water release decisions in multiple time scales (month, day, minutes), hydropower contracts scheduling, and water variability impacts.

environmental↗

Mixed nitrate and metal contamination influences operational speciation of toxic and essential elements

Environmental contamination constrains microbial communities impacting diversity and total metabolic activity. The former S-3 Ponds contamination site at Oak Ridge Reservation (ORR), TN, has elevated concentrations of nitric acid and multiple metals from decades of processing nuclear material. To determine the nature of the metal contamination in the sediment, a three-step sequential chemical extraction (BCR) was performed on sediment segments from a core located upgradient (EB271, non-contaminated) and one downgradient (EB106, contaminated) of the S-3 Ponds. The resulting exchangeable, reducing, and oxidizing fractions were analyzed for 18 different elements. Comparison of the two cores revealed changes in operational speciation for several elements caused by the contamination. Those present from the S-3 Ponds, including Al, U, Co, Cu, Ni, and Cd, were not only elevated in concentration in the EB106 core but were also operationally more available with increased mobility in the acidic environment. Other elements, including Mg, Ca, P, V, As, and Mo, were less operationally available in EB106 having decreased concentrations in the exchangeable fraction. Here, the bioavailability of essential macro nutrients Mg, Ca, and P from the two types of sediment was determined using three metal-tolerant bacteria previously isolated from ORR. Mg and Ca were available from both sediments for all three strains; however, P was not bioavailable from either sediment for any strain. The decreased operational speciation of P in contaminated ORR sediment may increase the dependence of the microbial community on other pools of P or select for microorganisms with increased P scavenging capabilities. Hence, the microbial community at the former S-3 Ponds contamination site may be constrained not only by increased toxic metal concentrations but also by the availability of essential elements, including P.

54 ENVIRONMENTAL SCIENCES↗

Life‐Cycle Assessment Considerations for Batteries and Battery Materials

Abstract Rechargeable batteries are necessary for the decarbonization of the energy systems, but life‐cycle environmental impact assessments have not achieved consensus on the environmental impacts of producing these batteries. Nonetheless, life cycle assessment (LCA) is a powerful tool to inform the development of better‐performing batteries with reduced environmental burden. This review explores common practices in lithium‐ion battery LCAs and makes recommendations for how future studies can be more interpretable, representative, and impactful. First, LCAs should focus analyses of resource depletion on long‐term trends toward more energy and resource‐intensive material extraction and processing rather than treating known reserves as a fixed quantity being depleted. Second, future studies should account for extraction and processing operations that deviate from industry best‐practices and may be responsible for an outsized share of sector‐wide impacts, such as artisanal cobalt mining. Third, LCAs should explore at least 2–3 battery manufacturing facility scales to capture size‐ and throughput‐dependent impacts such as dry room conditioning and solvent recovery. Finally, future LCAs must transition away from kg of battery mass as a functional unit and instead make use of kWh of storage capacity and kWh of lifetime energy throughput.

25 ENERGY STORAGE↗

In Situ/Operando (Soft) X-ray Spectroscopy Study of Beyond Lithium-ion Batteries

The lightweight, rechargeable lithium-ion battery is one of the dominant energy storage devices globally in portable electronics due to its high energy density, no memory effect, wide operating voltage, lightweight, and good charge efficiency. However, due to safety concerns, the depletion of lithium reserves, and the corresponding increase of cost, an alternative battery system becomes more and more desirable. To develop alternative battery systems with low cost and high material abundance, for example, sodium, magnesium, zinc, and calcium, it is important to understand the chemical and electronic structure of materials. Additionally, soft X-ray spectroscopy, for example, X-ray absorption spectroscopy (XAS), X-ray emission spectroscopy (XES), and resonant inelastic soft X-ray scattering (RIXS), is an element-specific technique with sensitivity to the local chemical environment and structural order of the element of interest. Modern soft X-ray systems enable operando experiments that can be applied to amorphous and crystalline samples, making it a powerful tool for studying the electronic and structural changes in electrode and electrolyte species. In this article, the application of in situ/operando (soft) X-ray spectroscopy in beyond lithium-ion batteries is reviewed to demonstrate how such spectroscopic characterizations could facilitate the interpretation of interfacial phenomena under in situ/operando condition and subsequent development of the beyond lithium-ion batteries.

(soft) X-ray spectroscopy↗

GPU Direct I/O with HDF5

Exascale HPC systems are being designed with accelerators, such as GPUs, to accelerate parts of applications. In machine learning workloads as well as large-scale simulations that use GPUs as accelerators, the CPU (or host) memory is currently used as a buffer for data transfers between GPU (or device) memory and the file system. If the CPU does not need to operate on the data, then this is sub-optimal because it wastes host memory by reserving space for duplicated data. Furthermore, this “bounce buffer” approach wastes CPU cycles spent on transferring data. A new technique, NVIDIA GPUDirect Storage (GDS), can eliminate the need to use the host memory as a bounce buffer. Thereby, it becomes possible to transfer data directly between the device memory and the file system. This direct data path shortens latency by omitting the extra copy and enables higher-bandwidth. To take full advantage of GDS in existing applications, it is necessary to provide support with existing I/O libraries, such as HDF5 and MPI-IO, which are heavily used in applications. In this paper, we describe our effort of integrating GDS with HDF5, the top I/O library at NERSC and at DOE leadership computing facilities. We design and implement this integration using a HDF5 Virtual File Driver (VFD). The GDS VFD provides a file system abstraction to the application that allows HDF5 applications to perform I/O without the need to move data between CPUs and GPUs explicitly. We compare performance of the HDF5 GDS VFD with explicit data movement approaches and demonstrate superior performance with the GDS method.

Ravi, J↗

Optimized Dispatch of Distributed Energy Resources for Resiliency and Power Quality Improvements at the Grid-Edge

Distributed Energy Resources (DERs) installed on low-voltage distribution systems, both utility-owned and nonutility owned may be employed to make improvements to system resiliency and power quality, in addition to simply serving load demand. By selectively dispatching active and reactive power from these existing DERs, improvements in voltage profiles and service availability during adverse events may be achieved. Further benefits can be gained by optimally choosing which DERs to dispatch power from, and the distribution of power from those DERs. For a given operating condition, using Linear Programming methods, optimal power dispatch values for individual DERs can be determined, while considering variables such as voltage gains, losses in the lines and the DERs, and DER reserve capacities. One such optimization technique is developed in this paper, and results from a real-time simulation study on a modified IEEE 13-bus distribution system with three DERs, are being presented. The operation of the optimized DER selection and dispatch algorithm is shown during normal operation of the transmission system when the DERs operate in grid-connected mode. Similar analyses can drive decision making during transmission system failure when the DERs operate in grid-forming or islanded mode.

Chowdhury, Prithwiraj Roy↗

Multi-layered Energy Management Framework for Extreme Fast Charging Stations Considering Demand Charges, Battery Degradation, and Forecast Uncertainties

To achieve a cost-effective and expeditious charging experience for extreme fast charging station (XFCS) owners and electric vehicle (EV) users, the optimal operation of XFCS is crucial. It is however challenging to simultaneously manage the profit from energy arbitrage, the cost of demand charges, and the degradation of a battery energy storage system (BESS) under uncertainties. This paper, therefore, proposes a multi-layered multi-time scale energy flow management framework for an XFCS by considering long- and short-term forecast uncertainties, monthly demand charges reduction, and BESS life degradation. In the proposed approach, an upper scheduling layer (USL) ensures the overall operation economy and yields optimal scheduling of the energy resources on a rolling horizon basis, thereby considering the long-term forecast errors. A lower dispatch layer (LDL) takes the short-term forecast errors into account during the real-time operation of the XFCS. Per the latest research, monthly demand charges can be as high as 90% of the total monthly bills for EV fast charging stations; to this end, this paper takes the first attempt at the reduction of demand charges cost by considering the trade-off between the energy cost and monthly demand charges. Contrasting literature, this work allocates an energy reserve in the BESS stored energy to deal with the impact of short-term forecast errors on the optimized real-time operation of the XFCS. Moreover, degradation modeling considers the trade-off between short-term benefits and long-term BESS life degradation. As a result, case studies and a comparative analysis prove the efficacy of the proposed framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Analysis of PNM's Renewable Reserve Requirements to Meet New Mexico's Decarbonization Goals

Over the next three years, the Public Service Company of New Mexico (PNM) plans to increase utility-scale solar photovoltaic (PV) capacity from today’s roughly 330MW to about 1600MW. This massive increase in variable generation—from about 15% to 75% of peak load—will require changes in how PNM operates their system. We characterize the 5 and 30-minute solar and wind forecast errors that the system is likely to experience in order to determine the level of reserves needed to counteract such events. Our focus in this study is on negative forecast error (in other words, shortfalls relative to forecast) – whereas excess variable generation can be curtailed if needed, a shortfall must be compensated for to avoid loss of load. Calculating forecast error requires the use of the same forecasting methods that PNM uses or a reasonable approximation thereof. For wind, we use a persistence forecast on actual 5-minute 2019 wind output data (scaled up to reflect the amount of wind capacity planned for 2025). For solar, we use a formula incorporating the clear sky index (CSI) for the forecast. As the solar on the grid now is a small fraction of what is planned for 2025, we generated 5-minute solar data using 2019 weather inputs. We find that to handle 99.9% of the 5-minute negative forecast errors, a maximum of 275MW of variable generation reserve during daylight hours, and a maximum of 75MW during non-daylight hours, should be sufficient. Note that this variable generation reserve is an additional reserve category that specifies reserves over and above what are currently carried for contingency reserve. This would require a significant increase in reserve relative to what PNM currently carries or can call upon from other utilities per reserve sharing agreements. This variable generation reserve specification may overestimate the actual level needed to deal with PNM’s planned variable generation in 2025. The forecasting methodologies used in this study likely underperform PNM’s forecasting – and better forecasting allows for less reserve. To obtain more precise estimates, it is necessary to consider load and use the same forecasting inputs and methods used by PNM.

14 SOLAR ENERGY↗

Final Report for ARPA-E NODES "Real-Time Optimization and Control of Next-Generation Distribution Infrastructure" Project

The project examined next-generation power distribution systems with high levels of power- electronics-interfaced distributed energy resources (DERs) that include: renewable energy systems (RESs), energy-storage devices, electric vehicles, fuel cells, small-scale diesel generators, and controllable loads. The project developed a comprehensive distribution- network management framework that unifies real-time voltage and frequency control with network-wide energy management under an integrated framework. The aim of the project was to: i) systematically optimize network-wide operation and congruently regulate voltages and frequency in the face of high volatility induced by rapidly varying RES and uncontrolled loads; ii) facilitate high renewable integration beyond 50% on an energy basis; iii) meet power-quality requirements and operational constraints; and, iv) respect response, ramp- time, and hold-time requirements for synthetic frequency and regulating reserves via fast- and longer-term dynamic energy management.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deployment of Community Scale Solar Photovoltaic Energy Systems in Forest County Potawatomi Community

FCPC is a federally recognized tribe with a membership of more than 1400. The Tribe has a reservation in Forest County, Wisconsin, and tribal trust lands in Milwaukee County, Wisconsin, with significant governmental and business operations in both areas. Until relatively recently, FCPC was one of the poorest tribes in the Midwest. Due to its successful gaming operations, it now has improved its financial situation and is using its resources to benefit both its members and the general public through environmental and other community efforts, many of which are long-delayed because of the extended period of abject poverty. The Tribe has developed the long-term goal of becoming energy independent using renewable resources. In order to meet this goal, the Tribe has taken several important steps. As an interim step, FCPC is purchasing nearly 55 million kilowatt hours of renewable energy certificates (“RECs”) annually from certified renewable energy facilities in the United States. These RECs offset more than 100% of the present electricity use at all of the Tribe’s facilities. The Tribe is currently ranked number 11 on the Environmental Protection Agency’s (EPA) Top 20 Local Government list of green power purchasers and is a member of the EPA’s Green Power Partnership. The original project suggested small scale installations on tribal homes and certain government buildings. The Tribe suggested that the project would result in 730 kw installed. By revising the project, the Tribe was able to install 938 kw and owns the largest installation in Northern Wisconsin with the 800 kW installation at the Potawatomi Carter Casino Hotel (“PCCH”). The PCCH installation, in summer months, can provide near 90% of the use during daylight hours. Although tracking was not immediately available FCPC has since confirmed significant production with certain quarterly savings nearing $210,000. These installations provide a reduction in facility costs providing more revenue for Tribal services including cultural, health, sustainable food sources, environmental preservation and other Tribal initiatives. Further, the installations have resulted in positive steps towards the Tribe’s goals of energy sovereignty and the use of 100% renewable clean energy. Finally, the PCCH project, specifically, has had the additional benefit of providing a likely area for a microgrid. The size of the installation and offset achieved have pushed the Tribe toward planning for storage and a microgrid system that would both further the Tribe’s energy goals and provide a safe haven for the Community during times of need.

14 SOLAR ENERGY↗

Experimental Investigation of Inhibitive Drilling Fluids Performance: Case Studies from United States Shale Basins

Shale formations are attractive prospects due to their potential in oil and gas production. Some of the largest shale formations in the mainland US, such as the Tuscaloosa Marine Shale (TMS), have reserves estimated to be around 7 billion barrels. Despite their huge potential, shale formations present major concerns for drilling operators. These prospects have unique challenges because of all their alteration and incompatibility issues with drilling and completion fluids. Most shale formations undergo numerous chemical and physical alterations, making their interaction with the drilling and completion fluid systems very complex to understand. In this study, a high-pressure, high-temperature (HPHT) drilling simulator was used to mimic real time drilling operations to investigate the performance of inhibitive drilling fluid systems in two major shale formations (Eagle Ford Shale and Tuscaloosa Marine Shale). A series of drilling experiments using the drilling simulator and clay swelling tests were conducted to evaluate the drilling performance of the KCl drilling fluid and cesium formate brine systems and their effectiveness in minimizing drilling concerns. Cylindrical cores were used to mimic vertical wellbores. It was found that the inhibitive muds systems (KCl and cesium formate) provided improved drilling performance compared to conventional fluid systems. Among the inhibitive systems, the cesium formate brine showed the best drilling performances due to its low swelling rate and improved drilling performance.

04 OIL SHALES AND TAR SANDS↗

Managing Solar Photovoltaic Integration in the Western United States: Resource Adequacy Considerations

This study examines the impact of reserve margin-based reliability assessment, as commonly used in capacity expansion models, on planning resource-adequate power systems under high penetrations of solar photovoltaics (PV). As a generation resource, PV is operationally different from the conventional dispatchable resources for which most capacity expansion models were designed. The question this study attempts to answer is whether large amounts of PV on a system (in this case, the Western Interconnection of North America) would bias the results of conventional reserve margin-based capacity expansion modeling towards an over- or under-provisioning of resource adequacy. This analysis used NREL’s Resource Planning Model (RPM) for capacity expansion modeling and NREL’s Probabilistic Resource Adequacy Suite (PRAS) for resource adequacy assessment. RPM uses a reserve margin requirement to enforce resource adequacy. PRAS, a collection of tools for studying the resource adequacy of power systems and the adequacy contributions of individual resources on a probabilistic basis, was used to compute multiple resource adequacy metrics across a number of simulated scenarios and system representations with differing regional detail. In all cases, including high PV penetrations (up to 33% annual generation from PV, interconnection-wide), RPM was able to produce resource-adequate systems as measured by normalized expected unserved energy and loss-of-load expectation results from PRAS. The accuracy of reserve margin approaches depends heavily on the underlying assumptions informing the capacity credit assigned to variable and energy-limited resources, particularly when such resources are abundant in the modeled system. RPM’s standard methodology for estimating variable and flexible resources’ capacity contributions, which is based on the top 100 hours of net load, did not appear to systematically undervalue or overvalue variable generation relative to a more rigorous equivalent firm capacity assessment using PRAS, although both over- and under-valuations were observed in specific scenarios. In the worst cases, the top 100 hour method underestimated the equivalent firm capacity of PV by two percentage points, and overestimated the equivalent firm capacity of PV by five percentage points. Calculating capacity contributions based on the top 10 hours of net load systematically underestimated equivalent firm capacities at more modest PV penetrations, but was often a better approximation of equivalent firm capacity than the existing 100-hour approach in scenarios with higher PV penetrations.

14 SOLAR ENERGY↗

The COVID-19 High-Performance Computing Consortium

In March of 2020, recognizing the potential of High Performance Computing (HPC) to accelerate understanding and the pace of scientific discovery in the fight to stop COVID-19, the HPC community assembled the largest collection of worldwide HPC resources to enable COVID-19 researchers worldwide to advance their critical efforts. Amazingly, the COVID-19 HPC Consortium was formed within one week through the joint effort of the Office of Science and Technology Policy (OSTP), the U.S. Department of Energy (DOE), the National Science Foundation (NSF), and IBM to create a unique public–private partnership between government, industry, and academic leaders. This article is the Consortium's story–how the Consortium was created, its founding members, what it provides, how it works, and its accomplishments. We will reflect on the lessons learned from the creation and operation of the Consortium and describe how the features of the Consortium could be sustained as a National Strategic Computing Reserve to ensure the nation is prepared for future crises.

97 MATHEMATICS AND COMPUTING↗

Concurrent Optimization of Capital Cost and Expected O&M

Concentrating solar power (CSP) technologies can utilize heat from concentrated sunlight from a field of tracking mirrors to generate electricity, reform fuel, provide process heat, or augment fossil plant heat sources. Electricity-generating power tower systems focus light from thousands of independent heliostats onto a thermal receiver, which uses the focused light to warm a heat transfer fluid (HTF), typically, a molten nitrate salt. The HTF is then sent to a power generation cycle or diverted into thermal energy storage (TES) for later use. Thermal storage is – in principle – a straightforward proposition. However, optimal utilization of a TES resource is complex and multi-faceted: thermal energy may be dispatched to produce electricity immediately upon first availability, or thermal energy may be reserved for next-day peak periods at risk of filling storage and dumping energy, or a portion of the thermal energy can be reserved to maintain equipment temperatures, reducing power cycle startup time, etc. Many possible dispatch permutations variously emphasize producing peak power, operating through transients, expediting daily startup, etc. The best operation strategy can change day-to-day throughout the year, depending on the weather and market pricing forecasts. The project we describe in this report develops a software package that allows users to explore design optimization, operations decisions, and performance characterization of concentrating solar power tower plants. Users interface with the tool through a scripting language, and results are reported in time series tables, plots, runtime logs, and design outputs. Users choose from a list of variables such as tower height, solar multiple, design-point irradiance, thermal storage size, etc., and specify information about the system using a list of parameters. The software can then optimize the specified variables to reduce the cost of energy produced by the system while meeting certain production requirements, accounting for uncertain weather and electricity price forecasts, and correcting for equipment failures or repair time. The software we develop is the first comprehensive design tool of its kind to incorporate all of these aspects while being deployed as open source.

14 SOLAR ENERGY↗

Could on-site fuel storage economically reduce power plant-gas grid dependence in pipeline constrained areas like New England?

In the Northeastern United States, natural gas supply constraints have led to periods when gas shortages have caused up to a quarter of all unscheduled power plant outages. Dual fuel oil/gas generators or local gas storage might mitigate gas supply shortages. We use historical power plant operational and availability data to develop a supply curve of the costs required for generators to mitigate fuel shortage failures in New England. Based on 2012–2018 data, we find that the historical fuel shortages at approximately 2 GW worth of gas-fired capacity could be mitigated using on-site fuel storage. For comparison, New England’s average reserve margin was 1.7–2.8 GW over our sample period. Oil dual fuel plants would recoup their investment if compensated with a reliability adder of $\$ 3-7$/MWh during their normal operations, while $\$ 7-16$/MWh would incentivize using onsite, compressed natural gas storage. We estimate that the capital expenses associated with the fuel storage options would be less expensive than installing battery backup for resource adequacy at current battery prices.

03 NATURAL GAS↗

Evaluating Movement Patterns of the Rattlesnake Hills Elk Herd on Hanford for Calendar Years 2019-2024

Biologists first documented elk on the Hanford Site in 1972; since then, the elk herd known as the Rattlesnake Hills Elk Herd (RHEH) has grown substantially (PNNL-13331, Population Characteristics and Seasonal Movement Patterns of the Rattlesnake Hills Elk Herd: Status Report 2000). Through the 1990s, the core range of the RHEH was focused on the portion of the Hanford Reach National Monument known as the Fitzner-Eberhardt Arid Lands Ecology (ALE) Reserve. More recently, larger numbers of elk have been occupying the U.S. Department of Energy (DOE), Hanford Field Office (HFO), formerly the DOE, Richland Operations Office managed portion- of the Hanford Site, known as central Hanford (Figure 1-1). This began with bachelor groups of bulls occupying the site intermittently, and the herd has grown to resident herds, including bulls, cows, and calves. The Washington Department of Fish and Wildlife (WDFW) established a target herd size for the RHEH of less than 350 animals to minimize damages on adjacent private agricultural lands (Washington State Elk Herd Plan–Yakima Elk Herd [WDFW 2002]). Attempts to control the RHEH population through hunting on private lands and a relocation effort during 2000 have failed to limit growth of the population toward the WDFW target, and the herd exceeds 1,600 according to recent counts (PNNL-13331; DOE/RL- 2023-20, Hanford Annual Site Environmental Report for Calendar Year 2022). Although elk are present on central Hanford year-round, they continue to move between areas offsite, the ALE Reserve, and central Hanford throughout the year, and it is these movements that result in many of the elk-vehicle collisions (EVC) that occur along Hanford Site roads and on the Washington State highways bordering the site. In addition, changes in management strategies on the ALE Reserve, including recent and potential future tribal elk hunts, may alter herd behavior and result in additional animals transiting onto and off central Hanford.

54 ENVIRONMENTAL SCIENCES↗